CN109682085A - Hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method - Google Patents
Hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method Download PDFInfo
- Publication number
- CN109682085A CN109682085A CN201910010062.3A CN201910010062A CN109682085A CN 109682085 A CN109682085 A CN 109682085A CN 201910010062 A CN201910010062 A CN 201910010062A CN 109682085 A CN109682085 A CN 109682085A
- Authority
- CN
- China
- Prior art keywords
- balcony
- outlet
- line
- circulatory mediator
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 81
- 238000009434 installation Methods 0.000 title claims abstract description 31
- 229910003460 diamond Inorganic materials 0.000 claims abstract description 7
- 239000010432 diamond Substances 0.000 claims abstract description 7
- 238000005452 bending Methods 0.000 claims abstract description 4
- 230000001154 acute Effects 0.000 claims description 2
- 239000000498 cooling water Substances 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 210000001513 Elbow Anatomy 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000002194 synthesizing Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/40—Solar thermal energy, e.g. solar towers
- Y02E10/44—Heat exchange systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/40—Solar thermal energy, e.g. solar towers
- Y02E10/47—Mountings or tracking
Abstract
The present invention relates to solar energy techniques fields, are specifically exactly hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method.The circulatory mediator pipeline of solar energy balcony wall hanging water heater horizontal hovering in balcony is hung at present, is taken up space, cannot be fixed by wall.Present invention employs the equipment such as vertical water tank, the hidden line baffle of outlet (circulatory mediator inlet and outlet, cold and hot water entrance) behind the plate solar collector of straight upper circulatory mediator inlet and outlet, side.Circulatory mediator inlet/outlet pipe preset built-in pipe from balcony cross wall is drawn, and built-in pipe is concordantly located to export under this floor room balcony window along windowsill, and the other end connects the diamond shape magazine of circulatory mediator pipe outlet.The pre-buried interface of hot water pipe is on rear side of water tank.Baffle is installed, the circulatory mediator pipe and hot water pipe connecting line of outgoing wall are covered.Effect of the present invention is the exposed installation method ratio of same conventional line, and circulatory mediator pipeline bending number does not increase, and pipeline realizes stealthy installation.
Description
Technical field
The present invention relates to solar energy techniques fields, be specifically exactly hidden-line multi balcony wall-hanging solar hot water facility with
And pipeline hidden line installation method.
Background technique
Country encourages the utilization of solar energy clean energy resource, and installation of high building balcony wall-hanging solar heat is forced in many provinces
Hydrophone.Currently, the basic mode of installation of high building balcony wall-hanging solar water heater is after external walls of building painting brush is good, in sun
The top, close balcony cross wall under platform window, artificial from punching outward within doors, medium circulation pipe is pierced by from hole, and one end connects sun
Plate solar outside platform.The water tank of one end connection balcony.Plate solar is mounted under balcony outdoor window, and water tank is mounted on room
Interior balcony cross wall.
For this traditional mounting means, have the following deficiencies:
Plug-in plate solar maximum cannot use substantially 2.4 meters of * 0.8 meter of plate solars close to balcony window lower edge now,
And still there is shading phenomenon.Because new building balcony window increases, upper and lower floor balcony window spacing becomes smaller, and plate can be kept off down on the lower
Layer user's light.
Originally plate solar circulatory mediator exports first transverse fold, exports from side surface upper part, then passes through the gold of connection
Belong to the upward bending of medium hose and protrude into indoor balcony from hole, purpose has more to as far as possible install plate solar upwards
2 bendings increase medium circulation resistance.
Circulatory mediator pipeline in the room hang by horizontal hovering, takes up space, unbecoming, cannot fix by wall, user has strong complaints.
It at present using close to balcony cross wall, punches from inside to outside, is limited to Equipment, when punching, hole centre distance cross wall 80-150
Millimeter.Equipment punches time-consuming, destructible exterior-wall heat insulation and exterior wall paint, is also easy to destroy building iron.
Using lower outlet tank, waterpipe is also exposed, occupied space, unsightly.
Summary of the invention
In consideration of it, the present invention provides a kind of hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation sides
Method.It is intended to overcome the drawbacks described above in the presence of existing mounting means.
First in design building balcony wall-hanging solar, the position of solar energy vertical water tank is determined, according to water tank location
Determine the outlet of circulatory mediator built-in pipe and hot and cold water embedded pipe orifice.In civil construction, first under good circulatory mediator built-in pipe and cold
Hot water built-in pipe.
Water tank is mounted on cross wall and balcony partition angle.Balcony cross wall, which can be hung over, can also hang over balcony partition.By too
Positive energy installation specification, determines water tank topmost apart from balcony roof distance.
With water tank opposite direction balcony cross wall forward projection, determine that projection, (by balcony direction longitudinal direction), determines water tank heat along outer
Water out is hot water embedded pipe orifice in balcony cross wall subpoint, determines that water tank cold water inlet is pre- for cold water in balcony cross wall subpoint
Pipe laying mouth.
Balcony cross wall built-in pipe indoors, a pre-buried inlet pipe of circulatory mediator, a pre-buried return pipe of circulatory mediator.Built-in pipe
In cross wall constant depth, the not exposed balcony cross wall of minimum-depth of being subject to runs parallel to open air, in this floor room balcony window
Lower concordantly to locate to export along windowsill, the built-in pipe other end connects diamond shape magazine.
Diamond shape magazine acute angle is 20-80 degree, general to select 45 degree.Magazine point left import and right import.See attached drawing 3.
Circulatory mediator import magazine is in water tank forward projection, and for horizontal cross against projecting along outer, longitudinal direction is located at water tank
Lower 10 centimetres of circulatory mediator import or so.
Circulatory mediator exports magazine in water tank forward projection, and for horizontal cross against projecting along outer, longitudinal direction is located at water tank
Circulatory mediator exports lower 10 centimetres or so.
Simplify installation, only the pre-buried return pipe of pre-buried circulatory mediator and an installation circulatory mediator export magazine, circulatory mediator inlet pipe
It is drawn in the pre-buried return pipe of circulatory mediator and outlet magazine, flat built-in pipe is best.Every built-in pipe only wears single medium pipeline
It is suitable with circle built-in pipe.
Plate solar takes straight outlet on the upside of circulatory mediator pipe, and it is that circulation is situated between that it is upper, which to be all made of side, for present plate solar
Matter inlet and outlet.Two bendings of medium pipeline are reduced in this way.This plate solar divides upper left outlet and upper right outlet, is respectively suitable for
Xi Qiang installation and Dong Qiang installation.See attached drawing 2.
Water tank exports (circulatory mediator, hot and cold water) water tank, this water tank point left outlet tank and right outlet after using vertical side
Water tank is respectively suitable for Xi Qiang installation and Dong Qiang installation.See attached drawing 4, attached drawing 5.
When equipment is installed, circulatory mediator length of tube is first calculated, has wrapped insulating layer by specification, the metal spiral shell of heat preservation will be wrapped
Rotation medium tube is pierced by from built-in pipe.
Plate solar is installed in balcony outdoor locations according to built-in pipe, connects outdoor circulatory mediator pipe and balcony wall-hanging is flat
Plate interface.
Water tank is installed.It is installed by position is pre-designed.
Circulatory mediator magazine cover board is buckled, is screwed down.
Remove the circulatory mediator pipe of excess length, circulatory mediator inlet tube is connected with water tank circulatory mediator import, and circulation is situated between
Matter outlet and water tank circulatory mediator outlet connection.
135 degree of standard component water pipe elbows, the vertical balcony cross wall of the elbow other end, balcony cross are first connect in water tank Inlet and outlet water nozzle
Wall reserving hot water mouth is connected with tank hot water mouthful, and balcony cross wall is reserved cold water outlet and connected with water tank cold water outlet.
Power on.
Baffle is installed.Cover the circulatory mediator pipe and hot water pipe connecting line of outgoing wall.See attached drawing 6.
Synthesis sees that with the exposed installation method ratio of conventional line: circulatory mediator pipeline bending number does not increase, and pipeline is substantially equal
Even inclination, medium smooth degree are good.Pipeline medium tube realizes stealthy installation.Water lines are embedded in wall, also achieve stealthy peace
Dress.Balcony plate realizes maximization and above proposes installation, reduces Problem of Shading.Invisible circulatory mediator connecting line and hot and cold water connect
Wiring, it is very beautiful, reduce occupancy balcony space.
Fig. 1, hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method schematic diagram.
Fig. 2, circulatory mediator inlet and outlet are located at the balcony wall-hanging solar flat plate collector on the upside of plate solar.1, it recycles
Medium is answered back, 2, circulatory mediator outlet, 3, heat exchanger tube, 4, plate frame.
Fig. 3, diamond shape magazine schematic diagram.1, box cover screw, 2, the outlet of circulatory mediator pipe, 3, lower casing, 4, upper box cover, 5, pre-
Pipe laying connector.
Fig. 4 exports vertical water tank main view behind side.1, hot water outlet, 2, circulatory mediator entrance, 3, circulatory mediator outlet,
4, cold water inlet.
Fig. 5, water tank cross-sectional view.
Fig. 6, ray-screening board schematic diagram.
The present invention is not suitable for balcony cross wall and lands glass structure.
Claims (7)
1. hidden-line multi balcony wall-hanging solar hot water facility is it is characterized by: balcony wall-hanging solar flat plate collector circulatory mediator
Inlet and outlet are located on the upside of plate solar, and heat-conducting medium pipe goes out directly from cabinet, go out after not bending from outside, balcony wall-hanging is too
Positive energy flat plate collector divides upper left outlet, upper right outlet, is respectively suitable for Xi Qiang installation and Dong Qiang is installed, see attached drawing 2.
2. hidden-line multi balcony wall-hanging solar hot water facility is it is characterized by: indoor circulation medium inlet and outlet nozzle has magazine, magazine
Shape is diamond shape, and diamond shape acute angle is 20-80 degree, general to select 45 degree, and magazine point left import, right import are respectively suitable for Xi Qiang
Installation and Dong Qiang installation, are shown in attached drawing 3.
3. hidden-line multi balcony wall-hanging solar hot water facility is it is characterized by: export vertical water tank behind side, circulatory mediator inlet and outlet,
Cold and hot water entrance is located at vertical water tank side rear portion, and hot water outlet, circulatory mediator entrance, circulatory mediator outlet, cooling water inlet are certainly
Upper and lower positioned at a row, outlet and water tank center of circle connecting line and the water tank center of circle and wall vertical line included angle are 20-70 degree, generally
45 degree (in water tank cross-sectional view) is selected, hot water outlet radian upper end diversion outlet from tank body, cold water inlet is from water tank
Radian lower end diversion outlet under ontology, the left and right outlet tank of water tank point are respectively suitable for Xi Qiang installation and Dong Qiang installation, see attached
Fig. 4, attached drawing 5.
4. hidden-line multi balcony wall-hanging solar hot water facility pipeline hidden line installation method is it is characterized in that, in pre-buried Jie of balcony cross wall
Matter built-in pipe, a pre-buried inlet pipe of circulatory mediator, a pre-buried return pipe of circulatory mediator, built-in pipe is in cross wall constant depth, with most
Subject to the not exposed indoor balcony cross wall of small depth, open air is run parallel to, is concordantly located under this floor room balcony window along windowsill
Outlet, the built-in pipe other end connect diamond shape magazine.
5. hidden-line multi balcony wall-hanging solar hot water facility pipeline hidden line installation method is it is characterized in that with water tank towards balcony cross
Wall forward projection determines that projection (leans on balcony direction longitudinal) along outer, and circulatory mediator import magazine is in water tank forward projection, water
Flat laterally to abut along outside projection, longitudinal to be located at lower 10 centimetres or so of the import of water tank circulatory mediator, circulatory mediator exports magazine and exists
In water tank forward projection, for horizontal cross against projecting along outer, longitudinal water tank circulatory mediator that is located at exports lower 10 centimetres or so.
6. hidden-line multi balcony wall-hanging solar hot water facility its feature of pipeline hidden line installation method is simplifying installation method, only pre-buried
The pre-buried return pipe of circulatory mediator and installation outlet magazine, circulatory mediator inlet pipe draw in the pre-buried return pipe of circulatory mediator and outlet magazine
Out, flat built-in pipe is best, and every built-in pipe only wears the suitable with circle built-in pipe of single medium pipeline.
7. hidden-line multi balcony wall-hanging solar hot water facility pipeline hidden line installation method is it is characterized in that there is ray-screening board, ray-screening board is hidden
Lid indoor balcony water tank circulatory mediator exposing connecting line and hot and cold water exposing connecting line, are shown in attached drawing 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910010062.3A CN109682085A (en) | 2019-01-07 | 2019-01-07 | Hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910010062.3A CN109682085A (en) | 2019-01-07 | 2019-01-07 | Hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109682085A true CN109682085A (en) | 2019-04-26 |
Family
ID=66192629
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910010062.3A Pending CN109682085A (en) | 2019-01-07 | 2019-01-07 | Hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109682085A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2603356Y (en) * | 2003-01-25 | 2004-02-11 | 陈开碇 | Solar energy structure member in building |
CN1924482A (en) * | 2006-09-21 | 2007-03-07 | 苏福章 | Integrated balcony heater for building |
CN200940936Y (en) * | 2006-09-07 | 2007-08-29 | 中山华帝燃具股份有限公司 | Water heater having built in connected pipeline |
CN201897330U (en) * | 2010-10-26 | 2011-07-13 | 刘洪才 | Balcony wall-mounted solar water heater |
CN103759426A (en) * | 2014-02-10 | 2014-04-30 | 山东力诺瑞特新能源有限公司 | Micro-power cycle balcony wall-mounted solar system |
CN203615623U (en) * | 2013-12-05 | 2014-05-28 | 许加臣 | Timing frequency conversion double-circulation solar water heater |
CN204963264U (en) * | 2015-09-30 | 2016-01-13 | 黄石东贝机电集团太阳能有限公司 | Multi -functional pressure -bearing water tank of many heats source |
CN206001716U (en) * | 2016-07-29 | 2017-03-08 | 宋诏 | A kind of Flat-attached type solar walls |
CN207317287U (en) * | 2017-07-27 | 2018-05-04 | 于崇 | A kind of balcony wall-hanging solar water heater of flat water tank one |
-
2019
- 2019-01-07 CN CN201910010062.3A patent/CN109682085A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2603356Y (en) * | 2003-01-25 | 2004-02-11 | 陈开碇 | Solar energy structure member in building |
CN200940936Y (en) * | 2006-09-07 | 2007-08-29 | 中山华帝燃具股份有限公司 | Water heater having built in connected pipeline |
CN1924482A (en) * | 2006-09-21 | 2007-03-07 | 苏福章 | Integrated balcony heater for building |
CN201897330U (en) * | 2010-10-26 | 2011-07-13 | 刘洪才 | Balcony wall-mounted solar water heater |
CN203615623U (en) * | 2013-12-05 | 2014-05-28 | 许加臣 | Timing frequency conversion double-circulation solar water heater |
CN103759426A (en) * | 2014-02-10 | 2014-04-30 | 山东力诺瑞特新能源有限公司 | Micro-power cycle balcony wall-mounted solar system |
CN204963264U (en) * | 2015-09-30 | 2016-01-13 | 黄石东贝机电集团太阳能有限公司 | Multi -functional pressure -bearing water tank of many heats source |
CN206001716U (en) * | 2016-07-29 | 2017-03-08 | 宋诏 | A kind of Flat-attached type solar walls |
CN207317287U (en) * | 2017-07-27 | 2018-05-04 | 于崇 | A kind of balcony wall-hanging solar water heater of flat water tank one |
Non-Patent Citations (1)
Title |
---|
艾特贸易网: "《预埋暗管、暗盒缺陷原因分析及防治措施》", 《艾特贸易网-网址:HTTP://WAP.AITMY.COM/21-0-239698-1.HTML?FROM=SINGLEMESSAGE&ISAPPINSTALLED=0#_MOTW_》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3076450A (en) | Plastic solar heater | |
EP0027701A1 (en) | Domestic space-heating systems and radiators therefor | |
CN206800726U (en) | A kind of focused solar energy building curtain wall integrated applied system | |
CN109682085A (en) | Hidden-line multi balcony wall-hanging solar hot water facility and pipeline hidden line installation method | |
CN201041416Y (en) | Balcony integral wall-hanging type solar water heater | |
CN103062826A (en) | Heat pipe type solar warmer | |
CN204962944U (en) | Air can radiator | |
CN108087953A (en) | A kind of household has the floor hot-water heating insulation construction of filtering function with self-warming type | |
CN203907730U (en) | Skirting line heating system | |
CN107178842A (en) | Water power dual purpose heat radiator and air-conditioning system | |
CN203771742U (en) | Louvered flat-panel solar heat collector | |
CN201133096Y (en) | Novel solar energy warming bathing room | |
CN205191954U (en) | Curtain solar collector | |
CN204901940U (en) | Hanging oven chamber pipe protection structure that heats outward | |
CN202993604U (en) | Solar water heater | |
CN204665705U (en) | Hermetically sealed antifreeze waterproof thermal-insulated flat type solar heat collector | |
CN211691128U (en) | Building structure top cover with good heat insulation effect | |
CN207407426U (en) | A kind of solar water heater with heating function | |
CN211695417U (en) | Full-hidden water heater mounting structure | |
CN207763041U (en) | Remote control Far infrared electric wall heating | |
CN211720158U (en) | Groove type bridge with good ventilation performance | |
CN206019017U (en) | For the cistern device on wall-hung boiler | |
CN205747528U (en) | A kind of solar water heater of glass heat superconducting | |
CN203066520U (en) | Solar energy bathing and insulating room | |
CN214701236U (en) | Water tank shell, water tank and electric water heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190426 |