CN109779109A - High-stage unit plate curtain wall construction installation method - Google Patents
High-stage unit plate curtain wall construction installation method Download PDFInfo
- Publication number
- CN109779109A CN109779109A CN201910039052.2A CN201910039052A CN109779109A CN 109779109 A CN109779109 A CN 109779109A CN 201910039052 A CN201910039052 A CN 201910039052A CN 109779109 A CN109779109 A CN 109779109A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- lifting frame
- wall construction
- wall material
- stage unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses high-stage unit plate curtain wall construction installation methods, it the following steps are included: (1), first will side it is logical or steel band is welded into lifting frame, curtain wall material is covered on lifting frame outer surface again, it is smooth above and below the curtain wall material paste, left and right flanging is buckled in lifting frame outer surface, the splicing seams up and down of curtain wall material be located at that side is logical or steel band on;(2), postposition adapter is connected on the outside of civil engineering main structure, the postposition adapter is by the adjustable attachment strap for being equipped with horizontal distribution of bolt, and the lifting frame, which is taken, to be placed on attachment strap, and the inner surface of the lifting frame is welded with degree control plate.The beneficial effects of the invention are as follows the duration for substantially reducing building-site curtain wall construction, the verticality of lifting frame is guaranteed by degree control plate, guarantees that docking is neat up and down, while can resist the influence of wind pressure very well.
Description
Technical field
The present invention relates to building decoration area more particularly to high-stage unit plate curtain wall construction installation methods.
Background technique
Assembled architecture is with pre-constructed unit building made of assemble in site.Developing assembled architecture is mode of construction
Major transformation, is the important measure for promoting supply side structural reform and novel Urbanization Progress, the energy that is conducive to economize on resources,
It reduces construction pollution, promote labor productivity and quality safety level, may advantageously facilitate construction industry and information-based industrialization is deep
Degree fusion cultivates the new kinetic energy of NPD projects, pushes neutralizing superfluous production capacity.In recent years, China tries to explore to develop and promote assembled
Building, pushes the transition and upgrade of building trade, however as building external envelope structure, curtain wall is building essential and basic one
Point, curtain wall in the prior art is tower structure, and curtain wall is divided into several bulks when installing, and muti-piece curtain wall panel is spliced integral
How curtain wall realizes the stable connection of each curtain wall panel to improve the stability of curtain wall panel in the splicing of each curtain wall panel,
The problems such as improving assembly efficiency, reducing production cost becomes urgent problem in the industry already, thus need to develop a kind of novel
Curtain wall form, be suitable for assembled architecture.
Chinese invention patent publication number CN108396892A discloses assembled architecture curtain wall and installation method, wherein should
Assembled architecture curtain wall includes: the multiple unit plates of curtain wall being distributed in matrix, passes through plate between adjacent unit plates of curtain wall
The connection of seam component;The unit plates of curtain wall includes: concrete exterior wall combined wall board;Multiple first built-in fittings and second pre-buried
Part, multiple first built-in fittings default in concrete exterior wall combined wall board;Multiple second built-in fittings default in outside concrete
In wall combined wall board in the side wall at hole;Curtain skeleton, the curtain skeleton are fixed on built-in fitting, and the curtain skeleton includes
First keel and the second keel;Curtain wall panel, the curtain wall panel are fixed on curtain skeleton, and curtain wall panel includes nontransparent
Curtain wall panel and transparent curtain wall panel, the nontransparent curtain wall panel are fixed on the first keel, the transparent curtain wall panel
It is fixed on the second keel.The building curtain wall component is more, and installation is cumbersome, for another example Chinese invention patent publication number
CN107762010A discloses the installation method and its curtain wall system of a kind of modular architectural curtain wall system, comprising the following steps:
S1 makes modular architectural unit and unit plates of curtain wall, the erection support on the beam of modular architectural unit, in curtain wall unit
The unit plates of curtain wall for being equipped with pendant is articulated on the support on modular architectural unit, in curtain by mounting suspension member on plate
Heat-preservation cotton and anti-guncotton are installed between wall unit plate and modular architectural unit;S2 will be equipped with the module of unit plates of curtain wall
Change the modular architectural of being assembled integrally of building unit;S3 makes waterproof between adjacent unit plates of curtain wall.The curtain wall
It can not fit together perfectly between each unit plates of curtain wall of system, be installed on the column between adjacent unit plates of curtain wall
Connector, connector are arranged between the gap of adjacent unit plates of curtain wall, and pressing plate is mounted by means of bolts on connection
On part, unit plates of curtain wall is arranged in towards extraneous side, for connecting bright frame ornamental strip in pressing plate;Bright frame ornamental strip is passed through
Buckle is fixedly mounted on pressing plate, so that bright frame ornamental strip is covered the gap between adjacent unit plates of curtain wall, is brought volume thus
Outer installation cost, and bright frame ornamental strip is easy to damage, maintenance cost is high.
Summary of the invention
The technical problem to be solved by the present invention is to existing building curtain wall, there are many drawbacks, provide a kind of high-stage thus
Unit plate curtain wall construction installation method.
The technical scheme is that high-stage unit plate curtain wall construction installation method, it the following steps are included: (1),
First will side is logical or steel band is welded into lifting frame, then curtain wall material is covered on lifting frame outer surface, on the curtain wall material
Under it is smooth paste, left and right flanging is buckled in lifting frame outer surface, the splicing seams up and down of curtain wall material be located at that side is logical or steel band on;
(2), postposition adapter is connected on the outside of civil engineering main structure, the postposition adapter is equipped with water by the way that bolt is adjustable
Divide the attachment strap of cloth equally, the lifting frame, which is taken, to be placed on attachment strap, and the inner surface of the lifting frame is welded with degree control plate.
Curtain wall material described in above scheme is copper, aluminium, stainless steel or composite material.
The outer surface of lifting frame described in above scheme is plane/cambered surface.
The beneficial effects of the invention are as follows curtain wall materials and lifting frame can be previously prepared, and when in-site installation only needs to cover
The lifting frame for covering curtain wall material is placed on attachment strap, is welded degree control plate, is substantially reduced building-site curtain
The duration of wall construction, the splicing seams up and down of curtain wall material be located at that side is logical or steel band on, can save adjacent unit plates of curtain wall it
Between packing material, both saved material cost, also shortened installation period, the verticality of lifting frame is by degree control plate
Guarantee, guarantees that docking is neat up and down, while can resist the influence of wind pressure very well;Overall structure is simple, and installation maintenance is convenient.
Detailed description of the invention
Fig. 1 is mounting structure schematic diagram of the invention;
In figure, 1, curtain wall material, 2, bolt, 3, degree control plate, 4, square logical/steel band, 5, attachment strap, 6, postposition adapter.
Specific embodiment
With reference to the accompanying drawing, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, it is retouched
The embodiment stated is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, originally
Field those of ordinary skill every other embodiment without making creative work, belongs to protection model of the invention
It encloses.
Embodiment 1: as shown in Figure 1, the present invention the following steps are included: (1), first will side it is logical or steel band is welded into hoisting frame
Frame, then curtain wall material is covered on lifting frame outer surface, it is smooth above and below the curtain wall material paste, left and right flanging is buckled in lifting
Frame outer surface, the splicing seams up and down of curtain wall material are located on square logical or steel band 4;(2), it is connected on the outside of civil engineering main structure
Postposition adapter 6, the postposition adapter pass through the adjustable attachment strap 5 for being equipped with horizontal distribution of bolt 2, the lifting frame
It takes and is placed on attachment strap, the inner surface of the lifting frame is welded with degree control plate 3.Wherein curtain wall material selects copper sheet, hangs
The frame that frames up is plane, and attachment strap selects steel plate.
Embodiment 2: the difference from embodiment 1 is that curtain wall material is aluminium sheet, lifting frame is cambered surface, and attachment strap is selected stainless
Steel plate.
Embodiment 3: the difference from embodiment 1 is that curtain wall material is stainless steel plate, lifting frame is plane, and attachment strap is selected
Stainless steel plate.
Embodiment 4: the difference from embodiment 1 is that curtain wall material is composite panel, such as magnesium alloy, titanium alloy, glass
Glass fiber, rubber, ceramics, graphite etc., lifting frame are cambered surface, attachment strap Ceramics plate.
Claims (4)
1. high-stage unit plate curtain wall construction installation method, it is characterized in that it the following steps are included: (1), first will side be logical or steel
Tape welding is connected into lifting frame, then curtain wall material is covered on lifting frame outer surface, smooth above and below the curtain wall material to paste, is left
Right folding side is buckled in lifting frame outer surface, and the splicing seams up and down of curtain wall material are located on square logical or steel band;(2), in civil engineering main body
Postposition adapter is connected on the outside of structure, the postposition adapter passes through the adjustable attachment strap for being equipped with horizontal distribution of bolt,
The lifting frame, which is taken, to be placed on attachment strap, and the inner surface of the lifting frame is welded with degree control plate.
2. high-stage unit plate curtain wall construction installation method as described in claim 1, it is characterized in that the curtain wall material is
Copper, aluminium, stainless steel or composite material.
3. high-stage unit plate curtain wall construction installation method as described in claim 1, it is characterized in that the lifting frame
Outer surface is plane.
4. high-stage unit plate curtain wall construction installation method as described in claim 1, it is characterized in that the lifting frame
Outer surface is cambered surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910039052.2A CN109779109A (en) | 2019-01-16 | 2019-01-16 | High-stage unit plate curtain wall construction installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910039052.2A CN109779109A (en) | 2019-01-16 | 2019-01-16 | High-stage unit plate curtain wall construction installation method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109779109A true CN109779109A (en) | 2019-05-21 |
Family
ID=66499444
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910039052.2A Pending CN109779109A (en) | 2019-01-16 | 2019-01-16 | High-stage unit plate curtain wall construction installation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109779109A (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2142129Y (en) * | 1992-10-20 | 1993-09-15 | 贺春红 | Non-external frame glass curtain wall |
| CN101769029A (en) * | 2009-01-05 | 2010-07-07 | 深圳市方大装饰工程有限公司 | Novel curtain wall and installation method thereof |
| CN101936073A (en) * | 2010-08-24 | 2011-01-05 | 龙信建设集团有限公司 | Construction method of combined hidden frame curtain wall of glass and corrugated aluminum sheet |
| CN202706268U (en) * | 2012-05-14 | 2013-01-30 | 深圳市方大装饰工程有限公司 | Curtain wall system easy to install |
| CN105804296A (en) * | 2014-12-31 | 2016-07-27 | 深圳市方大建科集团有限公司 | Unit type porcelain plate curtain wall |
| CN207376909U (en) * | 2017-10-30 | 2018-05-18 | 弗思特工程咨询南京有限公司 | Aluminium sheet mounts installation system |
-
2019
- 2019-01-16 CN CN201910039052.2A patent/CN109779109A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2142129Y (en) * | 1992-10-20 | 1993-09-15 | 贺春红 | Non-external frame glass curtain wall |
| CN101769029A (en) * | 2009-01-05 | 2010-07-07 | 深圳市方大装饰工程有限公司 | Novel curtain wall and installation method thereof |
| CN101936073A (en) * | 2010-08-24 | 2011-01-05 | 龙信建设集团有限公司 | Construction method of combined hidden frame curtain wall of glass and corrugated aluminum sheet |
| CN202706268U (en) * | 2012-05-14 | 2013-01-30 | 深圳市方大装饰工程有限公司 | Curtain wall system easy to install |
| CN105804296A (en) * | 2014-12-31 | 2016-07-27 | 深圳市方大建科集团有限公司 | Unit type porcelain plate curtain wall |
| CN207376909U (en) * | 2017-10-30 | 2018-05-18 | 弗思特工程咨询南京有限公司 | Aluminium sheet mounts installation system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211974492U (en) | Clean room sectional assembly type exposed keel partition wall system | |
| CN114457943A (en) | Large-span curved surface pull rod curtain wall-sunshade truss pull rod structure and construction method | |
| CN209494095U (en) | Glass curtain wall corner structure based on monoblock type keel | |
| CN203640115U (en) | Modular curtain wall panel | |
| CN211974490U (en) | Clear fossil fragments light partition wall system of toilet | |
| CN109779109A (en) | High-stage unit plate curtain wall construction installation method | |
| CN103104057A (en) | Full-glass self-balance glass curtain wall | |
| CN116180602B (en) | A welding construction method for curved special-shaped main tower decorative panels with inner concrete and outer steel | |
| CN212200935U (en) | Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node | |
| CN216811161U (en) | Modular structure of airport terminal corridor | |
| CN113216654B (en) | Construction method for steel truss side-sealed parapet adopting color steel rock wool sandwich board | |
| CN213741807U (en) | Heavy stone curtain wall structure installed in pulling and hanging combination manner | |
| CN216690107U (en) | Roof system with integrated aluminum alloy structure | |
| CN212926641U (en) | Assembled metal modeling fixing system for splicing connection surfaces of public space wall and roof | |
| CN211774890U (en) | Corner flying wing unit plate component | |
| CN209066659U (en) | A kind of building steel glass curtain wall | |
| CN210263476U (en) | Mounting structure of high wall body in large tracts of land unidirectional flow toilet | |
| CN213927840U (en) | Assembled enclosure wall | |
| CN223189864U (en) | Modular wall panel and wall structure | |
| CN211572169U (en) | Assembled aluminum plate mounting structure convenient to change | |
| CN112282403A (en) | Outer hanging protection frame of high-rise steel construction regularization of assembled | |
| CN216340575U (en) | Quick mounting structure of archaize building octagonal column metal panel | |
| CN221277201U (en) | Connection structure of steel tube concrete column pouring operation platform | |
| CN220133314U (en) | Glass breast board capable of being rapidly detached and reused | |
| CN111851962A (en) | Synchronous lifting method of large-area ultra-thin grille ceiling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190521 |