Beam-ends frame joint and its installation and replacement method Download PDFInfo
- Publication number
- CN109763418A CN109763418A CN201811578892.8A CN201811578892A CN109763418A CN 109763418 A CN109763418 A CN 109763418A CN 201811578892 A CN201811578892 A CN 201811578892A CN 109763418 A CN109763418 A CN 109763418A
- Authority
- CN
- China
- Prior art keywords
- end plate
- main steel
- steel plate
- concrete
- beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 45
- 239000010959 steel Substances 0.000 claims abstract description 45
- 238000000034 method Methods 0.000 claims description 4
- 238000005498 polishing Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 10
- 239000000463 material Substances 0.000 abstract description 5
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 3
- 240000005158 Phaseolus vulgaris Species 0.000 description 3
- 230000001066 destructive Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003313 weakening Effects 0.000 description 1
Abstract
The invention discloses bridge frame joint, including main steel plate, the main steel plate side is fixedly connected with the first connection board, and the main steel plate other side is fixedly connected with second connection end plate, is provided with lacing wire between first connection board and second connection end plate.In Replacement and Repair problem after disruption, connection type is connected by screw bolts, the replaceable component with splice plate, solves the problems, such as that building destroys damage location quick-replaceable, simple to install, construction is simple, consumption material is few, reduces expense.It is advantageous to the repairing construction after destruction, reduce operating expenses, improves the efficiency of construction.
Description
Technical field
The present invention relates to bridge construction technical fields.
Specifically, being to be related to a kind of installation of brutal or maintenance.
Background technique
In relation to research shows that following 50 years, China probably occur it is especially big, there is destructive earthquake, earthquake meeting
A degree of negative effect is caused to Chinese society and economic development.So we it is necessary to concrete structure bean column node
Performance comprehensively studied, and research and develop new ductile bean column node form, enhance the anti-seismic performance of bean column node, and in reality
It is applied in the engineering of border, reduces casualties and economic loss of the China in earthquake.
So to guarantee more " opposite " safety of column, therefore want " strong column and weak beam ".The mentality of designing of weakening type node is by right
Beam away from certain distance at beam-to-column joint is weakened, and is promoted plastic hinge to occur and extend in beam weak point, is dropped significantly
The low stress concentration phenomenon of node region, avoids node from occurring crack too early, to reach Ductility Design purpose, weak point phase
When in playing the role of fuse.Since plastic hinge occurs and extends in the weak point of beam, so that longer one section of beam is almost
Enter plasticity simultaneously, that is, has been truly realized Ductility Design, has given full play to the plastic property of steel, considerably increased the consumption of structure
It can performance.Replacement and Repair problem after destruction is another research direction of building field.For being connected by screw bolts, with spelling
The replaceable component of fishplate bar can solve the problems, such as to destroy building damage location quick-replaceable, simple to install, construction is simple, consumption
Material is few, reduces expense.It is advantageous to the repairing construction after destruction, reduce operating expenses, improves the efficiency of construction.
Strong column and weak beam is the structuring concept proposed from seismic design of structures angle.It is exactly that column is not broken prior to beam
It is bad, be locality, pillar, which destroys, will jeopardize the safety of total because beam destruction belongs to component damage --- it may be whole
Body collapses, and consequence is serious.
Concrete structure has reasonable utilization of materials, and normability is good, and durability and fire resistance are preferable, and maintenance cost is low, just
Degree is big, is easy to the advantages that gathering materials on the spot, have a wide range of applications field.
Summary of the invention
It is an object of the invention to overcome the shortcoming of above-mentioned traditional technology, a kind of structure of beam-ends frame joint is provided
With the method for installation and replacement.
The purpose of the present invention is what is reached by following technical measures: bridge frame joint, including main steel plate, feature
Be: the main steel plate side is fixedly connected with the first connection board, and the main steel plate other side is fixedly connected with the second connection
End plate is provided with lacing wire between first connection board and second connection end plate.
A kind of improvement as above-mentioned technical proposal: there are two the lacing wire settings, the lacing wire setting described in one of them
In one end of main steel plate, the other end of main steel plate is arranged in lacing wire described in another one.
A kind of improvement as above-mentioned technical proposal: described two lacing wires are symmetrical arranged relative to main steel plate, institute
State the width of lacing wire and the first connection board, second connection end plate it is of same size.
A kind of improvement as above-mentioned technical proposal: the side of the lacing wire is provided with the first notch, the lacing wire it is another
Side is provided with the second notch, and first notch and the second notch mirror symmetry are arranged.
A kind of improvement as above-mentioned technical proposal: first notch and the second notch be respectively formed one it is trapezoidal.
A kind of improvement as above-mentioned technical proposal: several connecting holes, institute are evenly arranged in first connection board
Connecting hole is stated across the first connection board, the side of main steel plate is arranged in several described connecting hole a part, and another part is set
It sets in the other side of main steel plate.
A kind of improvement as above-mentioned technical proposal: several connecting holes, institute are evenly arranged on the second connection end plate
Connecting hole is stated across the first connection board, the side of main steel plate is arranged in several described connecting hole a part, and another part is set
It sets in the other side of main steel plate.
A kind of improvement as above-mentioned technical proposal: described one end to the cantilever beam being arranged on support column far from support column
Portion polishes, and the one end of the cantilever beam far from support column is smooth without protrusion and pit, and the cantilever beam is far from support column
Cantilever beam end plate is fixedly installed in one end, and the cantilever beam end plate is fixed by screw or the method for concreting is consolidated with cantilever beam
Fixed integral, the beams of concrete is a rectangular configuration, and the both ends of the beams of concrete are polished, the beams of concrete
Beams of concrete end plate, the concrete are fixedly installed without protrusion and pit, the both ends of the beams of concrete after the polishing of both ends
Beam end plate is fixed by screw or the method for concreting is integrally fixed with beams of concrete.
A kind of improvement as above-mentioned technical proposal: in the bridge frame joint use process, wherein the first connecting pin
Plate is connected with transverse arm beam end plate, and the second connection end plate is connected with beams of concrete end plate.
A kind of improvement as above-mentioned technical proposal: solid by screw between first connection board and transverse arm beam end plate
Fixed connection setting, the second connection end plate are fixedly connected with setting by screw with beams of concrete end plate.
By adopting the above-described technical solution, compared with prior art, the invention has the advantages that the invention of this work is utilized and cuts
The mentality of designing of weak type node weakens the beam away from certain distance at beam-to-column joint by bridge frame joint, promotees
So that plastic hinge is occurred and is extended in beam weak point, reduces the stress concentration phenomenon of node region, node is avoided to occur too early
Crack, reaches Ductility Design purpose, and weak point plays the role of fuse.So that longer one section of beam almost enters modeling simultaneously
Property, that is, it has been truly realized Ductility Design, has given full play to the plastic property of steel, has increased the energy-dissipating property of structure.
In Replacement and Repair problem after disruption, connection type is connected by screw bolts, the replaceable component with splice plate,
Solve the problems, such as that building destroys damage location quick-replaceable, simple to install, construction is simple, consumption material is few, reduces expense.To broken
Repairing construction after bad is advantageous, reduces operating expenses, improves the efficiency of construction.
Present invention will be further explained below with reference to the attached drawings and specific embodiments.
Detailed description of the invention
Attached drawing 1 is the main view of beam-ends frame joint of the present invention.
Attached drawing 2 is the top view of beam-ends frame joint of the present invention.
Attached drawing 3 is the perspective view of beam-ends frame joint of the present invention and its installation and replacement method.
Specific embodiment
Embodiment 1: as shown in attached drawing 1-2, bridge frame joint, including main steel plate 2,2 side of main steel plate is fixed to be connected
It is connected to the first connection board 1-1,2 other side of main steel plate is fixedly connected with second connection end plate 1-2, first connecting pin
Lacing wire 3 is provided between plate 1-1 and second connection end plate 1-2.
There are two the settings of lacing wire 3, and one end of main steel plate 2, another one are arranged in the lacing wire 3 described in one of them
The other end of main steel plate 2 is arranged in the lacing wire 3.
Described two lacing wires 3 are symmetrical arranged relative to main steel plate 2, the width of the lacing wire 3 and the first connecting pin
Plate 1-1, second connection end plate 1-2 it is of same size.
The side of the lacing wire 3 is provided with the first notch 4-1, and the other side of the lacing wire 3 is provided with the second notch 4-2,
The first notch 4-1 and the second notch 4-2 mirror symmetry are arranged.
The first notch 4-1 and the second notch 4-2 be respectively formed one it is trapezoidal.
Several connecting holes are evenly arranged on the first connection board 1-1, the connecting hole passes through the first connection board
The side of main steel plate 2 is arranged in 1-1, several described connecting hole a part, and the other side of main steel plate 2 is arranged in another part.
Several connecting holes are evenly arranged on the second connection end plate 1-2, the connecting hole passes through the first connection board
The side of main steel plate 2 is arranged in 1-1, several described connecting hole a part, and the other side of main steel plate 2 is arranged in another part.
Embodiment 2: as illustrated in the accompanying drawings from 1 to 3, the installation and replacement method of bridge frame joint, including main steel plate 2, the master
2 side of steel plate is fixedly connected with the first connection board 1-1, and 2 other side of main steel plate is fixedly connected with second connection end plate 1-
2, lacing wire 3 is provided between the first connection board 1-1 and second connection end plate 1-2.
There are two the settings of lacing wire 3, and one end of main steel plate 2, another one are arranged in the lacing wire 3 described in one of them
The other end of main steel plate 2 is arranged in the lacing wire 3.
Described two lacing wires 3 are symmetrical arranged relative to main steel plate 2, the width of the lacing wire 3 and the first connecting pin
Plate 1-1, second connection end plate 1-2 it is of same size.
The side of the lacing wire 3 is provided with the first notch 4-1, and the other side of the lacing wire 3 is provided with the second notch 4-2,
The first notch 4-1 and the second notch 4-2 mirror symmetry are arranged, and the first notch 4-1 and the second notch 4-2 are respectively formed one
It is a trapezoidal.
Several connecting holes are evenly arranged on the first connection board 1-1, the connecting hole passes through the first connection board
The side of main steel plate 2 is arranged in 1-1, several described connecting hole a part, and the other side of main steel plate 2 is arranged in another part.
Several connecting holes are evenly arranged on the second connection end plate 1-2, the connecting hole passes through the first connection board
The side of main steel plate 2 is arranged in 1-1, several described connecting hole a part, and the other side of main steel plate 2 is arranged in another part.
Described to be polished far from the one end of support column the cantilever beam 5 being arranged on support column, the cantilever beam 5 is separate
One end of support column is smooth without protrusion and pit, and cantilever beam end plate 7-1 is fixedly installed far from one end of support column in the cantilever beam,
The cantilever beam end plate 7-1 is fixed by screw or the method for concreting is integrally fixed with cantilever beam 5, the concrete
Beam 6 is a rectangular configuration, and the both ends of the beams of concrete 6 are polished, without protrusion after the both ends polishing of the beams of concrete 6
And pit, the both ends of the beams of concrete 6 are fixedly installed beams of concrete end plate 7-2, the beams of concrete end plate 7-2 passes through
Screw is fixed or the method for concreting is integrally fixed with beams of concrete 6.
In the bridge frame joint use process, wherein the first connection board 1-1 is connected with transverse arm beam end plate 7-1,
The second connection end plate 1-2 is connected with beams of concrete end plate 7-2.
Setting is fixedly connected with by screw between the first connection board 1-1 and transverse arm beam end plate 7-1, described second connects
It meets end plate 1-2 and setting is fixedly connected with by screw with beams of concrete end plate 7-2.
Claims (10)
1. bridge frame joint, including main steel plate (2), it is characterised in that: main steel plate (2) side is fixedly connected with the first company
It connects end plate (1-1), main steel plate (2) other side is fixedly connected with second connection end plate (1-2), first connection board
Lacing wire (3) are provided between (1-1) and second connection end plate (1-2).
2. bridge frame joint according to claim 1, it is characterised in that: there are two lacing wire (3) settings, wherein one
In one end of main steel plate (2), lacing wire (3) described in another one is arranged in main steel plate (2) for a lacing wire (3) setting
The other end.
3. bridge frame joint according to claim 2, it is characterised in that: described two lacing wires (3) relative to
Main steel plate (2) is symmetrical arranged, the width of the lacing wire (3) and the width of the first connection board (1-1), second connection end plate (1-2)
It spends identical.
4. bridge frame joint according to claim 3, it is characterised in that: the side of the lacing wire (3) is provided with first
The other side of notch (4-1), the lacing wire (3) is provided with the second notch (4-2), first notch (4-1) and the second notch
The setting of (4-2) mirror symmetry.
5. bridge frame joint according to claim 4, it is characterised in that: first notch (4-1) and the second notch
(4-2) be respectively formed one it is trapezoidal.
6. according to claim 1-5 its any one of described in bridge frame joint, it is characterised in that: first connecting pin
Several connecting holes are evenly arranged on plate (1-1), the connecting hole passes through the first connection board (1-1), several connections
A part setting in hole is arranged in the side of main steel plate (2), another part in the other side of main steel plate (2).
7. bridge frame joint according to claim 6, it is characterised in that: on the second connection end plate (1-2) uniformly
Several connecting holes are provided with, the connecting hole passes through the first connection board (1-1), and several connecting hole a part settings exist
The side of main steel plate (2), another part are arranged in the other side of main steel plate (2).
8. the installation and replacement method of bridge frame joint described in -7 according to claim 1, it is characterised in that: described pair of branch
The cantilever beam (5) being arranged on dagger is polished far from the one end of support column, the one end of the cantilever beam (5) far from support column
It is smooth without protrusion and pit, the cantilever beam far from support column one end be fixedly installed cantilever beam end plate (7-1), the cantilever beam
End plate (7-1) is fixed by screw or the method for concreting is integrally fixed with cantilever beam (5), the beams of concrete (6)
Both ends for a rectangular configuration, the beams of concrete (6) are polished, without convex after the both ends polishing of the beams of concrete (6)
It rises and pit, the both ends of the beams of concrete (6) is fixedly installed beams of concrete end plate (7-2), the beams of concrete end plate
(7-2) is fixed by screw or the method for concreting is integrally fixed with beams of concrete (6).
9. the installation and replacement method of bridge frame joint according to claim 8, it is characterised in that: the bridge frame
In node use process, wherein the first connection board (1-1) is connected with transverse arm beam end plate (7-1), the second connection end plate
(1-2) is connected with beams of concrete end plate (7-2).
10. the installation and replacement method of bridge frame joint according to claim 9, it is characterised in that: described first connects
Connect and setting be fixedly connected with by screw between end plate (1-1) and transverse arm beam end plate (7-1), the second connection end plate (1-2) with
Beams of concrete end plate (7-2) is fixedly connected with setting by screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811578892.8A CN109763418A (en) | 2018-12-24 | 2018-12-24 | Beam-ends frame joint and its installation and replacement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811578892.8A CN109763418A (en) | 2018-12-24 | 2018-12-24 | Beam-ends frame joint and its installation and replacement method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109763418A true CN109763418A (en) | 2019-05-17 |
Family
ID=66450980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811578892.8A Pending CN109763418A (en) | 2018-12-24 | 2018-12-24 | Beam-ends frame joint and its installation and replacement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109763418A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113931056A (en) * | 2020-06-29 | 2022-01-14 | 中国二十冶集团有限公司 | Beam boot protection device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103255841A (en) * | 2013-05-31 | 2013-08-21 | 江苏科技大学 | Assembly-type concrete column-steel beam overhanging end plate type node connecting device |
CN106836484A (en) * | 2017-02-17 | 2017-06-13 | 北京工业大学 | A kind of end plate assembled corrugated web occlusion beam column node connection device for recovering function |
CN107143034A (en) * | 2017-07-11 | 2017-09-08 | 上海应用技术大学 | A kind of assembly concrete frame structure beam column rigid connection node |
CN206737120U (en) * | 2017-05-08 | 2017-12-12 | 无锡市房屋安全鉴定中心 | A kind of replaceable Prefabricated Concrete frame joint of the more circular hole splicing steel plates of beam-ends band |
KR20170139193A (en) * | 2016-06-08 | 2017-12-19 | 주식회사 포스코 | Seeel culumn strecture |
WO2018056437A1 (en) * | 2016-09-23 | 2018-03-29 | 新日鐵住金株式会社 | Beam-to-column connection structure, beam-to-column connection method, and reinforcement bar |
CN207176916U (en) * | 2017-06-09 | 2018-04-03 | 浙江长兴康华建筑安装工程有限公司 | A kind of steel construction central sill column node structure and the bracket for including the structure |
-
2018
- 2018-12-24 CN CN201811578892.8A patent/CN109763418A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103255841A (en) * | 2013-05-31 | 2013-08-21 | 江苏科技大学 | Assembly-type concrete column-steel beam overhanging end plate type node connecting device |
KR20170139193A (en) * | 2016-06-08 | 2017-12-19 | 주식회사 포스코 | Seeel culumn strecture |
WO2018056437A1 (en) * | 2016-09-23 | 2018-03-29 | 新日鐵住金株式会社 | Beam-to-column connection structure, beam-to-column connection method, and reinforcement bar |
CN106836484A (en) * | 2017-02-17 | 2017-06-13 | 北京工业大学 | A kind of end plate assembled corrugated web occlusion beam column node connection device for recovering function |
CN206737120U (en) * | 2017-05-08 | 2017-12-12 | 无锡市房屋安全鉴定中心 | A kind of replaceable Prefabricated Concrete frame joint of the more circular hole splicing steel plates of beam-ends band |
CN207176916U (en) * | 2017-06-09 | 2018-04-03 | 浙江长兴康华建筑安装工程有限公司 | A kind of steel construction central sill column node structure and the bracket for including the structure |
CN107143034A (en) * | 2017-07-11 | 2017-09-08 | 上海应用技术大学 | A kind of assembly concrete frame structure beam column rigid connection node |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113931056A (en) * | 2020-06-29 | 2022-01-14 | 中国二十冶集团有限公司 | Beam boot protection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4261607B2 (en) | Moment resistant structure, support member, and construction method | |
CN102758499B (en) | Precast prestressed steel girder with post-seismic restorable function | |
CN103590322B (en) | A kind of shear connector, combination beam and its construction method containing the shear connector | |
CN206157894U (en) | Improved generation assembled concrete beam -column joint connection structure | |
CN105569204A (en) | Replaceable beam-column joint earthquake damage control device | |
CN109989480B (en) | Assembled sliding friction type connecting structure of H-shaped steel beam and steel column | |
CN102644358A (en) | Steel coupling beam capable of being replaced after strong earthquake | |
CN109113189B (en) | Self-resetting circular steel tube concrete frame beam column joint with web plate provided with energy dissipation piece | |
CN108756412A (en) | Hinged assembly concrete shock frame structural system in beam | |
CN105672116A (en) | Prefabricated structure for steel-concrete combination beam | |
CN106120532A (en) | A kind of novel prefabricated assembled steel concrete composite beam bridge superstructure and processing technology thereof | |
CN109763418A (en) | Beam-ends frame joint and its installation and replacement method | |
KR101462843B1 (en) | Joint structure of steel column and steel beam, and joint structure of steel column and steel column and steel beam | |
CN102900166B (en) | Buckling restrained brace, as well as joint connecting plate and mounting method thereof | |
CN108612188B (en) | Assembled self-resetting prestressed concrete frame | |
KR101026012B1 (en) | Bridge deck dismantling method by means of united pulling jack and pier | |
CN106320517B (en) | Interchangeable upper end suspension type steel frame energy-dissipation beam column node after shake | |
CN105803939A (en) | Open steel tube and reinforced-concrete combined girder bridge structure | |
CN202347682U (en) | Buckling-restrained brace | |
CN104100017B (en) | Easily repair accentric support frame system | |
CN107795176B (en) | A kind of replaceable coupling beam of Self-resetting | |
CN209509171U (en) | A kind of connection structure when the dry construction for assembled between precast beam, column component | |
CN207003678U (en) | Replaceable bean column node with spliceosome with holes | |
CN110528377A (en) | Fashioned iron and concrete composite bridge | |
JP6489078B2 (en) | Floor slab support structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |