CN109609229A - Gas-liquid separation device is used in a kind of production of natural gas - Google Patents

Gas-liquid separation device is used in a kind of production of natural gas Download PDF

Info

Publication number
CN109609229A
CN109609229A CN201910085272.9A CN201910085272A CN109609229A CN 109609229 A CN109609229 A CN 109609229A CN 201910085272 A CN201910085272 A CN 201910085272A CN 109609229 A CN109609229 A CN 109609229A
Authority
CN
China
Prior art keywords
separator box
fixedly connected
coalescence
reserve tank
natural gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910085272.9A
Other languages
Chinese (zh)
Other versions
CN109609229B (en
Inventor
陈秀英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okay Energy Technology Tianjin Co ltd
Original Assignee
Zhengzhou Xinli Yu Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Xinli Yu Intelligent Technology Co Ltd filed Critical Zhengzhou Xinli Yu Intelligent Technology Co Ltd
Priority to CN201910085272.9A priority Critical patent/CN109609229B/en
Publication of CN109609229A publication Critical patent/CN109609229A/en
Application granted granted Critical
Publication of CN109609229B publication Critical patent/CN109609229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G OR C10K; LIQUIFIED PETROLEUM GAS; USE OF ADDITIVES TO FUELS OR FIRES; FIRE-LIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • C10L3/06Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
    • C10L3/10Working-up natural gas or synthetic natural gas
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G OR C10K; LIQUIFIED PETROLEUM GAS; USE OF ADDITIVES TO FUELS OR FIRES; FIRE-LIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • C10L3/06Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
    • C10L3/10Working-up natural gas or synthetic natural gas
    • C10L3/101Removal of contaminants
    • C10L3/106Removal of contaminants of water

Landscapes

  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Separating Particles In Gases By Inertia (AREA)

Abstract

The invention discloses a kind of natural gas production gas-liquid separation devices, including separator box, partition is fixedly connected on the inner wall of the separator box, position on the right side of the separator box and below partition is fixedly connected with air inlet pipe, the left end of the air inlet pipe is through separator box and extends to inside it, and the midpoint of the separation chamber interior wall bottom is fixedly connected with the first drain pipe.The present invention passes through separator box, partition, air inlet pipe, the first drain pipe, liquid reserve tank, corner block, the first coalescence silk screen, the first drainage block, snorkel, the second drain pipe, rotating electric machine, rotating shaft, fixed link, catches mist silk screen, the first coalescence filament plate, the second coalescence filament plate and exhaust pipe mutual cooperation, realize the effect of good separating effect, can thoroughly by natural gas water and light oil separate, without carrying out secondary separation, it is time saving and energy saving, the production efficiency for improving natural gas has ensured the economic benefit of natural gas manufacturing enterprise.

Description

Gas-liquid separation device is used in a kind of production of natural gas
Technical field
The present invention relates to natural gas technical field, gas-liquid separation device is used in specially a kind of natural gas production.
Background technique
Natural gas refers to a naturally occurring tangential gas in nature, including in atmospheric thermodynamics, hydrosphere and lithosphere it is various from The gas (including casing-head gas, reservoir gas, gas of mud volcano, coal bed gas and biology generate gas etc.) that right process is formed.And people are long-term Since general " natural gas " definition, be to be defined from the narrow sense of energy point of view, refer to and naturally contain the hydrocarbon in stratum The mixture of class and non-hydrocarbon gases.In the prior art, it will usually gas collector be set in the well head of oil/gas well, to collect Natural gas, due to containing water and light oil in the gas that flows out out of oil/gas well, it is difficult to directly as the natural gas of life, So needing to carry out gas-liquid separation processing, water and light oil are separated.And common natural gas production is filled with gas-liquid separation Set that separating effect is undesirable, cannot thoroughly by natural gas water and light oil separate, the day after being easy to cause separation Right gas can not supply people directly as life natural gas and use, and need to carry out secondary gas-liquid separation, not only time-consuming and laborious, and And the production efficiency of natural gas is reduced, seriously affect the economic benefit of natural gas manufacturing enterprise.
Summary of the invention
The purpose of the present invention is to provide a kind of natural gas production gas-liquid separation devices, have the excellent of good separating effect Point solves the problems, such as that common natural gas production gas-liquid separation device separating effect is undesirable.
To achieve the above object, the invention provides the following technical scheme: a kind of natural gas production gas-liquid separation device, packet Separator box is included, partition, position separator box right side and be located at below partition are fixedly connected on the inner wall of the separator box It is fixedly connected with air inlet pipe, the left end of the air inlet pipe through separator box and extends to inside it, the separation chamber interior wall bottom Midpoint be fixedly connected with the first drain pipe, the bottom of first drain pipe through separator box and extends to outside it, institute The bottom for stating the first drain pipe surface is fixedly connected with liquid reserve tank, at the top of the partition and be located at the first drain pipe and air inlet pipe it Between position be fixedly connected with corner block, be fixedly connected with the first coalescence silk screen on the left of the corner block, first coalescence The left side of silk screen is fixedly connected with separating on the left of chamber interior wall, and the right side at the top of the partition is fixedly connected with the first drainage block, The midpoint of the partition bottom is fixedly connected with snorkel, and the top of the snorkel sequentially passes through partition and from bottom to up One drainage block and the outside for extending to the first drainage block, the separation chamber interior wall left side and the position being located at the top of partition are fixed and are connected It is connected to the second drain pipe, second drain pipe far from one end of separator box sequentially passes through separator box and liquid reserve tank and by the storage The bottom end of the left side wall of liquid case extends to the inside of liquid reserve tank, and the midpoint at the top of the separator box is fixedly connected with electric rotating Machine, rotating shaft is fixedly connected on the output shaft of the rotating electric machine, and the bottom of the rotating shaft through separator box and is prolonged It extending to inside it, the position at left and right sides of the rotating shaft and inside separator box is symmetrical arranged there are two fixed link, It is fixedly connected between two ipsilateral fixed links by catching mist silk screen, on the left of the separation chamber interior wall and is located at the second drain Position above pipe is fixedly connected with the first coalescence filament plate, separation chamber interior wall right side and the position being located above the first drainage block It sets and is fixedly connected with the second coalescence filament plate, the top on the left of the separator box is fixedly connected with exhaust pipe, the right side of the exhaust pipe End is through separator box and extends to inside it.
Preferably, the bottom at left and right sides of the separation chamber interior wall is fixedly connected to the second drainage block, and described second draws The bottom of stream block contacts with each other with the bottom for separating chamber interior wall.
Preferably, the bottom on the right side of the liquid reserve tank is provided with plug, and liquid reserve tank and extension are run through in the left side of the plug Inside to it.
Preferably, the rotating shaft surface and be located at separation chamber interior wall at the top of position be fixedly connected with sealing ring, institute It states the top of sealing ring and is fixedly connected at the top of chamber interior wall with separating.
Preferably, it is fixedly connected between second drain pipe and liquid reserve tank.
Preferably, the bottom on the left of the separator box is fixedly connected with firm block, the left side of the firm block and second row Liquid pipe is fixedly connected.
