CN109736585A - Shear wall, floor total-prefabricated construction safety protecting method - Google Patents
Shear wall, floor total-prefabricated construction safety protecting method Download PDFInfo
- Publication number
- CN109736585A CN109736585A CN201910162878.8A CN201910162878A CN109736585A CN 109736585 A CN109736585 A CN 109736585A CN 201910162878 A CN201910162878 A CN 201910162878A CN 109736585 A CN109736585 A CN 109736585A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- layer
- railing
- floor
- superimposed sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention relates to the realm of building construction, especially a kind of shear wall, floor total-prefabricated construction safety protecting method carry out: prefabricated panel, the pre-buried railing fixed link of panel tops as follows;Railing is made, railing is mounted on panel tops, wallboard and railing are lifted into installation site and block-by-block is installed;Superimposed sheet is installed, superimposed sheet carries out tying up the pre-buried pipeline laying of muscle, floor after being installed, and pours in-situ layer after the installation of first layer wallboard;It pours completion maintenance and reaches and second layer wallboard is installed after intensity, remove the railing that first layer wallboard correspond to installation site, installation personnel safety belt is fixed near installation site on floor or the guard rail neighbouring with installation site;Second layer wallboard installs second layer superimposed sheet after being installed, superimposed sheet is tied up the pre-buried pipeline of muscle, floor and is laid with after being installed, pour in-situ layer, and maintenance reaches intensity after the completion of pouring;It repeats the above steps and each outer wall of floor plate is installed.The present invention is convenient for disassembly and assembly, and securely and reliably, construction cost is low.
Description
Technical field
The present invention relates to the realm of building construction, especially a kind of shear wall, floor total-prefabricated construction safety protecting method.
Background technique
Assembled architecture is the new industry in building industry, and related construction technology is new technology mostly, with tradition
The form of construction work of complete cast-in-place building be very different.Within for outer shear wall, floor total-prefabricated construction, scene exists
Minimal amount of concrete cast-in-situ construction, Side fascia, lining, superimposed sheet, stair, balcony slab etc. are all that batch production is prefabricated, scene
Lifting installation is merely possible to the security protection when components such as work team's installation Side fascia, superimposed sheet when using external scaffolding.When
When scaffold is only used as safety prevention measure, cost input is too high, and current assembled architecture has outside using Side fascia when constructing
Side install protective fence way, but such way need on Side fascia reserving hole to install protective fence;The drawbacks of such method
It is that the reserving hole water-proofing treatment on Side fascia is difficult, it is easy to cause external wall leak, post-processing difficulty and cost
It puts into huge.
Summary of the invention
In order to solve the above technical problems, the present invention proposes that convenient for disassembly and assembly, the safe and reliable shear wall of one kind, floor assemble entirely
Formula building safety means of defence.
The present invention adopts the following technical scheme:
A kind of shear wall, floor total-prefabricated construction safety protecting method carry out as follows:
1) prefabricated panel, in the pre-buried railing fixed link in the top of wallboard;
2) railing is made, railing is mounted on to the top of wallboard, the length of railing is consistent with the length of wallboard plane, passes through tower crane
Wallboard and railing are lifted into specified installation site together, block-by-block is installed, after the installation of first layer wallboard is in place, wallboard top
The railing in portion forms enclosed protective fence;
3) superimposed sheet is installed, superimposed sheet is carried out tying up the pre-buried pipeline laying of muscle, floor after being installed, be poured after the installation of first layer wallboard
In-situ layer is built, maintenance reaches floor decoration intensity after the completion of pouring;
4) maintenance installs second layer wallboard after reaching intensity, when installing second layer wallboard, by the corresponding first layer wall of installation site
Guard rail disassembly on plate, installation personnel safety belt are fixed on installation site nearby floor or the protection neighbouring with installation site
On railing;
5) second layer superimposed sheet is installed, superimposed sheet carries out tying up muscle, floor pre-buried after being installed after second layer wallboard is installed
Pipeline is laid with, and pours in-situ layer, and maintenance reaches intensity after the completion of pouring;
6) it repeats the above steps and each outer wall of floor plate is installed.
Compared with prior art, the beneficial effects of the present invention are:
The present invention can be avoided the through-hole for remaining for fixed protection column in advance on wallboard, keep wallboard whole without waterproof weak spot;Wall
Dismountable railing at the top of plate replaces outer protective scaffold, convenient for disassembly and assembly, saves cost.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of wallboard;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the scheme of installation of wallboard;
In figure: wallboard 1;Railing fixed link 2;Railing 3;Upright bar 301.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
Referring to attached drawing: a kind of shear wall, floor total-prefabricated construction safety protecting method carry out as follows:
1) prefabricated panel, in the pre-buried railing fixed link in the top of wallboard.
2) railing is made, the upright bar of railing is made by steel pipe, and vertical rod sleeve is fixed in the railing for being embedded in panel tops
On bar, the length of railing is consistent with the length of wallboard plane, and wallboard and railing are lifted into specified installation together by tower crane
Position, block-by-block are installed, and after the installation of first layer wallboard is in place, wallboard formed enclosed anti-encirclement along architectural plane one week
Column plays the role of security protection when installing superimposed sheet.
3) superimposed sheet is installed after the installation of first layer wallboard, superimposed sheet carries out tying up the pre-buried pipeline paving of muscle, floor after being installed
If pouring in-situ layer, maintenance reaches floor decoration intensity after the completion of pouring.
4) maintenance installs second layer wallboard after reaching intensity, when installing second layer wallboard, by installation site corresponding first
Guard rail disassembly on layer wallboard, installation personnel safety belt are fixed on installation site floor or neighbouring with installation site nearby
On guard rail;Sequence installation the second layer wallboard when, be installed to where, the protective fence on the first layer wallboard of corresponding position
Bar is removed, and non-installation position is not removed, and is always maintained at integrally closed protection state.
5) second layer superimposed sheet is installed, superimposed sheet carries out tying up muscle, floor after being installed after second layer wallboard is installed
Pre-buried pipeline is laid with, and pours in-situ layer, and maintenance reaches intensity after the completion of pouring.
6) it repeats the above steps and each outer wall of floor plate is installed, security protection is constantly in closed state.
The above is only a specific embodiment of the invention, but are not limited thereto to protection of the invention, all this technologies
Field technical staff it is thinkable to the technical program technical characteristic propose equivalent change or replacement, all cover in this hair
Within bright protection scope.
Claims (1)
1. a kind of shear wall, floor total-prefabricated construction safety protecting method, which is characterized in that carry out as follows:
1) prefabricated panel, in the pre-buried railing fixed link in the top of wallboard;
2) railing is made, railing is mounted on to the top of wallboard, the length of railing is consistent with the length of wallboard plane, passes through tower crane
Wallboard and railing are lifted into installation site together, block-by-block is installed, after the installation of first layer wallboard is in place, the column of panel tops
Bar forms enclosed protective fence;
3) superimposed sheet is installed, superimposed sheet is carried out tying up the pre-buried pipeline laying of muscle, floor after being installed, be poured after the installation of first layer wallboard
In-situ layer is built, maintenance reaches floor decoration intensity after the completion of pouring;
4) maintenance installs second layer wallboard after reaching intensity, when installing second layer wallboard, by the corresponding first layer wall of installation site
Guard rail disassembly on plate, installation personnel safety belt are fixed on installation site nearby floor or the protection neighbouring with installation site
On railing;
5) second layer superimposed sheet is installed, superimposed sheet carries out tying up muscle, floor pre-buried after being installed after second layer wallboard is installed
Pipeline is laid with, and pours in-situ layer, and maintenance reaches intensity after the completion of pouring;
6) it repeats the above steps and each outer wall of floor plate is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910162878.8A CN109736585A (en) | 2019-03-05 | 2019-03-05 | Shear wall, floor total-prefabricated construction safety protecting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910162878.8A CN109736585A (en) | 2019-03-05 | 2019-03-05 | Shear wall, floor total-prefabricated construction safety protecting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109736585A true CN109736585A (en) | 2019-05-10 |
Family
ID=66369366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910162878.8A Pending CN109736585A (en) | 2019-03-05 | 2019-03-05 | Shear wall, floor total-prefabricated construction safety protecting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109736585A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20001948U1 (en) * | 2000-02-03 | 2000-03-23 | Baumann Verwertungsgesellschaft Gmbh, 88471 Laupheim | Protective scaffold to be used in construction |
US20060180390A1 (en) * | 2005-02-01 | 2006-08-17 | Ken Thaler | Roof edge fall protection apparatus |
CN204370825U (en) * | 2014-11-21 | 2015-06-03 | 长沙远大住宅工业集团有限公司 | Assembled architecture faces frontier defense protection unit |
CN105113851A (en) * | 2015-09-14 | 2015-12-02 | 上海建工二建集团有限公司 | Multifunctional prefabricated assembled building construction fence and construction method thereof |
CN106968381A (en) * | 2017-04-28 | 2017-07-21 | 广东省建科建筑设计院有限公司 | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection |
-
2019
- 2019-03-05 CN CN201910162878.8A patent/CN109736585A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20001948U1 (en) * | 2000-02-03 | 2000-03-23 | Baumann Verwertungsgesellschaft Gmbh, 88471 Laupheim | Protective scaffold to be used in construction |
US20060180390A1 (en) * | 2005-02-01 | 2006-08-17 | Ken Thaler | Roof edge fall protection apparatus |
CN204370825U (en) * | 2014-11-21 | 2015-06-03 | 长沙远大住宅工业集团有限公司 | Assembled architecture faces frontier defense protection unit |
CN105113851A (en) * | 2015-09-14 | 2015-12-02 | 上海建工二建集团有限公司 | Multifunctional prefabricated assembled building construction fence and construction method thereof |
CN106968381A (en) * | 2017-04-28 | 2017-07-21 | 广东省建科建筑设计院有限公司 | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11655641B2 (en) | Construction building equipment and construction method thereof | |
CN106703416B (en) | Steel roof truss dead man hanging method in small space | |
ITFI20100096A1 (en) | "A COMPLEX OF PREFABRICATED ELEMENTS TO FORM A PREFABRICATED BUILDING AT AT LEAST TWO PLANS AND RELATED BUILDING AND INSTALLATION PROCEDURE" | |
CN110512719B (en) | Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence | |
CN102561690A (en) | Construction method for supporting structures on two sides of post-cast strip by use of brick column | |
CN209194697U (en) | A kind of prefabricated balcony of assembled architecture | |
CN104131688B (en) | The special external hanging type job platform of assembled architecture and method of operating thereof | |
CN203625942U (en) | Basement outer wall post-cast strip ahead water stopping structure | |
CN108798059A (en) | A kind of old masonry seismic reinforcing structure and construction method | |
CN104234447B (en) | Deep foundation ditch tool-type hangs stair | |
KR100579440B1 (en) | Formwork-reinforced PC panels and assembly structures thereof | |
CN206352388U (en) | A kind of special scaffold of dual operation platform elevator | |
CN103061508A (en) | Triangular slip form device and construction method for the same triangular slip form | |
CN102733608A (en) | Construction method for spray head layer of granulation tower | |
CN205976167U (en) | Based on cast -in -place floor structures of detachable positioning control spare | |
TWI673418B (en) | External wall cantilever construction platform and its assembly method | |
CN204645093U (en) | Basement outer wall post-cast strip advanced treatment structure | |
CN114837088A (en) | A kind of construction method of bearing platform on highway | |
CN109736585A (en) | Shear wall, floor total-prefabricated construction safety protecting method | |
KR100934376B1 (en) | Elevating and lowering platform and method of movement | |
CN106193621A (en) | Fabricated construction superimposed sheet string hangs construction method | |
KR100901016B1 (en) | Exterior Wall Scaffolding Safety Bracket of Building | |
KR20210141194A (en) | Construction Method and Device of Wall and Floor Structure in Elevator's Machine Room in Apartment Building and Office Using Hanging Structural Method by Steel and Deck Plate in Top-down Structure | |
KR20040076245A (en) | Wall structure with method of R.C steel reinforcing ground assembly(assembly plant) the method of estalishment with pulling up | |
CN204384738U (en) | Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |