CN109676694A - Waste and old plank process equipment and its application method based on roller sawing pipeline - Google Patents
Waste and old plank process equipment and its application method based on roller sawing pipeline Download PDFInfo
- Publication number
- CN109676694A CN109676694A CN201910074795.3A CN201910074795A CN109676694A CN 109676694 A CN109676694 A CN 109676694A CN 201910074795 A CN201910074795 A CN 201910074795A CN 109676694 A CN109676694 A CN 109676694A
- Authority
- CN
- China
- Prior art keywords
- conveyer
- plank
- station
- push
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 56
- 230000008569 process Effects 0.000 title claims abstract description 32
- 239000002699 waste material Substances 0.000 title claims abstract description 29
- 238000005520 cutting process Methods 0.000 claims abstract description 19
- 238000007667 floating Methods 0.000 claims abstract description 8
- 230000005540 biological transmission Effects 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 7
- 238000007493 shaping process Methods 0.000 claims description 7
- 230000003068 static effect Effects 0.000 claims description 7
- 230000007246 mechanism Effects 0.000 claims description 4
- 238000003754 machining Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 239000002023 wood Substances 0.000 claims description 2
- 230000005611 electricity Effects 0.000 claims 2
- 238000009510 drug design Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27B—SAWS FOR WOOD OR SIMILAR MATERIAL; COMPONENTS OR ACCESSORIES THEREFOR
- B27B5/00—Sawing machines working with circular or cylindrical saw blades; Components or equipment therefor
- B27B5/02—Sawing machines working with circular or cylindrical saw blades; Components or equipment therefor characterised by a special purpose only
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27B—SAWS FOR WOOD OR SIMILAR MATERIAL; COMPONENTS OR ACCESSORIES THEREFOR
- B27B25/00—Feeding devices for timber in saw mills or sawing machines; Feeding devices for trees
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27B—SAWS FOR WOOD OR SIMILAR MATERIAL; COMPONENTS OR ACCESSORIES THEREFOR
- B27B27/00—Guide fences or stops for timber in saw mills or sawing machines; Measuring equipment thereon
- B27B27/04—Guide fences or stops for timber in saw mills or sawing machines; Measuring equipment thereon arranged perpendicularly to the plane of the saw blade
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27B—SAWS FOR WOOD OR SIMILAR MATERIAL; COMPONENTS OR ACCESSORIES THEREFOR
- B27B5/00—Sawing machines working with circular or cylindrical saw blades; Components or equipment therefor
- B27B5/16—Saw benches
- B27B5/22—Saw benches with non-feedable circular saw blade
- B27B5/222—Saw benches with non-feedable circular saw blade the saw blade being arranged underneath the work-table; Guiding arrangements for the work-table
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27B—SAWS FOR WOOD OR SIMILAR MATERIAL; COMPONENTS OR ACCESSORIES THEREFOR
- B27B5/00—Sawing machines working with circular or cylindrical saw blades; Components or equipment therefor
- B27B5/29—Details; Component parts; Accessories
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Wood Science & Technology (AREA)
- Forests & Forestry (AREA)
- Feeding Of Workpieces (AREA)
Abstract
The invention discloses waste and old plank process equipments and its application method based on roller sawing pipeline, are related to plank processing technique field.Including lower layer's conveyer, upper layer conveyer, cutting work station, backer's component, push and pull component and output table, the upper layer conveyer is mounted on the upper end of lower layer's conveyer, it is floating type mounting structure between the upper layer conveyer and conveyer, there are two the cutting work station is total, it is the first station and second station respectively, first station and second station set up separately in the two sides of lower layer's conveyer, there are two backer's component is set, one of them is located at the input terminal of the first station 2, another is located at the input terminal of second station, the push-and-pull component is located at the middle part of lower layer's conveyer, the push-and-pull component is located at the output end of the first station, and push and pull the input terminal that component is located at second station.The present invention has rational design, easy to operate, provides the processing platform of a high-efficient automatic.
Description
Technical field
The present invention relates to plank processing technique fields, in particular to the waste and old plank processing based on roller sawing pipeline is set
It is standby.
Background technique
Very extensive to the utilization of plank at this stage, either industrial or civil field is seen everywhere making for plank
With.Especially in some building fields, makes mold and be unable to do without plank.It substantially cannot be existing in original after the plank use of building field
The secondary use in field, cuts out because will do it during making template, plank can be also damaged in disassembly process, plank is caused not have
There is secondary use value.Then there is recycling company that can recycle these old planks, be sold to plank secondary operation enterprise, add by secondary
Work is fabricated to pallet footing.Plank both ends are sawed into 45 degree of angles when secondary operation, convenient for assembly.Existing technology is all
Using the method for making nonstandard disk saw equipment sawing by oneself, gas source is provided with air compressor, Telescopic-cylinder is controlled by gas circuit,
Achieve the purpose that fix and advance when controlling plank sawing.
The plank of 20cm (or 15cm) width that upstream was cut is built up five pieces by worker, and the length for adjusting both ends is (maximum
Change utilizes plank, reduces waste), the plank cylinder-pressing folded, start propulsion cylinder, allow rack at the uniform velocity to being pushed forward
Into, set retreat the time, advance in place after auto-returned, worker unclamps again plank after return, and plank is turned around, and adjusts again
Length is saved, sawing next time is continued.Since links will lean on the manpower of worker to handle, such as plank of taking, stacking, adjusting
Length, fixation, starting machine, unload take, all multi-process such as stacking, to consume many times, the time accounting of real sawing is seldom,
Cause inefficient, production capacity is seldom.Along with operational safety is poor, there is very big hidden danger to personal safety
Summary of the invention
The object of the present invention is to provide the waste and old plank process equipments based on roller sawing pipeline.
Technical solution of the present invention: the waste and old plank process equipment based on roller sawing pipeline, including lower layer's conveyer,
Upper layer conveyer, cutting work station, backer's component, push-and-pull component and output table, the upper layer conveyer are mounted on lower layer's conveying
The upper end of machine, is floating type mounting structure between the upper layer conveyer and conveyer, the cutting work station altogether there are two, respectively
It is the first station and second station, first station and second station set up separately in the two sides of lower layer's conveyer, described to lean on
There are two mountain component is set, one of them is located at the input terminal of the first station 2, another is located at the input terminal of second station, described
Push-and-pull component is located at the middle part of lower layer's conveyer, and the push-and-pull component is located at the output end of the first station, and pushes and pulls component and be located at
The input terminal of second station, the output table are fixedly mounted on the output end of lower layer's conveyer.
In the above-mentioned waste and old plank process equipment based on roller sawing pipeline, lower layer's conveyer includes lower layer
Rack, the upper layer conveyer include upper layer rack, and the floating type mounting structure includes guide block, the fixed peace of the guide block
Mounted in the upper surface of lower rack, it is plugged with guide post on the guide block, is fixedly connected between the guide post and guide block, the upper layer
Guide sleeve is fixedly connected on the end face of rack, the guide sleeve is hollow cylindrical structure, and the guide sleeve runs through upper layer
The end face of rack, and guide sleeve is socketed on guide post, the guide sleeve is slidably connected with guide post, and the upper end in guide sleeve is also
It is socketed with spring, gag lever post is socketed at the top of the spring, is fixedly connected between the gag lever post and guide post, it is described floating type
Mounting structure is at least provided with eight.
In waste and old plank process equipment above-mentioned based on roller sawing pipeline, the upper layer conveyer and lower layer's conveying
Machine is all made of self-powered Conveyor.
In waste and old plank process equipment above-mentioned based on roller sawing pipeline, the hopper includes vertical case and leads
Hopper, the angle being mutually between the vertical case and guide case is between 100 ° -120 °.
In waste and old plank process equipment above-mentioned based on roller sawing pipeline, first station and second station
Bottom is provided with board, and the lower part of the board is fixedly installed with motor, and the top of the board is rotatably connected to transmission shaft,
It is sequentially connected between the motor and transmission shaft by belt, one end of the transmission shaft is fixedly connected with circular saw bit.
In waste and old plank process equipment above-mentioned based on roller sawing pipeline, backer's component include chassis and
Hydraulic cylinder, the chassis are fixedly mounted on the bottom of lower rack, and the hydraulic cylinder is fixedly mounted on chassis and conveys close to lower layer
On the end face of machine side, the output end of the hydraulic cylinder, which is fixedly connected, has backing, and the vertical cross-section of the backer is L-type structure.
In waste and old plank process equipment above-mentioned based on roller sawing pipeline, the push-and-pull component includes push-and-pull gas
Cylinder, output shaft, sliding slot and push plate, the push-and-pull cylinder are fixedly mounted on the inside of lower rack, the output shaft and push-and-pull
The output end of cylinder is fixedly connected, and the front end of the output shaft is fixedly connected with push plate, and the bottom of the push plate is fixedly connected with
Voussoir, the sliding slot are fixedly connected with lower rack, and the sliding slot is in the lower end of output shaft, and the bottom of the voussoir is embedded
On sliding slot, the voussoir is slidably connected with sliding slot, and the push plate is equipped with guide wheel on a side end face of push-and-pull cylinder, described
Guide wheel is existing Universal wheel structure.
In waste and old plank process equipment above-mentioned based on roller sawing pipeline, the surface of the push-and-pull component is also pacified
Equipped with one group of guide body structure, the guide body structure is located at the middle part of upper layer conveyer, the bottom peace of the guide body structure
Fill head directive wheel.
11, the application method of the waste and old plank process equipment based on roller sawing pipeline, comprising the following steps:
Step 1: the installation and debugging stage of equipment;After all mechanisms of equipment are installed, debugged;Debugging
It is divided into static debugging and dynamic debugging:
Step 2: after debugging, equipment is under optimal machining state, opens equipment.Worker takes the plank got ready
The input terminal for being placed on lower layer's conveyer is acted, first confirms before loosing one's grip and lets go after the position of saw to be descended, position are adjusted, plank meeting
Voluntarily walk forward, plank be straightened after running at backer's component it is parallel with roller, after straightening backer just can downlink, allow wood
Plate continues to move ahead, and plank is forwarded at the first station, is cut by circular saw bit, and sawing is complete to proceed into push-and-pull component
Plank is pushed into the side where second station by place, push-and-pull component, hereafter shaping can be carried out by backer's component again, with laggard
Enter and cut at second station, sawing, which is over, is transported to output table, carries out next process after output table output.
In the application method of the above-mentioned waste and old plank process equipment based on roller sawing pipeline, the static debugging packet
It includes the following contents: being powered first to equipment, observe the state of each indicator light in circuit, motor is run by frequency converter setting
Operating rate parameter and frequency parameter, manually boot motor 10, upper layer conveyer 5 and lower layer's conveyer 1, and observation is no different
Often.With the conveying speed of instrument measurement conveyer, the speed parameter of frequency converter is adjusted at any time, the speed until reaching technique requirement
Until.
In the application method of waste and old plank process equipment above-mentioned based on roller sawing pipeline, the dynamic debugging packet
Include the following contents: handle automatic switch goes to auto state when starting device, press can start automatically after auto-start button it is defeated
Send machine and motor.System parameter is pre-set according to the technological requirements.Operator, which places, to be conveyed to the plank of sawing to lower layer
The input terminal of machine 1 determines the lower saw point of plank as needed, loosens plank after determining, plank is allowed freely to advance, by backer
Plank runs to saw cutting area by sawing after component shaping, and equipment observes plank operation conditions when running at any time, sees the angle of cutting
And whether the depth of cutting meets technique requirement, can adjust transducer operational parameter in operation.
Compared with prior art, the present invention has apparent advantage, and traditional technology is there are lot of unstable factor, and this hair
Bright have a very big leap on safety in production and production capacity are promoted, the present invention take full advantage of the rotation of power roller at the uniform velocity, contact surface
The advantages that frictional force is big, speed is adjustable.Traditional cylinder is fixed to promote SAWING CONTROL very inconvenient, needs switchgear at any time,
In addition process is various, cause production capacity that can not be promoted.The present invention can be changed to manual/auto at any time switch by PLC hommization
Method greatly facilitates the operation of operator, alleviates the labor intensity of operator, greatly improves production capacity, reduces
The security risk of worker.
Detailed description of the invention
Fig. 1 is integral device structural representation of the invention;
Fig. 2 is enlarged diagram at A in Fig. 1;
Fig. 3 is the mounting structure schematic diagram of device bottom of the invention;
Fig. 4 is backer's component structure diagram in the present invention;
Fig. 5 is that component structure diagram is pushed and pulled in the present invention;
Fig. 6 is the mounting structure schematic diagram of conveyer at the middle and upper levels of the invention;
Fig. 7 is the top view illustration of integral device of the present invention;
Fig. 8 is the side view of integral device in the present invention.
In figure: 1- lower layer conveyer;The first station of 2-;3- pushes and pulls component;4- lower rack;41- guide block;The conveying of the upper layer 5-
Machine;The upper layer 51- rack;52- guide post;53- gag lever post;54- spring;55- guide sleeve;9- board;10- motor;15- transmission shaft;
16- second station;17- circular saw bit;18- push-and-pull cylinder;19- output shaft;20- sliding slot;21- voussoir;22 guide wheels;23- push plate;
24- output table;25 guide body structures;26- backer's component;27- hydraulic cylinder;28- backer.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to
According to.
Embodiment: the waste and old plank process equipment based on roller sawing pipeline, as shown in attached drawing 1-8, including lower layer is defeated
Send machine 1, upper layer conveyer 5, cutting work station, backer's component 26, push-and-pull component 3 and output table 24;
Referring to Fig.1 and Fig. 8, it is (interior to be all made of self-powered Conveyor for upper layer conveyer 5 and lower layer's conveyer 1
Frequency converter and gearbox are equipped with to be used to adjust conveying speed).There are two upper layer conveyer 5 is mounted side by side, and two upper layers
Conveyer 5 is fixedly mounted on the surface of lower layer's conveyer 1.When specific installation, referring to Fig. 6, under lower layer's conveyer 1 includes
Layer rack 4, the upper surface of lower rack 4 are fixedly installed with guide block 41, and guide post 52, guide post 52 and guide block 41 are plugged on guide block 41
Between be fixedly connected.Upper layer conveyer 5 includes upper layer rack 51, is fixedly connected with guide sleeve on the end face of upper layer rack 51
55, guide sleeve 55 is hollow cylindrical structure, and guide sleeve 55 runs through the end face of upper layer rack 51, and guide sleeve 55 is socketed in and leads
On column 52, guide sleeve 55 and guide post 52, that is slidably connected in the upper end of guide sleeve 55 are also socketed with spring 54, the top set of spring 54
It is connected to gag lever post 53, is fixedly connected between gag lever post 53 and guide post 52.Above-mentioned bindiny mechanism makes upper layer conveyer 5 have floating
Property, it is allowed to meet plank thickness deviation bring influence to be processed
It as shown in Figure 1 and Figure 2, is the first station 2 and second station 16, two works respectively there are two cutting work stations
Set up separately in the two sides of lower layer's conveyer 1 position.Referring to Fig. 2,16 side's of being slot type structure of the first station 2 and second station is conducive to
Side crops falls in cutting process.The bottom of first station 2 and second station 16 is provided with board 9, the lower part of board 9
It is fixedly installed with motor 10, motor 10 carries frequency converter.The top of board 9 is rotatably connected to transmission shaft 15, motor 10 and transmission
It is sequentially connected between axis 15 by belt 24.One end of transmission shaft 15 is fixedly connected with circular saw bit 17.Circular saw bit 17 is placed in
In cutting work station.
Referring to Fig. 3, backer's component 26 is mounted on the input terminal of second station 16.In addition in the input terminal of the first station 2
Component is had backing in installation (at the C in Fig. 3, backer's component at this is consistent with the structure of backer's component 26).Herein just wherein it
One is described specifically.As shown in figure 4, backer's component 26 includes chassis and hydraulic cylinder 27.In specific installation, chassis is fixedly mounted
In the bottom of lower rack 4, hydraulic cylinder 27 is fixedly mounted on chassis on the end face of 1 side of lower layer's conveyer, in hydraulic cylinder
27 output end is fixedly connected with 28 (as shown in Figure 4) of having backing.It is noted that the vertical cross-section of backer 28 is L-type structure,
It is divided into lateral face and vertical face, two sides is an integral structure.Wherein, lateral face is mounting surface (connecting with hydraulic cylinder 27), vertically
Face is on lower layer's conveyer 1 in the clearance space of roller.Design is advantageous in that at this: straight with plank after backer rises
Contact is vertical face, due between vertical face and hydraulic cylinder 27 without being directly connected to, so even if carry out for a long time
It uses, the stability of the transmission output of hydraulic cylinder 27 will not be influenced, be conducive to extend service life.Backer's component 26 passes through backer
28 uplink stops plank, and the plank on conveyer is helped to carry out conveying shaping, keeps plank side wall consistent with the direction of roller.
And backer 28 can also be played under (such as production capacity is excessively high to generate redundancy accumulation in ramp, influences to produce) the apparatus of load the case where
Stop the effect of subsequent plank input.
Referring to Fig.1, push-and-pull component 3 is located at the middle part of lower layer's conveyer 1, and push-and-pull component 3 is on lower layer's conveyer 1 two
Between roller.The specific structure for pushing and pulling component 3 is as shown in Figure 5.Pushing and pulling component 3 includes push-and-pull cylinder 18, output shaft 19, sliding slot
20 and push plate 23;Push-and-pull cylinder 18 is fixedly mounted on the inside of lower rack 4, the output end of output shaft 19 and push-and-pull cylinder 18
It is fixedly connected.The front end of output shaft 19 is fixedly connected with push plate 23, and the bottom of push plate 23 is fixedly connected with voussoir 21.Sliding slot 20 with
Lower rack 4 is fixedly connected, and sliding slot 20 is in the lower end of output shaft 19, and the bottom of voussoir 21 is embedded on sliding slot 20, wedge
Block 21 is slidably connected with sliding slot 20.Guide wheel 22 is installed on a side end face of the push plate 23 close to push-and-pull cylinder 18, the guide wheel 22
For existing Universal wheel structure.In the push-and-pull of plank, plank can will continue to convey under the action of conveyer, guide wheel 22 at this
Effect be to reduce the friction between plank and push plate 23.
It is noted that it is also equipped with one group of guide body structure 25 in the surface of push-and-pull component 3 in the present embodiment,
As can be seen from Figure 7, guide body structure 25 is located at the interval of two upper layer conveyers 5.Also, guide body structure 25 and lower layer
Mounting structure between conveyer 1 and upper layer conveyer 5 are consistent with the connection structure of lower layer conveyer 1, guide body structure 25
Highly also consistent (as shown in Figure 8) with the height of upper layer conveyer 5.In addition, the main body of guide body structure 25 includes mutually hanging down
The position-limited rack and skeleton directly installed, position-limited rack are located at the bottom of skeleton, the conveying of the installation direction and lower layer's conveyer 1 of position-limited rack
Direction is consistent, and position-limited rack is equipped with several (having 6 in the present embodiment).Directive wheel (guiding is installed in the bottom of position-limited rack
Wheel is Universal wheel structure), the directive wheel on a position-limited rack at least install 3 (the present embodiment is mounted with 5, as shown in Figure 8).
Universal wheel plays the role of guiding and deceleration to the plank in conveying, and push-and-pull component 3 is facilitated to elapse it.
Output table 24 is fixedly mounted on the conveying end of lower layer's conveyer 1, and in practical applications, transport platform 24 can be with other
Equipment is docked, such as stacking machine, and the plank processed is carried out to be output to next production process.
The application method of the waste and old plank process equipment based on roller sawing pipeline is as follows:
Step 1: the installation and debugging stage of equipment;After all mechanisms of equipment install, equipment is connected
To PLC system (Mitsubishi FX3U type PLC can be used), finally debugged;Debugging is divided into static debugging and dynamic debugging;
The main contents of static debugging are as follows: give equipment to be powered first, on observation device in each indicator light state whether just
Often.Manual mode is set by PLC control system, manually boots motor 10, upper layer conveyer 5 and lower layer's conveyer 1, is observed
Have without exception.With the conveying speed of instrument measurement conveyer, the speed parameter of frequency converter in conveyer is adjusted, until reaching technique
It is required that speed until.The relationship of converter parameter and other parameters is as shown below:
The main contents of dynamic debugging are as follows: dynamic debugging is essentially identical with static debugging, the difference is that by the hand of PLC
Auto state switches to auto state, can start conveyer and motor 10 automatically after pressing auto-start button.According to technique
It is required that pre-setting system parameter.Operator places the input terminal that lower layer's conveyer 1 is arrived to the plank of sawing, true as needed
The lower saw point for determining plank, loosens plank after determining, plank is allowed freely to advance, plank is run to after 26 shaping of backer's component
Plank operation conditions is observed when running by sawing, equipment in saw cutting area at any time, and whether the depth of the angle and cutting of seeing cutting accords with
Technique requirement is closed, the transducer operational parameter of motor 10 can be adjusted in operation, control such as the following figure:
After being adjusted, meet required technique requirement.This is arrived, debugging efforts terminate, and enter step 2;
Step 2: after debugging, equipment is under optimal machining state, opens equipment.Worker takes the plank got ready
The input terminal for being placed on lower layer's conveyer 1 is acted, first confirms before loosing one's grip and lets go after the position of saw to be descended, position are adjusted, plank
It can voluntarily walk forward, plank is straightened parallel with roller after running at backer's component 26, backer 28 just understands downlink after straightening,
Plank is allowed to continue to move ahead, plank is forwarded at the first station 2, is cut by circular saw bit 17, and sawing is complete to be proceeded into
It pushes and pulls at component 3, plank is pushed into the side where second station 16 by push-and-pull component, hereafter can be carried out again by backer's component
Shaping is subsequently entered and is cut at second station 16, and sawing, which is over, is transported to output table 24, and output table 24 carries out after exporting
Next process.
Claims (10)
1. the waste and old plank process equipment based on roller sawing pipeline, it is characterised in that: including lower layer's conveyer (1), upper layer
Conveyer (5), cutting work station, backer's component (26), push-and-pull component (3) and output table (24), upper layer conveyer (5) peace
It is floating type mounting structure between the upper layer conveyer (5) and conveyer (1) mounted in the upper end of lower layer's conveyer (1), it is described
Cutting work station altogether there are two, be the first station (2) and second station (16) respectively, first station (2) and the second work
Position (16) is set up separately in the two sides of lower layer's conveyer (1), and there are two backer's component (26) sets, one of them is located at the first station
2 input terminal, another is located at the input terminal of second station (16), and the push-and-pull component (3) is located in lower layer's conveyer (5)
Portion, push-and-pull component (3) are located at the output end of the first station (2), and push and pull the input that component (3) are located at second station (16)
End, the output table (24) are fixedly mounted on the output end of lower layer's conveyer (1).
2. the waste and old plank process equipment according to claim 1 based on roller sawing pipeline, it is characterised in that: described
Lower layer's conveyer (1) includes lower rack (4), and the upper layer conveyer (5) includes upper layer rack (51), described floating type
Mounting structure includes guide block (41), and the guide block (41) is fixedly mounted on the upper surface of lower rack (4), the guide block (41)
On be plugged with guide post (52), be fixedly connected between the guide post (52) and guide block (41), on the end face of the upper layer rack (51)
It is fixedly connected with guide sleeve (55), the guide sleeve (55) is hollow cylindrical structure, and the guide sleeve (55) runs through upper layer
The end face of rack (51), and guide sleeve (55) is socketed on guide post (52), the guide sleeve (55) is slidably connected with guide post (52),
The upper end in guide sleeve (55) is also socketed with spring (54), is socketed with gag lever post (53), institute at the top of the spring (54)
It states and is fixedly connected between gag lever post (53) and guide post (52), the floating type mounting structure is at least provided with eight.
3. the waste and old plank process equipment according to claim 1 based on roller sawing pipeline, it is characterised in that: described
Upper layer conveyer (5) and lower layer's conveyer (1) are all made of self-powered Conveyor.
4. the waste and old plank process equipment according to claim 1 based on roller sawing pipeline, it is characterised in that: described
The bottom of first station (2) and second station (16) is provided with board (9), and the lower part of the board (9) is fixedly installed with electricity
Machine (10), the motor (10) are connected with frequency converter, and the top of the board (9) is rotatably connected to transmission shaft (15), the electricity
It is sequentially connected between machine (10) and transmission shaft (15) by belt (24), one end of the transmission shaft (15) is fixedly connected with disk
Saw blade (17).
5. the waste and old plank process equipment according to claim 1 or 2 based on roller sawing pipeline, it is characterised in that:
Backer's component (26) includes chassis and hydraulic cylinder (27), and the chassis is fixedly mounted on the bottom of lower rack (4), institute
It states hydraulic cylinder (27) and is fixedly mounted on chassis on the end face of lower layer's conveyer (1) side, the output of the hydraulic cylinder (27)
End is fixedly connected have backing (28), and the vertical cross-section of the backer (28) is L-type structure.
6. the waste and old plank process equipment according to claim 1 or 2 based on roller sawing pipeline, it is characterised in that:
The push-and-pull component (3) includes push-and-pull cylinder (18), output shaft (19), sliding slot (20) and push plate (23), the push-and-pull gas
Cylinder (18) is fixedly mounted on the inside of lower rack (4), the fixed company of the output end of the output shaft (19) and push-and-pull cylinder (18)
It connects, the front end of the output shaft (19) is fixedly connected with push plate (23), and the bottom of the push plate (23) is fixedly connected with voussoir
(21), the sliding slot (20) is fixedly connected with lower rack (4), and the sliding slot (20) is in the lower end of output shaft (19), described
The bottom of voussoir (21) is embedded on sliding slot (20), and the voussoir (21) is slidably connected with sliding slot (20), and the push plate (23) is leaned on
It is equipped with guide wheel (22) on one side end face of nearly push-and-pull cylinder (18), the guide wheel (22) is existing Universal wheel structure.
7. the waste and old plank process equipment according to claim 6 based on roller sawing pipeline, it is characterised in that: described
One group of guide body structure (25) is also equipped with right above push-and-pull component (3), the guide body structure (25) is located at upper layer conveying
The middle part of machine (5), the bottom mounting head directive wheel of the guide body structure (25).
8. the application method of the waste and old plank process equipment according to claim 1 based on roller sawing pipeline, special
Sign is: the following steps are included:
Step 1: the installation and debugging stage of equipment;After all mechanisms of equipment are installed, PLC system is installed in equipment
System, is finally debugged;Debugging is divided into static debugging and dynamic debugging:
Step 2: after debugging, equipment is under optimal machining state, opens equipment.Worker, which picks up the plank got ready, puts
Input terminal in lower layer's conveyer (1) first confirms before loosing one's grip and lets go after the position of saw to be descended, position are adjusted, plank meeting
Voluntarily walk forward, plank be straightened after running at backer's component (26) it is parallel with roller, after straightening backer (28) just can under
Row allows plank to continue to move ahead, and plank is forwarded at the first station (2), is cut by circular saw bit (17), sawing is complete to be continued to move ahead
It enters at push-and-pull component (3), plank is pushed into the side where second station (16) by push-and-pull component, hereafter can be leaned on again
Mountain component carries out shaping, subsequently enters and is cut at second station (16), and sawing, which is over, to be transported to output table (24), output
Next process is carried out after platform (24) output.
9. the application method of the waste and old plank process equipment according to claim 8 based on roller sawing pipeline, special
Sign is: the static debugging includes the following contents: being powered first to equipment, observes the state of each indicator light in circuit, pass through
Frequency converter setting runs the operating rate parameter and frequency parameter of a motor, manually boots motor (10), upper layer conveyer (5)
And lower layer's conveyer (1), observation have without exception.With the conveying speed of instrument measurement conveyer, the speed of frequency converter is adjusted at any time
Parameter is spent, until reaching the speed of technique requirement.
10. the application method of the waste and old plank process equipment according to claim 8 based on roller sawing pipeline, special
Sign is: the dynamic debugging includes the following contents: going to auto state by PLC system handle automatic switch, presses automatic
Conveyer and motor (10) can be started after start button automatically, pre-set system parameter, operator according to the technological requirements
The plank to sawing is placed to the input terminal of lower layer's conveyer 1, the lower saw point of plank is determined as needed, loosens wood after determining
Plate allows plank freely to advance, and plank runs to saw cutting area by sawing, when equipment is run at any time after backer's component (26) shaping
Plank operation conditions is observed, whether the depth of the angle and cutting of observing cutting meets technique requirement, can adjust in operation
Transducer operational parameter.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910074795.3A CN109676694B (en) | 2019-01-25 | 2019-01-25 | Waste wood board processing equipment based on roller sawing conveying line and use method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910074795.3A CN109676694B (en) | 2019-01-25 | 2019-01-25 | Waste wood board processing equipment based on roller sawing conveying line and use method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109676694A true CN109676694A (en) | 2019-04-26 |
| CN109676694B CN109676694B (en) | 2021-08-27 |
Family
ID=66194743
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910074795.3A Active CN109676694B (en) | 2019-01-25 | 2019-01-25 | Waste wood board processing equipment based on roller sawing conveying line and use method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109676694B (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105751315A (en) * | 2016-04-26 | 2016-07-13 | 安徽安宿家居有限公司 | Edge sawing machine |
| CN205552702U (en) * | 2016-03-23 | 2016-09-07 | 嘉善六方木业有限公司 | Full -automatic final trimming saw |
| CN205588411U (en) * | 2016-04-17 | 2016-09-21 | 临沂金轮热压机械有限公司 | Limit production line is sawed with great ease to intelligence tuningout type wood -based plate |
| CN106903753A (en) * | 2017-04-24 | 2017-06-30 | 全友家私有限公司 | A kind of automatic single head pendulum saw |
| CN207344731U (en) * | 2017-08-18 | 2018-05-11 | 江西明匠智能系统有限公司 | Machine and wood cutting |
| CN208410090U (en) * | 2018-07-04 | 2019-01-22 | 锦屏县东南木业有限公司 | A kind of ecological board edge cutting machine |
-
2019
- 2019-01-25 CN CN201910074795.3A patent/CN109676694B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN205552702U (en) * | 2016-03-23 | 2016-09-07 | 嘉善六方木业有限公司 | Full -automatic final trimming saw |
| CN205588411U (en) * | 2016-04-17 | 2016-09-21 | 临沂金轮热压机械有限公司 | Limit production line is sawed with great ease to intelligence tuningout type wood -based plate |
| CN105751315A (en) * | 2016-04-26 | 2016-07-13 | 安徽安宿家居有限公司 | Edge sawing machine |
| CN106903753A (en) * | 2017-04-24 | 2017-06-30 | 全友家私有限公司 | A kind of automatic single head pendulum saw |
| CN207344731U (en) * | 2017-08-18 | 2018-05-11 | 江西明匠智能系统有限公司 | Machine and wood cutting |
| CN208410090U (en) * | 2018-07-04 | 2019-01-22 | 锦屏县东南木业有限公司 | A kind of ecological board edge cutting machine |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109676694B (en) | 2021-08-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106042089B (en) | A kind of batten assembling unit | |
| CN107599499A (en) | One kind packaging boxboard cutting device | |
| CN205736148U (en) | A kind of packing crates cardboard cutting device | |
| CN106078948A (en) | A kind of batten assembling unit with unidirectional propulsive mechanism | |
| CN218699668U (en) | Sliding table saw for cutting table plate | |
| CN201198147Y (en) | Splitting machine for paper standing feet of paper pallet | |
| CN109676694A (en) | Waste and old plank process equipment and its application method based on roller sawing pipeline | |
| CN205969363U (en) | Stuff makeup device | |
| CN113751626A (en) | Steel bar cutting device for building construction | |
| CN2912943Y (en) | Hackle tenoning machine | |
| CN207088060U (en) | LVL sheet material automatic multi-blade saw production lines | |
| CN103434878B (en) | Movable type automatic winding-up device | |
| CN220028866U (en) | High-efficient aluminium machine of cutting | |
| CN114536501B (en) | A method of using a fully automatic plate cutting device | |
| CN114670257B (en) | Full-automatic plate cutting device | |
| CN210820009U (en) | Continuous production line for finger joint plates | |
| CN210939681U (en) | Finger joint board cutting equipment | |
| CN210361769U (en) | Carpentry line machine | |
| CN208961116U (en) | An automatic cutting device for belay sheet connector | |
| CN210589754U (en) | Plywood hot press advances board device | |
| CN207807968U (en) | A kind of finger-jointed plate tenonen collected conducive to sawdust | |
| CN208713010U (en) | Sheet fabrication deep cutting | |
| CN209717951U (en) | A kind of horizontal saw of carpenter | |
| CN207888821U (en) | A kind of double end finger-jointed plate tenonen | |
| CN215790430U (en) | Plate splicing machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |