CN109778851A - Construction method of multi-stage expandable carrier bag grouting prestressed anchor rod - Google Patents

Construction method of multi-stage expandable carrier bag grouting prestressed anchor rod Download PDF

Info

Publication number
CN109778851A
CN109778851A CN201910126185.3A CN201910126185A CN109778851A CN 109778851 A CN109778851 A CN 109778851A CN 201910126185 A CN201910126185 A CN 201910126185A CN 109778851 A CN109778851 A CN 109778851A
Authority
CN
China
Prior art keywords
grouting
anchor
plate
anchor cable
slider
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910126185.3A
Other languages
Chinese (zh)
Other versions
CN109778851B (en
Inventor
朱凯
陈小林
唐杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Ang Chuang Technology Co Ltd
Original Assignee
Hangzhou Ang Chuang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Ang Chuang Technology Co Ltd filed Critical Hangzhou Ang Chuang Technology Co Ltd
Priority to CN201910126185.3A priority Critical patent/CN109778851B/en
Publication of CN109778851A publication Critical patent/CN109778851A/en
Application granted granted Critical
Publication of CN109778851B publication Critical patent/CN109778851B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of expansible supporting body pouch slip casting prestressed anchor construction methods of multistage, it is characterized in that, after drilling, the dispersed pressure anchor made in advance is placed in hole, several expansible supporting bodies are installed on anchor pole, and are wrapped up with pouch, once grouting then is carried out to drilling, expanded body is unfolded step by step after reaching some strength, finally carries out pouch slip casting and secondary grouting and anchorage cable stretching;The construction method include drilling and forming hole and borehole cleaning, the production of expansible supporting body and installation, Grouting Pipe and pouch installation, anchor cable decentralization, once grouting, expanded body extend step by step, pouch slip casting and secondary grouting, anchorage cable stretching and anchoring.Expansible supporting body can be unfolded in corresponding soil layer in the present invention, increase the contact area with the soil body, improve anchor force, reduce rock-bolt length and spacing, reduce cost, economize on resources.

Description

Multistage expansible supporting body pouch slip casting prestressed anchor construction method
Technical field
The present invention relates in slope protection project prestressed anchor construction more particularly to a kind of expansible supporting body of multistage The construction method of pouch slip casting prestressed anchor.
Background technique
Prestressed anchor is widely used in the engineerings such as side slope protection, foundation pit enclosure, can be divided into according to stress transfer mode Tension type prestressed anchor and pressure-type prestressed anchor.Traditional tension type anchor pole starches solid and anchor under tensile load effect Bond stress distribution between bar is uneven, be easy to cause stress concentration phenomenon, and the tensile stress generated in slurry solid to starch solid Drawing crack destroys, and influences the pull-out ultimate capacity of anchor pole.Especially under the conditions of Unfavorable geology, to reach design anchor force, need to add Long anchor pole reduces anchor pole spacing, and the loss of material and underground environment is thus brought to influence.And pressure type anchor rod is used, especially The pulling capacity of anchor rod body can be dispersed the pressure for being converted into slurry solid, make full use of slurry solid preferable by dispersed pressure anchor Crushing resistance, but the mode of conventional implantation supporting body is limited to the pull-out ultimate capacity for improving anchor pole, and the construction of supporting body Quality requirement is very high, once can't meet the quality requirement, often its bearing capacity can not show a candle to corresponding tension type anchor pole.
Summary of the invention
The problem of it is an object of the invention to for the construction of existing prestressed anchor, proposing a kind of multistage can expand Supporting body construction prestressed cable method is opened up, is adopted the following technical solutions.
Multistage expansible supporting body prestressed anchor construction method, which is characterized in that including following construction procedure:
S1, drilling and forming hole and borehole cleaning: carrying out cloth hole and drilling and forming hole by the spacing of wells of design, set up crosshead, and telephone-moving is in place, And locked drilling machine with fastener, guarantee that drilling machine does not have biggish shaking in drilling process;
S2, the production of expansible supporting body and anchor cable assembling:
S2.1, the processing of expansible supporting body and assembling are carried out, through hole is set in expanded body top end plate and bottom plate, in through hole Disrance sleeve is penetrated, is welded to connect with end plate and bottom plate, end plate lower weld four is to set square, and setting turns between each pair of set square Axis installs one piece of guide plate by shaft between two pieces of set squares, and welded end plate is the same as diameter annular block, shape between each pair of set square At sleeve;
S2.2, guide plate top are connected to sleeve and end plate by shaft, under a bushing portion, pintongs of the welding with diameter on the outside of guide plate Expansion board, the equidistant welding stiffener enhancing extension panel stiffness in expansion board inside, guide plate lower part certain distance weld several piece radiation Shape telescopic backboard has sliding block card slot on telescopic backboard, keeps expanded body not unfolded under not by external force;
S2.3, sliding block include sliding block upper plate and sliding block lower plate, are connected into sliding block upper plate and sliding block lower plate with sliding block connecting cylinder whole Body enhances sliding block overall stiffness in sliding block connecting cylinder surrounding eight pieces of ribs of uniform welding;
S2.4, the corresponding position that the expanded body being completed is installed to level-one anchor cable, second level anchor cable, three-level anchor cable, and with anti- Rotten cement casing filler material is filled the gap of disrance sleeve and anchor cable;
S3, Grouting Pipe and pouch installation:
S3.1, it is responsible in the installation pouch slip casting of expanded body center, inside expanded body, pouch is installed on pouch slip casting supervisor Slip casting horizontal branch pipe;
S3.2, pouch being covered outside expanded body, pouch top and the bottom are fixed at the pouch card slot of end plate and bottom plate by garter spring, And the air in pouch is extracted by pouch slip casting supervisor and pouch slip casting horizontal branch pipe, and blocks on pouch slip casting supervisor Mouthful;
S3.3, uniformly placed on prestressed anchor to middle bracket, outside expanded body, the fixed once grouting pipe of centering bracket and Secondary grouting pipe;
S4, anchor cable decentralization: will be put into hole under anchor cable in time after the completion of drilling borehole cleaning, expansible anchor cable moved at hole location, according to Design inclination angle, orientation it is artificial smooth, it is continuous promote, by sliding into hole under the self weight of anchor cable body and inertia;
S5, once grouting: once grouting pipe progress common pressure grouting, once grouting pipe will be passed through by configured cement grout as required From hole-bottom slurry-injection, until slurries flow to aperture, once grouting pipe is at the uniform velocity extracted during slip casting;
S6, expanded body extend step by step: after the slurry solid that slip casting is formed reaches prescribed strength, with jack pair two at aperture Three-level anchor cable carries out tensioning, and three-level anchor cable band movable slider moves up, and the sliding block upper plate on final sliding block is moved to non-return card slot Place cannot move again, stop tensioning at this time, and three-level anchor cable is tentatively fixed on anchor plate;According to above-mentioned steps gradually by second level Anchor cable, level-one anchor cable and corresponding expanded body are extended;
S7, pouch slip casting and secondary grouting: horizontal by pouch slip casting supervisor, pouch slip casting after expansible body all extension Branch pipe and secondary grouting pipe successively carry out slip casting, and the secondary grouting time determines according to live cement slurry condensation situation, the slip casting time Interval is appropriately extended, grouting pressure > 2.0MPa;
S8, anchorage cable stretching and anchoring: after the compression strength for starching solid reaches the 75% of design strength, classification is carried out to anchor cable It draws, every grade is incremented by by designing prestressed 25%, and every grade of stable 5min, afterbody ultra stretching 110% simultaneously stablizes 20 ~ 30min, so After lock, close anchor head.
Preferably, expanded body is made of upper end plate, middle part guide plate and expansion board, lower part expanded body bottom plate and bottom plate, end Plate and bottom plate are equipped with through hole corresponding with anchor cable and pouch slip casting general pipeline.
Preferably, sleeve is arranged at end plate lower part, and sleeve is pintongs ring bodies, and ring bodies is discontinuous at guide plate and set square, Guarantee that guide plate can rotate freely.
Preferably, for sliding block among four pieces of guide plates, anchor cable is fixed on the welding block in sliding block lower plate, sliding block by disrance sleeve Non-return card slot can be moved upward to by anchor cable, moving up for sliding block is turned out guide plate, finally makes expanded body at expansion shape State.
Preferably, disrance sleeve and anchor cable gap are filled with anti-corrosion cement casing filler material, anchor cable and disrance sleeve it is upper Lower end is fixed by tied silk.
Preferably, level-one anchor cable, second level anchor cable, three-level anchor cable are in end plate and to symmetrical, anchor cable series on middle bracket And expanded body number is determined according to actual formation situation, is not limited to three-level.
The beneficial effects of the present invention are:
1, pressure dispersing type non-bonded anchorage cable is reduced tension process, reduces construction period, had using classification otherness tensioning Effect accelerates anchor cable construction progress;
2, expansible supporting body can be unfolded in corresponding soil layer, increase the contact area with the soil body, improve anchor force;
3, anchor force is improved after expansible supporting body extension, can accordingly reduces the distance between the length or anchor pole of anchor pole, The usage amount for reducing anchor cable, reduces cost;
4, pouch wraps up expansible supporting body, reduces contact of the expansible supporting body with underground water, improving can expand Open up the service performance and safety of supporting body;
5, it is cased with disrance sleeve outside the anchor cable among expansible supporting body, it is viscous with waterproof anti-corrosion between disrance sleeve and anchor cable Material is filled, and slurries will not flow out pouch during slip casting, and slip casting effect is good.
Detailed description of the invention
Fig. 1 is multistage expansible supporting body prestress anchorage cable structure chart;
Fig. 2 is multistage expansible supporting body and anchor cable assembling figure;
Fig. 3 is certain grade of supporting body detail of construction;
Fig. 4 is detail drawing after certain grade of supporting body extension;
Fig. 5 is A-A sectional view in Fig. 2;
Fig. 6 is B-B sectional view in Fig. 2;
Fig. 7 is C-C sectional view in Fig. 2;
Fig. 8 is guide plate, sleeve, set square connection schematic diagram;
Fig. 9 is guide plate, expansion board connection schematic diagram;
Figure 10 is guide plate, expansion board connection three-dimensional figure one;
Figure 11 is guide plate, expansion board connection three-dimensional figure one;
Figure 12 is slide block structure figure;
Figure 13 is sliding block sectional view (D-D section);
Figure 14 is the structural schematic diagram after the completion of step 1;
Figure 15 is the structural schematic diagram after the completion of step 4;
Figure 16 is the structural schematic diagram after the completion of step 5;
Figure 17 is the structural schematic diagram after the completion of step 6;
Figure 18 is the structural schematic diagram after the completion of step 7.
It is marked in figure: 1- slope protection, 2- drilling, 31- level-one anchor cable, 32- second level anchor cable, 33- three-level anchor cable, 41- end plate, 42- sleeve, 43- guide plate, 44- expansion board, 45- telescopic backboard, 46- bottom plate, 47- set square, 48- stiffener, 49- separation sleeve Pipe, 410- shaft, 411- non-return card slot, 412- sliding block card slot, 5- pouch, 6- pouch card slot, 7- sliding block, 71- sliding block upper plate, 72- sliding block lower plate, 73- sliding block connecting cylinder, 74- ribs, 8- through hole, 9- centering bracket, 10- anchor head, 11- anchor plate, 12- Starch solid, 13- welding block, 14- once grouting pipe, 15- secondary grouting pipe, 161- pouch slip casting supervisor, 162- pouch slip casting level Branch pipe, 17- casing filler material.
Specific embodiment
In order to deepen the understanding of the present invention, below with reference to Fig. 1 to Figure 18, the embodiment of the present invention is made specifically Bright, following embodiment is implemented under the premise of the technical scheme of the present invention, gives detailed embodiment, but the present invention Protection scope be not limited to the following embodiments.
Drilling (2) depth is 20m, and bore diameter 15cm, expanded body height is 30cm, diameter 10cm, anchor cable use Prestressed anchor rope with pressure dispersing, by Unit three, totally six beam steel strand wires form every hole anchor cable, steel strand wires using diameter 15.24mm, A centering bracket is arranged along the every 1.5m of body of rod axis direction in the high strength low relaxed non-bending steel cable of intensity 1860MPa (9), level-one anchor cable (31) long 10m, second level anchor cable (32) long 15m, three-level anchor cable (33) long 19.5m, injecting paste material is using water ash Neat slurry than 0.45 ~ 0.50.Drilling tool uses TY210, and is equipped with corresponding tensioning equipment.
For the expansible supporting body pouch slip casting prestressed anchor construction of above-mentioned multistage, the present invention uses following construction procedure (Figure 14 ~ Figure 18):
S1, drilling and forming hole and borehole cleaning: carrying out cloth hole and drilling and forming hole by the spacing of wells of design, set up crosshead, and telephone-moving is in place, And locked drilling machine with fastener, guarantee that drilling machine does not have biggish shaking in drilling process, as shown in figure 14;
S2, the production of expansible supporting body and anchor cable assembling:
S2.1, expansible supporting body processing and assembling are carried out, through hole is set on expanded body top end plate (41) and bottom plate (46) (8), disrance sleeve (9) are penetrated in through hole (8), is welded to connect with end plate (41) and bottom plate (46), end plate (41) lower weld Shaft (410) are arranged between each pair of set square (47) in four pairs of set squares (47), are installed between two pieces of set squares by shaft (410) One piece of guide plate (43), welded end plate is formed sleeve (42) with diameter annular block between each pair of set square (47);
S2.2, guide plate (43) top are connected to sleeve (42) and end plate (41) by shaft (410), in sleeve (42) lower part, lead Pintongs expansion board (44) of the welding with diameter, equidistant welding stiffener (48) the enhancing expansion in expansion board (44) inside on the outside of plate (43) Panel rigidity, guide plate (43) lower part certain distance weld the radial telescopic backboard of several piece (45), and telescopic backboard has sliding block on (45) Card slot (412) keeps expanded body not unfolded under not by external force, as shown in Fig. 9 ~ Figure 11;
S2.3, sliding block (7) include sliding block upper plate (71) and sliding block lower plate (72), with sliding block connecting cylinder (73) by sliding block upper plate (71) It is integral with sliding block lower plate (72) connection, in eight pieces of ribs (74) of sliding block connecting cylinder (73) surrounding uniform welding, enhance sliding block Overall stiffness, as shown in Figure 12 and Figure 13;
S2.4, the expanded body being completed is installed to level-one anchor cable (31), second level anchor cable (32), three-level anchor cable (33) it is corresponding Position, and be filled with gap of the anti-corrosion cement casing filler material (17) to disrance sleeve (49) and anchor cable;
S3, Grouting Pipe and pouch installation:
S3.1, (161) are responsible in the installation pouch slip casting of expanded body center, inside expanded body, (161) are responsible in pouch slip casting Upper installation pouch slip casting horizontal branch pipe (162);
S3.2, pouch (5) is covered outside expanded body, pouch top and the bottom are fixed on end plate (41) and bottom plate (46) by garter spring At pouch card slot (6), and the air in pouch (5) is passed through into pouch slip casting supervisor (161) and pouch slip casting horizontal branch pipe (161) Abstraction, and it is suitable for reading to block pouch slip casting supervisor (161);
S3.3, it is uniformly placed on prestressed anchor to middle bracket (9), outside expanded body, the fixed primary note of centering bracket (9) Slurry pipe (14) and secondary grouting pipe (15);
S4, anchor cable decentralization: it will be put into hole under anchor cable in time after the completion of drilling (2) borehole cleaning, expansible anchor cable is moved at hole location, is pressed According to design inclination angle, artificial smooth, the continuous propulsion in orientation, by hole is slid under the self weight of anchor cable body and inertia, as shown in figure 15;
S5, once grouting: once grouting pipe progress common pressure grouting, once grouting pipe will be passed through by configured cement grout as required From hole-bottom slurry-injection, until slurries flow to aperture, once grouting pipe (14) is at the uniform velocity extracted during slip casting, as shown in figure 16;
S6, expanded body extend step by step: after the slurry solid (12) that slip casting is formed reaches prescribed strength, jack pair is used at aperture Two three-level anchor cables (33) carry out tensioning, and three-level anchor cable (33) band movable slider (7) moves up, the sliding block on final sliding block (7) Upper plate (71) is moved at non-return card slot (411) and cannot move again, stops tensioning at this time, and three-level anchor cable (33) is tentatively fixed on On anchor plate (11);Gradually second level anchor cable (32), level-one anchor cable (31) and corresponding expanded body are expanded according to above-mentioned steps Exhibition, as shown in figure 17;
S7, pouch slip casting and secondary grouting: after expansible body all extension, (161), pouch slip casting are responsible for by pouch slip casting Horizontal branch pipe (162) and secondary grouting pipe (15) successively carry out slip casting, and the secondary grouting time condenses situation according to live cement slurry Determine, slip casting time interval is appropriately extended, grouting pressure > 2.0MPa, as shown in figure 18;
S8, anchorage cable stretching and anchoring: after the compression strength for starching solid (12) reaches the 75% of design strength, anchor cable is divided Grade tensioning, every grade is incremented by by designing prestressed 25%, every grade of stable 5min, afterbody ultra stretching 110% and stablize 20 ~ Then 30min is locked, close anchor head (10).
Fig. 5 ~ Fig. 7, be respectively primary expansion body, secondary expansion body, three-level expanded body end plate sectional view, expanded body is by upper Portion's end plate (41), middle part guide plate (43) and expansion board (44), lower part expanded body bottom plate (45) and bottom plate (46) composition, end plate (41) Diameter is 10cm, has identical hole location on every grade of end plate (41), has on level-one end plate six roots of sensation disrance sleeve (49), on second level end plate There are four disrance sleeves (49), three-level end plate there are two disrance sleeves (49), and disrance sleeve (49) outer diameter is 2.5cm;Fig. 8 ~ figure 11 be guide plate (43) and sleeve (42), expansion board (44), the connection of set square (47), and end plate lower part has sleeve (42), set Cylinder (42) is pintongs ring bodies, and ring bodies is discontinuous at guide plate (43) and set square (47), guarantees that guide plate (43) can be free Rotation;Figure 11 ~ Figure 12, sliding block (7) include sliding block upper plate (71) and sliding block lower plate (72), sliding block upper plate (71) diameter 7cm, sliding block Lower plate (72) diameter 7.5cm, sliding block (7) is intermediate in four pieces of guide plates (43), and anchor cable is fixed under sliding block by disrance sleeve (49) Welding block (13) on plate (72), sliding block (7) can be moved upward to non-return card slot (411) by anchor cable, and moving up for sliding block (7) makes Guide plate (43) is turned out, and finally makes expanded body at unfolded state.
Above-described embodiment is only used for illustrating technical concept of the invention, rather than the restriction to rights protection of the present invention, It is all to be made a non-material change to the present invention using this design, protection scope of the present invention should all be fallen into.

Claims (6)

1.多级可扩展承载体囊袋注浆预应力锚杆施工方法,其特征在于,包括如下施工步骤:1. The construction method of multi-level expandable bearing body bag grouting prestressed anchor rod is characterized in that, comprising the following construction steps: S1、钻进成孔及清孔:按设计的钻孔间距进行布孔和钻进成孔,搭设操作架,移机就位,并用扣件将钻机锁定,保证钻进过程中钻机不会有较大的晃动;S1. Drilling into holes and clearing holes: according to the designed drilling spacing, arrange holes and drill into holes, set up an operating frame, move the machine in place, and lock the drilling rig with fasteners to ensure that the drilling rig will not be larger during the drilling process. shaking; S2、可扩展承载体制作及锚索组装:S2. Extensible carrier production and anchor cable assembly: S2.1、进行可扩展承载体加工与组装,扩展体顶部端板(41)和底板(46)上设置贯穿孔(8),贯穿孔(8)内穿入隔离套管(9),与端板(41)和底板(46)焊接连接,端板(41)下部焊接四对三角板(47),每对三角板(47)间设置转轴(410),两块三角板之间通过转轴(410)安装一块导板(43),在每对三角板(47)之间焊接端板同直径环状块,形成套筒(42);S2.1. Carry out the processing and assembly of the expandable carrier body. The top end plate (41) and the bottom plate (46) of the expansion body are provided with through holes (8), and the through holes (8) are inserted into the isolation sleeve (9), and the The end plate (41) and the bottom plate (46) are connected by welding, four pairs of triangular plates (47) are welded on the lower part of the end plate (41), a rotating shaft (410) is arranged between each pair of triangular plates (47), and a rotating shaft (410) is passed between the two triangular plates. A guide plate (43) is installed, and an annular block with the same diameter of the end plate is welded between each pair of triangular plates (47) to form a sleeve (42); S2.2、导板(43)上部通过转轴(410)连接着套筒(42)和端板(41),在套筒(42)下部,导板(43)外侧焊接同直径的四瓣扩展板(44),扩展板(44)内侧等距离焊接加劲板(48)增强扩展板刚度,导板(43)下部一定距离焊接数块辐射状扩展底板(45),扩展底板(45)上有滑块卡槽(412),使扩展体在不受外力作用下不会展开;S2.2. The upper part of the guide plate (43) is connected to the sleeve (42) and the end plate (41) through the rotating shaft (410). At the lower part of the sleeve (42), the outer side of the guide plate (43) is welded with a four-lobed expansion plate ( 44), the inner side of the expansion board (44) is equidistantly welded to the stiffening plate (48) to enhance the rigidity of the expansion board, and several radial expansion bottom plates (45) are welded at a certain distance from the lower part of the guide plate (43), and there are slider cards on the expansion bottom plate (45). Slot (412), so that the expansion body will not be expanded under the action of external force; S2.3、滑块(7)包括滑块上板(71)和滑块下板(72),用滑块连接筒(73)将滑块上板(71)和滑块下板(72)连接成整体,在滑块连接筒(73)四周均匀焊接八块加强肋(74),增强滑块整体刚度;S2.3. The slider (7) includes the upper slider plate (71) and the lower slider plate (72), and the slider upper plate (71) and the slider lower plate (72) are connected by the slider connecting cylinder (73). Connected as a whole, eight reinforcing ribs (74) are evenly welded around the slider connecting cylinder (73) to enhance the overall rigidity of the slider; S2.4、将组装完成的扩展体安装到一级锚索(31)、二级锚索(32)、三级锚索(33)的相应位置,并用防腐粘质套管填充料(17)对隔离套管(49)和锚索的间隙进行填充;S2.4. Install the assembled extension body to the corresponding positions of the primary anchor cable (31), the secondary anchor cable (32), and the tertiary anchor cable (33), and use the anti-corrosion viscose casing filler (17) Fill the gap between the isolation sleeve (49) and the anchor cable; S3、注浆管及囊袋安装:S3, grouting pipe and bag installation: S3.1、在扩展体中心位置安装囊袋注浆主管(161),在扩展体内部,囊袋注浆主管(161)上安装囊袋注浆水平支管(162);S3.1. Install the bladder grouting main pipe (161) at the center of the expansion body, and install the bladder grouting horizontal branch pipe (162) on the bladder grouting main pipe (161) inside the expansion body; S3.2、将囊袋(5)套在扩展体外部,囊袋上下部通过箍环固定在端板(41)和底板(46)的囊袋卡槽(6)处,并将囊袋(5)内的空气通过囊袋注浆主管(161)和囊袋注浆水平支管(161)抽除,并封堵囊袋注浆主管(161)上口;S3.2. Put the bladder bag (5) on the outside of the expansion body. The upper and lower parts of the bladder bag are fixed at the bladder bag grooves (6) of the end plate (41) and the bottom plate (46) through the hoop, and the bladder bag ( 5) The air inside is pumped out through the bladder grouting main pipe (161) and the bladder grouting horizontal branch pipe (161), and the upper mouth of the bladder grouting main pipe (161) is blocked; S3.3、在预应力锚杆上均匀放置对中支架(9),在扩展体外部,对中支架(9)固定一次注浆管(14)和二次注浆管(15);S3.3. Evenly place the centering bracket (9) on the prestressed anchor, and fix the primary grouting pipe (14) and the secondary grouting pipe (15) on the outside of the expansion body with the centering bracket (9); S4、锚索下放:钻孔(2)清孔完成后及时将锚索下放入孔,将可扩展锚索移至孔位处,按照设计倾角、方位人工平顺、连续推进,依靠锚索体的自重和惯性下滑入孔;S4. Lowering the anchor cable: Drilling (2) After the hole cleaning is completed, put the anchor cable into the hole in time, move the expandable anchor cable to the hole position, and manually advance smoothly and continuously according to the designed inclination angle and orientation, relying on the anchor cable body. The dead weight and inertia of the slide into the hole; S5、一次注浆:将按要求配置好的水泥浆液通过一次注浆管进行常压注浆,一次注浆管自孔底注浆,直至浆液流至孔口,注浆过程中一次注浆管(14)匀速拔出;S5. One-shot grouting: The cement grout prepared as required will be grouted at atmospheric pressure through the primary grouting pipe, and the primary grouting pipe will be grouted from the bottom of the hole until the slurry flows to the orifice. (14) Pull out at a constant speed; S6、扩展体逐级扩展:待注浆形成的浆固体(12)达到规定强度后,在孔口处用千斤顶对两根三级锚索(33)进行张拉,三级锚索(33)带动滑块(7)向上移动,最终滑块(7)上的滑块上板(71)移动至止回卡槽(411)处不能再移动,此时停止张拉,将三级锚索(33)初步固定在锚固板(11)上;按照上述步骤逐步将二级锚索(32)、一级锚索(31)和相应的扩展体进行扩展;S6. The expansion body is expanded step by step: after the slurry solid (12) formed by grouting reaches the specified strength, the two third-level anchor cables (33) are tensioned with a jack at the orifice, and the third-level anchor cables (33) Drive the slider (7) to move upward, and finally the slider upper plate (71) on the slider (7) moves to the non-return slot (411) and can no longer move. 33) Preliminarily fix on the anchor plate (11); gradually expand the secondary anchor cable (32), the primary anchor cable (31) and the corresponding expansion body according to the above steps; S7、囊袋注浆及二次注浆:待可扩展体全部扩展后,通过囊袋注浆主管(161)、囊袋注浆水平支管(162)和二次注浆管(15)依次进行注浆,二次注浆时间根据现场水泥浆凝结情况来定,注浆时间间隔适当延长,注浆压力>2.0MPa;S7. Bladder grouting and secondary grouting: After the expandable body is fully expanded, the bladder grouting main pipe (161), the bladder grouting horizontal branch pipe (162) and the secondary grouting pipe (15) are sequentially carried out. Grouting, the secondary grouting time is determined according to the setting condition of the cement slurry on site, the grouting time interval is appropriately extended, and the grouting pressure is more than 2.0MPa; S8、锚索张拉及锚固:当浆固体(12)的抗压强度达到设计强度的75%后,对锚索进行分级张拉,每级按设计预应力的25%递增,每级稳定5min,最后一级超张拉110%并稳定20~30min,然后锁定,封闭锚头(10)。S8. Anchor cable tensioning and anchoring: when the compressive strength of the slurry solid (12) reaches 75% of the design strength, the anchor cable is tensioned in stages, each stage is increased by 25% of the design prestress, and each stage is stable for 5 minutes , the last stage is hypertensioned by 110% and stabilized for 20~30min, and then locked to close the anchor head (10). 2.根据权利要求1所述的多级可扩展承载体囊袋注浆预应力锚杆施工方法,其特征在于,所述S2中,扩展体由上部端板(41)、中部导板(43)和扩展板(44)、下部扩展体底板(45)和底板(46)组成,端板(41)和底板(46)上设有与锚索和囊袋注浆总管(161)相对应的贯穿孔(8)。2. The multi-stage expandable carrier bag grouting prestressed anchor bolt construction method according to claim 1, characterized in that, in S2, the expansion body consists of an upper end plate (41) and a middle guide plate (43) It is composed of the expansion plate (44), the bottom expansion body bottom plate (45) and the bottom plate (46). hole (8). 3.根据权利要求1所述的多级可扩展承载体囊袋注浆预应力锚杆施工方法,其特征在于,所述S2中,端板下部有套筒(42),套筒(42)为四瓣环状体,在导板(43)和三角板(47)处环状体不连续,保证导板(43)能够自由旋转。3. The multi-stage expandable carrier bag grouting prestressed bolt construction method according to claim 1, characterized in that, in the S2, a sleeve (42) is provided at the lower part of the end plate, and the sleeve (42) It is a four-lobed annular body, and the annular body is discontinuous at the guide plate (43) and the triangular plate (47) to ensure that the guide plate (43) can rotate freely. 4.根据权利要求1所述的多级可扩展承载体囊袋注浆预应力锚杆施工方法,其特征在于,所述S2中,滑块(7)在四块导板(43)中间,锚索通过隔离套管(49)固定于滑块下板(72)上的焊块(13),滑块(7)可以通过锚索向上移动至止回卡槽(411),滑块(7)的上移使导板(43)向外转动,最终使扩展体成展开状态。4. The multi-stage expandable carrier bag grouting prestressed anchor rod construction method according to claim 1, characterized in that in S2, the slider (7) is in the middle of the four guide plates (43), and the anchor The cable is fixed to the welding block (13) on the lower plate (72) of the slider through the isolation sleeve (49). The upward movement makes the guide plate (43) rotate outwards, and finally makes the expansion body into the unfolded state. 5.根据权利要求1所述的多级可扩展承载体囊袋注浆预应力锚杆施工方法,其特征在于,所述S2中,隔离套管(49)和锚索间隙用防腐粘质套管填充料(17)填充,锚索与隔离套管(49)的上下端通过扎丝固定。5. The multi-stage expandable carrier bag grouting prestressed anchor bolt construction method according to claim 1, characterized in that, in the S2, an anti-corrosion adhesive sleeve is used for the isolation sleeve (49) and the gap between the anchor cables The pipe filling material (17) is filled, and the upper and lower ends of the anchor cable and the isolation sleeve (49) are fixed by binding wires. 6.根据权利要求1所述的多级可扩展承载体囊袋注浆预应力锚杆施工方法,其特征在于,所述S6中,一级锚索(31)、二级锚索(32)、三级锚索(33)在端板(41)和对中支架(9)上对称分布,锚索级数及扩展体个数依据实际地层情况确定,不限于三级。6. The multi-stage expandable carrier bag grouting prestressed anchor rod construction method according to claim 1, characterized in that, in S6, the first-level anchor cable (31) and the second-level anchor cable (32) The three-level anchor cables (33) are symmetrically distributed on the end plate (41) and the centering bracket (9).
CN201910126185.3A 2019-02-20 2019-02-20 Construction method for multistage expandable supporting body bag grouting prestressed anchor rod Expired - Fee Related CN109778851B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910126185.3A CN109778851B (en) 2019-02-20 2019-02-20 Construction method for multistage expandable supporting body bag grouting prestressed anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910126185.3A CN109778851B (en) 2019-02-20 2019-02-20 Construction method for multistage expandable supporting body bag grouting prestressed anchor rod

Publications (2)

Publication Number Publication Date
CN109778851A true CN109778851A (en) 2019-05-21
CN109778851B CN109778851B (en) 2021-02-09

Family

ID=66504635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910126185.3A Expired - Fee Related CN109778851B (en) 2019-02-20 2019-02-20 Construction method for multistage expandable supporting body bag grouting prestressed anchor rod

Country Status (1)

Country Link
CN (1) CN109778851B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676967A (en) * 2020-06-19 2020-09-18 中建富林集团有限公司 Construction method for pile-anchor support of spiral cage core anchor rod
CN112160782A (en) * 2020-09-30 2021-01-01 辽宁工程技术大学 Multi-stage retractable anti-falling anchor rod structure and using method
CN113431517A (en) * 2021-06-23 2021-09-24 华能灵台邵寨煤业有限责任公司 Quick plugging device suitable for multi-aperture cyclic multiplexing orifice
CN113969579A (en) * 2021-09-29 2022-01-25 华北水利水电大学 Multistage expansion utricule stock device
CN114737565A (en) * 2022-04-29 2022-07-12 中国矿业大学 Fully-recyclable distributed end support anchor rod and construction method thereof
CN115125946A (en) * 2022-05-30 2022-09-30 广州环投增城环保能源有限公司 A cascading umbrella-shaped anchor rod
CN115341934A (en) * 2022-07-22 2022-11-15 广西民族大学 Anchoring method and structure of anchor rod with enlarged head
CN116065580A (en) * 2023-03-31 2023-05-05 中冶建筑研究总院有限公司 High-bearing-capacity multi-bag expansion anchor rod drilling and expanding structure and integrated construction method thereof
CN116427402A (en) * 2023-04-04 2023-07-14 上海市基础工程集团有限公司 An anti-floating anchoring device for underground structures
CN116623674A (en) * 2023-06-30 2023-08-22 南京工业大学 A foundation pit support device with controllable deformation and its construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101067581A (en) * 2007-04-26 2007-11-07 中国科学院武汉岩土力学研究所 Pressure Distributed Anchor Cable Stress State Monitoring Device
CN103741687A (en) * 2014-01-27 2014-04-23 北方工业大学 Reaming pressure dispersion type anchor rod
CN104074190A (en) * 2014-06-16 2014-10-01 成都四海岩土工程有限公司 Secondary high-pressure grouting expansion bit anchor rod and construction method thereof
CN204551461U (en) * 2015-04-14 2015-08-12 中国建筑西南勘察设计研究院有限公司 A kind of pressure dispersing type electric hoist enlarged footing anchor cable
CN205653785U (en) * 2016-05-20 2016-10-19 朱鹏程 Umbellate form skeleton expands body anchor rope
CN106836217A (en) * 2017-02-15 2017-06-13 常州工学院 A kind of construction method of expansion end formula soil bolt or soil nailing
CN108360515A (en) * 2018-04-27 2018-08-03 中国铁道科学研究院深圳研究设计院 It is segmented reaming pressure anchor wire structure and construction method
CN108775014A (en) * 2018-06-27 2018-11-09 刘晓理 From the churning anchor cable or jet grouting anchor rod construction method for taking umbrella expansion body structure
CN208455617U (en) * 2018-06-27 2019-02-01 刘晓理 The film pouch-type umbrella enlarged footing of follow-up synchronous with whirl spraying anchor cable

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101067581A (en) * 2007-04-26 2007-11-07 中国科学院武汉岩土力学研究所 Pressure Distributed Anchor Cable Stress State Monitoring Device
CN103741687A (en) * 2014-01-27 2014-04-23 北方工业大学 Reaming pressure dispersion type anchor rod
CN104074190A (en) * 2014-06-16 2014-10-01 成都四海岩土工程有限公司 Secondary high-pressure grouting expansion bit anchor rod and construction method thereof
CN204551461U (en) * 2015-04-14 2015-08-12 中国建筑西南勘察设计研究院有限公司 A kind of pressure dispersing type electric hoist enlarged footing anchor cable
CN205653785U (en) * 2016-05-20 2016-10-19 朱鹏程 Umbellate form skeleton expands body anchor rope
CN106836217A (en) * 2017-02-15 2017-06-13 常州工学院 A kind of construction method of expansion end formula soil bolt or soil nailing
CN108360515A (en) * 2018-04-27 2018-08-03 中国铁道科学研究院深圳研究设计院 It is segmented reaming pressure anchor wire structure and construction method
CN108775014A (en) * 2018-06-27 2018-11-09 刘晓理 From the churning anchor cable or jet grouting anchor rod construction method for taking umbrella expansion body structure
CN208455617U (en) * 2018-06-27 2019-02-01 刘晓理 The film pouch-type umbrella enlarged footing of follow-up synchronous with whirl spraying anchor cable

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676967B (en) * 2020-06-19 2021-07-02 中建富林集团有限公司 Construction method for pile-anchor support of spiral cage core anchor rod
CN111676967A (en) * 2020-06-19 2020-09-18 中建富林集团有限公司 Construction method for pile-anchor support of spiral cage core anchor rod
CN112160782A (en) * 2020-09-30 2021-01-01 辽宁工程技术大学 Multi-stage retractable anti-falling anchor rod structure and using method
CN113431517A (en) * 2021-06-23 2021-09-24 华能灵台邵寨煤业有限责任公司 Quick plugging device suitable for multi-aperture cyclic multiplexing orifice
CN113969579B (en) * 2021-09-29 2022-12-27 华北水利水电大学 Multistage expansion utricule stock device
CN113969579A (en) * 2021-09-29 2022-01-25 华北水利水电大学 Multistage expansion utricule stock device
CN114737565B (en) * 2022-04-29 2023-03-03 中国矿业大学 Fully-recyclable distributed end-bearing anchor rod and construction method thereof
CN114737565A (en) * 2022-04-29 2022-07-12 中国矿业大学 Fully-recyclable distributed end support anchor rod and construction method thereof
CN115125946A (en) * 2022-05-30 2022-09-30 广州环投增城环保能源有限公司 A cascading umbrella-shaped anchor rod
CN115341934A (en) * 2022-07-22 2022-11-15 广西民族大学 Anchoring method and structure of anchor rod with enlarged head
CN116065580A (en) * 2023-03-31 2023-05-05 中冶建筑研究总院有限公司 High-bearing-capacity multi-bag expansion anchor rod drilling and expanding structure and integrated construction method thereof
CN116427402A (en) * 2023-04-04 2023-07-14 上海市基础工程集团有限公司 An anti-floating anchoring device for underground structures
CN116623674A (en) * 2023-06-30 2023-08-22 南京工业大学 A foundation pit support device with controllable deformation and its construction method

Also Published As

Publication number Publication date
CN109778851B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
CN109778851A (en) Construction method of multi-stage expandable carrier bag grouting prestressed anchor rod
CN107119680B (en) A kind of anchor pole or pile foundation variable diameters steel reinforcement cage and application
WO2020238501A1 (en) Full-assembly pressure-bearing type variable-diameter steel cage expansion head anchor rod pile system
CN104179178B (en) A flexible umbrella-shaped support bolt and its method for supporting soil slopes
CN204080802U (en) A kind of flexible umbrella support anchor rod
CN206396816U (en) A kind of blower foundation various dimensions ruggedized construction
CN206736901U (en) A kind of anchor pole or pile foundation variable diameters steel reinforcement cage
CN105350531B (en) The pile tube anchor pole composite foundation and construction technology of tension compression bidirectional load can be born
CN110792095B (en) Multi-pile bearing platform-spiral anchor composite foundation
CN102191772A (en) Prefabricated reaming pile and construction method thereof
CN206521873U (en) A kind of reducing steel reinforcement cage and its enlarging anchor rod or pile foundation
CN210086280U (en) Expanded footing soil anchor rod-precast concrete composite iron tower foundation structure
CN105040693B (en) End expanding type anti-float anchor rod
CN109898527B (en) A construction method for bamboo root-shaped interlocking anchor reinforcement pile and unstable rock slope reinforcement
CN109469055B (en) Local pipe seam type end expansion energy-absorbing anchor rod and construction method thereof
CN105220706B (en) Fan foundation system with expanded-feet and pre-stressed anchors and construction method for fan foundation system
CN109778841A (en) Recoverable presstressed reinforcing steel bored concrete pile and its construction method for foundation pit enclosure
CN209837020U (en) Multistage expandable supporting body bag grouting prestressed anchor rod
CN205035789U (en) Reduce bored concrete pile negative frictional force device
CN201406687Y (en) Deep foundation pit supporting structure
CN207193962U (en) A kind of overhead transmission line concrete precast pipe pile is implanted into pile-driving system
CN205742179U (en) Mechanical linkage anti-pulling anchor rod
CN206581314U (en) Screw head muscle body posttension pile foundation
CN105822333B (en) Mechanical linkage Pulling-Resistant Anchor Rod
CN204385762U (en) A kind of Rock Bolt Foundation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209

CF01 Termination of patent right due to non-payment of annual fee