CN109779109A - High-stage unit plate curtain wall construction installation method - Google Patents

High-stage unit plate curtain wall construction installation method Download PDF

Info

Publication number
CN109779109A
CN109779109A CN201910039052.2A CN201910039052A CN109779109A CN 109779109 A CN109779109 A CN 109779109A CN 201910039052 A CN201910039052 A CN 201910039052A CN 109779109 A CN109779109 A CN 109779109A
Authority
CN
China
Prior art keywords
curtain wall
lifting frame
wall construction
wall material
stage unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910039052.2A
Other languages
Chinese (zh)
Inventor
赵敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Cultural Creative Joint-Stock Co Of Copper Local Authorities
Original Assignee
Tongling Cultural Creative Joint-Stock Co Of Copper Local Authorities
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Cultural Creative Joint-Stock Co Of Copper Local Authorities filed Critical Tongling Cultural Creative Joint-Stock Co Of Copper Local Authorities
Priority to CN201910039052.2A priority Critical patent/CN109779109A/en
Publication of CN109779109A publication Critical patent/CN109779109A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses high-stage unit plate curtain wall construction installation methods, it the following steps are included: (1), first will side it is logical or steel band is welded into lifting frame, curtain wall material is covered on lifting frame outer surface again, it is smooth above and below the curtain wall material paste, left and right flanging is buckled in lifting frame outer surface, the splicing seams up and down of curtain wall material be located at that side is logical or steel band on;(2), postposition adapter is connected on the outside of civil engineering main structure, the postposition adapter is by the adjustable attachment strap for being equipped with horizontal distribution of bolt, and the lifting frame, which is taken, to be placed on attachment strap, and the inner surface of the lifting frame is welded with degree control plate.The beneficial effects of the invention are as follows the duration for substantially reducing building-site curtain wall construction, the verticality of lifting frame is guaranteed by degree control plate, guarantees that docking is neat up and down, while can resist the influence of wind pressure very well.

Description

High-stage unit plate curtain wall construction installation method
Technical field
The present invention relates to building decoration area more particularly to high-stage unit plate curtain wall construction installation methods.
Background technique
Assembled architecture is with pre-constructed unit building made of assemble in site.Developing assembled architecture is mode of construction Major transformation, is the important measure for promoting supply side structural reform and novel Urbanization Progress, the energy that is conducive to economize on resources, It reduces construction pollution, promote labor productivity and quality safety level, may advantageously facilitate construction industry and information-based industrialization is deep Degree fusion cultivates the new kinetic energy of NPD projects, pushes neutralizing superfluous production capacity.In recent years, China tries to explore to develop and promote assembled Building, pushes the transition and upgrade of building trade, however as building external envelope structure, curtain wall is building essential and basic one Point, curtain wall in the prior art is tower structure, and curtain wall is divided into several bulks when installing, and muti-piece curtain wall panel is spliced integral How curtain wall realizes the stable connection of each curtain wall panel to improve the stability of curtain wall panel in the splicing of each curtain wall panel, The problems such as improving assembly efficiency, reducing production cost becomes urgent problem in the industry already, thus need to develop a kind of novel Curtain wall form, be suitable for assembled architecture.
Chinese invention patent publication number CN108396892A discloses assembled architecture curtain wall and installation method, wherein should Assembled architecture curtain wall includes: the multiple unit plates of curtain wall being distributed in matrix, passes through plate between adjacent unit plates of curtain wall The connection of seam component;The unit plates of curtain wall includes: concrete exterior wall combined wall board;Multiple first built-in fittings and second pre-buried Part, multiple first built-in fittings default in concrete exterior wall combined wall board;Multiple second built-in fittings default in outside concrete In wall combined wall board in the side wall at hole;Curtain skeleton, the curtain skeleton are fixed on built-in fitting, and the curtain skeleton includes First keel and the second keel;Curtain wall panel, the curtain wall panel are fixed on curtain skeleton, and curtain wall panel includes nontransparent Curtain wall panel and transparent curtain wall panel, the nontransparent curtain wall panel are fixed on the first keel, the transparent curtain wall panel It is fixed on the second keel.The building curtain wall component is more, and installation is cumbersome, for another example Chinese invention patent publication number CN107762010A discloses the installation method and its curtain wall system of a kind of modular architectural curtain wall system, comprising the following steps: S1 makes modular architectural unit and unit plates of curtain wall, the erection support on the beam of modular architectural unit, in curtain wall unit The unit plates of curtain wall for being equipped with pendant is articulated on the support on modular architectural unit, in curtain by mounting suspension member on plate Heat-preservation cotton and anti-guncotton are installed between wall unit plate and modular architectural unit;S2 will be equipped with the module of unit plates of curtain wall Change the modular architectural of being assembled integrally of building unit;S3 makes waterproof between adjacent unit plates of curtain wall.The curtain wall It can not fit together perfectly between each unit plates of curtain wall of system, be installed on the column between adjacent unit plates of curtain wall Connector, connector are arranged between the gap of adjacent unit plates of curtain wall, and pressing plate is mounted by means of bolts on connection On part, unit plates of curtain wall is arranged in towards extraneous side, for connecting bright frame ornamental strip in pressing plate;Bright frame ornamental strip is passed through Buckle is fixedly mounted on pressing plate, so that bright frame ornamental strip is covered the gap between adjacent unit plates of curtain wall, is brought volume thus Outer installation cost, and bright frame ornamental strip is easy to damage, maintenance cost is high.
Summary of the invention
The technical problem to be solved by the present invention is to existing building curtain wall, there are many drawbacks, provide a kind of high-stage thus Unit plate curtain wall construction installation method.
The technical scheme is that high-stage unit plate curtain wall construction installation method, it the following steps are included: (1), First will side is logical or steel band is welded into lifting frame, then curtain wall material is covered on lifting frame outer surface, on the curtain wall material Under it is smooth paste, left and right flanging is buckled in lifting frame outer surface, the splicing seams up and down of curtain wall material be located at that side is logical or steel band on; (2), postposition adapter is connected on the outside of civil engineering main structure, the postposition adapter is equipped with water by the way that bolt is adjustable Divide the attachment strap of cloth equally, the lifting frame, which is taken, to be placed on attachment strap, and the inner surface of the lifting frame is welded with degree control plate.
Curtain wall material described in above scheme is copper, aluminium, stainless steel or composite material.
The outer surface of lifting frame described in above scheme is plane/cambered surface.
The beneficial effects of the invention are as follows curtain wall materials and lifting frame can be previously prepared, and when in-site installation only needs to cover The lifting frame for covering curtain wall material is placed on attachment strap, is welded degree control plate, is substantially reduced building-site curtain The duration of wall construction, the splicing seams up and down of curtain wall material be located at that side is logical or steel band on, can save adjacent unit plates of curtain wall it Between packing material, both saved material cost, also shortened installation period, the verticality of lifting frame is by degree control plate Guarantee, guarantees that docking is neat up and down, while can resist the influence of wind pressure very well;Overall structure is simple, and installation maintenance is convenient.
Detailed description of the invention
Fig. 1 is mounting structure schematic diagram of the invention;
In figure, 1, curtain wall material, 2, bolt, 3, degree control plate, 4, square logical/steel band, 5, attachment strap, 6, postposition adapter.
Specific embodiment
With reference to the accompanying drawing, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, it is retouched The embodiment stated is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment without making creative work, belongs to protection model of the invention It encloses.
Embodiment 1: as shown in Figure 1, the present invention the following steps are included: (1), first will side it is logical or steel band is welded into hoisting frame Frame, then curtain wall material is covered on lifting frame outer surface, it is smooth above and below the curtain wall material paste, left and right flanging is buckled in lifting Frame outer surface, the splicing seams up and down of curtain wall material are located on square logical or steel band 4;(2), it is connected on the outside of civil engineering main structure Postposition adapter 6, the postposition adapter pass through the adjustable attachment strap 5 for being equipped with horizontal distribution of bolt 2, the lifting frame It takes and is placed on attachment strap, the inner surface of the lifting frame is welded with degree control plate 3.Wherein curtain wall material selects copper sheet, hangs The frame that frames up is plane, and attachment strap selects steel plate.
Embodiment 2: the difference from embodiment 1 is that curtain wall material is aluminium sheet, lifting frame is cambered surface, and attachment strap is selected stainless Steel plate.
Embodiment 3: the difference from embodiment 1 is that curtain wall material is stainless steel plate, lifting frame is plane, and attachment strap is selected Stainless steel plate.
Embodiment 4: the difference from embodiment 1 is that curtain wall material is composite panel, such as magnesium alloy, titanium alloy, glass Glass fiber, rubber, ceramics, graphite etc., lifting frame are cambered surface, attachment strap Ceramics plate.

Claims (4)

1. high-stage unit plate curtain wall construction installation method, it is characterized in that it the following steps are included: (1), first will side be logical or steel Tape welding is connected into lifting frame, then curtain wall material is covered on lifting frame outer surface, smooth above and below the curtain wall material to paste, is left Right folding side is buckled in lifting frame outer surface, and the splicing seams up and down of curtain wall material are located on square logical or steel band;(2), in civil engineering main body Postposition adapter is connected on the outside of structure, the postposition adapter passes through the adjustable attachment strap for being equipped with horizontal distribution of bolt, The lifting frame, which is taken, to be placed on attachment strap, and the inner surface of the lifting frame is welded with degree control plate.
2. high-stage unit plate curtain wall construction installation method as described in claim 1, it is characterized in that the curtain wall material is Copper, aluminium, stainless steel or composite material.
3. high-stage unit plate curtain wall construction installation method as described in claim 1, it is characterized in that the lifting frame Outer surface is plane.
4. high-stage unit plate curtain wall construction installation method as described in claim 1, it is characterized in that the lifting frame Outer surface is cambered surface.
CN201910039052.2A 2019-01-16 2019-01-16 High-stage unit plate curtain wall construction installation method Pending CN109779109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910039052.2A CN109779109A (en) 2019-01-16 2019-01-16 High-stage unit plate curtain wall construction installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910039052.2A CN109779109A (en) 2019-01-16 2019-01-16 High-stage unit plate curtain wall construction installation method

Publications (1)

Publication Number Publication Date
CN109779109A true CN109779109A (en) 2019-05-21

Family

ID=66499444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910039052.2A Pending CN109779109A (en) 2019-01-16 2019-01-16 High-stage unit plate curtain wall construction installation method

Country Status (1)

Country Link
CN (1) CN109779109A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2142129Y (en) * 1992-10-20 1993-09-15 贺春红 Non-external frame glass curtain wall
CN101769029A (en) * 2009-01-05 2010-07-07 深圳市方大装饰工程有限公司 Novel curtain wall and installation method thereof
CN101936073A (en) * 2010-08-24 2011-01-05 龙信建设集团有限公司 Construction method of combined hidden frame curtain wall of glass and corrugated aluminum sheet
CN202706268U (en) * 2012-05-14 2013-01-30 深圳市方大装饰工程有限公司 Curtain wall system easy to install
CN105804296A (en) * 2014-12-31 2016-07-27 深圳市方大建科集团有限公司 Unit type porcelain plate curtain wall
CN207376909U (en) * 2017-10-30 2018-05-18 弗思特工程咨询南京有限公司 Aluminium sheet mounts installation system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2142129Y (en) * 1992-10-20 1993-09-15 贺春红 Non-external frame glass curtain wall
CN101769029A (en) * 2009-01-05 2010-07-07 深圳市方大装饰工程有限公司 Novel curtain wall and installation method thereof
CN101936073A (en) * 2010-08-24 2011-01-05 龙信建设集团有限公司 Construction method of combined hidden frame curtain wall of glass and corrugated aluminum sheet
CN202706268U (en) * 2012-05-14 2013-01-30 深圳市方大装饰工程有限公司 Curtain wall system easy to install
CN105804296A (en) * 2014-12-31 2016-07-27 深圳市方大建科集团有限公司 Unit type porcelain plate curtain wall
CN207376909U (en) * 2017-10-30 2018-05-18 弗思特工程咨询南京有限公司 Aluminium sheet mounts installation system

Similar Documents

Publication Publication Date Title
CN211974492U (en) Clean room sectional assembly type exposed keel partition wall system
CN114457943A (en) Large-span curved surface pull rod curtain wall-sunshade truss pull rod structure and construction method
CN209494095U (en) Glass curtain wall corner structure based on monoblock type keel
CN203640115U (en) Modular curtain wall panel
CN211974490U (en) Clear fossil fragments light partition wall system of toilet
CN109779109A (en) High-stage unit plate curtain wall construction installation method
CN103104057A (en) Full-glass self-balance glass curtain wall
CN116180602B (en) A welding construction method for curved special-shaped main tower decorative panels with inner concrete and outer steel
CN212200935U (en) Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node
CN216811161U (en) Modular structure of airport terminal corridor
CN113216654B (en) Construction method for steel truss side-sealed parapet adopting color steel rock wool sandwich board
CN213741807U (en) Heavy stone curtain wall structure installed in pulling and hanging combination manner
CN216690107U (en) Roof system with integrated aluminum alloy structure
CN212926641U (en) Assembled metal modeling fixing system for splicing connection surfaces of public space wall and roof
CN211774890U (en) Corner flying wing unit plate component
CN209066659U (en) A kind of building steel glass curtain wall
CN210263476U (en) Mounting structure of high wall body in large tracts of land unidirectional flow toilet
CN213927840U (en) Assembled enclosure wall
CN223189864U (en) Modular wall panel and wall structure
CN211572169U (en) Assembled aluminum plate mounting structure convenient to change
CN112282403A (en) Outer hanging protection frame of high-rise steel construction regularization of assembled
CN216340575U (en) Quick mounting structure of archaize building octagonal column metal panel
CN221277201U (en) Connection structure of steel tube concrete column pouring operation platform
CN220133314U (en) Glass breast board capable of being rapidly detached and reused
CN111851962A (en) Synchronous lifting method of large-area ultra-thin grille ceiling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521