CN109653756A - A kind of rectangular cross section hard rock mole and its construction method - Google Patents

A kind of rectangular cross section hard rock mole and its construction method Download PDF

Info

Publication number
CN109653756A
CN109653756A CN201910047816.2A CN201910047816A CN109653756A CN 109653756 A CN109653756 A CN 109653756A CN 201910047816 A CN201910047816 A CN 201910047816A CN 109653756 A CN109653756 A CN 109653756A
Authority
CN
China
Prior art keywords
section
girder
jurisdiction
area
rectangular cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910047816.2A
Other languages
Chinese (zh)
Other versions
CN109653756B (en
Inventor
齐志冲
陶磊
宁向可
贺飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201910047816.2A priority Critical patent/CN109653756B/en
Publication of CN109653756A publication Critical patent/CN109653756A/en
Application granted granted Critical
Publication of CN109653756B publication Critical patent/CN109653756B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/03Driving non-circular tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices

Abstract

The invention discloses a kind of rectangular cross section hard rock mole and its construction method, solve the problems, such as that rectangular cross section hard rock mole is slagged tap slow, ineffective in the prior art.The present invention includes girder, girder is equipped with excavating device, trimming device, propulsion system, duct piece assembling machine and slag-tapping system, slag-tapping system is connected with excavating device, trimming device is located at excavating device rear, the excavating device includes tool head and main driving, tool head is connected with main driving, and main driving is arranged on girder;The trimming device includes combination pick roller and drum drive, and combination pick roller is connected with drum drive, and drum drive is arranged on girder.Excavating device and trimming device of the present invention are used cooperatively, and the substep of hard rock is continuously excavated in realization, greatly improves work efficiency, and are a big innovations of constructing tunnel.

Description

A kind of rectangular cross section hard rock mole and its construction method
Technical field
The present invention relates to tunnel excavation technical field, a kind of rectangular cross section hard rock mole and its construction party are particularly related to Method.
Background technique
Due to the needs of China's modernization development, tunnel construction has been widely used for traffic, water conservancy, communication, metallurgy etc. In numerous areas.Many tunnels have the characteristics that long, big, buried, complex geologic conditions, and hard rock mole (i.e. TBM) is with it The advantages that formation hardness range is wide, operating environment is good, the level of informatization is high, high construction efficiency is excavated, tunnel construction is widely used in In.The mechanical equipment applied to the construction of rectangular cross section hard rock tunnel mostly uses greatly once-forming excavation method at present, once-forming Low efficiency is excavated in excavation method, is slagged tap slow, is not admitted to continuously excavate, and then influences construction efficiency.
Summary of the invention
For the deficiency in above-mentioned background technique, the present invention proposes a kind of rectangular cross section hard rock mole and its construction party Method solves the problems, such as that rectangular cross section hard rock mole is slagged tap slow, ineffective in the prior art.
The technical scheme of the present invention is realized as follows: a kind of rectangular cross section hard rock mole, including girder, set on girder There are excavating device, trimming device, propulsion system, duct piece assembling machine and slag-tapping system, slag-tapping system is connected with excavating device, repairs Engagement positions are located at excavating device rear, and the excavating device includes tool head and main driving, tool head and main driving It is connected, main driving is arranged on girder;The trimming device includes combination pick roller and drum drive, combines pick Roller is connected with drum drive, and drum drive is arranged on girder.
The tool head includes operator disk and secondary cutterhead, and secondary cutterhead is symmetricly set on the two sides of operator disk, secondary cutterhead Highest point and the highest point of operator disk be located on same level straight line, the outermost points of the outermost points of secondary cutterhead and disk of operating In same vertical straight line.
The combination pick roller includes horizontal axis and vertical pivot, and vertical pivot is symmetricly set on the two sides of drum drive, horizontal axis The top of drum drive is set, roller is equipped on horizontal axis and vertical pivot, roller is equipped with the pick being uniformly arranged.
The highest point of roller on the horizontal axis and the highest point of secondary cutterhead are located in the same horizontal plane, the roller on vertical pivot Outermost points and the outermost points of secondary cutterhead be located in same vertical plane, the length of vertical pivot is less than the diameter for disk of operating.
The girder is equipped with front end panel and rear dust excluding plate, and master is driven through front end panel and is connected with girder, modifies Device is between front end panel and rear dust excluding plate.
The propulsion system includes Cheng Xue mechanism and propelling cylinder, and Cheng Xue mechanism is slidably connected with girder, propelling cylinder One end is connected with girder, the other end is connected with Cheng Xue mechanism.
The rear portion of the girder is equipped with rear support, and rear support is connected by oil cylinder with girder.
A kind of construction method of rectangular cross section hard rock mole, steps are as follows: S1: device being hoisted to tunnel through starting well It is interior, and assembled debugging is carried out, then pipe sheet assembling is carried out in tunnel originating terminal;
S2: rear support is retracted to girder, and the Cheng Xue mechanism stretching of propulsion system mentions on assembled section of jurisdiction for propelling cylinder For fulcrum;
S3: start main driving and drum drive, while propelling cylinder stretches out, girder is driven to move forward, realize and excavate dress It sets and is moved forward with trimming device;Main driving drives operator disk and secondary cutterhead rotation to excavate face, operate disk and pair Dregs under cutterhead excavates is exported through slag-tapping system;Drum drive drives combination pick roll rotational, to operator disk and pair It is modified the part that cutterhead does not excavate;
S4: after propelling cylinder stretches out range, rear support is stretched out, and Cheng Xue mechanism is withdrawn, and then propelling cylinder retracts, and is driven Cheng Xue mechanism is slided along girder, while duct piece assembling machine carries out pipe sheet assembling;
S5: repeating step S2 ~ S4, until completing tunnel excavation and pipe sheet assembling.
The part that disk and secondary cutterhead do not excavate of operating in the step S3 is respectively the firstth area, the secondth area, third area and the 4th area, trimming device fall into the 5th of operator disk excavation from the dregs that the firstth area, the secondth area, third area and the 4th area are modified In area;The volume in the 5th area is equal to the sum of the firstth area, the secondth area, third area and the 4th area's volume.
Section of jurisdiction in the step S1 and step S4 includes upper section of jurisdiction, lower section of jurisdiction, left section of jurisdiction and right section of jurisdiction, left section of jurisdiction and the right side Section of jurisdiction is symmetricly set between section of jurisdiction, lower section of jurisdiction and is connected respectively with upper section of jurisdiction, lower section of jurisdiction by bolt.
The present invention excavates hard rock using tool head, realizes Rapid Excavation, and the dregs under excavating is through going out slag system System transports tunnel outer, improves and excavates efficiency.The setting of trimming device will modify area for modifying to the part that do not excavate Dregs heap drop down onto tunnel bottom, reduce slag discharge amount, improve slag discharge efficiency.Cheng Xue mechanism of the present invention can directly stretching in section of jurisdiction On, support is provided for propulsion system, convenient for the driving forward of excavating device and trimming device, excavating device and trimming device cooperation It uses, the substep of hard rock is continuously excavated in realization, greatly improves work efficiency, and is a big innovation of constructing tunnel.
Detailed description of the invention
In order to illustrate the embodiments of the present invention more clearly, attached drawing needed in describing below to embodiment makees letter Singly introduce, it should be apparent that, drawings in the following description are only some embodiments of the invention, skill common for this field For art personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is whole interior structural schematic diagram of the present invention.
Fig. 2 is excavating device schematic front view of the present invention.
Fig. 3 is trimming device schematic front view of the present invention.
Fig. 4 is excavating device outline excavation schematic diagram.
Fig. 5 is tunnel cross-section schematic diagram after trimming device finishing.
Fig. 6 is that trimming device modifies status diagram.
Fig. 7 is section of jurisdiction supporting status diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor Embodiment shall fall within the protection scope of the present invention.
Embodiment 1, as illustrated in fig. 1 and 2, a kind of rectangular cross section hard rock mole, including girder 1, girder 1, which is equipped with, to be excavated Device, trimming device, propulsion system, duct piece assembling machine 20 and slag-tapping system, slag-tapping system are connected with excavating device, excavate dress Tunnel outer is discharged through slag-tapping system in the dregs set under excavating.Trimming device is located at excavating device rear, for excavating device The part that do not excavate is modified, i.e., is trimmed to rectangular cross section for non-rectangle.The excavating device includes tool head 2 and master Driving 3, tool head 2 are connected with main driving 3, and tool head 2 is circular beater plate, and main driving 3 is arranged in girder 1 On, tool head 2 is connected with main driving 3 respectively, and realization independently drives, and provides driving force, band for tool head Dynamic tool head rotation.The trimming device includes combination pick roller 4 and drum drive 5, and combination pick roller 4 is Inverted U-shaped roller frame, combination pick roller 4 are connected with drum drive 5, and drum drive 5 is arranged on girder 1, rolling Cylinder driving device 5 drives combination pick roller rotation by chain or gear respectively, is operated alone, rotates respectively, to finishing area Carry out scraping finishing.
Further, the tool head 2 includes operator disk 2-1 and secondary cutterhead 2-2, and operator disk 2-1 and secondary cutterhead 2-2 are equal For circular beater plate, the cutter diameter for the disk 2-1 that operates is greater than the cutter diameter of secondary cutterhead 2-2, and operator disk 2-1 carries out major part and opens It digs, secondary cutterhead 2-2 carries out auxiliary excavation.Secondary cutterhead 2-2 is symmetricly set on the two sides of operator disk 2-1, to the top of face into Row excavates.The highest point of secondary cutterhead 2-2 and the highest point of operator disk 2-1 are located on same level straight line, make upper part excavation face For the upper plane of rectangular cross section.The outermost points of secondary cutterhead 2-2 and the outermost points of operator disk 2-1 are located at same vertical straight line On, so that its outline excavation is formed the side plane of rectangular cross section.The excavation of operator disk 2-1 and secondary cutterhead 2-2 belong to preliminary main excavation, Rectangular cross section can be just formed under the finishing of trimming device.The dregs operated under disk 2-1 and pair cutterhead 2-2 excavation is through slag-tapping system Transport tunnel outer, operator disk 2-1 and pair cutterhead 2-2 cooperation are excavated, provide excavation efficiency, at the same be convenient for trimming device into The finishing of one step.
Embodiment 2, as shown in figure 3, a kind of rectangular cross section hard rock mole, the combination pick roller 4 includes horizontal axis 4-1 Horizontally disposed with vertical pivot 4-2, horizontal axis 4-1, vertical pivot 4-2 is vertically arranged, and vertical pivot 4-2 is symmetricly set on the two of drum drive 5 Side, horizontal axis 4-1 are arranged in the top of drum drive 5, are fixed with roller 4-3, roller on horizontal axis 4-1 and vertical pivot 4-2 4-3 is equipped with the pick 4-4 being uniformly arranged.Horizontal axis 4-1 carries out independent rotation, vertical pivot 4-2 under the driving of drum drive 5 Independent rotation is also carried out under the driving of drum drive 5, the pick 4-4 on roller 4-3 scrapes the hard rock in finishing area Cut finishing.
Further, the highest point of the roller 4-3 on the horizontal axis 4-1 and the highest point of secondary cutterhead 2-2 are located at same level In face, i.e., for modifying the part that do not excavate between operator disk top and secondary cutterhead, the upper plane of the rectangular cross section of formation and master Cutterhead outline excavation is tangent.The outermost points of roller 4-3 on vertical pivot 4-2 and the outermost points of secondary cutterhead 2-2 are located at same perpendicular In facing directly, i.e., for modifying the part that do not excavate between operator disk two sides and secondary cutterhead, the side of the rectangular cross section of formation and master 0 Cutterhead outline excavation is tangent.The length of vertical pivot 4-2 is less than the diameter of operator disk 2-1, in order to which the dregs for modifying area is fallen in operator The amount of discharge dregs is reduced in the lower part of disk outline excavation, improves slag discharge efficiency.
Further, the girder 1 is equipped with front end panel 6 and rear dust excluding plate 7, and main driving 3 passes through front end panel 6 and girder 1 is connected, trimming device between front end panel 6 and rear dust excluding plate 7, convenient for trimming device to finishing area's hard rock finishing, It is fallen simultaneously convenient for finishing area's dregs heap.The propulsion system includes Cheng Xue mechanism 8 and propelling cylinder 9, Cheng Xue mechanism 8 and existing pick It is similar into the support shoe system on machine, support is provided for propulsion system.Cheng Xue mechanism 8 is slidably connected with girder 1, convenient for girder The movement in direction.One end of propelling cylinder 9 is connected with girder 1, the other end is connected with Cheng Xue mechanism 8.Pass through propelling cylinder Stretching realize that excavating device, the stepping of trimming device and girder are mobile.The rear portion of the girder 1 is equipped with rear support 10, rear to prop up Support 10 is connected by oil cylinder with girder 1, for withdrawing the support to girder in Cheng Xue mechanism.
Other structures are same as Example 1.
Embodiment 3, as shown in Fig. 4 ~ 7, a kind of construction method of rectangular cross section hard rock mole, steps are as follows: S1: laying out the ground plan of a fortified work Device is hoisted in tunnel by hair well, and carries out assembled debugging, then carries out pipe sheet assembling in tunnel originating terminal;Ensure at device In normal steady state, carries out excavation and prepare.
S2: before excavation movement starts, rear support is retracted to girder, and the Cheng Xue mechanism stretching of propulsion system is assembled On section of jurisdiction, fulcrum is provided for propelling cylinder.It carries out and excavates posture preparation.
S3: start main driving and drum drive, while propelling cylinder stretches out, girder is driven to move forward, realization is opened It digs device and trimming device moves forward;Main driving drives operator disk and secondary cutterhead rotation to excavate face, disk of operating Dregs under excavating with secondary cutterhead is exported through slag-tapping system;Drum drive drives combination pick roll rotational, to operator disk It is modified the part that do not excavated with secondary cutterhead.The part that operator disk and secondary cutterhead do not excavate is respectively the first area A1, the secondth area A2, third area A3 and the 4th area A4, trimming device are modified from the first area A1, the second area A2, third area A3 and the 4th area A4 Dregs fall into operator disk excavate the 5th area A5 in;The volume of 5th area A5 is equal to the first area A1, the second area A2, third area A3 The sum of with the 4th area's A4 volume.
S4: after propelling cylinder stretches out range, rear support is stretched out, and Cheng Xue mechanism is withdrawn, and then propelling cylinder retracts, Cheng Xue mechanism is driven to slide along girder, while duct piece assembling machine carries out pipe sheet assembling.Section of jurisdiction include upper section of jurisdiction 11, lower section of jurisdiction 12, Left section of jurisdiction 13 and right section of jurisdiction 14, left section of jurisdiction 13 and right section of jurisdiction 14 are symmetricly set between section of jurisdiction 11, lower section of jurisdiction 12 and pass through spiral shell Bolt is connected with upper section of jurisdiction 11, lower section of jurisdiction 12 respectively.Left and right two sections of jurisdiction can respectively to the left, right side level slide stretching hole wall, And keep the stability of total.After Cheng Xue mechanism does not support the region section of jurisdiction, clamping screw between urgent section of jurisdiction is adjusted Gap between whole left and right sides section of jurisdiction, guarantees the stability of tunnel segment structure.
S5: repeating step S2 ~ S4, until completing tunnel excavation and pipe sheet assembling.
Other structures are same as Example 2.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of rectangular cross section hard rock mole, including girder (1), girder (1) is equipped with excavating device, trimming device, propulsion System, duct piece assembling machine (20) and slag-tapping system, slag-tapping system are connected with excavating device, after trimming device is located at excavating device Side, it is characterised in that: the excavating device includes tool head (2) and main driving (3), tool head (2) and main driving (3) it is connected, main driving (3) is arranged on girder (1);The trimming device includes combination pick roller (4) and drum driven Device (5), combination pick roller (4) are connected with drum drive (5), and drum drive (5) is arranged in girder (1) On.
2. rectangular cross section hard rock mole according to claim 1, it is characterised in that: the tool head (2) includes It operates disk (2-1) and secondary cutterhead (2-2), secondary cutterhead (2-2) is symmetricly set on the two sides of operator disk (2-1), secondary cutterhead (2-2) Highest point and the highest point of operator disk (2-1) are located on same level straight line, the outermost points and operator disk of secondary cutterhead (2-2) The outermost points of (2-1) are located in same vertical straight line.
3. rectangular cross section hard rock mole according to claim 1 or 2, it is characterised in that: the combination pick roller (4) Including horizontal axis (4-1) and vertical pivot (4-2), vertical pivot (4-2) is symmetricly set on the two sides of drum drive (5), and horizontal axis (4-1) is set The top in drum drive (5) is set, is equipped with roller (4-3) on horizontal axis (4-1) and vertical pivot (4-2), is set on roller (4-3) There is the pick (4-4) being uniformly arranged.
4. rectangular cross section hard rock mole according to claim 3, it is characterised in that: the roller on the horizontal axis (4-1) The highest point of (4-3) and the highest point of secondary cutterhead (2-2) are located in the same horizontal plane, and the roller (4-3) on vertical pivot (4-2) is most Points outside and the outermost points of secondary cutterhead (2-2) are located in same vertical plane, and the length of vertical pivot (4-2) is less than operator disk (2-1) Diameter.
5. rectangular cross section hard rock mole according to claim 1 or 4, it is characterised in that: before the girder (1) is equipped with Support plate (6) and rear dust excluding plate (7), main driving (3) is connected by front end panel (6) with girder (1), before trimming device is located at Between support plate (6) and rear dust excluding plate (7).
6. rectangular cross section hard rock mole according to claim 1 or 4, it is characterised in that: the propulsion system includes support Boots mechanism (8) and propelling cylinder (9), Cheng Xue mechanism (8) are slidably connected with girder (1), one end of propelling cylinder (9) and girder (1) it is connected, the other end is connected with Cheng Xue mechanism (8).
7. rectangular cross section hard rock mole according to claim 6, it is characterised in that: the rear portion of the girder (1) is equipped with Rear support (10), rear support (10) are connected by oil cylinder with girder (1).
8. a kind of construction method of rectangular cross section hard rock mole as described in claim 1, it is characterised in that: steps are as follows: Device: being hoisted in tunnel through starting well, and carry out assembled debugging by S1, then carries out pipe sheet assembling in tunnel originating terminal;
S2: rear support is retracted to girder, and the Cheng Xue mechanism stretching of propulsion system mentions on assembled section of jurisdiction for propelling cylinder For fulcrum;
S3: start main driving and drum drive, while propelling cylinder stretches out, girder is driven to move forward, realize and excavate dress It sets and is moved forward with trimming device;Main driving drives operator disk and secondary cutterhead rotation to excavate face, operate disk and pair Dregs under cutterhead excavates is exported through slag-tapping system;Drum drive drives combination pick roll rotational, to operator disk and pair It is modified the part that cutterhead does not excavate;
S4: after propelling cylinder stretches out range, rear support is stretched out, and Cheng Xue mechanism is withdrawn, and then propelling cylinder retracts, and is driven Cheng Xue mechanism is slided along girder, while duct piece assembling machine carries out pipe sheet assembling;
S5: repeating step S2 ~ S4, until completing tunnel excavation and pipe sheet assembling.
9. the construction method of rectangular cross section hard rock mole according to claim 8, it is characterised in that: in the step S3 The part that operator disk and secondary cutterhead do not excavate is respectively the firstth area (A1), the secondth area (A2), third area (A3) and the 4th area (A4), Trimming device falls into operator from the dregs that the firstth area (A1), the secondth area (A2), third area (A3) and the 4th area (A4) are modified In the 5th area (A5) that disk excavates;The volume in the 5th area (A5) is equal to the firstth area (A1), the secondth area (A2), third area (A3) and the The sum of 4th area (A4) volume.
10. the construction method of rectangular cross section hard rock mole according to claim 8 or claim 9, it is characterised in that: the step Section of jurisdiction in S1 and step S4 includes upper section of jurisdiction (11), lower section of jurisdiction (12), left section of jurisdiction (13) and right section of jurisdiction (14), left section of jurisdiction (13) And right section of jurisdiction (14) be symmetricly set between section of jurisdiction (11), lower section of jurisdiction (12) and by bolt respectively with upper section of jurisdiction (11), under Section of jurisdiction (12) is connected.
CN201910047816.2A 2019-01-18 2019-01-18 Rectangular section hard rock tunneling machine and construction method thereof Active CN109653756B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910047816.2A CN109653756B (en) 2019-01-18 2019-01-18 Rectangular section hard rock tunneling machine and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910047816.2A CN109653756B (en) 2019-01-18 2019-01-18 Rectangular section hard rock tunneling machine and construction method thereof

Publications (2)

Publication Number Publication Date
CN109653756A true CN109653756A (en) 2019-04-19
CN109653756B CN109653756B (en) 2024-03-15

Family

ID=66120120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910047816.2A Active CN109653756B (en) 2019-01-18 2019-01-18 Rectangular section hard rock tunneling machine and construction method thereof

Country Status (1)

Country Link
CN (1) CN109653756B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778319A (en) * 2019-11-22 2020-02-11 中铁工程装备集团有限公司 Rectangular heading machine and construction method thereof
CN112727483A (en) * 2021-02-07 2021-04-30 中铁工程装备集团有限公司 Tunnel boring machine and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08270385A (en) * 1995-03-29 1996-10-15 Kajima Corp Shield machine
JPH08338195A (en) * 1995-06-12 1996-12-24 Kawasaki Heavy Ind Ltd Tunnel boring machine
CN102410027A (en) * 2011-10-19 2012-04-11 中铁隧道装备制造有限公司 Novel dual-mode TBM (tunnel boring machine) and control method thereof
CN102691506A (en) * 2012-06-29 2012-09-26 北方重工集团有限公司 Spherical support girder turning mechanism for open-type hard-rock boring machines
CN108571325A (en) * 2018-05-16 2018-09-25 中铁工程装备集团有限公司 A kind of shape of a hoof tunneling boring rock tunnel development machine and its construction method
CN109209413A (en) * 2018-10-26 2019-01-15 中铁工程装备集团有限公司 The multi-cutter-disk of robot support excavates the soft arm development machine in arbitrary cross-section tunnel
CN209483360U (en) * 2019-01-18 2019-10-11 中铁工程装备集团有限公司 A kind of rectangular cross section hard rock mole

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08270385A (en) * 1995-03-29 1996-10-15 Kajima Corp Shield machine
JPH08338195A (en) * 1995-06-12 1996-12-24 Kawasaki Heavy Ind Ltd Tunnel boring machine
CN102410027A (en) * 2011-10-19 2012-04-11 中铁隧道装备制造有限公司 Novel dual-mode TBM (tunnel boring machine) and control method thereof
CN102691506A (en) * 2012-06-29 2012-09-26 北方重工集团有限公司 Spherical support girder turning mechanism for open-type hard-rock boring machines
CN108571325A (en) * 2018-05-16 2018-09-25 中铁工程装备集团有限公司 A kind of shape of a hoof tunneling boring rock tunnel development machine and its construction method
CN109209413A (en) * 2018-10-26 2019-01-15 中铁工程装备集团有限公司 The multi-cutter-disk of robot support excavates the soft arm development machine in arbitrary cross-section tunnel
CN209483360U (en) * 2019-01-18 2019-10-11 中铁工程装备集团有限公司 A kind of rectangular cross section hard rock mole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778319A (en) * 2019-11-22 2020-02-11 中铁工程装备集团有限公司 Rectangular heading machine and construction method thereof
CN112727483A (en) * 2021-02-07 2021-04-30 中铁工程装备集团有限公司 Tunnel boring machine and construction method thereof

Also Published As

Publication number Publication date
CN109653756B (en) 2024-03-15

Similar Documents

Publication Publication Date Title
CN110541708B (en) Drilling machine for excavating rectangular vertical shaft
CN108286440A (en) A kind of anti-sticking list shield TBM of NEW TYPE OF COMPOSITE and its construction method
CN109653756A (en) A kind of rectangular cross section hard rock mole and its construction method
CN102268993A (en) Method for excavating tunnel in high liquid limit soil
CN202391424U (en) Supporting type comprehensive bolter miner
CN104712333A (en) Large-width one-step roadway formation roadway rapid excavation technology
CN209483360U (en) A kind of rectangular cross section hard rock mole
CN104533408A (en) Large-width comprehensive coal road driving anchor machine with simultaneous drifting function
CN204386597U (en) The coal road comprehensive dig-anchor machine of large width simultaneous drifting
CN207647539U (en) The embedded telescoping mechanism of fully-mechanized mining working surface hydraulic support
CN109610454A (en) A kind of underground obstacle barrier clearing device and its construction method
CN212225215U (en) Accurate jacking equipment of line box culvert construction for railway construction
CN208900105U (en) A kind of multi-arm type cantilever excavator
CN208900103U (en) A kind of multi-arm type cantilever excavator for carrying hobboing cutter broken rock
CN106996100A (en) A kind of plane ditch for agricultural irrigation is built canals device
CN210509229U (en) Automatic circulating steel belt laying device for digging and supporting anchor combined unit
CN208763081U (en) Digging machine for deep pit digging
CN210530855U (en) External tube sheet type assembling device and open shield machine
CN208702415U (en) The rotational automatic tool changing device of three tool apron of shield machine
CN208669316U (en) A kind of cantilever excavator for carrying hobboing cutter broken rock
CN208900104U (en) A kind of multi-arm type cantilever excavator for carrying outstanding cutter broken rock
CN202300409U (en) Tunnel excavation equipment
CN202936827U (en) Mining ditcher
CN110512677A (en) Suitable for large-scale canal for water conveyance do not cut off the water reparation the underwater soil body position excavating device
CN211900656U (en) Combine and dig quick-witted machine-mounted temporary support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant