CN109750941A - Building template assembly and aluminum alloy window frame mounting method - Google Patents
Building template assembly and aluminum alloy window frame mounting method Download PDFInfo
- Publication number
- CN109750941A CN109750941A CN201910156347.8A CN201910156347A CN109750941A CN 109750941 A CN109750941 A CN 109750941A CN 201910156347 A CN201910156347 A CN 201910156347A CN 109750941 A CN109750941 A CN 109750941A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- window frame
- alloy window
- formwork
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000838 Al alloy Inorganic materials 0.000 title claims abstract description 77
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000009434 installation Methods 0.000 claims abstract description 24
- 238000005452 bending Methods 0.000 claims description 5
- 239000011248 coating agent Substances 0.000 claims description 4
- 238000000576 coating method Methods 0.000 claims description 4
- 238000005034 decoration Methods 0.000 claims description 2
- 238000009415 formwork Methods 0.000 claims 25
- 239000000853 adhesive Substances 0.000 claims 1
- 230000001070 adhesive effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 20
- 210000003205 muscle Anatomy 0.000 description 19
- 238000005266 casting Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 3
- 239000003292 glue Substances 0.000 description 3
- 239000012528 membrane Substances 0.000 description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 239000004411 aluminium Substances 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a building template component, wherein an aluminum alloy window frame which is used for connecting and being detachable from a front mold component and a rear mold component is arranged between the front mold component and the rear mold component, the front mold component, the rear mold component and the aluminum alloy window frame enclose a mold cavity, the aluminum alloy window frame comprises a frame body, and an embedded rib which extends into the mold cavity is arranged on the frame body. The invention also discloses an aluminum alloy window frame installation method, which comprises the following steps: a: preparing a front mold assembly and a rear mold assembly; b: the front die assembly and the rear die assembly are connected through an aluminum alloy window frame, the front die assembly and the rear die assembly enclose a die cavity together, the aluminum alloy window frame comprises a frame body, and embedded ribs are arranged on the frame body; c: pouring concrete in the mold cavity and curing to form a concrete wall; d: and detaching the front die assembly and the rear die assembly from the aluminum alloy window frame. By adopting the building template assembly and the aluminum alloy window frame mounting method to mount the aluminum alloy window frame, the construction progress can be improved, and the construction cost can be reduced.
Description
[technical field]
The present invention relates to a kind of building template assemblies, and the invention further relates to a kind of aluminum alloy window frame installation methods.
[background technique]
Aluminum alloy window frame can be all installed on concrete wall during architecture construction at present, traditional mounting means is logical
It crosses setscrew aluminum alloy window frame is fixed on concrete wall, needs to punch on concrete wall, the step such as embedment bolt
Suddenly, process is various, causes construction speed low, and construction cost is high, and the aluminum alloy window frame dimensional accuracy installed in this way is low, waterproof
Performance is poor.
Therefore, the present invention is based on above deficiency and generates.
[summary of the invention]
The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a kind of structure is simple, aluminum alloy window frame can be realized
The building template assembly of Fast Installation reduces construction cost to improve construction speed, and can ensure that aluminum alloy window frame is anti-
Aqueous more preferably to install flatness height, installation dimension precision is high.
The present invention also provides a kind of aluminum alloy window frame installation methods.Aluminum alloy window frame, construction speed are installed using this method
Fastly, construction cost is low, and the aluminum alloy window frame waterproof performance installed is more preferable, and installation flatness is high, and installation dimension precision is high.
The present invention is achieved by the following technical solutions:
A kind of building template assembly, it is characterised in that: including front die component 1 and back die component 2, the front die component 1
Be equipped between back die component 2 for connect the two and the aluminum alloy window frame 3 that can separate with the two, the front die component 1, after
Membrane module 2 and aluminum alloy window frame 3 surround the die cavity 5 for casting concrete wall 4, and the aluminum alloy window frame 3 includes framework
31, the framework 31, which is equipped with, to be extend into die cavity 5 and can be embedded in the embedded muscle 32 in concrete wall 4.
Building template assembly as described above, it is characterised in that: the front die component 1 include interconnected first before
Template 11, the second front template 12 and third front template 13, the back die component 2 include the first rear pattern plate 21, the second rear pattern plate
22 and third rear pattern plate 23, between second front template 12 and the second rear pattern plate 22 and 13 He of third front template
The aluminum alloy window frame 3 is equipped between third rear pattern plate 23.
Building template assembly as described above, it is characterised in that: second front template 12 and the second rear pattern plate 22
Inner sidewall is concordant with the inner sidewall of framework 31 between the two, the inner sidewall of the third front template 13 and third rear pattern plate 23
It is concordant with the inner sidewall of framework 31 between the two.
Building template assembly as described above, it is characterised in that: second front template 12, the second rear pattern plate 22,
Three front templates 13 and third rear pattern plate 23 are equipped with bayonet slot 6, and the framework 31, which is equipped with, to be engaged with corresponding bayonet slot 6
Strip 33.
Building template assembly as described above, it is characterised in that: the strip 33 is located at the two sides of framework 31 and to mould
The inclination of 5 side of chamber extends, and the bayonet slot 6 is skewed slot and matches with strip 33.
Building template assembly as described above, it is characterised in that: the embedded muscle 32 includes the linear extension into die cavity 5
Straight line muscle 321 and relative rectilinear muscle 321 bend bending muscle 322.
Building template assembly as described above, it is characterised in that: first front template 11 and the first rear pattern plate 21 it
Between be equipped with connection bolt 7 connecting the two.
A kind of aluminum alloy window frame installation method, characterized by the following steps:
A: preparation front die component 1 and back die component 2;
B: being connected front die component 1 and back die component 2 by aluminum alloy window frame 3, and the aluminum alloy window frame 3 is with before
Membrane module 1 and rear module 2 surround the die cavity 5 for casting concrete wall 4 together, and the aluminum alloy window frame 3 includes frame
Body 31, the framework 31, which is equipped with, to be extend into die cavity 5 and can be embedded in the embedded muscle 32 in concrete wall 4;
C: casting concrete and concrete wall 4 is solidified into die cavity 5;
D: front die component 1 and back die component 2 are separated with aluminum alloy window frame 3, aluminum alloy window frame 3 is then by being embedded in coagulation
Embedded muscle 32 in cob wall body 4 is fixed on concrete wall 4.
Aluminum alloy window frame installation method as described above, it is characterised in that: the front die component 1 includes interconnected
First front template 11, the second front template 12 and third front template 13, the back die component 2 include the first rear pattern plate 21, second
Rear pattern plate 22 and third rear pattern plate 23, mould between second front template 12 and the second rear pattern plate 22 and before the third
The aluminum alloy window frame 3, second front template 12, the second rear pattern plate are equipped between plate 13 and third rear pattern plate 23
22, it is equipped with bayonet slot 6 on third front template 13 and third rear pattern plate 23, the framework 31 is equipped with can be with corresponding bayonet
The strip 33 that slot 6 engages.
Aluminum alloy window frame installation method as described above, it is characterised in that: further include following steps after the step D:
Step E: filling out between concrete wall 4 and strip 33 and set structure glue 8, and setting finishing applies on concrete wall 4
Layer 9.
Compared with prior art, the present invention has the following advantages:
1, between the front die component and back die component of building template assembly of the present invention be equipped with for connect both and can be with two
The aluminum alloy window frame that person separates, front die component, back die component and aluminum alloy window frame surround the die cavity for casting concrete wall,
Aluminum alloy window frame includes framework, and framework, which is equipped with, to be extend into die cavity and can be embedded in the embedded muscle in concrete walls body.Therefore,
Aluminum alloy window frame becomes a part of building template assembly, in the casting process of concrete wall, burying on aluminum alloy window frame
If muscle is just poured into concrete walls body, to enable aluminum alloy to window frame and concrete wall to melt during one-pass molding to be one
Body avoids aluminum alloy window frame by the defect that construction speed is low and construction cost is high caused by expansion bolt installation, and
So that aluminum alloy window frame connect closer with concrete wall, waterproof performance is more preferable, and installation flatness is higher, installation dimension essence
Degree is high, improves construction quality.
2, aluminum alloy window frame installation method of the present invention is very simple, just by aluminum window in concrete wall casting process
The embedded muscle of frame is poured into concrete walls body, so that the installation of aluminum alloy window frame and pouring for concrete wall carry out simultaneously simultaneously
Combine together, save installation cost, waterproof performance is more preferable, installation flatness it is higher, substantially increase engineering construction into
Degree.
3, the use of building template assembly and aluminum alloy window frame installation method of the present invention can be improved construction speed, and reduction is applied
Work cost improves construction quality, is suitble to promote and apply.
[Detailed description of the invention]
Fig. 1 is the schematic diagram of building template assembly of the present invention;
Fig. 2 is schematic diagram of the building template assembly of the present invention in casting concrete wall;
Fig. 3 is the schematic diagram that aluminum alloy window frame is mounted on concrete wall;
Fig. 4 is the enlarged view in Fig. 2 at A;
Fig. 5 is the enlarged view in Fig. 3 at B.
[specific embodiment]
The invention will be further described below in conjunction with the accompanying drawings:
As shown in Figures 1 to 5, a kind of building template assembly, including front die component 1 and back die component 2, the preceding mould group
The aluminum alloy window frame 3 for connecting the two and can separate with the two, the front die component are equipped between part 1 and back die component 2
1, back die component 2 and aluminum alloy window frame 3 surround the die cavity 5 for casting concrete wall 4, and the aluminum alloy window frame 3 includes
Framework 31, the framework 31, which is equipped with, to be extend into die cavity 5 and can be embedded in the embedded muscle 32 in concrete wall 4.Aluminium closes
Golden window frame 3 becomes a part of building template assembly, embedded on aluminum alloy window frame 3 in the casting process of concrete wall 4
Muscle 32 is just poured into concrete wall 4, is melted during one-pass molding to enable aluminum alloy to window frame 3 with concrete wall 4
It is integrated, avoids aluminum alloy window frame 3 by expansion bolt and the defect that caused construction speed is low and construction cost is high is installed,
And aluminum alloy window frame 3 is made to connect closer with concrete wall 4, waterproof performance is more preferable, and installation flatness is higher, installation
Dimensional accuracy is high, improves construction quality.
As depicted in figs. 1 and 2, the front die component 1 includes the first front template 11 interconnected, the second front template 12
With third front template 13, the back die component 2 includes the first rear pattern plate 21, the second rear pattern plate 22 and third rear pattern plate 23, institute
Between the second front template 12 and the second rear pattern plate 22 stated and between the third front template 13 and third rear pattern plate 23
Equipped with the aluminum alloy window frame 3.First front template 11, the second front template 12, third front template 13, the first rear pattern plate 21,
Two rear pattern plates 22 and third rear pattern plate 23 can use aluminum alloy mould plate.
As depicted in figs. 1 and 2, the inner sidewall of second front template 12 and the second rear pattern plate 22 and frame between the two
The inner sidewall of body 31 is concordant, the inner sidewall of the third front template 13 and third rear pattern plate 23 and framework 31 between the two
Inner sidewall is concordant.
As shown in Figure 4 and Figure 5, second front template 12, the second rear pattern plate 22, third front template 13 and third rear mold
Plate 23 is equipped with bayonet slot 6, and the framework 31 is equipped with the strip 33 that can be engaged with corresponding bayonet slot 6.Pass through strip 33
Engaging with bayonet slot 6 and the connection for realizing aluminum alloy window frame 3 Yu front die component 1 and back die component 2, are connected firmly, Er Qie
It is also very convenient and efficient when front die component of dismantling 1 and back die component 2.
As shown in Figure 4 and Figure 5, the strip 33 is located at the two sides of framework 31 and tilts to 5 side of die cavity and extends, described
Bayonet slot 6 be skewed slot and to be matched with strip 33.Therefore, inclined bayonet slot 6 cooperates with inclined strip 33, so that aluminium alloy
Window frame 3 and front die component 1 and back die component 2 are connected firmly closely in casting process, avoid disengaging the thickness along concrete wall 4
Degree direction disengages and gap occurs, it is ensured that the quality of construction wall.
As shown in Figure 4 and Figure 5, the embedded muscle 32 includes the linearly extended straight line muscle 321 and relatively straight into die cavity 5
The bending muscle 322 that line muscle 321 is bent.The setting of bending muscle 322 enables to the connection of aluminum alloy window frame 3 Yu concrete wall 4
More securely.
As depicted in figs. 1 and 2, company connecting the two is equipped between first front template 11 and the first rear pattern plate 21
Connecting bolt 7.Front die component 1 and back die component 2 are connected firmly by connection bolt 7, so that keeping in 4 casting process of concrete wall
The stabilization of 5 size of die cavity, it is ensured that construction quality.
A kind of aluminum alloy window frame installation method, includes the following steps:
A: preparation front die component 1 and back die component 2;
B: being connected front die component 1 and back die component 2 by aluminum alloy window frame 3, and the aluminum alloy window frame 3 is with before
Membrane module 1 and rear module 2 surround the die cavity 5 for casting concrete wall 4 together, and the aluminum alloy window frame 3 includes frame
Body 31, the framework 31, which is equipped with, to be extend into die cavity 5 and can be embedded in the embedded muscle 32 in concrete wall 4, described
Front die component 1 includes the first front template 11 interconnected, the second front template 12 and third front template 13, the back die component
2 include the first rear pattern plate 21, the second rear pattern plate 22 and third rear pattern plate 23, second front template 12 and the second rear pattern plate 22
Between and the third front template 13 and third rear pattern plate 23 between be equipped with the aluminum alloy window frame 3, described the
Bayonet slot 6, the framework are equipped on two front templates 12, the second rear pattern plate 22, third front template 13 and third rear pattern plate 23
31 are equipped with the strip 33 that can be engaged with corresponding bayonet slot 6;
C: casting concrete and concrete wall 4 is solidified into die cavity 5;
D: front die component 1 and back die component 2 are separated with aluminum alloy window frame 3, aluminum alloy window frame 3 is then by being embedded in coagulation
Embedded muscle 32 in cob wall body 4 is fixed on concrete wall 4.
E: filling out between concrete wall 4 and strip 33 and set structure glue 8, the setting finishing coating 9 on concrete wall 4.
There are gaps between strip 33 and concrete wall 4, and coating decorative layer is relatively difficult in the gap, therefore pass through structure glue 8
It can be convenient the gap between Fast Filling strip 33 and concrete wall 4, avoid the occurrence of hollow structure, finishing coating 9 then rises
To the effect of beautiful decoration.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910156347.8A CN109750941A (en) | 2019-03-01 | 2019-03-01 | Building template assembly and aluminum alloy window frame mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910156347.8A CN109750941A (en) | 2019-03-01 | 2019-03-01 | Building template assembly and aluminum alloy window frame mounting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109750941A true CN109750941A (en) | 2019-05-14 |
Family
ID=66407996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910156347.8A Pending CN109750941A (en) | 2019-03-01 | 2019-03-01 | Building template assembly and aluminum alloy window frame mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109750941A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060025920A (en) * | 2004-09-18 | 2006-03-22 | 주식회사 알루폼스코리아 | Window frame fixing structure and construction method accordingly. |
CN103866885A (en) * | 2014-03-20 | 2014-06-18 | 中国建筑第二工程局有限公司 | Energy-saving heat-insulating structure of lighting window and construction method thereof |
CN104213800A (en) * | 2014-08-29 | 2014-12-17 | 中国建筑第八工程局有限公司 | Anti-seepage combined type aluminum alloy window and installing method thereof |
KR101508960B1 (en) * | 2014-01-17 | 2015-04-08 | (주)한국록셀보드 | A method for constructing a window sash on the outside insulation wall of structure |
CN106088537A (en) * | 2016-07-07 | 2016-11-09 | 中国建筑第二工程局有限公司 | Window auxiliary frame pre-embedding construction method |
CN106522745A (en) * | 2016-11-29 | 2017-03-22 | 钱志刚 | Fast installation type integrated window |
CN206174448U (en) * | 2016-08-16 | 2017-05-17 | 黄灿 | Concrete wall mould and concrete wall |
CN107514207A (en) * | 2017-08-10 | 2017-12-26 | 河南省第二建设集团有限公司 | The window frame and its construction technology used on a kind of fair-faced concrete wall |
CN107842197A (en) * | 2017-10-21 | 2018-03-27 | 广西广投同力德科技有限公司 | A kind of pull tab formula aluminum template system |
CN208089106U (en) * | 2017-09-21 | 2018-11-13 | 中民筑友科技投资有限公司 | A kind of window frame connector and prefabricated panel |
CN209874858U (en) * | 2019-03-01 | 2019-12-31 | 中山中瑞建筑装饰工程有限公司 | Building template assembly |
-
2019
- 2019-03-01 CN CN201910156347.8A patent/CN109750941A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060025920A (en) * | 2004-09-18 | 2006-03-22 | 주식회사 알루폼스코리아 | Window frame fixing structure and construction method accordingly. |
KR101508960B1 (en) * | 2014-01-17 | 2015-04-08 | (주)한국록셀보드 | A method for constructing a window sash on the outside insulation wall of structure |
CN103866885A (en) * | 2014-03-20 | 2014-06-18 | 中国建筑第二工程局有限公司 | Energy-saving heat-insulating structure of lighting window and construction method thereof |
CN104213800A (en) * | 2014-08-29 | 2014-12-17 | 中国建筑第八工程局有限公司 | Anti-seepage combined type aluminum alloy window and installing method thereof |
CN106088537A (en) * | 2016-07-07 | 2016-11-09 | 中国建筑第二工程局有限公司 | Window auxiliary frame pre-embedding construction method |
CN206174448U (en) * | 2016-08-16 | 2017-05-17 | 黄灿 | Concrete wall mould and concrete wall |
CN106522745A (en) * | 2016-11-29 | 2017-03-22 | 钱志刚 | Fast installation type integrated window |
CN107514207A (en) * | 2017-08-10 | 2017-12-26 | 河南省第二建设集团有限公司 | The window frame and its construction technology used on a kind of fair-faced concrete wall |
CN208089106U (en) * | 2017-09-21 | 2018-11-13 | 中民筑友科技投资有限公司 | A kind of window frame connector and prefabricated panel |
CN107842197A (en) * | 2017-10-21 | 2018-03-27 | 广西广投同力德科技有限公司 | A kind of pull tab formula aluminum template system |
CN209874858U (en) * | 2019-03-01 | 2019-12-31 | 中山中瑞建筑装饰工程有限公司 | Building template assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210791422U (en) | Building block combined mould | |
CN211279523U (en) | Resin bus joint casting mold | |
CN109750941A (en) | Building template assembly and aluminum alloy window frame mounting method | |
CN205530846U (en) | Integrated building system of modularization | |
CN209874858U (en) | Building template assembly | |
JP5319945B2 (en) | Model having disappearance model in part and casting method using the same | |
JPH11170267A (en) | Production of mold for molding tire | |
CN102310443A (en) | Method for producing solid wood composite door with filling type door core | |
CN111595656A (en) | Forming mold and preparation method for testing dissimilar concrete interface fracture performance | |
CN206530058U (en) | Plug-in type stair pour mould | |
CN214784903U (en) | Heat-insulation external wall panel | |
CN210999274U (en) | Adjustable laminated plate die | |
CN221774828U (en) | A partition board mold capable of being quickly adjusted and disassembled | |
CN206110605U (en) | Marble laminate flooring | |
CN103802203B (en) | The preparation method of decorative heat preservation one body composite board and die for preparation tool | |
CN111779182A (en) | A modular wall panel forming structure and a method for forming a modular wall panel | |
CN214531888U (en) | Take concrete placement template of wall body decoration | |
CN210023663U (en) | Casting mould | |
CN204266577U (en) | For the anchor structure Elastic forming board of moulded concrete styling panel | |
CN214819443U (en) | Prefabricated mould for water retaining platform of pipe well | |
CN108453866A (en) | A kind of preparation facilities and preparation method of semi-closed structure biscuit of ceramics | |
CN215054505U (en) | An insulating exterior wall panel | |
CN213742340U (en) | Windowsill coping construction structure based on BIM technology | |
CN220381774U (en) | Shaping mould after bonding of piano hammer and hammer handle | |
CN210148371U (en) | Prefabricated staircase mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190514 |
|
RJ01 | Rejection of invention patent application after publication |