CN109578066A - A kind of mine down-hole spoil transport is-broken-to fill integral method - Google Patents

A kind of mine down-hole spoil transport is-broken-to fill integral method Download PDF

Info

Publication number
CN109578066A
CN109578066A CN201811461482.5A CN201811461482A CN109578066A CN 109578066 A CN109578066 A CN 109578066A CN 201811461482 A CN201811461482 A CN 201811461482A CN 109578066 A CN109578066 A CN 109578066A
Authority
CN
China
Prior art keywords
broken
spoil
belt
transport
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811461482.5A
Other languages
Chinese (zh)
Other versions
CN109578066B (en
Inventor
辛亚军
董帅
姬红英
吕鑫
郝海春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Polytechnic University
Original Assignee
Henan Polytechnic University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Polytechnic University filed Critical Henan Polytechnic University
Priority to CN201811461482.5A priority Critical patent/CN109578066B/en
Publication of CN109578066A publication Critical patent/CN109578066A/en
Application granted granted Critical
Publication of CN109578066B publication Critical patent/CN109578066B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/002Crushing devices specifically for conveying in mines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/02Transport of mined mineral in galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/06Filling-up mechanically

Abstract

The present invention discloses a kind of-broken-the filling integral method of mine down-hole spoil transport, specifically include that adjusting expansion bracket fastening nut and rear mobile roller bearing seat nut according to field condition realizes that the whole of balata belt is moved forward and backward, it opens speed-regulating switch and starts motor, broken bulk spoil will be needed to be placed on starting belt and fall into secondary breaker, spoil enters batcher after two-stage crushing crusher machine, it falls by setting speed and is transported on balata belt to filling area later, transport is to opening hydraulic thrust column behind the designated position of filling area for compaction plate to being pushed forward to tamp Gangue, the back-and-forth motion of preceding traveling roller and rear traveling roller interacts progress with what tracked machine drive pedestal and steel frame moved integrally, fill area is completed integrally to fill.The method of the present invention has the characteristics that easily operated, step is reasonable, not only solves belt disassembling complexity problem, and reduces the mobile frequency of equipment, reduces filling cost, improves work efficiency.

Description

A kind of mine down-hole spoil transport is-broken-to fill integral method
Technical field
The present invention relates to a kind of transports of mine down-hole spoil, and-being crushed-fills integral method, is the tool by designed, designed There are the broken application method that practical operation in filling area is placed on tunnel filling motorisation unit of multi-functional quick downhole gangue, tool Body is designed into the application method of mining haul stowage unit.
Background technique
In coal mining, with coal output can a large amount of spoils of association, spoil underground transportation difficulty, and gug at This is higher, and formed after spoil gug take up a large area, seriously polluted hillock, lose more than gain, so generally using cash Gug in the directly broken mode filled in underground does not utilize spoil to stone.But with the continuous filling of spoil, spoil conveying dress It sets needs constantly to move back, needs frequently to adjust the length of conveyor belt, heavy workload, and device for filling will realize a left side in tunnel Right translation, it is time-consuming and laborious.Simultaneously as the drawbacks such as device for filling is larger, and Belt Length adjustment is frequent occur, lane is seriously reduced Road waste filling efficiency.Therefore, seek and solve the transport-of spoil in certain special cases it is broken-filling is most important.
It is broken with tunnel filling motorisation unit that the present invention is based on the multi-functional quick downhole gangues of one kind of designed, designed, mentions Go out the downhole gangue with retractable belt and is crushed transport device in spoil transport, the broken use with practical operation in filling Method transports stowage unit for downhole gangue and needs to convert Belt Length and the mobile number of reduction equipment in certain special cases The problem of propose a kind of effective method.
Summary of the invention
The defect that the present invention is frequently moved for existing mine down-hole stowage unit multi-section belt, filling filling, provides one - broken-filling integral method of kind mine down-hole spoil transport, it is intended to solve belt conveyer and add in certain special cases The problem that long, shortening and equipment frequently move more effectively solves spoil from transport to filling using the mode of a tractor serves several purposes Step is many and diverse in the process, achievees the purpose that the fining of mine down-hole stowage unit and diversification.
To achieve the above object, the present invention proposes that a kind of mine down-hole spoil transport is-broken-and fills integral method, main It include: the entirety for adjusting expansion bracket fastening nut and rear mobile roller bearing seat nut realization balata belt according to field condition It is moved forward and backward, opens speed-regulating switch and start motor, broken bulk spoil will be needed to be placed on starting belt and fall into second level Crusher, spoil enter batcher after two-stage crushing crusher machine, fall on balata belt by setting speed to filling later Area's transport opens hydraulic thrust column for compaction plate to being pushed forward to tamp Gangue, moves forward after transport to filling area designated position The back-and-forth motion of dynamic roller and rear traveling roller interacts progress with what tracked machine drive pedestal and steel frame moved integrally, completes to fill Fill out region entirety filling.The method of the present invention has the characteristics that easily operated, step is reasonable, not only solves belt disassembling complicated difficult Topic, and reduce the mobile frequency of equipment, filling cost is reduced, is improved work efficiency.
A kind of mine well spoil transport is-broken-to fill integral method, the specific steps are as follows:
Step 1 is adjusted according to field condition by fixed link fastening nut, preceding mobile roller bearing seat nut and telescopic rail group At scalable frame and rear mobile roller bearings nut reach actual shipment to realize that the whole of balata belt is moved forward and backward Suitable distance, it is ensured that the safety of broken each component of transport device.
Step 2 opens the power-equipment on speed-regulating switch support piece for opening, in motor according to transport and filling needs By power transmission to driving chain under effect, driving chain engaged transmission chain wheel drives high-order roller rotation, balata belt hasp It is contacted with the friction roller bearing of high-order roller, balata belt starts turning.
Step 3 will need broken bulk spoil to be stably placed on starting balata belt, bulk spoil with belt to The crusher that lower section is fallen at upper transport to high-order roller carries out specified particle size and is crushed, and the baffle among broken support frame prevents small Block rubble splashes damage machine.
Step 4 opens crusher switch, and bulk spoil enters secondary breaker and is broken into fritter specified particle size spoil, Batcher is supplied on lower rubber belt fritter spoil is uniform or quantitative, to be transported and be filled to filling area.
Step 5, broken spoil are transported to the designated position of filling area, slow down the speed of balata belt transport, and opening pushes away column Hydraulic thrust column is driven compaction plate to being pushed forward to tamp Gangue, hydraulic thrust column is withdrawn after the completion of tamping, and extensive by switch The multiple original travelling speed of balata belt carries out filling next time.
Step 6, back-and-forth motion and the tracked machine of preceding traveling roller and rear traveling roller drive pedestal and steel frame integrally to move Dynamic interaction carries out, and completes fill area and integrally fills.
The advantages of the present invention are: the method for the present invention has the characteristics that easily operated, step is reasonable, not only solves It has determined belt disassembling complexity problem, and has reduced the mobile frequency of equipment, reduced filling cost, improve work efficiency.
Detailed description of the invention
Fig. 1 is that a kind of transport of mine down-hole spoil-is crushed-filling integral method structural front view.
Fig. 2 is Fig. 1 top view.
Fig. 3 is Fig. 1 left view.
In figure: 1 is balata belt;2 be high-order roller;3 be low level roller;4 be preceding traveling roller;5 be rear traveling roller; 6 be telescopic rail;7 be fixed link;8 be batcher;9 be secondary breaker;10 be broken bearing support;11 be steel frame;12 are Tracked machine;13 be pedestal;14 be driving chain;15 be power-equipment;16 be motive power part;17 be transmission chain wheel;18 be tune Speed switch;19 be hydraulic thrust column;20 switch to push away column;21 be compaction plate.
Specific embodiment
The present invention is described in further detail with example with reference to the accompanying drawing.
As shown in Fig. 1 ~ 3, the present invention provides a kind of transports of mine down-hole spoil, and-being crushed-fills integral method, mainly It include: to adjust scalable frame fixed link fastening nut and rear mobile roller bearing seat nut realization balata belt according to field condition It is whole be moved forward and backward, open speed-regulating switch and start motor, broken bulk spoil will be needed to be placed on starting belt and fallen Enter crusher, spoil falls again after crusher two-stage crushing and transports on belt to filling area, transport to filling area specific bit It postpones and opens hydraulic thrust column for compaction plate to being pushed forward to tamp Gangue, the front and back of preceding traveling roller and rear traveling roller is moved It is dynamic to interact progress with what tracked machine drive pedestal and steel frame moved integrally, it completes fill area and integrally fills.
Specific step is as follows for this method:
Step 1 is adjusted according to field condition by 7 fastening nut of fixed link, 4 bearing block nut of preceding traveling roller and telescopic rail 6 The scalable frame and rear 5 bearing nut of traveling roller of composition reach practical fortune to realize that the whole of balata belt 1 is moved forward and backward Defeated suitable distance, it is ensured that the safety of broken each component of transport device.
Step 2 fastens fixed link 7 and preceding 4 bearing block nut of traveling roller in scalable frame after adjusting position, it is ensured that broken The safety of broken each component of transport device.
Step 3 opens the power-equipment 15 on 18 support piece for opening 16 of speed-regulating switch according to transport and filling needs, By power transmission to driving chain 14 under the action of motor, 14 engaged transmission chain wheel 17 of driving chain drives high-order roller 2 to rotate, 1 hasp of balata belt is contacted with the friction roller bearing of high-order roller 2, and balata belt 1 starts turning.
Step 4 will need broken bulk spoil to be stably placed on starting balata belt 1, bulk spoil with belt to The crusher 9 that lower section is fallen at upper transport to high-order roller 2 carries out specified particle size and is crushed, and the baffle being crushed among support frame 10 is anti- Only fritter rubble splashes damage machine.
Step 5 is opened crusher 9 and is switched, and bulk spoil enters secondary breaker 9 and is broken into fritter specified particle size cash Stone, batcher 8 is supplied on lower rubber belt 1 fritter spoil is uniform or quantitative, to be transported and be filled to filling area It fills out.
Step 6, broken spoil are transported to the designated position of filling area, slow down the speed of the transport of balata belt 1, and opening pushes away Hydraulic thrust column 19 is driven compaction plate 21 to being pushed forward to tamp Gangue by column switch 20, hydraulic wait withdraw after the completion of tamping Column 19 is pushed away, and restores the filling of the original travelling speed of balata belt 1 progress next time.
Step 7, the back-and-forth motion of preceding traveling roller 4 and rear traveling roller 5 and tracked machine 12 drive pedestal 13 and steel frame 11 interactions moved integrally carry out, and complete fill area and integrally fill.
The preferred embodiment of the patent is described in detail above, and protection scope of the present invention is not limited only to The description of present embodiment, but be limited according to claim.

Claims (1)

  1. It is-broken -1. a kind of mine well spoil transport to fill integral method, which comprises the steps of:
    Step 1 is adjusted according to field condition by fixed link fastening nut, preceding mobile roller bearing seat nut and telescopic rail group At scalable frame and rear mobile roller bearings nut reach actual shipment to realize that the whole of balata belt is moved forward and backward Suitable distance, it is ensured that the safety of broken each component of transport device;
    Step 2 fastens fixed link and preceding mobile roller bearing seat nut in scalable frame after adjusting position, it is ensured that broken transport The safety of each component of device;
    Step 3 opens the power-equipment on speed-regulating switch support piece for opening, in the effect of motor according to transport and filling needs It is lower by power transmission to driving chain, driving chain engaged transmission chain wheel drives high-order roller rotation, balata belt hasp and high The friction roller bearing contact of position roller, balata belt start turning;
    Step 4 will need broken bulk spoil to be stably placed on starting balata belt, and bulk spoil is transported upwards with belt The crusher transported to below falling at high-order roller carries out specified particle size and is crushed, and the baffle among broken support frame prevents fritter broken Stone splashes damage machine;
    Step 5 opens crusher switch, and bulk spoil enters secondary breaker and is broken into fritter specified particle size spoil, is fed Machine is supplied on lower rubber belt fritter spoil is uniform or quantitative, to be transported and be filled to filling area;
    Step 6, broken spoil are transported to the designated position of filling area, slow down the speed of balata belt transport, and opening pushes away column and opens It closes, drives compaction plate to being pushed forward to tamp Gangue on hydraulic thrust column, hydraulic thrust column is withdrawn after the completion of tamping, and restore The original travelling speed of balata belt carries out filling next time;
    Step 7, the back-and-forth motion of preceding traveling roller and rear traveling roller and tracked machine drive pedestal and steel frame to move integrally Interaction carries out, and completes fill area and integrally fills.
CN201811461482.5A 2018-12-02 2018-12-02 Mine underground gangue transportation-crushing-filling integrated method Active CN109578066B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811461482.5A CN109578066B (en) 2018-12-02 2018-12-02 Mine underground gangue transportation-crushing-filling integrated method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811461482.5A CN109578066B (en) 2018-12-02 2018-12-02 Mine underground gangue transportation-crushing-filling integrated method

Publications (2)

Publication Number Publication Date
CN109578066A true CN109578066A (en) 2019-04-05
CN109578066B CN109578066B (en) 2020-06-05

Family

ID=65926315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811461482.5A Active CN109578066B (en) 2018-12-02 2018-12-02 Mine underground gangue transportation-crushing-filling integrated method

Country Status (1)

Country Link
CN (1) CN109578066B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520185A (en) * 2020-04-27 2020-08-11 中国矿业大学 End slope mining goaf filling machine and filling method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3639997A1 (en) * 1986-11-22 1988-05-26 Adam Udo Maschinenfabrik Compact pneumatic-stowing station
PL159012B1 (en) * 1988-08-30 1992-11-30 Zabrzanskie Gwarectwo Weglowe Backfilling machinery employing waste material, in particular mine one
CN202954848U (en) * 2012-11-15 2013-05-29 迁西县林汇机械制造有限公司 Long-stroke telescopic arm of filling machine
CN104033153A (en) * 2014-06-25 2014-09-10 中国矿业大学 Coal mine underground mining, dress and filling integral method
CN203822367U (en) * 2014-04-29 2014-09-10 佳木斯煤矿机械有限公司 Casting and filling machine for roadway
CN205503124U (en) * 2016-04-20 2016-08-24 山东科技大学 System of portable waste rock breakage in pit
CN206720225U (en) * 2017-03-05 2017-12-08 崔彦峰 A kind of coal road belt elevating conveyor
CN207393252U (en) * 2017-09-21 2018-05-22 山东东山新驿煤矿有限公司 A kind of spoil automatic filling system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3639997A1 (en) * 1986-11-22 1988-05-26 Adam Udo Maschinenfabrik Compact pneumatic-stowing station
PL159012B1 (en) * 1988-08-30 1992-11-30 Zabrzanskie Gwarectwo Weglowe Backfilling machinery employing waste material, in particular mine one
CN202954848U (en) * 2012-11-15 2013-05-29 迁西县林汇机械制造有限公司 Long-stroke telescopic arm of filling machine
CN203822367U (en) * 2014-04-29 2014-09-10 佳木斯煤矿机械有限公司 Casting and filling machine for roadway
CN104033153A (en) * 2014-06-25 2014-09-10 中国矿业大学 Coal mine underground mining, dress and filling integral method
CN205503124U (en) * 2016-04-20 2016-08-24 山东科技大学 System of portable waste rock breakage in pit
CN206720225U (en) * 2017-03-05 2017-12-08 崔彦峰 A kind of coal road belt elevating conveyor
CN207393252U (en) * 2017-09-21 2018-05-22 山东东山新驿煤矿有限公司 A kind of spoil automatic filling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520185A (en) * 2020-04-27 2020-08-11 中国矿业大学 End slope mining goaf filling machine and filling method thereof

Also Published As

Publication number Publication date
CN109578066B (en) 2020-06-05

Similar Documents

Publication Publication Date Title
US9096389B2 (en) Advancing longwall system for surface mining
CN103097658B (en) Continuous extraction mining system
US5112111A (en) Apparatus and method for continuous mining
US8434706B2 (en) Overburden removal system with triple track mobile sizer
AU2010230688B2 (en) Mobile crusher
RU2645694C2 (en) Method for separately mining and transporting thick coal seam with gangue, and backfilling goaf with gangue
CN100494635C (en) Method for filling goaf by gangue
CN202117674U (en) Continuous miner of open coal mine with roller laterally arranged
AU671029B2 (en) Mobile machine for processing raw mineral ores in-situ
CN102239008A (en) Mobile crusher
CN104405437A (en) Mining method employing solid filling and fully-mechanized coal mining hybrid working face
CN204602379U (en) Crawler-type mobile cone crusher station
CN1782326B (en) Method for treating waste rock in coal mine
US20140183003A1 (en) Cold Planer with Aligned Transition Zone
US4607799A (en) Mobile stone crusher
CN202360093U (en) High-efficiency clumpy coal shovel
CN102168555B (en) Ultralow surface full-hydraulic drill type coal mining machine
WO2013170630A1 (en) Reciprocating percussive digging-loading machine
CN104291121B (en) Bulk cargo collecting device, bulk cargo carloader and loading method
CN203247618U (en) Hydraulic spading loading machine
CN203174447U (en) Side-cutting type turnout screen scarifier
CN203844003U (en) Vehicle-mounted concrete stirring device with movable gravity center
CN103883329B (en) Mine hard rock excavation construction method
US9452888B2 (en) High volume loading and stacking apparatus and method
CN107670768B (en) A kind of ore extraction transfer device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant