CN109750793A - A kind of precast hollow wall column and its construction method - Google Patents
A kind of precast hollow wall column and its construction method Download PDFInfo
- Publication number
- CN109750793A CN109750793A CN201910020510.8A CN201910020510A CN109750793A CN 109750793 A CN109750793 A CN 109750793A CN 201910020510 A CN201910020510 A CN 201910020510A CN 109750793 A CN109750793 A CN 109750793A
- Authority
- CN
- China
- Prior art keywords
- open tubular
- tubular column
- column
- female
- male connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of precast hollow wall column and its construction methods, precast hollow wall column is made of the splicing of more piece open tubular column, the open tubular column is equipped with the internal cavities through both ends, open tubular column one end is equipped with female, the other end is equipped with male connector, spliced between adjacent open tubular column by male connector and female, be prefabricated in the factory open tubular column first, the male connector and female of open tubular column both ends three steps step type are reserved according to shape, prefabricated open tubular column is stitched together as needed, the male connector and female of adjacent vacant stem are to being correspondingly connected with, the steel reinforcement cage bound is transferred in the internal cavities of open tubular column, crossbeam reinforcing bar is bound on preformed hole on corresponding open tubular column, supporting beam template, finally it is poured the internal cavities of the sequential casting open tubular column on crossbeam top, after maintenance molding, complete the construction of precast hollow wall.The present invention constructs relative to traditional wall column, easy to operate, construction technology is simple, at low cost, high-efficient, ecological, environmental protective.
Description
Technical field
The present invention relates to house construction engineering field, it is related to a kind of room and builds assembled technology more particularly to a kind of precast hollow wall
Column and its construction method.
Background technique
During building house or mansion, it is necessary to first build and build foundation, then on this basis with reinforcing bar and mixed mud
The construction of main body is carried out, including wall column and crossbeam etc., traditional construction method are after arranging reinforcing steel bar shelf, to be wrapped up with template,
Then then placing concrete, compacting, coagulation forming are successively increased.The shortcoming of this construction method is exactly construction efficiency
Not high, template loss is excessive, and environmental pollution is serious, and is easy waste concrete in the construction process.
Existing prefabricated construction system be using prefabricated solid component as main member, it is cast-in-place through assembly, connection, part
Made of concrete structure.It is solid wall column that the shortcomings that this construction method, which is prefabricated wall column all, is the connection of upper and lower wall column
Difficulty is brought with part cast-in-place construction, and the quality after pile is difficult to control.
Summary of the invention
The purpose of the present invention is low for assembled wall column construction efficiency and excessive, existing prefabricated wall column pile is lost in template
Quality is difficult to control and the problems such as connecting portion constructional difficulties, and it is simple to provide a kind of construction technology, at low cost, high-efficient, ecological
Precast hollow wall column and its construction method.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is that:
A kind of precast hollow wall column, it is characterised in that: be made of the splicing of more piece open tubular column, the open tubular column, which is equipped with, runs through two
The internal cavities at end, open tubular column one end are equipped with female, and the other end is equipped with male connector, passes through male connector and female between adjacent open tubular column
Splicing forms complete concrete wall column, male connector and female composition connection in internal cavities placing concrete after the completion of splicing
Part.
As an improvement, the open tubular column lower end of bottommost is flush end or is connected with ground by connector, the sky of top
Stem top is flush end or is connected with crossbeam by connector.
As an improvement, the end of the open tubular column is that three steps are stepped, wherein the middle part of highest step is equipped with protrusion, most
The matched groove of protrusion on size and adjacent vacant stem is equipped in the middle part of low step, the ladder at open tubular column both ends is contrary, so that
Open tubular column one end is male connector, and the other end is female.
As an improvement, the ladder table top at the male connector end is equipped with several connection sleeves or connection reinforcing bar, the female
The ladder table top at end is equipped with the corresponding connection reinforcing bar of quantity and position or connection sleeve.
As an improvement, the connection sleeve is higher than ladder table top, and when so that adjacent vacant stem docking, the ladder table top of male connector
There is gap between the ladder table top of female, when adjacent vacant stem internal cavities are poured concrete, concrete is by the rank of male connector
Gap between halfpace face and the ladder table top of female is filled up.
As an improvement, open tubular column end face cavity mouth surrounding each ladder table top up to less be equipped with a connection reinforcing bar or
Person connects sleeve.
As an improvement, the connection reinforcing bar is equipped with unidirectional groove, the connection sleeve is equipped with unidirectional tooth, so that connection
Reinforcing bar can be inserted into the one-way movement of connection sleeve, and the connection sleeve is expansion sleeve, and connection sleeve, which is equipped with, pricks muscle, work as connection
When reinforcing bar and connection sleeve fix, tightened by pricking muscle.
As an improvement, the ladder table top of the hollow column end is intilted inclined-plane, so that ladder table top is generally
Wedge shape.
As an improvement, the open tubular column upper side is equipped with the preformed hole for installing crossbeam.
A kind of precast hollow wall column construction method, which comprises the following steps:
Step 1, precast hollow column, be prefabricated in the factory open tubular column, according to hollow column dimension assembling reinforcement, then inside and outside installation
Template is fixed between inner and outer template with pull rod, the male connector and female of open tubular column both ends three steps step type is reserved according to shape, is poured
Prefabricated open tubular column is obtained after note maintenance molding;
Prefabricated open tubular column, is stitched together by step 2, open tubular column splicing installation as needed, the public affairs of adjacent vacant stem
Head and female, in the ladder table top preset clearance of adjacent hollow column end, are transferred to being correspondingly connected in the internal cavities of open tubular column
The steel reinforcement cage bound;
Step 3, installation crossbeam, bind crossbeam reinforcing bar, supporting beam template on corresponding open tubular column on preformed hole;
Step 4, casting, according to being first poured crossbeam lower part, being poured crossbeam again, the sequential casting for being finally poured crossbeam top is empty
The internal cavities of stem after maintenance molding, complete the construction of precast hollow wall.
The medicine have the advantages that
The present invention uses structure for the male connector of mirror type and female connection type, so that the duplicate mould of each open tubular column
Block, male connector and female use staged, and Tai Ji door tilts, and form wedge shape, so that open tubular column Aligning degree is significantly when installation
It improves, can be effectively prevented because contraposition caused by open tubular column self weight process is difficult to install, while presetting and running through in open tubular column
The inner wall cavity at both ends, after open tubular column is installed as needed, the casting concrete in internal cavities completes last system
To make, such beam column had not only had the cast-in-place intensity of tradition but also had had the convenient degree of assembled beam-column installation and meet construction period,
The advantages of being provided simultaneously with cast-in-place beam column and fabricated construction, relative to conventional wall column construction method, it is of the invention it is easy to operate, apply
Work simple process and low cost, high-efficient, ecological, environmental protective.
Detailed description of the invention
Fig. 1 is the molding open tubular column structural schematic diagram (male connector) of factory process.
Fig. 2 is the molding open tubular column structural schematic diagram (female) of factory process.
Fig. 3 is A-A cross-sectional view in Fig. 1.
Fig. 4 is two sections of open tubular column connection installation relation schematic diagrames.
Fig. 5 is that open tubular column connects into precast hollow wall column structural schematic diagram.
Fig. 6 is connection reinforcing bar and connection sleeve installation relation schematic diagram.
1- open tubular column, 2- male connector, 3- female, 4- highest step, 5- middle bench, the minimum step of 6-, 7- protrusion, 8- are recessed
Slot, 9- connection sleeve, 10- connection reinforcing bar, 11- internal cavities, the unidirectional groove of 12-, the unidirectional tooth of 13-, 14- preformed hole, 15- are vertical
Muscle, 16- stirrup, 17- crossbeam, 18- cast-in-place concrete, 19- concrete, 20- prick muscle.
Specific embodiment
With reference to the accompanying drawing to mode of the invention and implementation steps further instruction
As depicted in figs. 1 and 2, a kind of precast hollow wall column is made of the splicing of more piece open tubular column 1, and the open tubular column 1 is equipped with
Internal cavities 11 through both ends, 1 one end of open tubular column are equipped with female 3, and the other end is equipped with male connector 2, leads between adjacent open tubular column 1
It crosses male connector 2 and female 3 is spliced, in 11 placing concrete 19 of internal cavities after the completion of splicing, form complete concrete wall column, it is public
First 2 and female 3 form connector, 1 lower end of open tubular column of bottommost is flush end or is connected with ground by connector, top
Open tubular column 1 at the top of flush end or to be connected with crossbeam by connector, in the present embodiment, the end of the open tubular column 1 is three
Step is stepped, and wherein the middle part of highest step 4 is equipped with protrusion 7, is equipped on size and adjacent vacant stem 1 in the middle part of minimum step 6
Raised 7 matched grooves 8, the ladder at 1 both ends of open tubular column is contrary, so that 1 one end of open tubular column is male connector 2, the other end is mother
First 3, the ladder table top at 2 end of male connector is equipped with several connection reinforcing bars 10, and the ladder table top at 3 end of female is equipped with quantity
Connection sleeve 9 corresponding with position, 1 upper side of open tubular column are equipped with the preformed hole 14 for installing crossbeam 17.
In the present embodiment, 1 end face cavity mouth surrounding of open tubular column each ladder table top up to less be equipped with a connection steel
Muscle 10 or connection sleeve 9, as depicted in figs. 1 and 2, in the present embodiment, each rank of 1 male end surface cavity mouth surrounding of open tubular column
Halfpace face is equipped with a connection reinforcing bar 10, and each ladder table top of female end face cavity mouth surrounding is equipped with a connection sleeve
9。
As an improvement embodiment, the connection sleeve 9 be higher than ladder table top so that adjacent vacant stem 1 dock when,
There is gap between the ladder table top of male connector 2 and the ladder table top of female 3, is poured concrete in 1 internal cavities 11 of adjacent vacant stem
When, the gap between the ladder table top of male connector 2 and the ladder table top of female 3 is filled up in cast-in-place concrete 18.
As a kind of specific embodiment, the connection reinforcing bar 10 is equipped with unidirectional groove 12, and 9 inner wall of connection sleeve is set
There is unidirectional tooth 13, the connection insertion of reinforcing bar 10 is enabled to connect the one-way movement of sleeve 9, the connection sleeve 9 is expansion sleeve, even
Female connector cylinder 9, which is equipped with, pricks muscle 20, when connecting reinforcing bar 10 and connection sleeve 9 fixes, is tightened by pricking muscle 20.
As a kind of specific embodiment, the ladder table top of 1 end of open tubular column is intilted inclined-plane, so that ladder
Table top is generally wedge-shaped, is conducive to improve the bonding strength between connected open tubular column 1, to prevent neighbouring open tubular column 1 from installing
When, relatively transverse movement (left and right or back-and-forth motion).
Open tubular column 1 is formed in factory process in the embodiment of the present invention, using batch production, modularization, standardized production.First
8 vertical muscle 15 of respective diameters are selected to be longitudinally arranged according to the load-bearing requirements of wall column, stirrup 16 is wanted according to construction and calculating
Ask binding as shown in Figure 2 equidistant to vertical muscle 15, then inner membrance and external mold be installed, it is inside and outside touch between fixed with pull rod, strictly press
It reserves the internal cavities 11 of open tubular column 1 according to construction drawing, the preformed hole 14 of crossbeam 17 is installed and as the three of male connector 2 and female 3
Step ladder type end side, casting concrete form and do dabbing processing.
A kind of precast hollow wall column construction method, comprising the following steps:
Step 1, precast hollow column 1, be prefabricated in the factory open tubular column 1, according to 1 size assembling reinforcement of open tubular column, then installs
Inner and outer template is fixed between inner and outer template with pull rod, 2 He of male connector of 1 both ends of open tubular column, three step step type is reserved according to shape
Female 3 obtains prefabricated open tubular column 1 after casting maintenance molding;
Prefabricated open tubular column 1, is stitched together by step 2, the splicing installation of open tubular column 1 as needed, adjacent vacant stem 1
To being correspondingly connected with, the ladder table top preset clearance in 1 end of adjacent vacant stem is empty in the inside of open tubular column 1 for male connector 2 and female 3
Chamber 11 transfers the steel reinforcement cage bound, specifically: open tubular column 1 is lifted at the scene using crane, so that an open tubular column 1
The connection reinforcing bar 10 of end is inserted into the connection sleeve 9 of 1 end of adjacent vacant stem, and 1 end of adjacent vacant stem, three step is stepped wrong
Position docking, and have gap between the ladder table top of male connector 2 and the ladder table top of female 3, and do dabbing processing, wait formwork to pour
Build concrete;
Step 3, installation crossbeam 17, bind 17 reinforcing bar of crossbeam, supporting crossbeam 17 on corresponding open tubular column 1 on preformed hole 14
Template;
Step 4, casting are finally poured the sequence on 17 top of crossbeam according to being first poured 17 lower part of crossbeam, being poured crossbeam 17 again
The internal cavities 11 of open tubular column 1 are poured, after maintenance molding, complete the construction of precast hollow wall.
It is to be noted that in the embodiment of the present invention, crossbeam 17 both can whole cast-in-sites, can also be at 17 end of crossbeam
Portion's reserved steel bar is only poured the end that crossbeam 17 is connect with open tubular column 1.
Claims (10)
1. a kind of precast hollow wall column, it is characterised in that: be made of the splicing of more piece open tubular column, the open tubular column, which is equipped with, runs through both ends
Internal cavities, open tubular column one end is equipped with female, and the other end is equipped with male connector, is spelled between adjacent open tubular column by male connector and female
It connects, in internal cavities placing concrete after the completion of splicing, forms complete concrete wall column, male connector and female form connector.
2. precast hollow wall column as described in claim 1, it is characterised in that: the open tubular column lower end of bottommost be flush end or with
Ground is connected by connector, and the open tubular column top of top is flush end or is connected with crossbeam by connector.
3. precast hollow wall column as described in claim 1, it is characterised in that: the end of the open tubular column is three step ladders
Type, wherein the middle part of highest step is equipped with protrusion, and size is equipped in the middle part of minimum step and protrusion on adjacent vacant stem is matched recessed
The ladder of slot, open tubular column both ends is contrary, so that open tubular column one end is male connector, the other end is female.
4. precast hollow wall column as claimed in claim 3, it is characterised in that: the ladder table top at the male connector end is equipped with several
The ladder table top that connection sleeve perhaps connects the reinforcing bar female end is equipped with the corresponding connection reinforcing bar of quantity and position or company
Female connector cylinder.
5. precast hollow wall column as claimed in claim 4, it is characterised in that: the connection sleeve is higher than ladder table top, so that
When adjacent vacant stem docks, there is gap between the ladder table top of male connector and the ladder table top of female, it is empty inside adjacent vacant stem
When chamber is poured concrete, concrete fills up the gap between the ladder table top of male connector and the ladder table top of female.
6. precast hollow wall column as claimed in claim 4, it is characterised in that: in each rank of open tubular column end face cavity mouth surrounding
At least provided with a connection reinforcing bar or connection sleeve on halfpace face.
7. precast hollow wall column as claimed in claim 4, it is characterised in that: the connection reinforcing bar is equipped with unidirectional groove, institute
It states connection sleeve and is equipped with unidirectional tooth, connection reinforcing bar is enabled to be inserted into the one-way movement of connection sleeve, the connection sleeve is swollen
Expansion set cylinder, connection sleeve, which is equipped with, pricks muscle, when connecting reinforcing bar and connection sleeve fixes, is tightened by pricking muscle.
8. precast hollow wall column as claimed in claim 4, it is characterised in that: the ladder table top of the hollow column end is inside
Inclined inclined-plane, so that ladder table top is generally wedge-shaped.
9. the precast hollow wall column as described in claim 1 to 8 any one, it is characterised in that: the open tubular column upper side is set
There is the preformed hole for installing crossbeam.
10. a kind of precast hollow wall column construction method, which comprises the following steps:
Step 1, precast hollow column, be prefabricated in the factory open tubular column, according to hollow column dimension assembling reinforcement, then installs interior external mold
Plate is fixed between inner and outer template with pull rod, the male connector and female of open tubular column both ends three steps step type is reserved according to shape, is poured
Prefabricated open tubular column is obtained after maintenance molding;
Step 2, open tubular column splicing installation, prefabricated open tubular column is stitched together as needed, the male connector of adjacent vacant stem and
Female is to being correspondingly connected with, and in the ladder table top preset clearance of adjacent hollow column end, transfers binding in the internal cavities of open tubular column
Good steel reinforcement cage;
Step 3, installation crossbeam, bind crossbeam reinforcing bar, supporting beam template on corresponding open tubular column on preformed hole;
Step 4, casting are finally poured the sequential casting open tubular column on crossbeam top according to being first poured crossbeam lower part, being poured crossbeam again
Internal cavities, maintenance molding after, complete precast hollow wall construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910020510.8A CN109750793A (en) | 2019-01-09 | 2019-01-09 | A kind of precast hollow wall column and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910020510.8A CN109750793A (en) | 2019-01-09 | 2019-01-09 | A kind of precast hollow wall column and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109750793A true CN109750793A (en) | 2019-05-14 |
Family
ID=66405304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910020510.8A Pending CN109750793A (en) | 2019-01-09 | 2019-01-09 | A kind of precast hollow wall column and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109750793A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630017A (en) * | 2019-09-30 | 2019-12-31 | 重庆华硕建设有限公司 | Construction joint forming device for plate-shaped component |
CN112049327A (en) * | 2020-08-13 | 2020-12-08 | 浙江省建筑科学设计研究院有限公司 | Semi-grouting sleeve assembly and mounting method thereof |
CN115434451A (en) * | 2022-10-19 | 2022-12-06 | 华北理工大学 | Fabricated concrete connecting structure and construction method |
US11952768B1 (en) | 2022-10-19 | 2024-04-09 | North China University Of Science And Technology | Fabricated concrete connection structure and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2223154Y (en) * | 1994-12-16 | 1996-03-27 | 上海钢铁工艺技术研究所 | Sleeve barrel for cold-press connecting bar |
JP2008255626A (en) * | 2007-04-04 | 2008-10-23 | Meiken Kogyo Kk | Method for joining wooden member |
CN103422620A (en) * | 2013-08-27 | 2013-12-04 | 陕西建科兴业钢结构有限公司 | Prefabricated hollow steel-reinforced concrete column and splicing structure and splicing method thereof |
CN203452268U (en) * | 2013-08-21 | 2014-02-26 | 南阳市行知专利技术服务有限公司 | Box-type combined concrete column |
CN105164361A (en) * | 2013-04-29 | 2015-12-16 | 国际壳牌研究有限公司 | Insert and method for directional drilling |
CN207436045U (en) * | 2017-11-02 | 2018-06-01 | 山东科技大学 | A kind of prefabricated hollow steel pipe pile |
CN108678167A (en) * | 2018-08-04 | 2018-10-19 | 四川建安装配式工程科技股份有限公司 | Shape for hat beam column connection part, beam column package assembly and installation method using the beam column connection part |
-
2019
- 2019-01-09 CN CN201910020510.8A patent/CN109750793A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2223154Y (en) * | 1994-12-16 | 1996-03-27 | 上海钢铁工艺技术研究所 | Sleeve barrel for cold-press connecting bar |
JP2008255626A (en) * | 2007-04-04 | 2008-10-23 | Meiken Kogyo Kk | Method for joining wooden member |
CN105164361A (en) * | 2013-04-29 | 2015-12-16 | 国际壳牌研究有限公司 | Insert and method for directional drilling |
CN203452268U (en) * | 2013-08-21 | 2014-02-26 | 南阳市行知专利技术服务有限公司 | Box-type combined concrete column |
CN103422620A (en) * | 2013-08-27 | 2013-12-04 | 陕西建科兴业钢结构有限公司 | Prefabricated hollow steel-reinforced concrete column and splicing structure and splicing method thereof |
CN207436045U (en) * | 2017-11-02 | 2018-06-01 | 山东科技大学 | A kind of prefabricated hollow steel pipe pile |
CN108678167A (en) * | 2018-08-04 | 2018-10-19 | 四川建安装配式工程科技股份有限公司 | Shape for hat beam column connection part, beam column package assembly and installation method using the beam column connection part |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630017A (en) * | 2019-09-30 | 2019-12-31 | 重庆华硕建设有限公司 | Construction joint forming device for plate-shaped component |
CN110630017B (en) * | 2019-09-30 | 2022-01-14 | 重庆华硕建设有限公司 | Construction joint forming device for plate-shaped component |
CN112049327A (en) * | 2020-08-13 | 2020-12-08 | 浙江省建筑科学设计研究院有限公司 | Semi-grouting sleeve assembly and mounting method thereof |
CN115434451A (en) * | 2022-10-19 | 2022-12-06 | 华北理工大学 | Fabricated concrete connecting structure and construction method |
US11952768B1 (en) | 2022-10-19 | 2024-04-09 | North China University Of Science And Technology | Fabricated concrete connection structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109750793A (en) | A kind of precast hollow wall column and its construction method | |
CN205935421U (en) | Novel full grout sleeve that can spacing reinforcing bar | |
CN115977276B (en) | Assembled wall connecting piece and construction method | |
CN214833726U (en) | Prefabricated steel tube bundle shear wall | |
CN212427769U (en) | Interlocking building block for mould-disassembly-free constructional column | |
CN211848867U (en) | Tooth groove type prefabricated bridge pier and bearing platform connecting structure | |
CN108442413B (en) | Prefabricated tunnel wall horizontal seam reinforcing structure and splicing method | |
CN207079770U (en) | A kind of T-shaped reinforced concrete wall cavity body structure | |
CN215631065U (en) | Precast beam convenient to equipment and preparation mould thereof | |
CN215055316U (en) | Primary and secondary beam node post-cast section template device | |
CN210767213U (en) | Novel public building conversion beam column node structure | |
CN206034655U (en) | Connecting sleeve and prefab of application and connected node of prefab thereof | |
CN211257076U (en) | Utility tunnel bottom plate and side wall connection structure | |
CN210798044U (en) | Wallboard in prefabricated of assembly type structure | |
CN209308158U (en) | A kind of precast shear wall using cast-in-place connection type | |
CN114134805A (en) | Prefabricated pier adopting splicing and construction method | |
CN210217164U (en) | Concrete 3D prints component casing and structure | |
CN209244001U (en) | A kind of precast shear wall | |
CN207121999U (en) | A kind of precast concrete connector | |
CN218562324U (en) | Be suitable for precast module of cushion cap of single pile | |
CN117587922B (en) | High-efficient assembled concrete connected node structure | |
CN216196149U (en) | Prefabricated reinforced concrete slab stair component | |
CN219138055U (en) | Assembled green toughness crack resistance building wall form | |
CN109869044A (en) | A kind of modularization dismounting enclosure wall | |
CN219826367U (en) | Assembled integral precast concrete earthquake-resistant wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190514 |