Preferably, the outside of the first coalescence filament plate and the second coalescence filament plate, which is respectively arranged with, scrapes scrubbing brush, the scraper plate The width of brush is matched with the first coalescence filament plate or the second coalescence filament plate, and the side point scraped scrubbing brush and be provided with bristle It is not bonded the surface setting of the first coalescence filament plate and the second coalescence filament plate, and makes the bristle and the first coalescence filament plate Or second coalescence filament plate surface be in contact, telescope motor, the output of the telescope motor are provided at the top of the separator box Axis is connected through the separator box and with the scrubbing brush of scraping.
Preferably, on the right side of the separation chamber interior wall and position above partition is fixedly connected with the second air inlet pipe, institute The top for stating the right side wall that the second air inlet pipe sequentially passes through separator box and liquid reserve tank far from one end of separator box extends to liquid reserve tank Inside, be provided with the elastic inflated capsule that can extend along longitudinal direction in the deflated condition on the top surface of the inside of the liquid reserve tank, The top surface of the elastic inflated capsule is fixedly connected with the inner top surface of the liquid reserve tank, and the outer rim of the elastic inflated capsule with it is described The inner wall of liquid reserve tank is mutually supported, the elastic inflated capsule be provided centrally with through the elastic inflated capsule and with the first row The compatible fluid-through port in the port of liquid pipe is provided with multiple by the bullet around the fluid-through port on the elastic inflated capsule Property gas cell bottom surface be connected to the venthole of second air inlet pipe, the venthole is being located at the one of elastic inflated capsule bottom surface End is provided with liquid level meter, is provided with air pump on the left of the liquid reserve tank, the air flue of the air pump through the liquid reserve tank and with institute It states elastic inflated capsule to be connected, the air pump is controlled by the liquid level meter.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention passes through separator box, partition, air inlet pipe, the first drain pipe, liquid reserve tank, corner block, the first coalescence silk screen, first Drainage block, the second drain pipe, rotating electric machine, rotating shaft, fixed link, catches mist silk screen, the first coalescence filament plate, second at snorkel It coalesces filament plate and exhaust pipe to cooperate, realizes the effect of good separating effect, it can be thoroughly by water in natural gas and light Matter oil is separated, time saving and energy saving without carrying out secondary separation, improves the production efficiency of natural gas, has ensured that natural gas is raw Produce the economic benefit of enterprise.
2, the present invention is prevented water and light oil to be trapped in separator box bottom, is filled in by setting by setting the second drainage block Son facilitates staff to clear up the liquid in liquid reserve tank, by the way that sealing ring is arranged, prevents separation the natural gas in case and passes through rotation Separator box is flowed out in gap between shaft and separator box, consolidates block by being arranged, plays the firm effect to the second drain pipe, Prevent the second drain pipe from shaking.
3, the present invention scrapes scrubbing brush by setting, scrapes scrubbing brush to the first coalescence filament plate and the second coalescence by telescope motor drive Filament plate carries out wiper respectively, so that the water and lighter fluid that absorb on the first coalescence filament plate and the second coalescence filament plate are further It is separated with the first coalescence filament plate and the second coalescence filament plate, to guarantee the absorbability of the first coalescence filament plate and the second coalescence filament plate, Further ensure the effect of gas-liquid separation.
4, the present invention is by setting elastic inflated capsule, so that the natural gas remained in liquid reserve tank is recovered to separator box It is interior, the waste and air pollution of natural gas are avoided, and reduce production cost.
Detailed description of the invention
Fig. 1 is the cross-sectional view of the structure of front view of the present invention.
In figure: 1 separator box, 2 partitions, 3 air inlet pipe, 4 first drain pipes, 5 liquid reserve tanks, 6 corner blocks, 7 first coalescence silk screens, Mist silk screen, 15 are caught in 8 first drainage blocks, 9 snorkels, 10 second drain pipes, 11 rotating electric machines, 12 rotating shafts, 13 fixed links, 14 First coalescence filament plate, 16 second coalescence filament plates, 17 exhaust pipes, 18 second drainage blocks, 19 plugs, 20 sealing rings, 21 firm blocks, 22 Scrape scrubbing brush, 23 second air inlet pipe, 24 gas cells, 25 fluid-through ports, 26 ventholes, 27 liquid level meters, 28 air pumps, 29 telescope motors.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of natural gas production gas-liquid separation device, including separator box 1,1 inner wall of separator box or so two The bottom of side is fixedly connected to the second drainage block 18, the bottom of the second drainage block 18 and the bottom phase mutual connection of 1 inner wall of separator box Touching prevents water and light oil to be trapped in 1 bottom of separator box, fixed company on the inner wall of separator box 1 by setting the second drainage block 18 It is connected to partition 2,1 right side of the separator box and position for being located at 2 lower section of partition is fixedly connected with air inlet pipe 3, the left end of air inlet pipe 3 is run through It separator box 1 and extends to inside it, the midpoint of 1 inner wall bottom of separator box is fixedly connected with the first drain pipe 4, the first drain pipe 4 bottom is through separator box 1 and extends to outside it, and the bottom on 4 surface of the first drain pipe is fixedly connected with liquid reserve tank 5, liquid storage The bottom on 5 right side of case is provided with plug 19, and the left side of plug 19 through liquid reserve tank 5 and extends to inside it, by the way that plug is arranged 19, facilitate staff to clear up the liquid in liquid reserve tank 5, the top of partition 2 and between the first drain pipe 4 and air inlet pipe 3 Position is fixedly connected with corner block 6, and the left side of corner block 6 is fixedly connected with the first coalescence silk screen 7, a left side for the first coalescence silk screen 7 It is fixedly connected on the left of side and 1 inner wall of separator box, the right side at 2 top of partition is fixedly connected with the first drainage block 8,2 bottom of partition Midpoint be fixedly connected with snorkel 9, the top of snorkel 9 sequentially passes through partition 2 and the first drainage block 8 from bottom to up and prolongs It extends to the outside of the first drainage block 8, on the left of 1 inner wall of separator box and is located at the position at 2 top of partition and is fixedly connected with the second drain Pipe 10, the second drain pipe 10 far from one end of separator box 1 sequentially pass through separator box 1 and liquid reserve tank 5 and by a left sides for the liquid reserve tank 5 The bottom end of side wall extends to the inside of liquid reserve tank 5, is fixedly connected between the second drain pipe 10 and liquid reserve tank 5,1 left side of separator box Bottom is fixedly connected with firm block 21, and the left side of firm block 21 is fixedly connected with the second drain pipe 10, by the way that firm block 21 is arranged, The firm effect to the second drain pipe 10 is played, prevents the second drain pipe 10 from shaking, the midpoint at 1 top of separator box is solid Surely it is connected with rotating electric machine 11, rotating shaft 12, the bottom of rotating shaft 12 are fixedly connected on the output shaft of rotating electric machine 11 Through separator box 1 and extend to inside it, 12 surface of rotating shaft and be located at 1 inner wall of separator box at the top of position be fixedly connected with Sealing ring 20 is fixedly connected at the top of the top of sealing ring 20 and 1 inner wall of separator box, by the way that sealing ring 20 is arranged, is prevented separation Natural gas in case 1 flows out separator box 1,12 left and right sides of rotating shaft by the gap between rotating shaft 12 and separator box 1 And be located at the position inside separator box 1 and be symmetrical arranged there are two fixed link 13, it is logical between two ipsilateral fixed links 13 It crosses and catches mist silk screen 14 and be fixedly connected, on the left of 1 inner wall of separator box and be located at the position of 10 top of the second drain pipe and be fixedly connected with the One coalescence filament plate 15,1 inner wall of separator box right side and the position for being located at 8 top of the first drainage block are fixedly connected with the second coalescence filament plate 16, the outside of the first coalescence filament plate 15 and the second coalescence filament plate 16 is respectively arranged with and scrapes scrubbing brush 22, the width for scraping scrubbing brush 22 It is matched with the first coalescence filament plate 15 or the second coalescence filament plate 16, and the side difference scraped scrubbing brush 22 and be provided with bristle It is bonded the surface setting of the first coalescence filament plate 15 and the second coalescence filament plate 16, and makes the bristle and first coalesced filament The surface of plate 15 or the second coalescence filament plate 16 is in contact, and the top of the separator box 1 is provided with telescope motor 29, the flexible electricity The output shaft of machine 29 is connected through the separator box 1 and with the scrubbing brush 22 of scraping, and scrapes scrubbing brush 22 by the drive of telescope motor 29 The surface of the first coalescence filament plate of fitting and the second coalescence filament plate wiper repeatedly up and down, so that the first coalescence filament plate and the second coalesced filament The water and lighter fluid absorbed on plate is further mutually separated with coalescence filament plate, ensure that the absorbability of coalescence filament plate, separation The top in 1 left side of case is fixedly connected with exhaust pipe 17, and the right end of exhaust pipe 17 through separator box 1 and is extended to inside it, separated The second air inlet pipe 23,23 separate points of second air inlet pipe are fixedly connected on the right side of 1 inner wall of case and positioned at the position of 2 top of partition The top that one end from case 1 sequentially passes through the right side wall of separator box 1 and liquid reserve tank 5 extends to the inside of liquid reserve tank 5, passes through second Air inlet pipe 23 can import the natural gas in liquid reserve tank 5 in separator box 1, be provided with and inflating on the top surface of the inside of liquid reserve tank 5 The elastic inflated capsule 24 that can extend along longitudinal direction under state, the interior top of the top surface of the elastic inflated capsule 24 and the liquid reserve tank 5 Face is fixedly connected, and the outer rim of the elastic inflated capsule 24 and the inner wall of the liquid reserve tank 5 are mutually supported, the elastic inflated capsule 24 Be provided centrally with through the elastic inflated capsule 24 and fluid-through port 25 compatible with the port of first drain pipe 4, ring Around the fluid-through port 25, it is provided with multiple bottom surfaces by the elastic inflated capsule 24 on the elastic inflated capsule 24 and is connected to institute The venthole 26 of the second air inlet pipe 23 is stated, the venthole 26 is provided with liquid level meter in the one end for being located at 24 bottom surface of elastic inflated capsule 27, the left side of the liquid reserve tank 5 is provided with air pump 28, the air flue of the air pump 28 through the liquid reserve tank 5 and with the elasticity Gas cell 24 is connected, and the air pump 28 is controlled by the liquid level meter 27, is inflated by air pump 28 into elastic inflated capsule 24, bullet Property gas cell 24 is extended downwardly along the inner wall of liquid reserve tank 5, is returned so that the natural gas in liquid reserve tank 5 is extruded along the first drain pipe 4 Separator box 1 is returned, or is returned in separator box 1 along venthole 26 through the second air inlet pipe 23, natural gas waste is avoided, also avoids distributing Environment is polluted into environment, in lasting extension, the liquid level meter 27 of bottom setting touches in liquid reserve tank 5 elastic inflated capsule 24 When liquid, to 28 return signal of air pump, so that air pump 28 stops inflating to elastic inflated capsule 24, the natural gas quilt in liquid reserve tank 5 Compel to be back in separator box 1, then air pump 28 is evacuated, and elastic inflated capsule 24 is shunk under the action of natural resiliency is back to liquid storage The top of case 5 coalesces silk screen by separator box 1, partition 2, air inlet pipe 3, the first drain pipe 4, liquid reserve tank 5, corner block 6, first 7, first drainage block 8, snorkel 9, the second drain pipe 10, rotating electric machine 11, rotating shaft 12, fixed link 13, catch mist silk screen 14, First coalescence filament plate 15, second coalesces filament plate 16 and exhaust pipe 17 cooperates, and realizes the effect of good separating effect, can be thorough Bottom by natural gas water and light oil separate, it is time saving and energy saving without carrying out secondary separation, improve the life of natural gas Efficiency is produced, has ensured the economic benefit of natural gas manufacturing enterprise.
In use, the casing connection of air inlet pipe 3 and oil/gas well is divided so that the gas in casing is entered by air inlet pipe 3 From in case 1 so that the water and light oil in natural gas containing liquid condense into big drop after encountering corner block 6, then due to Gravity is dropped on the second drainage block 18, is then flowed into liquid reserve tank 5 by the first drain pipe 4, and then air-flow passes through the One coalescence silk screen 7 is agglomerated into big drop, is then dripped, is finally flowed into liquid reserve tank 5 by gravity, then air-flow passes through ventilation Pipe 9 enters the top of partition 2, and rotating shaft 12, fixed link 13 are then successively driven by rotating electric machine 11 and catches mist silk screen 14 and is revolved Turn, thus by catching the constantly rotation of mist silk screen 14 to coalesce remaining moisture and light oil in natural gas, so that big drop is coalesced, Then due to the effect of centrifugal force, so that big drop is thrown out of and catches mist silk screen 14, then fall on the first drainage block 8, then lead to Cross the second drain pipe 10 flow into liquid reserve tank 5 in, while by first coalescence filament plate 15 and second coalescence filament plate 16 collective effect under, Remaining water and lighter fluid in natural gas in absorption and separation case 1, are then agglomerated into big drop, then due to gravity, Big drips flow into liquid reserve tank 5, then by being completely separated on the first drainage block 8 eventually by the second drain pipe 10 Natural gas afterwards is transferred to down one of production stage by exhaust pipe 17.
In summary: natural gas production gas-liquid separation device passes through separator box 1, partition 2, air inlet pipe 3, first row Liquid pipe 4, liquid reserve tank 5, corner block 6, first coalesce silk screen 7, first and drain block 8, snorkel 9, the second drain pipe 10, rotating electric machine 11, rotating shaft 12, fixed link 13, catch mist silk screen 14, first and coalesce filament plate 15, second to coalesce filament plate 16 and exhaust pipe 17 mutual Cooperation, solves the problems, such as that common natural gas production gas-liquid separation device separating effect is undesirable.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of natural gas production gas-liquid separation device, including separator box (1), it is characterised in that: the separator box (1) it is interior It is fixedly connected on wall partition (2), the position on the right side of the separator box (1) and below partition (2) is fixedly connected with air inlet It manages (3), the left end of the air inlet pipe (3) through separator box (1) and extends to inside it, separator box (1) the inner wall bottom Midpoint is fixedly connected with the first drain pipe (4), and the bottom of first drain pipe (4) through separator box (1) and extends to it The bottom of outside, the first drain pipe (4) surface is fixedly connected with liquid reserve tank (5), at the top of the partition (2) and is located at first Position between drain pipe (4) and air inlet pipe (3) is fixedly connected with corner block (6), is fixedly connected on the left of the corner block (6) There is the first coalescence silk screen (7), is fixedly connected on the left of the left side of first coalescence silk screen (7) and separator box (1) inner wall, it is described Right side at the top of partition (2) is fixedly connected with the first drainage block (8), and the midpoint of partition (2) bottom is fixedly connected with logical Tracheae (9), the top of the snorkel (9) sequentially pass through partition (2) and the first drainage block (8) from bottom to up and extend to first The outside of drainage block (8), separator box (1) the inner wall left side and the position being located at the top of partition (2) are fixedly connected with second row Liquid pipe (10), second drain pipe (10) far from separator box (1) one end sequentially pass through separator box (1) and liquid reserve tank (5) and The inside of liquid reserve tank (5), the midpoint at the top of the separator box (1) are extended to by the bottom end of the left side wall of the liquid reserve tank (5) It is fixedly connected with rotating electric machine (11), is fixedly connected with rotating shaft (12) on the output shaft of the rotating electric machine (11), it is described The bottom of rotating shaft (12) is through separator box (1) and extends to inside it, at left and right sides of the rotating shaft (12) and is located at The internal position of separator box (1) is arranged symmetrically, and there are two fixed link (13), lead between two ipsilateral fixed links (13) It crosses and catches mist silk screen (14) and be fixedly connected, on the left of separator box (1) the inner wall and position that is located above the second drain pipe (10) is solid Surely it is connected with the first coalescence filament plate (15), on the right side of separator box (1) the inner wall and position that is located above the first drainage block (8) is solid Surely it is connected with the second coalescence filament plate (16), the top on the left of the separator box (1) is fixedly connected with exhaust pipe (17), the exhaust The right end of pipe (17) is through separator box (1) and extends to inside it.
2. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that: the separator box (1) bottom at left and right sides of inner wall is fixedly connected to the second drainage block (18), and described second drains the bottom of block (18) and divide Bottom from case (1) inner wall contacts with each other.
3. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that: the liquid reserve tank (5) bottom on the right side of is provided with plug (19), and the left side of the plug (19) through liquid reserve tank (5) and extends to inside it.
4. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that: the rotating shaft (12) surface and be located at separator box (1) inner wall at the top of position be fixedly connected with sealing ring (20), the top of the sealing ring (20) It is fixedly connected at the top of portion and separator box (1) inner wall.
5. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that: second drain It is fixedly connected between pipe (10) and liquid reserve tank (5).
6. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that: the separator box (1) bottom on the left of is fixedly connected with firm block (21), and the left side and the second drain pipe (10) of the firm block (21) are fixed to be connected It connects.
7. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that:
The outside of first coalescence filament plate (15) and the second coalescence filament plate (16), which is respectively arranged with, scrapes scrubbing brush (22), the scraper plate The width for brushing (22) is matched with first coalescence filament plate (15) or the second coalescence filament plate (16), and the scrubbing brush (22) of scraping is set The side for being equipped with bristle is bonded the surface setting of first coalescence filament plate (15) and the second coalescence filament plate (16) respectively, and makes institute It states bristle to be in contact with the surface of first coalescence filament plate (15) or the second coalescence filament plate (16), the top of the separator box (1) Portion is provided with telescope motor (29), and the output shaft of the telescope motor (29) through the separator box (1) and scrapes scrubbing brush with described (22) it is connected.
8. a kind of natural gas production gas-liquid separation device according to claim 1, it is characterised in that: the separator box (1) position on the right side of inner wall and above partition (2) is fixedly connected with the second air inlet pipe (23), second air inlet pipe (23) The top for the right side wall that one end far from separator box (1) sequentially passes through separator box (1) and liquid reserve tank (5) extends to liquid reserve tank (5) Inside, be provided with the elastic inflated that can extend along longitudinal direction in the deflated condition on the top surface of the inside of the liquid reserve tank (5) The top surface of capsule (24), the elastic inflated capsule (24) is fixedly connected with the inner top surface of the liquid reserve tank (5), and the elastic inflated The outer rim of capsule (24) and the inner wall of the liquid reserve tank (5) are mutually supported, and the elastic inflated capsule (24) is provided centrally with through institute Elastic inflated capsule (24) and fluid-through port (25) compatible with the port of first drain pipe (4) are stated, around the fluid-through port (25), it is provided with multiple bottom surfaces by the elastic inflated capsule (24) on the elastic inflated capsule (24) and is connected to described second The venthole (26) of air inlet pipe (23), the venthole (26) are provided with liquid level in the one end for being located at elastic inflated capsule (24) bottom surface Device (27) is provided with air pump (28) on the left of the liquid reserve tank (5), and the air flue of the air pump (28) runs through the liquid reserve tank (5) And be connected with the elastic inflated capsule (24), the air pump (28) is controlled by the liquid level meter (27).
CN201910085272.9A 2019-01-29 2019-01-29 Gas-liquid separation device for natural gas production Active CN109609229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910085272.9A CN109609229B (en) 2019-01-29 2019-01-29 Gas-liquid separation device for natural gas production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910085272.9A CN109609229B (en) 2019-01-29 2019-01-29 Gas-liquid separation device for natural gas production

Publications (2)

Publication Number Publication Date
CN109609229A true CN109609229A (en) 2019-04-12
CN109609229B CN109609229B (en) 2020-11-24

Family

ID=66018650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910085272.9A Active CN109609229B (en) 2019-01-29 2019-01-29 Gas-liquid separation device for natural gas production

Country Status (1)

Country Link
CN (1) CN109609229B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112408683A (en) * 2020-11-19 2021-02-26 王俊斌 Automatic abluent gradient formula clarifier
CN117363391A (en) * 2023-12-05 2024-01-09 烟台华港能源科技有限公司 Wet natural gas drying equipment for natural gas liquefaction pretreatment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1493279A1 (en) * 1987-11-17 1989-07-15 Предприятие П/Я А-3605 Oild separating device
SU1498537A1 (en) * 1987-03-06 1989-08-07 Саратовский филиал Специального конструкторского бюро Всесоюзного научно-производственного объединения "Союзгазавтоматика" Gas separator
CN1904476A (en) * 2005-07-20 2007-01-31 Smc株式会社 discharge separator
CN201943682U (en) * 2011-02-26 2011-08-24 李军 Gas separation device for oil wellhead casing
CN204147714U (en) * 2014-08-25 2015-02-11 上海卓旋化工科技有限公司 The solid four-phase separator of a kind of air water oil
CN105327576A (en) * 2014-08-16 2016-02-17 西安格瑞德化工新材料有限公司 Natural-gas processing equipment
CN205627485U (en) * 2016-05-04 2016-10-12 西安市三桥机电设备有限公司 Collision formula gas -liquid coalescence -separation device
CN206604245U (en) * 2017-03-31 2017-11-03 赵亚宁 Self-cleaning y-type filter
CN206715497U (en) * 2017-03-09 2017-12-08 中国海洋石油总公司 A kind of underwater combined type natural gas gas-liquid separation device
CN108148643A (en) * 2018-02-08 2018-06-12 江苏优耐特过滤装备有限公司 Vertical multi-stage separator
CN108452595A (en) * 2018-04-18 2018-08-28 佛山市千注利科技有限公司 A kind of factory's novel waste gas treatment device
CN108623118A (en) * 2018-05-07 2018-10-09 西安交通大学 A kind of continuous exhaust pneumatic wallop, the backwash of interval deslagging band three phase separator

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1498537A1 (en) * 1987-03-06 1989-08-07 Саратовский филиал Специального конструкторского бюро Всесоюзного научно-производственного объединения "Союзгазавтоматика" Gas separator
SU1493279A1 (en) * 1987-11-17 1989-07-15 Предприятие П/Я А-3605 Oild separating device
CN1904476A (en) * 2005-07-20 2007-01-31 Smc株式会社 discharge separator
CN201943682U (en) * 2011-02-26 2011-08-24 李军 Gas separation device for oil wellhead casing
CN105327576A (en) * 2014-08-16 2016-02-17 西安格瑞德化工新材料有限公司 Natural-gas processing equipment
CN204147714U (en) * 2014-08-25 2015-02-11 上海卓旋化工科技有限公司 The solid four-phase separator of a kind of air water oil
CN205627485U (en) * 2016-05-04 2016-10-12 西安市三桥机电设备有限公司 Collision formula gas -liquid coalescence -separation device
CN206715497U (en) * 2017-03-09 2017-12-08 中国海洋石油总公司 A kind of underwater combined type natural gas gas-liquid separation device
CN206604245U (en) * 2017-03-31 2017-11-03 赵亚宁 Self-cleaning y-type filter
CN108148643A (en) * 2018-02-08 2018-06-12 江苏优耐特过滤装备有限公司 Vertical multi-stage separator
CN108452595A (en) * 2018-04-18 2018-08-28 佛山市千注利科技有限公司 A kind of factory's novel waste gas treatment device
CN108623118A (en) * 2018-05-07 2018-10-09 西安交通大学 A kind of continuous exhaust pneumatic wallop, the backwash of interval deslagging band three phase separator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谭世语: "《化工工艺学 第4版》", 31 January 2015, 重庆大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112408683A (en) * 2020-11-19 2021-02-26 王俊斌 Automatic abluent gradient formula clarifier
CN112408683B (en) * 2020-11-19 2023-09-12 王俊斌 Gradient purifier capable of automatically cleaning
CN117363391A (en) * 2023-12-05 2024-01-09 烟台华港能源科技有限公司 Wet natural gas drying equipment for natural gas liquefaction pretreatment
CN117363391B (en) * 2023-12-05 2024-02-13 烟台华港能源科技有限公司 Wet natural gas drying equipment for natural gas liquefaction pretreatment

Also Published As

Publication number Publication date
CN109609229B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN110410135A (en) Full-wet circulating water filtration and dust removal system and working method for roadway excavation working face
CN110812892A (en) A high-efficiency gas-liquid separator for chemical production
CN106118778A (en) A kind of novel natural gas filter separator
CN103657261B (en) For the gravity settling chamber of MAP tail gas depositing dust
CN109609229B (en) Gas-liquid separation device for natural gas production
CN206345833U (en) Oil shale distillation system high-efficiency dust remover
CN217679385U (en) High leakproofness's oil gas field produces tank for water
CN213556091U (en) Venturi scrubber for dust removal of synthesis gas
CN201102911Y (en) Waste oil water collecting device
CN215692681U (en) Water bath dust collector for pollution prevention system
CN219333381U (en) Coalescence oil-water separator with filter screen anti-blocking function
CN211098389U (en) A waste gas treatment device for power plants
CN211393946U (en) Oil-water separation device capable of overflowing and circularly cleaning
CN114482976A (en) High-efficiency horizontal three-phase separator
CN210410025U (en) Glass fiber reinforced plastic dust removal tower
CN206103606U (en) Double entry vapour and liquid separator
CN113617068A (en) Gas separator for petroleum conveying pipeline
CN220878260U (en) Dust settling device for gold mining
CN222111249U (en) A new type of purification device
CN112275074A (en) Energy-saving treatment device and system for exhaust gas of gas-fired boiler
CN113105921B (en) Device and method for purifying noncondensable gas generated by pyrolysis of waste tire
CN219701163U (en) Novel oil-water separation device for cleaning machine
CN216725884U (en) High-efficient three-phase separator
CN221981822U (en) Automatic cleaning type filter bag dust collector
CN223287851U (en) A waste gas treatment device for real stone paint production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201110

Address after: Workshop No.3, Zhongzhou economic trade, No.188, Xinhe Road, Xinfeng Town, Nanhu District, Jiaxing City, Zhejiang Province, 314000

Applicant after: Jiaxing geek Travel Products Co.,Ltd.

Address before: 450000 No. 6 Building, No. 91 Huanghe East Road, Zhengdong New District, Zhengzhou City, Henan Province

Applicant before: ZHENGZHOU XINLINGYU INTELLIGENT TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230208

Address after: Room-1-602, building B-4, No. 16, Haitai development road 5, Huayuan Industrial Zone, Binhai New Area, Tianjin (outside the ring road)

Patentee after: OKAY ENERGY TECHNOLOGY (TIANJIN) Co.,Ltd.

Address before: 314000 workshop 3, Zhongzhou economy and trade, 188 Xinhe Road, Xinfeng Town, Nanhu District, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing geek Travel Products Co.,Ltd.