CN109702578B - An end face treatment device for building construction pipelines that is convenient for fixing different sizes - Google Patents
An end face treatment device for building construction pipelines that is convenient for fixing different sizes Download PDFInfo
- Publication number
- CN109702578B CN109702578B CN201910088929.7A CN201910088929A CN109702578B CN 109702578 B CN109702578 B CN 109702578B CN 201910088929 A CN201910088929 A CN 201910088929A CN 109702578 B CN109702578 B CN 109702578B
- Authority
- CN
- China
- Prior art keywords
- support plate
- telescopic rod
- rotating rod
- rod
- telescopic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
- Grinding Of Cylindrical And Plane Surfaces (AREA)
Abstract
本发明公开了一种便于固定不同尺寸的建筑施工管道端面处理装置,包括底板,所述底板的左端上表面固定安装有第一伸缩杆,所述第一伸缩杆的顶端固定连接有支撑板,所述把手的右端固定安装有第一齿盘,所述支撑板的上端内部活动连接有转杆,所述转杆的中间通过螺栓安装连接有活动筒,所述第二伸缩杆的上端固定连接有电机,所述第二打磨块的外表面固定安装有第二打磨块,所述转杆的右端外表面等角度连接有第三伸缩杆。该便于固定不同尺寸的建筑施工管道端面处理装置,打磨全面均匀,可以手动控制圆形端面的打磨程度和效果,有对管道内部的撑圆结构,对管道夹紧结构的高度和夹紧范围方便调节,有对废屑的集中收集装置。
The invention discloses an end surface treatment device for building construction pipelines of different sizes which is convenient for fixing, comprising a base plate, a first telescopic rod is fixedly installed on the upper surface of the left end of the base plate, and a support plate is fixedly connected to the top of the first telescopic rod; The right end of the handle is fixedly installed with a first toothed plate, the upper end of the support plate is movably connected with a rotating rod, the middle of the rotating rod is connected with a movable cylinder through bolts, and the upper end of the second telescopic rod is fixedly connected There is a motor, a second grinding block is fixedly installed on the outer surface of the second grinding block, and a third telescopic rod is equiangularly connected to the outer surface of the right end of the rotating rod. The end face treatment device for building construction pipelines of different sizes is easy to fix, and the grinding is uniform across the board. The grinding degree and effect of the circular end face can be manually controlled. Adjustment, there is a centralized collection device for waste.
Description
技术领域technical field
本发明涉及建筑施工相关技术领域,具体为一种便于固定不同尺寸的建筑施工管道端面处理装置。The invention relates to the related technical field of building construction, in particular to an end surface treatment device of a building construction pipeline which is convenient for fixing different sizes.
背景技术Background technique
在建筑施工过程中,常常会用到送水、送油等问题,必然用到不同长度、内径和不同形状的管道,所以需要通过管道切割装置进行切割,而管道在切割之后,在切割的这个端面会留有毛刺,考虑到这些毛刺会影响管道与管道之间连接的封闭性,从而影响输送效率,长时间使用会存在一定的安全隐患,目前多是工人直接手动去除毛刺,耗费大量的劳动力。In the process of building construction, water supply, oil supply and other issues are often used, and pipes of different lengths, inner diameters and shapes must be used, so it needs to be cut by a pipe cutting device, and after the pipe is cut, the end face of the cutting is There will be burrs. Considering that these burrs will affect the tightness of the connection between the pipeline and the pipeline, thus affecting the transmission efficiency, there will be certain safety hazards in long-term use. At present, most workers directly remove the burrs manually, which consumes a lot of labor.
但是现有的建筑施工管道端面处理装置例如公告号为CN 107627167 A的一种建筑用管道端面高效处理装置在使用过程中存在着以下问题:对管道端面的打磨范围有限,打磨不够全面均匀,无法手动控制圆形端面的打磨程度和效果,无法保证环形端面的平整度;没有对管道内部的撑圆结构,管道在打磨时的稳定性不够,对管道夹紧结构的高度和夹紧范围均不方便调节,同时没有缓冲效果;没有对废屑的集中收集装置,容易导致废屑杂乱。However, the existing construction pipeline end surface treatment device, such as a high-efficiency treatment device for construction pipeline end surface with the announcement number of CN 107627167 A, has the following problems in the use process: the grinding range of the pipeline end surface is limited, the grinding is not comprehensive and uniform, and the Manual control of the grinding degree and effect of the circular end face cannot guarantee the flatness of the annular end face; there is no circular support structure inside the pipe, the stability of the pipe during grinding is not enough, and the height and clamping range of the pipe clamping structure are not satisfied. It is easy to adjust and has no buffering effect; there is no centralized collection device for waste, which easily leads to messy waste.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种便于固定不同尺寸的建筑施工管道端面处理装置,以解决上述背景技术中提出的对管道端面的打磨范围有限,打磨不够全面均匀,无法手动控制圆形端面的打磨程度和效果,无法保证环形端面的平整度;没有对管道内部的撑圆结构,管道在打磨时的稳定性不够,对管道夹紧结构的高度和夹紧范围均不方便调节,同时没有缓冲效果;没有对废屑的集中收集装置,容易导致废屑杂乱的问题。The object of the present invention is to provide a pipeline end surface treatment device for building construction that is convenient for fixing different sizes, so as to solve the problem that the grinding range of the pipeline end surface proposed in the above background technology is limited, the grinding is not comprehensive and uniform, and the grinding degree of the circular end surface cannot be manually controlled. and effect, the flatness of the annular end face cannot be guaranteed; there is no support circle structure inside the pipe, the stability of the pipe during grinding is not enough, the height and clamping range of the pipe clamping structure are inconvenient to adjust, and there is no buffer effect; There is no centralized collection device for waste, which easily leads to the problem of clutter.
为实现上述目的,本发明提供如下技术方案:一种便于固定不同尺寸的建筑施工管道端面处理装置,包括底板,所述底板的左端上表面固定安装有第一伸缩杆,且第一伸缩杆的上端外侧紧密贴合设置有第一弹簧,所述第一伸缩杆的顶端固定连接有支撑板,且支撑板的下端内部贯穿设置有把手,所述把手的右端固定安装有第一齿盘,所述支撑板的上端内部活动连接有转杆,且转杆的左侧外表面固定安装有第二齿盘,所述转杆的中间通过螺栓安装连接有活动筒,且活动筒的上表面固定连接有第二伸缩杆,所述第二伸缩杆的上端固定连接有电机,且电机的右端固定安装有第一打磨块,所述第一打磨块的外表面固定安装有第二打磨块,所述转杆的右端外表面等角度连接有第三伸缩杆,且第三伸缩杆远离转杆的一侧外表面紧密贴合设置有第二弹簧,所述第三伸缩杆远离转杆的一端固定安装有滚轮,所述转杆的右端通过螺栓安装连接有活动块,且活动块的下端固定安装有风扇,所述第一伸缩杆的右侧设置有收集槽,且收集槽的右侧设置有第四伸缩杆,所述第四伸缩杆的上端固定连接有外支板,且外支板的内表面等角度设置有第三弹簧,并且第三弹簧上固定连接有内支板,所述外支板的前后两侧上表面均固定连接有螺纹杆。In order to achieve the above purpose, the present invention provides the following technical solutions: an end surface treatment device for building construction pipelines of different sizes that is easy to fix, comprising a base plate, and a first telescopic rod is fixedly installed on the upper surface of the left end of the base plate, and the first telescopic rod is The outer side of the upper end is closely fitted with a first spring, the top end of the first telescopic rod is fixedly connected with a support plate, and the lower end of the support plate is internally provided with a handle, and the right end of the handle is fixedly installed with a first toothed plate, so The upper end of the support plate is movably connected with a rotating rod, and the left outer surface of the rotating rod is fixedly installed with a second toothed plate, the middle of the rotating rod is connected with a movable cylinder through bolts, and the upper surface of the movable cylinder is fixedly connected There is a second telescopic rod, the upper end of the second telescopic rod is fixedly connected with a motor, and the right end of the motor is fixedly installed with a first grinding block, the outer surface of the first grinding block is fixedly installed with a second grinding block, the A third telescopic rod is equiangularly connected to the outer surface of the right end of the rotating rod, and the outer surface of the side of the third telescopic rod away from the rotating rod is closely fitted with a second spring, and the end of the third telescopic rod away from the rotating rod is fixedly installed There is a roller, the right end of the rotating rod is connected with a movable block by bolts, and the lower end of the movable block is fixedly installed with a fan, the right side of the first telescopic rod is provided with a collection groove, and the right side of the collection groove is provided with a second Four telescopic rods, the upper end of the fourth telescopic rod is fixedly connected with an outer support plate, and the inner surface of the outer support plate is provided with a third spring at an equal angle, and an inner support plate is fixedly connected to the third spring, and the outer support plate is fixedly connected to the third spring. The upper surfaces of the front and rear sides of the plate are fixedly connected with threaded rods.
优选的,所述支撑板在底板上为升降结构,且第一伸缩杆关于支撑板前后对称设置有2组。Preferably, the support plate is a lifting structure on the bottom plate, and two sets of the first telescopic rods are symmetrically arranged in front and rear with respect to the support plate.
优选的,所述把手、第一齿盘、第二齿盘和转杆构成连动结构,且转杆在支撑板的内部为转动结构。Preferably, the handle, the first toothed plate, the second toothed plate and the rotating rod form a linkage structure, and the rotating rod is a rotating structure inside the support plate.
优选的,所述转杆包括轴体、第一安装孔和第二安装孔,轴体的中间外表面等间距开设有第一安装孔,轴体的右端外表面开设有第二安装孔。Preferably, the rotating rod includes a shaft body, a first installation hole and a second installation hole, the middle outer surface of the shaft body is provided with the first installation holes at equal intervals, and the outer surface of the right end of the shaft body is provided with the second installation hole.
优选的,所述活动筒在轴体的外表面为滑动结构,且活动筒通过第一安装孔与轴体相连接,并且电机在活动筒的外侧为伸缩结构。Preferably, the movable cylinder has a sliding structure on the outer surface of the shaft body, and the movable cylinder is connected with the shaft body through the first mounting hole, and the motor has a telescopic structure on the outside of the movable cylinder.
优选的,所述第三伸缩杆和滚轮均关于转杆的中心对称设置有4组,且滚轮在转杆的外侧为伸缩结构。Preferably, four sets of the third telescopic rod and the roller are symmetrically arranged with respect to the center of the rotating rod, and the roller is a telescopic structure on the outside of the rotating rod.
优选的,所述活动块在转杆的右端为转动结构,且活动块通过第二安装孔与轴体相连接,活动块呈“T”字型结构,且活动块的上端部分呈“U”字型结构。Preferably, the movable block is a rotating structure at the right end of the rotating rod, and the movable block is connected to the shaft body through the second mounting hole, the movable block is in a "T" shape, and the upper end of the movable block is in a "U" shape font structure.
优选的,所述收集槽的上表面呈倾斜结构,且收集槽的右边缘与第二打磨块的右表面在同一平面上,并且第一打磨块和第二打磨块构成“T”字型结构。Preferably, the upper surface of the collection groove is in an inclined structure, the right edge of the collection groove and the right surface of the second grinding block are on the same plane, and the first grinding block and the second grinding block form a "T"-shaped structure .
优选的,所述第四伸缩杆关于外支板前后对称设置有2组,且外支板在底板上为升降结构。Preferably, two groups of the fourth telescopic rods are symmetrically arranged in front and rear with respect to the outer support plate, and the outer support plate is a lifting structure on the bottom plate.
优选的,所述内支板和外支板构成伸缩结构,且外支板的中间和内支板均呈弧形结构,并且外支板和内支板在螺纹杆上均设置有2组。Preferably, the inner support plate and the outer support plate form a telescopic structure, the middle of the outer support plate and the inner support plate are arc structures, and both the outer support plate and the inner support plate are provided with two groups on the threaded rod.
与现有技术相比,本发明的有益效果是:该便于固定不同尺寸的建筑施工管道端面处理装置,对管道端面的打磨范围可调,打磨全面均匀,可以手动控制圆形端面的打磨程度和效果,保证环形端面打磨的平整度,有对管道内部的撑圆结构,管道在打磨时的稳定性较高,对管道夹紧结构的高度和夹紧范围方便调节,同时有缓冲效果,有对废屑的集中收集装置;Compared with the prior art, the beneficial effects of the present invention are as follows: the end face treatment device for building construction pipelines of different sizes can be easily fixed, the grinding range of the pipe end face is adjustable, the grinding is uniform in all aspects, and the grinding degree and the grinding degree of the circular end face can be manually controlled. Effect, to ensure the smoothness of the annular end face grinding, there is a round structure for the inside of the pipe, the stability of the pipe during grinding is high, the height and clamping range of the pipe clamping structure are easily adjusted, and at the same time, it has a buffering effect, which is suitable for Centralized collection device for waste;
1、通过设置有把手、转杆、活动筒和第二伸缩杆,可以手动转动把手,在齿盘啮合的作用下带动转杆和电机转动,可以对管道端面的一圈进行打磨,且可以控制每一处的打磨时长,使端面打磨更加平整,由于活动筒方便拆卸安装以及第二伸缩杆的伸缩作用,调节打磨块贴紧管道的内外表面,使打磨更加全面有效;1. By being provided with a handle, a rotating rod, a movable cylinder and a second telescopic rod, the handle can be manually rotated, and the rotating rod and the motor can be driven to rotate under the action of the toothed disc meshing, which can grind a circle of the end face of the pipe, and can control The grinding time of each place makes the end surface grinding more flat. Due to the convenient disassembly and installation of the movable cylinder and the telescopic effect of the second telescopic rod, the grinding block is adjusted to stick to the inner and outer surfaces of the pipe, so that the grinding is more comprehensive and effective;
2、通过设置有第三伸缩杆、第二弹簧和滚轮,通过第三伸缩杆的伸缩作用方便带动滚轮进行管道的内径撑起,且第二弹簧的缓冲效果增加管道稳定性,在滚轮的作用下保证第三伸缩杆能够更随转杆转动;2. By being provided with a third telescopic rod, a second spring and a roller, it is convenient to drive the roller to support the inner diameter of the pipe through the telescopic action of the third telescopic rod, and the buffering effect of the second spring increases the stability of the pipe, and the role of the roller to ensure that the third telescopic rod can rotate with the rotating rod;
3、通过设置有活动块、风扇和收集槽,通过在转杆的右端安装活动块和风扇,方便将废屑从管道的内部吹出,再通过收集槽进行收集;3. By providing a movable block, a fan and a collection groove, and by installing a movable block and a fan on the right end of the rotating rod, it is convenient to blow the waste from the inside of the pipe, and then collect it through the collection groove;
4、通过设置有外支板、第三弹簧、内支板和螺纹杆,通过螺纹杆的作用下方便随意调节2组外支板、内支板之间的距离,从而方便放置不同内径的管道,通过螺纹杆的作用将管道进行夹紧固定,同时通过多组第三弹簧进行缓冲。4. By being provided with an outer support plate, a third spring, an inner support plate and a threaded rod, the distance between the two groups of outer support plates and the inner support plate can be adjusted freely under the action of the threaded rod, so as to facilitate the placement of pipes with different inner diameters , the pipe is clamped and fixed by the action of the threaded rod, and buffered by a plurality of groups of third springs at the same time.
附图说明Description of drawings
图1为本发明正视剖面结构示意图;Fig. 1 is the front view sectional structure schematic diagram of the present invention;
图2为本发明第二伸缩杆和支撑板的侧视结构示意图;Fig. 2 is the side view structure schematic diagram of the second telescopic rod and the support plate of the present invention;
图3为本发明外支板、内支板、第四伸缩杆和螺纹杆连接的侧视结构示意图;Figure 3 is a schematic side view of the structure of the connection between the outer support plate, the inner support plate, the fourth telescopic rod and the threaded rod of the present invention;
图4为本发明转杆结构示意图;FIG. 4 is a schematic view of the structure of the rotating rod of the present invention;
图5为本发明转杆和活动筒安装的侧视剖面结构示意图;Fig. 5 is the side view sectional structure schematic diagram of the installation of the rotating rod and the movable cylinder of the present invention;
图6为本发明图1中A处放大结构示意图;Fig. 6 is the enlarged structural schematic diagram of A place in Fig. 1 of the present invention;
图7为本发明图1中B处放大结构示意图;Fig. 7 is the enlarged structural schematic diagram at B in Fig. 1 of the present invention;
图8为本发明活动块与转杆安装的侧视剖面结构示意图。FIG. 8 is a schematic cross-sectional view of the side view of the installation of the movable block and the rotating rod according to the present invention.
图中:1、底板;2、第一伸缩杆;3、第一弹簧;4、支撑板;5、把手;6、第一齿盘;7、转杆;701、轴体;702、第一安装孔;703、第二安装孔;8、第二齿盘;9、活动筒;10、第二伸缩杆;11、电机;12、第一打磨块;13、第二打磨块;14、第三伸缩杆;15、第二弹簧;16、滚轮;17、活动块;18、风扇;19、收集槽;20、第四伸缩杆;21、外支板;22、第三弹簧;23、内支板;24、螺纹杆。In the figure: 1. Bottom plate; 2. The first telescopic rod; 3. The first spring; 4. The support plate; 5. The handle; Installation hole; 703, the second installation hole; 8, the second toothed plate; 9, the movable cylinder; 10, the second telescopic rod; 11, the motor; 12, the first grinding block; 13, the second grinding block; 14, the first Three telescopic rods; 15, the second spring; 16, the roller; 17, the movable block; 18, the fan; 19, the collection groove; 20, the fourth telescopic rod; 21, the outer support plate; 22, the third spring; 23, the inner Support plate; 24, threaded rod.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-8,本发明提供一种技术方案:一种便于固定不同尺寸的建筑施工管道端面处理装置,包括底板1、第一伸缩杆2、第一弹簧3、支撑板4、把手5、第一齿盘6、转杆7、第二齿盘8、活动筒9、第二伸缩杆10、电机11、第一打磨块12、第二打磨块13、第三伸缩杆14、第二弹簧15、滚轮16、活动块17、风扇18、收集槽19、第四伸缩杆20、外支板21、第三弹簧22、内支板23和螺纹杆24,底板1的左端上表面固定安装有第一伸缩杆2,且第一伸缩杆2的上端外侧紧密贴合设置有第一弹簧3,第一伸缩杆2的顶端固定连接有支撑板4,且支撑板4的下端内部贯穿设置有把手5,把手5的右端固定安装有第一齿盘6,支撑板4的上端内部活动连接有转杆7,且转杆7的左侧外表面固定安装有第二齿盘8,转杆7的中间通过螺栓安装连接有活动筒9,且活动筒9的上表面固定连接有第二伸缩杆10,第二伸缩杆10的上端固定连接有电机11,且电机11的右端固定安装有第一打磨块12,第一打磨块12的外表面固定安装有第二打磨块13,转杆7的右端外表面等角度连接有第三伸缩杆14,且第三伸缩杆14远离转杆7的一侧外表面紧密贴合设置有第二弹簧15,第三伸缩杆14远离转杆7的一端固定安装有滚轮16,转杆7的右端通过螺栓安装连接有活动块17,且活动块17的下端固定安装有风扇18,第一伸缩杆2的右侧设置有收集槽19,且收集槽19的右侧设置有第四伸缩杆20,第四伸缩杆20的上端固定连接有外支板21,且外支板21的内表面等角度设置有第三弹簧22,并且第三弹簧22上固定连接有内支板23,外支板21的前后两侧上表面均固定连接有螺纹杆24。Please refer to FIGS. 1-8 , the present invention provides a technical solution: an end surface treatment device for building construction pipelines of different sizes that is easy to fix, comprising a bottom plate 1 , a first
如图1-2中支撑板4在底板1上为升降结构,且第一伸缩杆2关于支撑板4前后对称设置有2组,方便调节支撑板4和转杆7的高度,使转杆7的中轴线始终与管道的中心保持在同一水平线上,如图1中把手5、第一齿盘6、第二齿盘8和转杆7构成连动结构,且转杆7在支撑板4的内部为转动结构,方便手动控制转杆7的转动,从而控制第二打磨块13在端面任意处的打磨时长,使打磨更加平整。As shown in Figure 1-2, the
如图4中转杆7包括轴体701、第一安装孔702和第二安装孔703,轴体701的中间外表面等间距开设有第一安装孔702,轴体701的右端外表面开设有第二安装孔703,方便活动筒9和活动块17的安装调节,如图5-6中活动筒9在轴体701的外表面为滑动结构,且活动筒9通过第一安装孔702与轴体701相连接,并且电机11在活动筒9的外侧为伸缩结构,通过活动筒9和第二伸缩杆10的作用方便调节第一打磨块12和第二打磨块13,使其对管道的端面、上边缘、下边缘均进行打磨,使打磨的更加全面。As shown in FIG. 4 , the
如图7中第三伸缩杆14和滚轮16均关于转杆7的中心对设置有4组,且滚轮16在转杆7的外侧为伸缩结构,从管道的内部进行支撑,增加稳定性,如图8中活动块17在转杆7的右端为转动结构,且活动块17通过第二安装孔703与轴体701相连接,活动块17呈“T”字型结构,且活动块17的上端部分呈“U”字型结构,方便调节风扇18的角度,将管道内部的废屑进行集中收集。As shown in FIG. 7 , the third
如图1中收集槽19的上表面呈倾斜结构,且收集槽19的右边缘与第二打磨块13的右表面在同一平面上,并且第一打磨块12和第二打磨块13构成“T”字型结构,方便更好的收集到收集槽19的内部,方便工作人员清理,如图1-3中第四伸缩杆20关于外支板21前后对称设置有2组,且外支板21在底板1上为升降结构,方便根据管道的高度位置直接调节外支板21和内支板23的高度将管道进行支撑。As shown in FIG. 1 , the upper surface of the
如图1-3中内支板23和外支板21构成伸缩结构,且外支板21的中间和内支板23均呈弧形结构,并且外支板21和内支板23在螺纹杆24上均设置有2组,方便夹紧不同内径的管道,且具有更好的缓冲效果。As shown in Figures 1-3, the
工作原理:首先将装置推动到管道的附近,然后根据管道的高度尺寸对第四伸缩杆20进行调节,直至下端的外支板21和内支板23接触并支撑住管道,然后再将第四伸缩杆20旋紧固定,再将上侧的外支板21和内支板23向下滑动夹紧在管道的上表面,旋紧螺纹杆24外表面的螺帽从而将管道进行夹紧固定,通过第三弹簧22进行缓冲作用,然后根据管道的高度对应调节第一伸缩杆2,使转杆7的右端位于管道的中心位置,然后伸缩调节4组第三伸缩杆14,使滚轮16紧密贴合在管道的内表面,并对活动块17和风扇18的角度进行调节和固定,接着调节活动筒9的安装位置,使第二打磨块13紧密贴合在管道的左端面,然后将电机11接通电源通过第二打磨块13对端面进行打磨,并通过操作把手5来控制第二打磨块13在端面上的位置和打磨时长,从而使端面打磨更加平整,再拆卸安装活动筒9和调节第二伸缩杆10,使第一打磨块12分别紧贴在管道左端边缘的内外表面,依次进行打磨,使打磨更加全面,并且在打磨的过程中,通过风扇18的作用将管道内部聚拢的废屑吹动到收集槽19的内部进行收集,这就是该装置的工作原理以及操作方法。Working principle: first push the device to the vicinity of the pipeline, and then adjust the fourth
最后应当说明的是,以上内容仅用以说明本发明的技术方案,而非对本发明保护范围的限制,本领域的普通技术人员对本发明的技术方案进行的简单修改或者等同替换,均不脱离本发明技术方案的实质和范围。Finally, it should be noted that the above content is only used to illustrate the technical solution of the present invention, rather than limiting the protection scope of the present invention. The essence and scope of the technical solution of the invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910088929.7A CN109702578B (en) | 2019-01-30 | 2019-01-30 | An end face treatment device for building construction pipelines that is convenient for fixing different sizes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910088929.7A CN109702578B (en) | 2019-01-30 | 2019-01-30 | An end face treatment device for building construction pipelines that is convenient for fixing different sizes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109702578A CN109702578A (en) | 2019-05-03 |
| CN109702578B true CN109702578B (en) | 2020-10-09 |
Family
ID=66263317
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910088929.7A Active CN109702578B (en) | 2019-01-30 | 2019-01-30 | An end face treatment device for building construction pipelines that is convenient for fixing different sizes |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109702578B (en) |
Families Citing this family (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110216541B (en) * | 2019-05-23 | 2020-12-11 | 温州炘都工业设计有限公司 | A water pipe burr grinding device |
| CN110695825B (en) * | 2019-10-23 | 2021-01-12 | 湖北正信管件有限公司 | Production device of nodular cast iron pipe fitting |
| CN110814888B (en) * | 2019-12-07 | 2020-12-22 | 安徽瑞邦生物科技有限公司 | Pipeline mouth grinding device for pipeline machining |
| CN111015417B (en) * | 2019-12-27 | 2021-07-20 | 陕西勇拓机械科技有限公司 | Steel bar end burr polishing mechanism and using method |
| CN112476219B (en) * | 2020-11-04 | 2021-09-14 | 常德长岭机械制造科技有限公司 | Smooth cleaning device of tobacco machinery inner stepped shaft production processing surface |
| CN112338657A (en) * | 2020-11-06 | 2021-02-09 | 株洲精工硬质合金有限公司 | A surface equipment of polishing for bar-shaped carbide |
| CN112621405B (en) * | 2020-12-10 | 2022-02-08 | 济南大森家具有限公司 | A practice thrift environmental protection grinding device for cylindrical furniture is made |
| CN113001371B (en) * | 2021-03-18 | 2022-01-18 | 重庆顺宏机械有限公司 | Device is cut out to energy-saving accurate pipe fitting production volume based on intelligence is made |
| CN113275960B (en) * | 2021-06-03 | 2022-02-25 | 常州市丰乐精锻有限公司 | Barrel component automatic processing equipment |
| CN114749931B (en) * | 2022-04-08 | 2023-04-28 | 中山市吕何鑫自动化设备有限公司 | Metal pipe fitting manufacturing and processing equipment and manufacturing and processing technology |
| CN115256105B (en) * | 2022-09-27 | 2023-03-24 | 江苏神铸智能科技有限公司 | Pipe fitting connection groove processing machine |
| CN116061034B (en) * | 2023-03-23 | 2023-06-20 | 江苏渝辉数控机械科技有限公司 | Pipe incision grinding device |
| CN119703958A (en) * | 2025-03-03 | 2025-03-28 | 张家港沙钢金洲管道有限公司 | Deburring equipment for steel pipe port |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100355363B1 (en) * | 1999-11-16 | 2002-10-12 | 백차현 | Brake disc polishing machine for automobiles |
| CN103894900B (en) * | 2014-04-17 | 2015-12-02 | 衢州图艺工业设计有限公司 | A kind of card cast steel pipe beveling machine |
| CN105312993A (en) * | 2015-10-28 | 2016-02-10 | 芜湖市恒浩机械制造有限公司 | Valve body inner wall polishing device |
| CN106625174A (en) * | 2017-02-06 | 2017-05-10 | 马鞍山市盈天钢业有限公司 | Circular tube inner wall rust and dust removing device |
| CN107263292A (en) * | 2017-07-14 | 2017-10-20 | 合肥耀世同辉科技有限公司 | A kind of cutting machine with holding function |
| CN107363695B (en) * | 2017-09-05 | 2019-01-04 | 南京拓创精密金属材料有限公司 | A kind of stainless steel cylinder polishing wire drawing process equipment |
| CN207239976U (en) * | 2017-10-13 | 2018-04-17 | 天津通卓机器人有限公司 | A kind of pipe fitting grinding clamp |
| CN208147531U (en) * | 2018-03-23 | 2018-11-27 | 南京高达管业科技有限公司 | A kind of automobile exhaust tube end burr removal device |
| CN108747670B (en) * | 2018-05-31 | 2020-10-09 | 长江师范学院 | Polishing device and polishing method for polishing inner wall of pipeline |
| CN108747629A (en) * | 2018-06-26 | 2018-11-06 | 芜湖精达机械制造有限公司 | A kind of heat exchanger processing water main grinding device |
| CN108723921A (en) * | 2018-08-15 | 2018-11-02 | 潍坊高航机械科技有限公司 | Hand-held pipeline-weld interface grinding device |
| CN108747748A (en) * | 2018-08-19 | 2018-11-06 | 潍坊高航机械科技有限公司 | The bionical grinding device of hand-held tube groove |
-
2019
- 2019-01-30 CN CN201910088929.7A patent/CN109702578B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN109702578A (en) | 2019-05-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109702578A (en) | One kind is convenient for fixed various sizes of construction pipeline end face processing unit | |
| CN218427295U (en) | Metal pipe fitting burnishing and polishing device | |
| CN216407960U (en) | A water conservancy pipeline support connection device for water conservancy projects | |
| CN207756657U (en) | A kind of architectural engineering manual tube bender | |
| CN221943424U (en) | Pipeline supporting device | |
| CN220452942U (en) | An easily adjustable assembled pipe support | |
| CN209648657U (en) | A kind of bearing roller positioning fixture | |
| CN209491554U (en) | A kind of fixture for clamping wheel hub of wind turbine | |
| CN211398801U (en) | Support device for gas conveying pipeline | |
| CN209831768U (en) | Circular tube cutting equipment | |
| CN210585511U (en) | Plastic-coated paint spraying device for spiral steel pipe | |
| CN221839092U (en) | Petroleum conveying pipeline | |
| CN221682443U (en) | Water pipe fixing clamp easy to assemble and disassemble | |
| CN223519360U (en) | A curved manual polishing device suitable for aluminum round tubes | |
| CN221936535U (en) | An airport apron tower steel structure assembly limiting mechanism | |
| CN112077392A (en) | A cutting device for processing a drive shaft | |
| CN220445765U (en) | Pipeline processing strutting arrangement | |
| CN219581790U (en) | Cutting device is used in processing of stainless steel sculpture | |
| CN223098978U (en) | Hardware rapid locking tool | |
| CN217749668U (en) | Raw material cutting device for machining | |
| CN218226896U (en) | Pipeline cutting machine | |
| CN219975645U (en) | A pipe installation and fixing device | |
| CN221912183U (en) | Pipeline cutting device with nozzle stub replacement for non-excavation pipeline restoration | |
| CN222818595U (en) | A kind of pipeline surface maintenance equipment for rainwater and sewage pipe network construction | |
| CN210635642U (en) | A roll changing device of a steel plate heat treatment furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20190503 Assignee: HAIHUI GROUP Co.,Ltd. Assignor: RIZHAO POLYTECHNIC Contract record no.: X2025980040247 Denomination of invention: A device for processing the end face of building construction pipes of different sizes Granted publication date: 20201009 License type: Common License Record date: 20251208 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20190503 Contract record no.: X2025980043402 Denomination of invention: A device for processing the end face of building construction pipes of different sizes Granted publication date: 20201009 License type: Common License Record date: 20251215 |
