CN109650152A - A kind of cable warehouse for finished product - Google Patents

A kind of cable warehouse for finished product Download PDF

Info

Publication number
CN109650152A
CN109650152A CN201811357696.8A CN201811357696A CN109650152A CN 109650152 A CN109650152 A CN 109650152A CN 201811357696 A CN201811357696 A CN 201811357696A CN 109650152 A CN109650152 A CN 109650152A
Authority
CN
China
Prior art keywords
cable
finished
warehouse
guide rail
pay
Prior art date
Application number
CN201811357696.8A
Other languages
Chinese (zh)
Inventor
乔治国
Original Assignee
乔治国
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 乔治国 filed Critical 乔治国
Priority to CN201811357696.8A priority Critical patent/CN109650152A/en
Publication of CN109650152A publication Critical patent/CN109650152A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/32Stands or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/32Stands or frameworks
    • B65H49/324Constructional details

Abstract

The invention discloses a kind of cable warehouse for finished products, cable warehouse for finished product ontology including being located at workshop side, guide rail III is equipped between the cable warehouse for finished product ontology and workshop, the guide rail III is equipped with electric transporting vehicle, two rows of cable pay-off rack arrays relatively disposed in parallel are equipped in the cable warehouse for finished product ontology, guide rail I is equipped between two rows of cable pay-off rack arrays, the guide rail I is equipped with cable after-combustion vehicle, the outside of two rows of cable pay-off rack arrays is equipped with guide rail II, the guide rail II is equipped with gantry crane, the top of the gantry crane is equipped with ceiling.Beneficial effects of the present invention: 1, full electric drive, energy consumption is small, and production cost is low;2, time few, high production efficiency is carried, personnel's occupancy is few;3, green non-pollution, securely and reliably;4, warehouse compartment is accurate, convenient for management;5, all weather operations, not by meteorological effect.

Description

A kind of cable warehouse for finished product

Technical field

The present invention relates to cable finished product field of storage, relate in particular to a kind of cable warehouse for finished product.

Background technique

The finished product of state's inner cable be all cable reel after workshop completes last procedure, equipped with finished cable by Fork truck is sent to the storage of cable product stockyard, is equipped with fixed partition rewinding equipment in cable product stockyard.Such as the cable of certain specification It needs to deliver, then the cable reel equipped with the specification cable is searched out by warehouse keeper, and by forklift transport to fixed partition after-combustion It at equipment, and is loaded on cable pay-off rack, the cable of predetermined length is unloaded from cable pay-off rack again after completing segmentation, remaining Cable send original place back to, the cable divided is again by fork truck on the haulage vehicle.

The shortcomings that traditional approach is: (1) finished cable is divided from storage, and after-combustion is all complete by hydraulic forklift to delivering At the operation of fuel oil fork truck, maintenance cost is high, and pollutes environment.(2) product stockyard is disorderly and unsystematic, and positioning is found difficult.(3) at The transport of product cable reel repeatedly, loading and unloading low efficiency.(4) fork truck frequently walks the accident of being easy to produce between cable reel, peace It not can guarantee entirely.(5) water inlet is easy in the cable rainy season of open space storage cause quality accident.Summer sunlight irradiates cable meter Face is also easy to produce aging phenomenon.(6) monthly difficulty of making an inventory is not easy using efficient computer+warehouse compartment mode.(7) it is unfavorable for night Between and the rainy day work.

Therefore, develop one kind can either all weather operations, operating cost is low, high production efficiency, the trouble of no safety, not dirty The problem of contaminating environment, and not needing the equipment development expense of investment great number, become cable enterprise urgent need to resolve.

Summary of the invention

For the problems in the relevant technologies, the present invention proposes a kind of cable warehouse for finished product, solves finished cable outdoor storage Difficult management, transport segmentation after-combustion low efficiency, energy consumption is high, and environmental pollution is also easy to produce safety accident, causes product quality hidden The problems such as suffering from.

In order to achieve the above technical purposes, the technical scheme is that it is such:

A kind of cable warehouse for finished product, including be located at workshop side cable warehouse for finished product ontology, the cable warehouse for finished product ontology with Guide rail III is equipped between workshop, the guide rail III is equipped with electric transporting vehicle, is equipped with two in the cable warehouse for finished product ontology Cable pay-off rack array relatively disposed in parallel is arranged, is equipped with guide rail I, the guide rail I between two rows of cable pay-off rack arrays It is equipped with cable after-combustion vehicle, the outside of two rows of cable pay-off rack arrays is equipped with guide rail II, and the guide rail II is equipped with gantry The top of driving, the gantry crane is equipped with ceiling.

Further, each cable pay-off rack array is composed of several cable pay-off rack rods arranged in horizontal line.

Further, the cable pay-off rack includes two columns being vertically arranged I and turns above the column I Axis I, I lower end of column are fixed by foundation bolt and ground, and the upper end of the column I is horizontally installed with shaft I, and described turn Axis I passes through the centre bore of cable reel.

Further, the cable after-combustion vehicle includes the electrical walking device of lower section and the cable disk drive device on top.

Further, illuminator is installed with below the ceiling.

Beneficial effects of the present invention: 1, full electric drive, energy consumption is small, and production cost is low;2, time few, production efficiency is carried Height, personnel occupy few;3, green non-pollution, securely and reliably;4, warehouse compartment is accurate, convenient for management;5, all weather operations, not by meteorology It influences.

Detailed description of the invention

It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.

Fig. 1 is a kind of structural schematic diagram of cable warehouse for finished product according to embodiments of the present invention;

Fig. 2 is the structural schematic diagram of the cable pay-off rack according to embodiments of the present invention;

Fig. 3 is the structural schematic diagram of cable after-combustion vehicle described in the embodiment of the present invention;

Fig. 4 is the structural schematic diagram of electric transporting vehicle described in the embodiment of the present invention.

In figure:

1, cable warehouse for finished product ontology;2, workshop;3, cable pay-off rack array;31, cable pay-off rack;311, column I;312, Foundation bolt;313, shaft I;314, cable reel;4, guide rail I;5, guide rail II;6, guide rail III;7, cable after-combustion vehicle;71, electronic Running gear;72, cable disk drive device;8, gantry crane;9, electric transporting vehicle.

Specific embodiment

Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.

As shown in Figs 1-4, a kind of cable warehouse for finished product, the cable warehouse for finished product ontology 1 including being located at 2 side of workshop, institute It states and is equipped with guide rail III 6 between cable warehouse for finished product ontology 1 and workshop 2, the guide rail III 6 is equipped with electric transporting vehicle 9, production The finished cable in workshop 2 is transported to cable warehouse for finished product ontology by electric transporting vehicle 9, then hangs in cable pay-off rack battle array by gantry crane 8 The different location of column 3, the good finished cable of segmentation after-combustion are packed into electric transporting vehicle 9 by gantry crane 8;The cable warehouse for finished product sheet It is equipped with two rows of cable pay-off rack arrays 3 relatively disposed in parallel in body 1, is equipped with and leads between two rows of cable pay-off rack arrays 3 Rail I 4, the guide rail I 4 are equipped with cable after-combustion vehicle 7, and the outside of two rows of cable pay-off rack arrays 3 is equipped with guide rail II 5, institute Guide rail II 5 is stated equipped with gantry crane 8, the top of the gantry crane 8 is equipped with ceiling, plays the role of rain-proof, sunshade, eliminate Rainy season rainwater enters quality accident caused by cable inside, eliminates the aging phenomenon that summer sun generates cable, Ke Yishi Existing twenty four hours all weather operations.

In the present embodiment, each cable pay-off rack array 3 is combined by several 31 rods arranged in horizontal line of cable pay-off rack It forms.

In the present embodiment, the cable pay-off rack 31 including two columns I 311 being vertically arranged and is located at the column The shaft I 313 of I 311 tops, I 311 lower end of column fixed by foundation bolt 312 with ground, the column I 311 it is upper End is horizontally installed with shaft I 313, and the shaft 313 passes through the centre bore of cable reel 314, and cable reel 314 can be in shaft I Thus rotation, finished cable are released.

In the present embodiment, the cable after-combustion vehicle 7 includes that the electrical walking device 71 of lower section and the cable reel on top drive Dynamic device 72, the cable drive disk device includes two root posts II, and two root posts II are under the driving of motor in level side It can open and move upwards, convenient for the handling of cable reel 314, the sliding block that can move up and down is equipped in two root posts II, It is moved up and down under the driving of motor to be suitable for the cable reel 314 of different-diameter, shaft II, one end is equipped on sliding block It is connect with cable reel 314, one end is connect with motor, and then cable reel 314 is driven to make rotating motion, will be on cable pay-off rack 31 Cable be wound on the empty cable reel of cable after-combustion vehicle 7.

In the present embodiment, illuminator is installed with below the ceiling.

At work, the cable finished product to get off from workshop 2 last procedure can be lifted on electricity with shop traveller On dynamic transport vehicle 9, finished cable is sent in cable warehouse for finished product ontology 1 by electric transporting vehicle 9: by cable warehouse for finished product ontology 1 Gantry crane 8 finished cable of storage is sent into scheduled position in cable pay-off rack array 3;When the cable of certain model need to divide When cutting delivery, cable after-combustion vehicle 7 walking arrive the model cable position, by the cable of required length by the after-combustion of finished cable disk to On the empty cable reel of cable after-combustion vehicle 7, then it is lifted on electric transporting vehicle 9 by gantry row 8.

The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of cable warehouse for finished product, which is characterized in that the cable warehouse for finished product ontology (1) including being located at workshop (2) side, institute It states and is equipped with guide rail III (6) between cable warehouse for finished product ontology (1) and workshop (2), the guide rail III (6) is equipped with electric transportation Vehicle (9), is equipped with two rows of cable pay-off rack arrays (3) relatively disposed in parallel in the cable warehouse for finished product ontology (1), described in two rows Guide rail I (4) is equipped between cable pay-off rack array (3), the guide rail I (4) is equipped with cable after-combustion vehicle (7), two rows of electricity The outside of cable pay off rack array (3) is equipped with guide rail II (5), and the guide rail II (5) is equipped with gantry crane (8), gantry row The top of vehicle (8) is equipped with ceiling.
2. a kind of cable warehouse for finished product according to claim 1, which is characterized in that each cable pay-off rack array (3) is It is composed of several cable pay-off racks (31) rods arranged in horizontal line.
3. a kind of cable warehouse for finished product according to claim 2, which is characterized in that the cable pay-off rack (31) includes two The column I (311) being vertically arranged and the shaft I (313) being located above the column I (311), column I (311) lower end are logical It crosses foundation bolt (312) to fix with ground, the upper end of the column I (311) is horizontally installed with shaft I (313), the shaft I (313) centre bore of cable reel (314) is passed through.
4. a kind of cable warehouse for finished product according to claim 1, which is characterized in that the cable after-combustion vehicle (7) includes lower section Electrical walking device (71) and top cable disk drive device (72).
5. a kind of cable warehouse for finished product according to claim 1, which is characterized in that be installed with headlamp below the ceiling Tool.
CN201811357696.8A 2018-11-15 2018-11-15 A kind of cable warehouse for finished product CN109650152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811357696.8A CN109650152A (en) 2018-11-15 2018-11-15 A kind of cable warehouse for finished product

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811357696.8A CN109650152A (en) 2018-11-15 2018-11-15 A kind of cable warehouse for finished product

Publications (1)

Publication Number Publication Date
CN109650152A true CN109650152A (en) 2019-04-19

Family

ID=66112009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811357696.8A CN109650152A (en) 2018-11-15 2018-11-15 A kind of cable warehouse for finished product

Country Status (1)

Country Link
CN (1) CN109650152A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8602669D0 (en) * 1985-02-07 1986-03-12 Grapha Holding Ag Storing storage elements
EP0411955A1 (en) * 1989-08-04 1991-02-06 Yoshida Kogyo K.K. Rack for storing spools with strips wound therearound
CN103896108A (en) * 2014-03-27 2014-07-02 重庆市隆泰稀土新材料有限责任公司 Automatic carrying system for H-shaped wheels of gantry-type wire stranding machine
CN203997511U (en) * 2014-05-15 2014-12-10 国缆集团有限公司 One electric wire manufacturing enterprise private carrier
CN204490189U (en) * 2014-12-23 2015-07-22 西安泰力松新材料股份有限公司 A kind of automatic wire-collecting machine and auto take-up
CN205342456U (en) * 2015-12-28 2016-06-29 世纪百利(天津)科技发展有限公司 Between portable processing vehicle
CN106429612A (en) * 2016-11-01 2017-02-22 沈晓坤 Fixed cable three-dimensional storage machining system
CN106486211A (en) * 2016-11-01 2017-03-08 沈晓坤 Movable type cable solid storing system of processing
CN106628792A (en) * 2015-10-28 2017-05-10 国网山东昌乐县供电公司 Power cable storage device with dust, dampness and rain prevention functions

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8602669D0 (en) * 1985-02-07 1986-03-12 Grapha Holding Ag Storing storage elements
EP0411955A1 (en) * 1989-08-04 1991-02-06 Yoshida Kogyo K.K. Rack for storing spools with strips wound therearound
CN103896108A (en) * 2014-03-27 2014-07-02 重庆市隆泰稀土新材料有限责任公司 Automatic carrying system for H-shaped wheels of gantry-type wire stranding machine
CN203997511U (en) * 2014-05-15 2014-12-10 国缆集团有限公司 One electric wire manufacturing enterprise private carrier
CN204490189U (en) * 2014-12-23 2015-07-22 西安泰力松新材料股份有限公司 A kind of automatic wire-collecting machine and auto take-up
CN106628792A (en) * 2015-10-28 2017-05-10 国网山东昌乐县供电公司 Power cable storage device with dust, dampness and rain prevention functions
CN205342456U (en) * 2015-12-28 2016-06-29 世纪百利(天津)科技发展有限公司 Between portable processing vehicle
CN106429612A (en) * 2016-11-01 2017-02-22 沈晓坤 Fixed cable three-dimensional storage machining system
CN106486211A (en) * 2016-11-01 2017-03-08 沈晓坤 Movable type cable solid storing system of processing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜会敏: "《仓储与配送管理》", 31 January 2015, 东南大学出版社 *

Similar Documents

Publication Publication Date Title
US9605659B2 (en) Transportable system for self-contained energy micro-grid with wind turbine
CN102085957B (en) Automatic three-dimensional warehousing system
US4755690A (en) Hydroelectric power installation and turbine generator apparatus therefor
DE102008028764A1 (en) Mechanical Hubspeicher power plant with Seilwindenhub
CN203097382U (en) Mechanical stereoscopic storage equipment with entrance-exits capable of being configured as needed
CN203021253U (en) Mechanical synchronous lifting mechanism
CN105236063A (en) Turret type three-dimensional goods storage rack and automatic goods storing and taking method
CN105292897B (en) A kind of manned handling High Level Rack of lift
US7973420B2 (en) Energy storage
CN202022519U (en) Automated tridimensional warehousing system
CN107939614B (en) Hydraulic inclined push type offshore wind turbine installation system
CN2656552Y (en) Ring type automatic multi-story garage
CN102616703B (en) Track-free intelligent moving device of goods shelf warehouse
CN106430026B (en) Electric power overhaul workbench and its system
CN202063473U (en) Three-dimensional warehouse intelligent stacking machine
CN104265037B (en) A kind of compact car deeper subsurface remotely accurately controls the circular parking garage of automatic access
CN207174621U (en) A kind of automatic shelf of grain and oil storage
CN206267616U (en) A kind of mobile collapsible anemometer tower
CN205276955U (en) Three -dimensional dispatch device in bicycle underground
CN205855853U (en) A kind of underground mine use track hoisting machine
CN206901143U (en) A kind of stereo warehouse device based on Internet of Things
CN205894773U (en) Intelligent multi -functional three -dimensional bicycle access system in ground
CN103010767B (en) Novel container handling system
CN108086751A (en) Parallel operation tunnel stacking multi-storied garage
CN206107206U (en) Battery changing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination