CN109577517B - Fabricated shear wall structure and construction method - Google Patents

Fabricated shear wall structure and construction method Download PDF

Info

Publication number
CN109577517B
CN109577517B CN201811434475.6A CN201811434475A CN109577517B CN 109577517 B CN109577517 B CN 109577517B CN 201811434475 A CN201811434475 A CN 201811434475A CN 109577517 B CN109577517 B CN 109577517B
Authority
CN
China
Prior art keywords
plate
shear wall
steel bar
frame
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811434475.6A
Other languages
Chinese (zh)
Other versions
CN109577517A (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau South China Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201811434475.6A priority Critical patent/CN109577517B/en
Publication of CN109577517A publication Critical patent/CN109577517A/en
Application granted granted Critical
Publication of CN109577517B publication Critical patent/CN109577517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/6116Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by locking means on lateral surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/6187Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means on top and/or bottom surfaces of the slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention relates to an assembled shear wall structure, which comprises an assembled shear wall, a U-shaped rib reserved on the side surface, a vertically reserved connecting rib, a floor slab, an integral type inner side quick positioning piece, a verticality adjusting rod, an adjusting rod base, a frame support, a suspended steel bar placing batten, an upper covering plate, an upper prefabricated wall body, a lower cast-in-place wall body, a steel bar positioning steel plate, a prefabricated assembled floating window and an integral type adjusting bearing bracket, wherein the U-shaped rib is reserved on the side surface of the assembled shear; the side surface of the assembled shear wall is provided with a reserved U-shaped rib, the top of the assembled shear wall is provided with a vertical reserved connecting rib, and the lower part of the assembled shear wall is provided with a floor slab; the assembled shear wall is connected with the installed wall body through the detachable and stereotyped outer side guide grid plate to perform temporary guide assembly. The invention has the beneficial effects that: according to the invention, the temporary guide frame lattice plate is arranged and connected with the integral type inner side quick positioning piece, so that the shearing force is guided to be quickly positioned and installed, the accurate positioning is realized, the precision is ensured, the positioning and installing speed of the shearing force wall is improved, the integral structure is more stable, and the quality safety is ensured.

Description

Fabricated shear wall structure and construction method
Technical Field
The invention relates to an assembled shear wall structure and a construction method, belongs to the technical field of prefabricated and construction of an assembled concrete structure, and is suitable for positioning and mounting engineering of an assembled shear wall.
Background
With the continuous development of the real estate industry, the industrialization mode of the fabricated structure building is gradually formed along with the change of the building economy, and the application of the fabricated shear wall structure building in the civil residence is more and more extensive. In the installation and construction process of the assembled shear wall structure, the difficulties of difficult positioning, difficult reinforcement, complex procedures of adjusting the horizontal verticality of the shear wall, poor control of the construction progress due to large workload and the like exist, the construction efficiency is low, and meanwhile, the construction precision is not good enough.
In view of the above, in view of the conventional shortcomings, a new fabricated shear wall structure and a new construction method are urgently needed, so that the construction quality and the construction efficiency are improved, and the safety and reliability of the construction quality are ensured.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provides an assembled shear wall structure and a construction method.
The assembled shear wall structure comprises an assembled shear wall, a U-shaped rib reserved on the side surface, a vertically reserved connecting rib, a floor slab, an integral type inner side quick positioning piece, a verticality adjusting rod, an adjusting rod base, a frame support, a suspended steel bar placing batten, an upper covering plate, an upper prefabricated wall body, a lower cast-in-place wall body, a steel bar positioning steel plate, a prefabricated assembled floating window and an integral type adjusting bearing bracket;
the side surface of the assembled shear wall is provided with a reserved U-shaped rib, the top of the assembled shear wall is provided with a vertical reserved connecting rib, and the lower part of the assembled shear wall is provided with a floor slab; the assembled shear wall is connected with the installed wall body through the detachable and shaped outer side guide grid plate to perform temporary guide assembly; the floor-penetrating fixing bolt is connected with the lateral square steel frame, the ground channel steel frame and the triangular rib plate; a jack limiting cavity push plate is fixed on the groove-shaped bolt hole, and an adjusting rod base is connected with a verticality adjusting rod to form an integral inner side quick positioning piece; the shear wall top is pre-embedded with a steel plate with a short screw rod to fix the L-shaped hanging plates, hanging frame horizontal connecting plates are arranged between the L-shaped hanging plates to form an upper adjusting integral hanging frame, and the upper adjusting integral hanging frame is connected with a verticality adjusting rod;
a bracket fixing bottom plate is arranged at the bottom of the frame bracket; the suspended steel bar placing batten is fixed with a replaceable steel bar support cavity through a support cavity fixing screw, a middle connecting plate with holes of a fixed support and a top plate with holes of the support are fixed on a frame support, and an upper cover plate is connected through a replaceable steel bar fixing vertical cylinder to form a multi-diameter steel bar test piece manufacturing device;
a lower cast-in-place wall body is arranged at the lower part of the upper prefabricated wall body, a secondary grouting layer is arranged between the upper prefabricated wall body and the lower prefabricated wall body, and a cast-in-place floor slab is arranged on one side of the lower cast-in-place wall body; the vertical joint bars and the lower cast-in-place wall main bars are connected through connecting sleeves, and the positions of the connecting sleeves are arranged in a jacking and supporting mode through integral groined fixing bar frames, guide short bar grooves and prefabricated blocks with the same marks; the steel bar positioning steel plate is provided with a positioning steel plate bottom slot key, and a bar penetrating hole is reserved in the positioning steel plate bottom slot key; the steel bar positioning steel plate is connected with the lower cast-in-place wall formwork through a positioning steel plate supporting toothed plate;
the prefabricated bay window is provided with a horizontal connecting bolt, and the upper end of the prefabricated bay window is provided with a lifting lug; the integral type adjustable bearing bracket comprises a jack, an integral type adjustable bracket, a bay window top limiting groove, a bay window bottom limiting hole, a bracket bottom plate, a bracket top plate, a top plate limiting bolt and a bracket supporting rod; the bracket main adjusting upright rod is connected with an upright rod platform type reinforcing end; the lengthening rotary handle is connected with the fixed adjusting rotary handle, and a shaped elevation adjusting bolt cylinder is arranged at the fixed adjusting rotary handle; and a chain block and a safety rope connecting lifting lug are arranged on the modular lifting beam.
Preferably, the method comprises the following steps: the adjusting rod base consists of an L plate fixed on the floor slab, an L plate jack limiting cavity, an adjusting jack and a fastening bottom bolt; the L-shaped hanging plate is fixed on the assembled shear wall through a wall pre-buried horizontal bolt; and reserving a reserved hole of the floor slab on the floor slab.
Preferably, the method comprises the following steps: the height-adjustable vertical rod and the elevation-adjustable shelving ribbon board are fixed on the upper covering plate through an upper covering plate fastening bolt; the steel bar penetrates through the upper cover plate, the top plate with the holes of the support and the middle connecting plate with the holes of the support, the steel bar is inserted into the grouting sleeve to be fixed, the grouting sleeve is provided with a grouting pipe, and the grouting sleeve is sealed through a sleeve flexible sealing body.
Preferably, the method comprises the following steps: the edge of the steel bar positioning steel plate is provided with an L-shaped reinforcing rib to form an offset rib correction U-shaped hoop plate protection device.
Preferably, the method comprises the following steps: the temporary pull rod and the temporary pull rope are combined and temporarily fixed between the bay window temporary channel steel fixing frame and the inner side fixing frame through the framework fixing studs.
The construction method of the assembled shear wall structure comprises the following steps:
step one, construction preparation: preparing a detachable stereotyped outer-side guide frame lattice plate, a side square steel frame, a verticality adjusting rod, an L-shaped hanging plate, a hanging frame horizontal connecting plate, a hanging steel bar shelving batten, a connecting sleeve and an integral groined fixing rib frame which are required by construction;
step two, installing a shear wall positioning piece: the assembled shear wall is connected with the installed wall body through the detachable and shaped outer side guide grid plate to perform temporary guide assembly;
step three, adjusting the installation of the integral hanging rack: the shear wall top is pre-embedded with a steel plate with a short screw rod to fix the L-shaped hanging plate, an upper adjusting integral hanging rack is formed by hanging rack horizontal connecting plates, and a verticality adjusting rod is connected;
step four, installing a steel bar test piece manufacturing device: the suspended steel bar placing batten is welded and fixed on the frame support, a replaceable steel bar support cavity is fixed on the suspended steel bar placing batten through a support cavity fixing screw, a support hole middle connecting plate and a support hole top plate are fixed on the frame support, and an upper cover plate is connected through a replaceable steel bar fixing vertical cylinder to form the multi-diameter steel bar test piece manufacturing device;
step five, fixing the connecting sleeve: connecting the vertical joint bars with the lower cast-in-situ wall main bars through connecting sleeves, and arranging the positions of the connecting sleeves in a jacking and supporting manner by using integral groined fixing bar frames, guide short bar grooves and prefabricated blocks with the same marks;
step six, hoisting the prefabricated bay window: a chain block and a safety rope connecting lifting lug are arranged on the modular lifting beam; and the temporary pull rod and the temporary pull rope are combined and temporarily fixed between the bay window temporary channel steel fixing frame and the inner side fixing frame through a framework fixing stud.
The invention has the beneficial effects that:
(1) according to the invention, the temporary guide frame lattice plate is arranged and connected with the integral type inner side quick positioning piece, so that the shearing force is guided to be quickly positioned and installed, the accurate positioning is realized, the precision is ensured, the positioning and installing speed of the shearing force wall is improved, the integral structure is more stable, and the quality safety is ensured.
(2) The replaceable steel bar support cavity is fixed on the suspended steel bar placing batten by the support cavity fixing screw, and the multi-diameter steel bar test piece manufacturing device is formed by connecting the replaceable steel bar fixing vertical cylinder with the middle connecting plate with the holes, the top plate with the holes of the support and the upper covering plate, so that the cost is saved, and the manufacturing speed of the steel bar grouting sleeve connecting test piece with different diameters is increased.
(3) The invention adopts the integral type adjusting bearing bracket, is convenient to disassemble and accurate to position, and improves the positioning and mounting speed of the shear wall.
(4) The invention has the advantages of compact connection of all construction procedures, strong operability, high work efficiency, high field installation speed, beautiful appearance and reliable quality.
Drawings
FIG. 1 is a schematic view of a rapid positioning structure of an assembled shear wall;
FIG. 2 is a schematic view of an integral type inside quick positioning member for adjusting verticality;
FIG. 3 is a schematic structural diagram of a fabricated shear wall grouting sleeve connection test piece;
FIG. 4 is a schematic view of a fabricated shear wall connection configuration;
FIG. 5 is a view of the reinforcement positioning means;
FIG. 6 is a schematic view of a prefabricated mechanical load bearing bracket;
FIG. 7 is a schematic view of the prefabricated bay window hoist;
fig. 8 is a schematic view of the use of a prefabricated bay window U-shaped treatment.
Description of reference numerals: 1-assembled shear wall, 2-side reserved U-shaped rib, 3-vertical reserved connecting rib, 4-wall pre-embedded horizontal bolt, 5-floor slab, 6-floor slab reserved hole, 7-detachable stereotyped outer side guide frame grid plate, 8-floor slab penetrating fixing bolt, 9-integral type inner side rapid positioning piece, 10-side square steel frame, 11-ground groove steel frame, 12-triangular rib plate, 13-verticality adjusting rod, 14-adjusting rod base, 15-groove bolt hole, 16-pushing plate with jack limiting cavity, 17-fixed floor slab L plate, 18-L plate jack limiting cavity, 19-adjusting jack, 20-fastening bottom bolt, 21-shear wall top pre-embedded short screw steel plate, 22-upper adjusting integral type hanging rack, 23-L-shaped hanging plate, 24-hanging rack horizontal connecting plate, 25-verticality tester, 26-frame support, 27-support fixed bottom plate, 28-hanging steel bar placing batten, 29-replaceable steel bar holding cavity, 30-holding cavity fixed screw, 31-support perforated middle connecting plate, 32-support perforated top plate, 33-replaceable steel bar fixed vertical cylinder, 34-height-adjustable vertical rod, 35-elevation-adjustable placing batten, 36-upper covering plate, 37-upper covering plate fastening bolt, 38-steel bar, 39-grouting sleeve, 40-grouting pipe, 41-sleeve flexible closed body, 42-upper prefabricated wall body, 43-lower cast-in-place wall body, 44-cast-in-place floor slab, 45-secondary grouting layer, 46-lower cast-in-place wall body main reinforcement, 47-connecting sleeve, 48-vertical dowel, 49-integral groined type fixed rib frame, 50-guide short rib groove, 51-prefabricated block top support with the same label, 52-reinforcing steel bar positioning steel plate, 53-positioning steel plate bottom groove key, 54-rib through hole, 55-positioning steel plate supporting toothed plate, 56-lower cast-in-place wall formwork, 57-L-shaped reinforcing rib, 58-prefabricated assembled bay window, 59-horizontal connecting bolt, 60-lifting lug, 61-lifting jack, 62-integral adjustable bracket, 63-bay window top limiting groove, 64-bay window bottom limiting hole, 65-bracket bottom plate, 66-bracket top plate, 67-top plate limiting bolt, 68-bracket supporting upright rod, 69-upright rod platform type reinforcing end, 70-bracket main adjusting upright rod, 71-shaped elevation adjusting bolt cylinder, 72-fixed adjusting rotary handle, 73-long rotary handle, 74-modular hanging beam, 75-inverted chain, 76-safety rope, 77-bay window temporary channel steel fixing frame, 78-temporary pull rod, 79-temporary pull rope, 80-inner side fixing frame and 81-framework fixing stud.
Detailed Description
The present invention will be further described with reference to the following examples. The following examples are set forth merely to aid in the understanding of the invention. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.
The assembled shear wall structure comprises an assembled shear wall 1, a side reserved U-shaped rib 2, a vertical reserved connecting rib 3, a floor slab 5, an integral inner side quick positioning piece 9, a verticality adjusting rod 13, an adjusting rod base 14, a frame support 26, a suspended steel bar placing batten 28, an upper covering plate 36, an upper prefabricated wall body 42, a lower cast-in-place wall body 43, a steel bar positioning steel plate 52, a prefabricated assembled floating window 58 and an integral adjusting bearing bracket.
The side surface of the assembled shear wall 1 is provided with a reserved U-shaped rib 2, the top of the assembled shear wall 1 is provided with a vertical reserved connecting rib 3, and the lower part of the assembled shear wall 1 is provided with a floor slab 5; the assembled shear wall 1 is connected with an installed wall body through a detachable shaped outer side guide frame lattice plate 7 for temporary guide assembly; the floor-penetrating fixing bolt 8 is connected with a side square steel frame 10, a ground channel steel frame 11 and a triangular rib plate 12; a groove-shaped bolt hole 15 is fixed with a jack limiting cavity push plate 16, and an adjusting rod base 14 is connected with a perpendicularity adjusting rod 13 to form an integral inner side rapid positioning piece 9; the shear wall top is pre-buried to take short screw steel sheet 21 to fix L shape link plate 23, sets up stores pylon level tie plate 24 between the L shape link plate 23 and constitutes the integral stores pylon 22 of upper portion regulation, and the integral stores pylon 22 of upper portion regulation connects the straightness regulation pole 13 that hangs down.
The bottom of the frame bracket 26 is provided with a bracket fixing bottom plate 27; the hanging steel bar placing batten 28 is fixed with a replaceable steel bar holding cavity 29 through a holding cavity fixing screw 30, a fixed support hole middle connecting plate 31 and a support hole top plate 32 on the frame support 26 are connected with an upper cover plate 36 through a replaceable steel bar fixing vertical cylinder 33, and the multi-diameter steel bar test piece manufacturing device is formed.
A lower cast-in-place wall body 43 is arranged at the lower part of the upper prefabricated wall body 42, a secondary grouting layer 45 is arranged between the upper prefabricated wall body and the lower prefabricated wall body, and a cast-in-place floor slab 44 is arranged on one side of the lower cast-in-place wall body 43; the vertical dowel bars 48 and the lower cast-in-situ wall main bars 46 are connected through connecting sleeves 47, and the positions of the connecting sleeves 47 are arranged through integral groined fixing bar frames 49, guide short bar grooves 50 and precast block jacking supports 51 with the same marks; the steel bar positioning steel plate 52 is provided with a positioning steel plate bottom slot key 53, and a rib penetrating hole 54 is reserved in the positioning steel plate bottom slot key 53; the steel bar positioning steel plate 52 is connected with the lower cast-in-situ wall formwork 56 through a positioning steel plate supporting toothed plate 55.
The prefabricated bay window 58 is provided with a horizontal connecting bolt 59, and the upper end of the prefabricated bay window 58 is provided with a lifting lug 60; the integral type adjustable bearing bracket comprises a jack 61, an integral type adjustable bracket 62, a bay window top limiting groove 63, a bay window bottom limiting hole 64, a bracket bottom plate 65, a bracket top plate 66, a top plate limiting bolt 67 and a bracket standing rod 68; the bracket main adjusting upright rod 70 is connected with an upright rod platform type reinforcing end 69; a fixed adjusting rotary handle 72 is connected through a lengthening rotary handle 73, and a shaped elevation adjusting bolt cylinder 71 is arranged at the fixed adjusting rotary handle 72; the modular hanging beam 74 is provided with a chain block 75 and a safety rope 76 which are connected with the lifting lugs 60.
The adjusting rod base 14 consists of an L plate 17 fixed on the floor slab, an L plate jack limiting cavity 18, an adjusting jack 19 and a fastening bottom bolt 20; the L-shaped hanging plate 23 is fixed on the assembled shear wall 1 through the wall pre-embedded horizontal bolt 4; and a floor slab preformed hole 6 is reserved on the floor slab 5.
The height-adjustable vertical rod 34 and the elevation-adjustable resting strip plate 35 are fixed on the upper shroud plate 36 through an upper shroud plate fastening bolt 37; the steel bar 38 penetrates through the upper covering plate 36, the support perforated top plate 32 and the support perforated middle connecting plate 31, the steel bar 38 is inserted into the grouting sleeve 39 and fixed, the grouting sleeve 39 is provided with a grouting pipe 40, and the grouting sleeve 39 is sealed through a sleeve flexible sealing body 41.
The edge of the steel bar positioning steel plate 52 is provided with an L-shaped reinforcing rib 57 to form a U-shaped hoop plate protecting device for correcting the offset rib.
The temporary pull rod 78 and the temporary pull rope 79 are combined and temporarily fixed between the bay window temporary channel steel fixing frame 77 and the inner side fixing frame 80 through a framework fixing stud 81.
The construction method of the assembled shear wall structure comprises the following steps:
step one, construction preparation: preparing a detachable stereotyped outer-side guide frame lattice plate 7, a side-surface square steel frame 10, a verticality adjusting rod 13, an L-shaped hanging plate 23, a hanging frame horizontal connecting plate 24, a suspended steel bar laying slat 28, a connecting sleeve 47 and an integral groined-shaped fixing rib frame 49 which are required by construction;
step two, installing a shear wall positioning piece: the assembled shear wall 1 is connected with an installed wall body through a detachable shaped outer side guide frame lattice plate 7 for temporary guide assembly;
step three, adjusting the installation of the integral hanging rack: the shear wall top is pre-embedded with a steel plate 21 with a short screw rod to fix an L-shaped hanging plate 23, an upper adjusting integral hanging rack 22 is formed by hanging rack horizontal connecting plates 24 and is connected with a verticality adjusting rod 13;
step four, installing a steel bar test piece manufacturing device: the suspended steel bar placing strip plate 28 is fixedly welded on the frame support 26, a replaceable steel bar support cavity 29 is fixed on the suspended steel bar placing strip plate 28 through a support cavity fixing screw 30, a support hole middle connecting plate 31 and a support hole top plate 32 are fixed on the frame support 26, and an upper cover plate 36 is connected through a replaceable steel bar fixing vertical cylinder 33 to form the multi-diameter steel bar test piece manufacturing device;
step five, fixing the connecting sleeve: the vertical dowel bars 48 and the lower cast-in-place wall main bars 46 are connected through connecting sleeves 47, and integral groined fixing bar frames 49, guide short bar grooves 50 and precast block jacking supports 51 with the same marks are arranged at the positions of the connecting sleeves 47;
step six, hoisting the prefabricated bay window: the modular hanging beam 74 is provided with a chain block 75 and a safety rope 76 which are connected with the lifting lugs 60; the temporary pull rod 78 and the temporary pull rope 79 are combined and temporarily fixed between the bay window temporary channel steel fixing frame 77 and the inner side fixing frame 80 through a framework fixing stud 81.

Claims (6)

1. An assembled shear wall structure is characterized by comprising an assembled shear wall (1), a U-shaped rib (2) reserved on the side surface, a vertical reserved connecting rib (3), a floor (5), an integral inner side quick positioning piece (9), a verticality adjusting rod (13), an adjusting rod base (14), a frame support (26), a suspended steel bar placing batten (28), an upper shroud plate (36), an upper prefabricated wall body (42), a lower cast-in-place wall body (43), a steel bar positioning steel plate (52), a prefabricated assembly bay window (58) and an integral adjusting bearing bracket;
the side surface of the assembly type shear wall (1) is provided with a reserved U-shaped rib (2), the top of the assembly type shear wall (1) is provided with a vertical reserved connecting rib (3), and the lower part of the assembly type shear wall (1) is provided with a floor slab (5); the assembled shear wall (1) is connected with an installed wall body through a detachable stereotyped outer side guide frame lattice plate (7) for temporary guide assembly; a floor-penetrating fixing bolt (8) is connected with a side square steel frame (10), a ground channel steel frame (11) and a triangular rib plate (12); a groove-shaped bolt hole (15) is fixed with a jack limiting cavity push plate (16), and an adjusting rod base (14) is connected with a verticality adjusting rod (13) to form an integral inner side rapid positioning piece (9); the shear wall top is pre-buried with a short screw steel plate (21) to fix L-shaped hanging plates (23), hanging frame horizontal connecting plates (24) are arranged between the L-shaped hanging plates (23) to form an upper adjusting integral hanging frame (22), and the upper adjusting integral hanging frame (22) is connected with a verticality adjusting rod (13);
a bracket fixing bottom plate (27) is arranged at the bottom of the frame bracket (26); a replaceable steel bar support cavity (29) is fixed on the suspended steel bar placement slat (28) through a support cavity fixing screw (30), a support frame holed middle connecting plate (31) and a support frame holed top plate (32) are fixed on a frame support (26), and an upper cover plate (36) is connected through a replaceable steel bar fixing vertical cylinder (33) to form a multi-diameter steel bar test piece manufacturing device;
a lower cast-in-place wall body (43) is arranged at the lower part of the upper prefabricated wall body (42), a secondary grouting layer (45) is arranged between the upper prefabricated wall body and the lower prefabricated wall body, and a cast-in-place floor slab (44) is arranged on one side of the lower cast-in-place wall body (43); the vertical dowel bars (48) and the lower cast-in-situ wall main bars (46) are connected through connecting sleeves (47), and the positions of the connecting sleeves (47) are arranged through integral groined-shaped fixing bar frames (49), guide short bar grooves (50) and prefabricated block jacking brackets (51) with the same marks; the steel bar positioning steel plate (52) is provided with a positioning steel plate bottom slot key (53), and a steel bar penetrating hole (54) is reserved in the positioning steel plate bottom slot key (53); the steel bar positioning steel plate (52) is connected with the lower cast-in-situ wall formwork (56) through a positioning steel plate supporting toothed plate (55);
a horizontal connecting bolt (59) is arranged on the prefabricated bay window (58), and a lifting lug (60) is arranged at the upper end of the prefabricated bay window (58); the integral type adjustable bearing bracket comprises a jack (61), an integral type adjustable bracket (62), a bay window top limiting groove (63), a bay window bottom limiting hole (64), a bracket bottom plate (65), a bracket top plate (66), a top plate limiting bolt (67) and a bracket supporting rod (68); the bracket main adjusting upright rod (70) is connected with an upright rod platform type reinforcing end (69); a lengthening rotary handle (73) is arranged to be connected with a fixed adjusting rotary handle (72), and a shaped elevation adjusting bolt cylinder (71) is arranged at the fixed adjusting rotary handle (72); a chain block (75) and a safety rope (76) are arranged on the modular hanging beam (74) to connect with the lifting lug (60).
2. The fabricated shear wall structure of claim 1, wherein the adjustment rod base (14) is composed of an L-plate (17) fixed to the floor slab, an L-plate jack limit cavity (18), an adjustment jack (19) and a fastening bottom bolt (20); the L-shaped hanging plate (23) is fixed on the assembled shear wall (1) through a wall pre-buried horizontal bolt (4); a floor slab preformed hole (6) is reserved on the floor slab (5).
3. Fabricated shear wall structure according to claim 1, wherein height-adjustable vertical rods (34) and elevation-adjustable rest strips (35) are fixed to the upper skin (36) by upper skin fastening bolts (37); the steel bar (38) penetrates through the upper cover plate (36), the top plate (32) with the holes of the support and the middle connecting plate (31) with the holes of the support, the steel bar (38) is inserted into the grouting sleeve (39) for fixation, the grouting sleeve (39) is provided with the grouting pipe (40), and the grouting sleeve (39) is sealed through the flexible sleeve sealing body (41).
4. The fabricated shear wall structure of claim 1, wherein the edge of the steel bar positioning steel plate (52) is provided with an L-shaped reinforcing rib (57) to form a U-shaped hoop plate protection device for correcting the offset rib.
5. The fabricated shear wall structure of claim 1, wherein the temporary pull rod (78) and the temporary pull rope (79) are combined and temporarily fixed between the bay window temporary channel steel fixing frame (77) and the inner side fixing frame (80) through a framework fixing stud (81).
6. A method of constructing a fabricated shear wall structure according to claim 1, comprising the steps of:
step one, construction preparation: preparing a detachable stereotyped outer-side guide frame grid plate (7), a side-surface square steel frame (10), a verticality adjusting rod (13), an L-shaped hanging plate (23), a hanging rack horizontal connecting plate (24), a hanging steel bar laying slat (28), a connecting sleeve (47) and an integral groined-shaped fixing rib frame (49) which are required by construction;
step two, installing a shear wall positioning piece: the assembled shear wall (1) is connected with an installed wall body through a detachable stereotyped outer side guide frame lattice plate (7) for temporary guide assembly;
step three, adjusting the installation of the integral hanging rack: an L-shaped hanging plate (23) is fixed by a steel plate (21) with a short screw rod embedded in the top of the shear wall, an upper adjusting integral hanging rack (22) is formed by horizontal connecting plates (24) of the hanging rack, and a verticality adjusting rod (13) is connected;
step four, installing a steel bar test piece manufacturing device: a suspended steel bar placing batten (28) is welded and fixed on a frame support (26), a replaceable steel bar support cavity (29) is fixed on the suspended steel bar placing batten (28) through a support cavity fixing screw rod (30), a support hole middle connecting plate (31) and a support hole top plate (32) are fixed on the frame support (26), and an upper cover plate (36) is connected through a replaceable steel bar fixing vertical cylinder (33), so that the multi-diameter steel bar test piece manufacturing device is formed;
step five, fixing the connecting sleeve: vertical dowel bars (48) and lower cast-in-place wall main bars (46) are connected through connecting sleeves (47), and integral groined fixing bar frames (49), guide short bar grooves (50) and prefabricated block jacking supports (51) with the same marks are arranged at the positions of the connecting sleeves (47);
step six, hoisting the prefabricated bay window: a chain block (75) and a safety rope (76) are arranged on the modular hanging beam (74) to connect with the lifting lug (60); the temporary pull rod (78) and the temporary pull rope (79) are combined and temporarily fixed between the bay window temporary channel steel fixing frame (77) and the inner side fixing frame (80) through a framework fixing stud (81).
CN201811434475.6A 2018-11-28 2018-11-28 Fabricated shear wall structure and construction method Active CN109577517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811434475.6A CN109577517B (en) 2018-11-28 2018-11-28 Fabricated shear wall structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811434475.6A CN109577517B (en) 2018-11-28 2018-11-28 Fabricated shear wall structure and construction method

Publications (2)

Publication Number Publication Date
CN109577517A CN109577517A (en) 2019-04-05
CN109577517B true CN109577517B (en) 2020-02-04

Family

ID=65924809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811434475.6A Active CN109577517B (en) 2018-11-28 2018-11-28 Fabricated shear wall structure and construction method

Country Status (1)

Country Link
CN (1) CN109577517B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118014B (en) * 2019-05-09 2024-01-02 广西建工集团第五建筑工程有限责任公司 Exterior wall template system free of exterior scaffold and construction method thereof
CN110318548B (en) * 2019-06-24 2023-08-22 天元建设集团有限公司 Assembled wall mounting bracket and construction method thereof
CN110439294B (en) * 2019-07-11 2020-08-25 中国十七冶集团有限公司 Quick mounting structure of integral shear force wall support frame of assembly
CN110984427B (en) * 2019-12-23 2021-03-19 中交第一航务工程局有限公司 Shear wall construction process based on fully-prefabricated floor slab
CN111561061B (en) * 2020-03-24 2021-12-10 河北工业大学 Assembled wallboard, wall structure and construction method of wall structure
CN112177352A (en) * 2020-09-29 2021-01-05 唐山盾石建筑工程有限责任公司 Construction method for splicing aerated concrete slabs
CN112459281A (en) * 2020-11-11 2021-03-09 杨玮军 Steel sheet shear force wall quick positioning connection structure among assembly type structure
CN114108833B (en) * 2021-12-13 2023-08-22 深圳市湛艺建设集团有限公司 Assembled wallboard connecting structure and construction method thereof
CN114687467A (en) * 2022-02-18 2022-07-01 洛阳城市建设勘察设计院有限公司 Vertical connection pouring method and correction support tool for assembled prefabricated shear wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101406535B1 (en) * 2012-06-13 2014-06-16 재단법인 포항산업과학연구원 Steel plate shear wall structure using block assembly
CN203821867U (en) * 2014-05-08 2014-09-10 河北联合大学 Shear wall body assembling and aligning device
CN106049705B (en) * 2016-08-03 2018-04-06 杭州江润科技有限公司 The construction method of armored concrete and outer insulation compositing outer wall one-piece casting molding structure
CN108316469A (en) * 2018-03-30 2018-07-24 广州大学 A kind of prefabrication system and its construction technology
CN108643382A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 The construction method that fabricated shear wall plate vertically connects

Also Published As

Publication number Publication date
CN109577517A (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN109577517B (en) Fabricated shear wall structure and construction method
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN109706939B (en) Deep foundation pit prestress combined steel support and construction method
CN114427258B (en) High-altitude large-span cantilever concrete member disassembly-free construction system and construction method
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN114214917A (en) Steel pipe concrete tied arch bridge and construction method
CN110528739A (en) FS keeps the temperature the integrated construction technique of exterior sheathing, aluminum alloy mould plate and climbing frame
CN213510645U (en) PBA secretly digs platform truck support template system that station side span was just propped up and is encircleed
CN216664766U (en) Assembled parapet that cornices
CN216616865U (en) High-efficient construction system of super high-rise structure of encorbelmenting
CN110219416B (en) Precast concrete Y-shaped beam assembly and construction method thereof
CN114775622A (en) Construction method of special-shaped deep foundation pit with construction space limitation of adjacent building structure
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN216947881U (en) Formwork support of I-shaped composite beam cast-in-situ bridge deck
CN211923517U (en) A auxiliary stay frame for installing platform in hydraulic pressure creeping formwork
CN210798994U (en) Concrete structure wall body unilateral template structure
US11946217B1 (en) Top plate jacking device and jacking construction method configured for V-shaped columns
CN111894031B (en) Tower crane foundation and construction method thereof
CN112962960B (en) Early formwork stripping support system of coincide floor rigid coupling independent stay
CN214423355U (en) Formwork device for pile foundation construction and construction system using same
CN212224665U (en) Prefabricated post guiding device and prestressing force frame construction's guide installation device of taking one's place
CN219365025U (en) PCT shear wall structure suitable for assembly type building construction
CN216663826U (en) Cast-in-place three-wall movable formwork for fully-closed sound barrier bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230804

Address after: Room 289, No. 333 Jiufo Jianshe Road, Zhongxin Guangzhou Knowledge City, Guangzhou, Guangdong Province, 510700 (self declared)

Patentee after: China Construction Eighth Engineering Bureau South China Construction Co.,Ltd.

Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang.

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

TR01 Transfer of patent right