CN109655601A - Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method - Google Patents

Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method Download PDF

Info

Publication number
CN109655601A
CN109655601A CN201910034083.9A CN201910034083A CN109655601A CN 109655601 A CN109655601 A CN 109655601A CN 201910034083 A CN201910034083 A CN 201910034083A CN 109655601 A CN109655601 A CN 109655601A
Authority
CN
China
Prior art keywords
model
test
hollow glass
foundation pit
glass tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910034083.9A
Other languages
Chinese (zh)
Inventor
方焘
张婷
刘春�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
Original Assignee
East China Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University filed Critical East China Jiaotong University
Priority to CN201910034083.9A priority Critical patent/CN109655601A/en
Publication of CN109655601A publication Critical patent/CN109655601A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/02Measuring arrangements characterised by the use of mechanical techniques for measuring length, width or thickness

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Remote Sensing (AREA)
  • Geology (AREA)
  • Medicinal Chemistry (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种模型试验基坑围护结构深层水平位移测试装置,包括顶部敞口的模型箱,模型箱内填入有砂土,砂土内固定有一圈模型桩,模型桩的两相对侧外分别固定连接有沿着深度方向等间隔分布的横向布置的钢棒,各钢棒的外围活动套装有空心玻璃管,空心玻璃管的内端自由置于模型桩附近,空心玻璃管的外端贯穿并伸出模型箱外并且空心玻璃管固定在模型箱的被贯穿位置处,各钢棒的外端沿着空心玻璃管内自由伸出模型箱外并连接至一位移测量装置。本发明公开了一种模型试验基坑围护结构深层水平位移测试装置的测试方法。本发明能够合理、精确地测出维护结构的深层水平位移。

The invention discloses a deep horizontal displacement testing device of a foundation pit enclosure structure for a model test, comprising a model box with an open top, the model box is filled with sand, a circle of model piles is fixed in the sand, and two opposite sides of the model pile are The laterally arranged steel rods distributed at equal intervals along the depth direction are fixedly connected to the sides and the outer sides respectively. The periphery of each steel rod is movably sheathed with a hollow glass tube. The inner end of the hollow glass tube is freely placed near the model pile, and the outer The end penetrates and protrudes out of the model box and the hollow glass tube is fixed at the penetrated position of the model box. The outer end of each steel rod freely extends out of the model box along the hollow glass tube and is connected to a displacement measuring device. The invention discloses a testing method of a deep horizontal displacement testing device for a model test foundation pit envelope structure. The invention can reasonably and accurately measure the deep horizontal displacement of the maintenance structure.

Description

Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method
Technical field
The present invention relates to foundation pit enclosure technical field of construction more particularly to a kind of model test foundation pit enclosure structure deep waters Flat displacement tester and test method.
Background technique
In recent years with the fast development of the infrastructure constructions such as domestic subway, important shape of the campshed as foundation pit enclosure structure One of formula, carries it and the research of deformation characteristic is always the heat subject in geotechnical engineering field.Due to field test Less economical, test result nonrepeatability, most scholar is carried out by the methods of theory analysis, model experiment and numerical analysis Correlative study.But Most scholars during carrying out model test often it is worried in be difficult to it is reasonable, accurately measure building enclosure Deeply mixing cement-soil pile.Horizontal displacement is to analyze the basic data of building enclosure deformation characteristic, and the accurate related data that obtains is pair The basis of the deformation characteristic of reasonable analysis building enclosure, and the rationally premise of understanding and design building enclosure.So taking assorted Measure, rationally measuring building enclosure deeply mixing cement-soil pile is particularly significant and has very important significance.
Summary of the invention
Technical problem to be solved by the present invention lies in view of the above shortcomings of the prior art, provide a kind of model test base Pit enclosure structure deeply mixing cement-soil pile test device, can rationally, accurately measure the deeply mixing cement-soil pile of enclosed structure.
Technical problem to be solved by the present invention lies in view of the above shortcomings of the prior art, a kind of model test is also provided The test method of foundation pit enclosure structure deeply mixing cement-soil pile test device can rationally, accurately measure the deep layer of enclosed structure Horizontal displacement.
In order to solve the above technical problems, the technical solution adopted by the present invention is that, a kind of model test foundation pit enclosure structure is deep Layer horizontal displacement test device, the model casing including open top are filled with sand in model casing, two rows of phases are fixed in sand Pair Model Pile, the steel for the lateral arrangement being spacedly distributed along depth direction is respectively fixedly connected on the outside of two rows of Model Piles Stick, the periphery of each rod iron are movably installed with hollow glass tube, and the inner end of hollow glass tube is freely placed near Model Pile, hollow glass The outer end of glass pipe run through and stretch out that model casing is outer and hollow glass tube be fixed on model casing by position, each rod iron Outer end in hollow glass tube along freely stretching out outside model casing and be connected to a displacement measuring device.
As a further improvement of the present invention, at the model casing open top at the sand on the outside of two rows of Model Piles Equipped with the displacement measuring device protruded into sand.
As a further improvement of the present invention, institute's displacement measurement device is dial gauge, and each dial gauge is commonly connected to One data acquisition equipment.
As a further improvement of the present invention, rod iron, hollow glass tube and the percentage on the outside of two rows of Model Piles Table has seven respectively.
As a further improvement of the present invention, the two opposite sides of the model casing are provided with seven round holes, each hollow The outer end proximal end of glass tube is fixed at respective circular hole.
As a further improvement of the present invention, the inner end of the rod iron is fixed in Model Pile by hot melt adhesive, hollow The outer end of glass tube is fixed at the round hole of model casing proximally by hot melt adhesive.
As a further improvement of the present invention, the hollow glass tube uses lucite tube.
As a further improvement of the present invention, the data acquisition equipment is deformeter.
In order to solve the above technical problems, the present invention also the technical solution adopted is that, a kind of model test foundation pit enclosure structure The test method of deeply mixing cement-soil pile test device, this method are by excavating the sand in Model Pile along depth direction point multilayer Soil, using model casing outside displacement measuring device measure the horizontal displacement of each rod iron, to obtain the deeply mixing cement-soil pile of Model Pile.
As a further improvement of the present invention, this method is fixed on the inside of two rows of Model Piles also after one layer of sand of every excavation Opposite purlin, and set up the purlin of support system support phase pair.
Compared with prior art, model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test of the invention Method has the beneficial effect that:
(1) by arranged on Model Pile depth direction can in hollow glass tube free-moving rod iron, and rod iron One end link model stake, the other end connect displacement measuring device, and Model Pile can occur together with rod iron, so as to reasonable, smart Really measure the deeply mixing cement-soil pile of Model Pile.
Through the following description and in conjunction with the attached drawings, the present invention will become more fully apparent, these attached drawings are used to explain the present invention Embodiment.
Detailed description of the invention
Fig. 1 is excavation of foundation pit model test apparatus schematic diagram.
Fig. 2 is excavation of foundation pit model test apparatus connection schematic diagram.
Fig. 3 is that pile lateral displacement arranges front schematic view.
Fig. 4 is pile lateral displacement schematic diagram, and displacement is positive and indicates that stake top is moved into Foundation Pit, and displacement is negative and indicates stake It pushes up and is moved outside Foundation Pit.
Specific embodiment
The embodiment of the present invention described referring now to the drawings, similar element numbers represent similar element in attached drawing.
Fig. 1-4 is please referred to, the model test foundation pit enclosure structure deeply mixing cement-soil pile test device includes model casing 1, model casing is having a size of 2200mm*1000mm*1500mm body structure, and box frame uses square steel, and top of the box is open, preceding Two sides are equipped with transparent plastic sheet afterwards, and the left and right sides is equipped with steel plate.Sand 2 is filled in model casing 1.Left and right is fixed in sand 2 Two rows of Model Piles 3, top and the sand 2 of Model Pile 3 are substantially flush, the bottom 200mm of the distance from bottom model casing 1 of Model Pile 3, The distance between two rows of Model Piles 3 are 530mm, and the distance between the Model Pile 3 in left side and model casing 1 are 1050mm, right side The distance between Model Pile 3 and model casing 1 are 330mm.Model Pile 3, which is first put into model casing 1, is further filled with sand 2.Two rows of models The outside of stake 3 is respectively fixedly connected with the rod iron 4 for the lateral arrangement (i.e. left and right directions) being spacedly distributed along depth direction, left The length for the rod iron 4 being fixedly connected on the outside of the Model Pile 3 of side is longer than the length for the rod iron 4 being fixedly connected on the outside of the Model Pile 3 on right side Degree, the diameter of rod iron 4 are 3-6mm, preferably 5mm.The periphery of each rod iron 4 is movably installed with hollow glass tube 5, hollow glass tube 5 diameter is 10mm.The inner end of each hollow glass tube 5 is freely placed near Model Pile 3, and the outer end of each hollow glass tube 5 is run through And stretch out outside 1 corresponding side of model casing, to facilitate experiment to test, and hollow glass tube 5 be fixed on model casing 1 by through position Place.The outer end of each rod iron 4 is outer and be connected to a displacement along model casing 1 and hollow glass tube 5 is freely stretched out in hollow glass tube 5 Measuring device 6, stretch out hollow glass tube 5 outside be for convenience with 6 connecting test of displacement measuring device, with displacement measuring device 6 Measure 4 free end travel of rod iron.Rod iron 4 can the free movement in hollow glass tube 5, do not influenced by sand body around, and Model Pile 3 with rod iron 4 again because being fixedly connected, therefore the displacement of Model Pile 3 passes to rod iron 4, by the displacement for measuring rod iron 4 It can be obtained the displacement of Model Pile 3, therefore the horizontal displacement of each point can pass through mould on the outside of 3 depth direction of two rows of Model Piles The measurement of measuring system 6 of 1 left and right sides depth direction of molding box arrangement obtains.
It is also equipped on the sand 2 of the open top position of the model casing 1 in the outside of two rows of Model Piles 3 and protrudes into sand 2 Interior displacement measuring device 6, there are five the displacement measuring devices 6 in 3 outside sand 2 of left side Model Pile, and five displacements are surveyed It measures in device 6 by close to Model Pile 3 to the interval the every two adjacent displacement measuring devices 6 in the direction far from Model Pile 3 Distance is successively 100mm, 100mm, 150mm, 150mm.The displacement measuring device 6 being packed into the 3 outside sand 2 of Model Pile of right side has Three, often the spacing distance between two adjacent displacement measuring devices 6 is 100mm.Institute's displacement measurement device 6 is percentage Table, each dial gauge are commonly connected to a data acquisition equipment, and the data acquisition equipment is deformeter.The two rows Model Pile 3 Rod iron 4, hollow glass tube 5 and the dial gauge in outside have seven respectively, seven rod irons 4 in 3 outside of left side Model Pile and the right side Seven rod irons 4 in 3 outside of side Model Pile are spacedly distributed along depth direction, spacing distance 150mm, the rod iron 4 of the top Apart from 2 top surface 150mm of sand.The periphery of each rod iron 4 is cased with a hollow glass tube 5, therefore per two adjacent hollow glass Spacing distance between glass pipe 5 is also 150mm, positioned at the 2 top surface 150mm of centre distance sand of the hollow glass tube 5 of the top, Each hollow glass tube 5 plays the role of isolation and protection to the displacement of corresponding rod iron 4.The left and right two-phase of the model casing 1 Seven round hole 1a, the spacing distance 150mm being spacedly distributed along depth direction are provided on the steel plate of opposite side, with Model Pile The hollow glass tube 5 of 3 left and right sides corresponds, and the outer end proximal end of each hollow glass tube 5 is fixed at the 1a of respective circular hole.It is described The inner end of rod iron 4 is fixed in Model Pile 3 by hot melt adhesive, and the outer end of hollow glass tube 5 is fixed on mould proximally by hot melt adhesive At the round hole 1a of molding box 1.The hollow glass tube 5 uses lucite tube.
The test method of the model test foundation pit enclosure structure deeply mixing cement-soil pile test device, this method is to pass through Divide multilayer to excavate the sand 2 in Model Pile 3 along depth direction, measures each rod iron using the displacement measuring device 6 outside model casing 1 4 horizontal displacement, to obtain the deeply mixing cement-soil pile of Model Pile 3.Excavating sand 2 to divide is five layers, and first layer cutting depth is 100mm, second layer cutting depth are 200mm, and third layer cutting depth is 200mm, and the 4th layer of cutting depth is 200mm, the 5th Layer cutting depth is 400mm.This method also it is every excavation one layer of sand after two rows of 3 inside stationary phases pair of Model Pile purlin 7, And set up the purlin 7 that support system 8 supports left and right opposite.After excavating first layer, first of support system 8 is erected at left and right Between the top of the Model Pile 3 on both sides, be specifically erected at the Model Pile 3 of the right and left the top connection crown beam 9 it Between, the spacing between second support system 8 in first of support system 8 and the second layer is 250mm, the third in third layer The 4th support system 8 and third layer between second support system 8 in road support system 8 and the second layer, in the 4th layer The 4th support system 8 between interior third road support system 8, in the 5th support system 8 and the 4th layer in layer 5 Between spacing be 250mm.During the experiment, measurement is ideal, is applicable in reliable model by simple economy Experimental method obtains the deeply mixing cement-soil pile of building enclosure.
Displacement measuring device 6, the hat in left side are also equipped at the top of the crown beam 9 of the top connection of the Model Pile 3 of the right and left The distance between immediate displacement measuring device 6 in the displacement measuring device 6 and 3 outside sand 2 of left side Model Pile at 9 top of beam It is 100mm.Immediate displacement measurement in the displacement measuring device 6 and 3 outside sand 2 of right side Model Pile at 9 top of right side crown beam The distance between device 6 is 100mm.
Combining most preferred embodiment above, invention has been described, but the invention is not limited to implementations disclosed above Example, and various modifications, equivalent combinations according to the essence of the present invention should be covered.

Claims (10)

1. a kind of model test foundation pit enclosure structure deeply mixing cement-soil pile test device characterized by comprising open top Model casing is filled with sand in model casing, and two rows of opposite Model Piles are fixed in sand, and the outside of two rows of Model Piles is solid respectively Surely it is connected with the rod iron for the lateral arrangement being spacedly distributed along depth direction, the periphery of each rod iron is movably installed with hollow glass Pipe, the inner end of hollow glass tube is freely placed near Model Pile, the outer end of hollow glass tube run through and stretch out model casing it is outer and Hollow glass tube be fixed on model casing by the position, the outer end of each rod iron is along freely stretching out model in hollow glass tube Case is outer and is connected to a displacement measuring device.
2. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as described in claim 1, it is characterised in that: institute It states and is also equipped with the displacement measuring device protruded into sand at the sand on the outside of two rows of Model Piles at model casing open top.
3. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 2, it is characterised in that: institute Displacement measurement device is dial gauge, and each dial gauge is commonly connected to a data acquisition equipment.
4. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 3, it is characterised in that: institute Rod iron, hollow glass tube and the dial gauge on the outside of two rows of Model Piles stated have seven respectively.
5. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 4, it is characterised in that: institute The two opposite sides for stating model casing are provided with seven round holes, and the outer end proximal end of each hollow glass tube is fixed at respective circular hole.
6. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 5, it is characterised in that: institute The inner end for stating rod iron is fixed in Model Pile by hot melt adhesive, and the outer end of hollow glass tube is fixed on model proximally by hot melt adhesive At the round hole of case.
7. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 6, it is characterised in that: institute Hollow glass tube is stated using lucite tube.
8. model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 3, it is characterised in that: institute Stating data acquisition equipment is deformeter.
9. a kind of test side of model test foundation pit enclosure structure deeply mixing cement-soil pile test device according to claim 1 Method, it is characterised in that: this method be by along depth direction point multilayer excavate Model Pile in sand, using model casing outside Displacement measuring device measures the horizontal displacement of each rod iron, to obtain the deeply mixing cement-soil pile of Model Pile.
10. the test method of model test foundation pit enclosure structure deeply mixing cement-soil pile test device as claimed in claim 8, It is characterized in that: the purlin of this method stationary phase pair on the inside of two rows of Model Piles also after one layer of sand of every excavation, and set up branch The purlin of support body system support phase pair.
CN201910034083.9A 2019-01-15 2019-01-15 Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method Pending CN109655601A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910034083.9A CN109655601A (en) 2019-01-15 2019-01-15 Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910034083.9A CN109655601A (en) 2019-01-15 2019-01-15 Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method

Publications (1)

Publication Number Publication Date
CN109655601A true CN109655601A (en) 2019-04-19

Family

ID=66120149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910034083.9A Pending CN109655601A (en) 2019-01-15 2019-01-15 Model test foundation pit enclosure structure deeply mixing cement-soil pile test device and test method

Country Status (1)

Country Link
CN (1) CN109655601A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113668619A (en) * 2021-07-02 2021-11-19 浙江工业大学 A vertical envelope horizontal displacement monitoring devices for foundation ditch model test

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090079615A (en) * 2008-01-18 2009-07-22 연세대학교 산학협력단 Horizontal Load Model Experiment
KR101025892B1 (en) * 2010-10-27 2011-03-30 강명석 Concrete steel house
CN105926688A (en) * 2016-04-30 2016-09-07 山东大学 Centrifugal model testing device provided with composite foundation and support structure with common shape and property and manufacturing method of centrifugal model testing device
CN107119731A (en) * 2017-06-12 2017-09-01 上海理工大学 Foundation ditch group excavates the model test apparatus to close to buildings deformation effect
CN108643247A (en) * 2018-05-16 2018-10-12 华东交通大学 Soft clay area rectangle foundation pit bottom soil body reinforced model testing device and test method
CN209513788U (en) * 2019-01-15 2019-10-18 华东交通大学 Model test foundation pit enclosure structure deeply mixing cement-soil pile test device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090079615A (en) * 2008-01-18 2009-07-22 연세대학교 산학협력단 Horizontal Load Model Experiment
KR101025892B1 (en) * 2010-10-27 2011-03-30 강명석 Concrete steel house
CN105926688A (en) * 2016-04-30 2016-09-07 山东大学 Centrifugal model testing device provided with composite foundation and support structure with common shape and property and manufacturing method of centrifugal model testing device
CN107119731A (en) * 2017-06-12 2017-09-01 上海理工大学 Foundation ditch group excavates the model test apparatus to close to buildings deformation effect
CN108643247A (en) * 2018-05-16 2018-10-12 华东交通大学 Soft clay area rectangle foundation pit bottom soil body reinforced model testing device and test method
CN209513788U (en) * 2019-01-15 2019-10-18 华东交通大学 Model test foundation pit enclosure structure deeply mixing cement-soil pile test device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
袁炳祥;吴跃东;陈锐;冯仲文;汪亦显;: "侧向受荷桩周土体内部位移场的模型试验研究", 浙江大学学报(工学版), no. 10 *
钱春香;陈立宏;唐松涛;柴小兵;: "DX桩室内模型试验方法", 北京交通大学学报, no. 06 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113668619A (en) * 2021-07-02 2021-11-19 浙江工业大学 A vertical envelope horizontal displacement monitoring devices for foundation ditch model test

Similar Documents

Publication Publication Date Title
CN107179396B (en) Multifunctional assembled geotechnical engineering physical similarity test system
CN103996348B (en) The cross-over tunnel construction indoor model test device on operation tunnel impact up and down
CN103117020B (en) Experimental facility for simulating shield tunnel dynamically boring causing ground loss and surface subsidence
CN102912780B (en) Sand Soil Immersion Test Method for Collapsible Deformation of Loess
CN201843152U (en) Simulation tester for construction and monitoring of deep foundation pit engineering
CN103940394B (en) Monitoring system and method for simulating excavation device of tunnel pipe shed construction method
CN108643247B (en) Testing device and testing method for soil body reinforcement model at bottom of rectangular foundation pit in soft soil area
CN203869679U (en) Monitoring system of tunnel pipe shed construction method simulation excavation device
CN104034606A (en) Multifunctional geotechnical synthesized material interface direct shear apparatus
CN106596268B (en) A kind of multi-water immersion working condition simulation test model box and test method
CN110554169A (en) tunnel excavation process simulation test device and method
CN103837360A (en) Tunnel pipe shed construction method simulated excavation device and implementation method thereof
CN107119731A (en) Foundation ditch group excavates the model test apparatus to close to buildings deformation effect
CN103558044A (en) Indoor model testing apparatus for analyzing influences of shield tunnel grouting construction on adjacent pile foundations
CN113089624B (en) Adjacent foundation pit asynchronous excavation simulation test device and test method
CN112081152A (en) Test device and method for simulating influence of foundation pit excavation on shield tunnel with anti-floating anchor rod
CN203745218U (en) Tunnel pipe shed construction method simulation excavation device
CN102426396A (en) Testing apparatus for simulating deep-displacement-initiated strata deformation coordination mechanism
CN102704459A (en) Test device of indoor model for reinforcing soft soil foundation by dynamic compaction
CN101832993A (en) Semi-module test box for dynamic compaction reinforced foundation model test
CN207797934U (en) Artificial digging pile quality control apparatus
CN107023041A (en) Model test apparatus of the anchor pole to reinforcing landslide-mass influential effect
CN105604104A (en) Experiment model and method for simulating differential settlement of foundation based on air bag method
CN209280028U (en) Measure the experimental provision of the distribution of tunnel Water And Earth Pressures and tunnel deformation rule
CN113006163A (en) Test device and test method for karst cave-containing foundation pit excavation model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419