CN109555532A CN201910046491.6A CN201910046491A CN109555532A CN 109555532 A CN109555532 A CN 109555532A CN 201910046491 A CN201910046491 A CN 201910046491A CN 109555532 A CN109555532 A CN 109555532A
Authority
CN
China
Prior art keywords
windlass
rack
shaft type
horizontal shaft
rock tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910046491.6A
Other languages
Chinese (zh)
Inventor
黄祖华
樊日宏
潘东贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910046491.6A priority Critical patent/CN109555532A/en
Publication of CN109555532A publication Critical patent/CN109555532A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1006Making by using boring or cutting machines with rotary cutting tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1086Drives or transmissions specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Abstract

The invention belongs to development machine fields, windlass is dug more particularly to a kind of horizontal shaft type rock tunnel, includes: cutting mechanism, shovel board portion, scratch board conveyor, roofbolt machine, running part, rear support portion, lubrication portion, hydraulic system, water system, electrical system, two lateral wall roof-bolters and rack;When horizontal shaft type rock tunnel digs windlass and enters tunnel and start to be excavated, first the rock that two lateral wall roof-bolters dig windlass two sides to horizontal shaft type rock tunnel is drilled and carries out suspension roof support, it is drilled again with the rock that roofbolt machine digs windlass two sides to horizontal shaft type rock tunnel and carries out suspension roof support, rear support portion is rotated again, make the bearing in rear support portion hammer into horizontal shaft type rock tunnel to dig in the soil at windlass rear portion, play the role of increasing horizontal shaft type rock tunnel digging windlass lateral thrust, so that horizontal shaft type rock tunnel is dug windlass and be easier to be crushed rock.

Description

A kind of horizontal shaft type rock tunnel digging windlass
[technical field]
The present invention relates to development machine fields, and in particular to a kind of horizontal shaft type rock tunnel digging windlass.
[background technique]
Currently, development machine in the excavation of rock tunnel, since the propulsive force that development machine needs is huge, is needed development machine Temporarily it is anchored, to increase the propulsive force of development machine, and existing development machine is not achieved and can quickly be anchored before driving, Encounter landslide or other geological disasters generation when quickly recede from tunnel, the safety of construction personnel cannot ensure.Institute With, it is also very desirable to a kind of preceding work effect that with anchoring work, can quickly improve development machine of horizontal shaft type rock tunnel digging windlass driving Rate, when causing danger, energy fast cancel anchoring improves the safety guarantee of operator.
[summary of the invention]
In view of problem above, the present invention provides a kind of horizontal shaft type rock tunnel digging windlass, which digs anchor Machine quickly can improve the working efficiency of development machine, when causing danger, energy before tunnel digs windlass driving with anchoring work Fast cancel anchoring, improves the safety guarantee of operator.
The technical problems to be solved by the invention are implemented with the following technical solutions:
A kind of horizontal shaft type rock tunnel digs windlass, includes: cutting mechanism, shovel board portion, scratch board conveyor, roofbolt Machine, running part, rear support portion, lubrication portion, hydraulic system, water system, electrical system, two lateral wall roof-bolters and rack;
Cutting mechanism includes cutting drum portion, roller catch bar, drum driven bar and rack bar;
Cutting drum portion is set in rack, and roller catch bar one end and the rotation of cutting drum portion connect;Roller catch bar The other end and the rotation of drum driven bar one end connect;The drum driven bar other end and the rotation of rack bar connect;Rack bar with it is hydraulic System 8 is fixedly connected;
Shovel board portion is set in rack, and shovel board portion is installed on cutting drum portion bottom, shovel board portion telescopic rod one end with The rotation connection of shovel board portion, the other end are fixedly connected with hydraulic system;
Scratch board conveyor is set in rack, and scratch board conveyor is connect with shovel board portion, and scratch board conveyor extends to machine Frame tail portion;
Roofbolt machine is fixedly installed in rack, and roofbolt machine is located above cutting drum portion;
Shovel board portion is set in rack, and running part is installed on scratch board conveyor two sides;
Rear support portion is located at electrical system lower part;And rear support portion is by being rotatably mounted on rack with rotation axis connection On;
Lubrication portion is installed in rack and between hydraulic system and running part;
Running part installation is connect with bottom of the frame for driving rack to walk;
Hydraulic system is installed in rack and is fixedly connected with lubrication portion;
Water system is installed in rack and is fixedly connected with hydraulic system;
Electrical system is installed in rack and is fixedly connected with water system;
Two lateral wall roof-bolters are set in rack, and two lateral wall roof-bolters are symmetrically disposed at left and right sides of scratch board conveyor, and And two lateral wall roof-bolter be located at roofbolt motor spindle.
Lubrication portion connection corresponding with the horizontal shaft type rock tunnel digging each oil site of windlass, for moistening to each oil site It is sliding.
Hydraulic system is dug each executive component of windlass with horizontal shaft type rock tunnel and is connect, for being each hydraulic actuator Power is provided.
Water system connection corresponding with the horizontal shaft type rock tunnel digging each cooling point of windlass, water system are used for each cooling point Cool down.
Electrical system is dug each motor of windlass with horizontal shaft type rock tunnel and is correspondingly connected with, and each motor of electrical system is supplied Electricity.
Rear support portion is provided with several bearing nails.
When horizontal shaft type rock tunnel digs windlass and enters tunnel and start to be excavated, first by two lateral wall roof-bolters to horizontal shaft type rock The rock that tunnel digs windlass two sides is drilled and carries out suspension roof support, then digs anchor to horizontal shaft type rock tunnel with roofbolt machine The rock of machine two sides is drilled and carries out suspension roof support, then rear support portion is rotated, and the bearing in rear support portion is made to follow closely nail Enter horizontal shaft type rock tunnel to dig in the soil at windlass rear portion, plays and increase the work that horizontal shaft type rock tunnel digs windlass lateral thrust With, make horizontal shaft type rock tunnel dig windlass be easier rock is crushed.Rack bar pushes the movement of drum driven bar;Roller drives Lever is pushing the rotation of roller catch bar, then by pushing the flexible of roller catch bar itself, realizes the flexible of cutting drum portion And advance;Make cutting drum portion is more flexible to cut to rock;Shovel board portion is set in rack, shovel board portion and is installed on Cutting drum portion bottom, the flexible of shovel board portion telescopic rod can drive the flexible of shovel board portion, the stone that cutting drum portion is cut down It falls in shovel board portion, then is transported on scratch board conveyor by shovel board portion, stone is transported to frame aft and carried out by scratch board conveyor Clearing and retrieving.
Preferably, protective plate, protective plate one end and the roofbolt machine other end and the fixed company of rack are additionally provided in rack It connects, protective plate is for blocking the soil or rock fallen down from tunnel top.
Preferred protective plate and the horizontal sextant angle of rack are 30-45 °, and soil or rock can be made effectively to slide from protective plate, It is unlikely to be deposited on protective plate.
Preferably, running part is steel tracks chassis, and running part can bear the weight of rack, and rack is driven to be transported It is dynamic.
Roller catch bar, drum driven bar, rack bar and shovel board portion telescopic rod are hydraulically extensible cylinder, and hydraulic system is Roller catch bar, drum driven bar, rack bar and shovel board portion telescopic rod provide the required power that stretches.
By adopting the above-described technical solution, the invention has the following advantages: horizontal shaft type rock tunnel digs windlass, energy It is quickly anchored before driving, quickly recedes from tunnel when encountering the generation of landslide or other geological disasters, guarantee is applied The safety of worker person improves the working efficiency of development machine, and when causing danger, energy fast cancel anchoring improves the peace of operator All risk insurance barrier.
[Detailed description of the invention]
Fig. 1 is the structural schematic diagram that horizontal shaft type rock tunnel of the present invention digs windlass.
Fig. 2 is the structural schematic diagram that horizontal shaft type rock tunnel of the present invention digs windlass.
Main element symbol description
Rack 101 Cutting mechanism 1 Shovel board portion 2
Scratch board conveyor 3 Roofbolt machine 4 Running part 5
Rear support portion 6 Lubrication portion 7 Hydraulic system 8
Water system 9 Electrical system 10 Lateral wall roof-bolter 111
Cutting drum portion 11 Roller catch bar 12 Drum driven bar 13
Rack bar 14 Shovel board portion telescopic rod 21 Dust block board 41
Bearing nail 61
[specific embodiment]
The following examples can help those skilled in the art that the present invention is more fully understood, but cannot be with any Mode limits the present invention.
Fig. 1-Fig. 2 is please referred to, a kind of horizontal shaft type rock tunnel digging windlass includes: cutting mechanism 1, shovel board portion 2, scraper plate Transporter 3, roofbolt machine 4, running part 5, rear support portion 6, lubrication portion 7, hydraulic system 8, water system 9, electrical system 10, two Lateral wall roof-bolter 111 and rack 101;
Cutting mechanism 1 includes cutting drum portion 11, roller catch bar 12, drum driven bar 13 and rack bar 14;
Cutting drum portion 11 is for being crushed rock, and cutting drum portion 11 is set to 101 in rack, roller catch bar 12 one end and the rotation of cutting drum portion 11 connect;12 other end of roller catch bar and the rotation of 13 one end of drum driven bar connect;Rolling Cylinder 13 other end of drive rod and the rotation of rack bar 14 connect;Rack bar 14 is fixedly connected with hydraulic system 8;
Shovel board portion 2 is set in rack 101, shovel board portion 2 and is installed on 11 bottom of cutting drum portion, shovel board portion telescopic rod 21 one end and the rotation of shovel board portion 2 connect, and the other end is fixedly connected with hydraulic system 8;
Scratch board conveyor 3 is set in rack 101, and scratch board conveyor 3 is connect with shovel board portion 2, and scratch board conveyor 3 prolongs Extend to 101 tail portion of rack;
Roofbolt machine 4 is fixedly installed in rack 101, and roofbolt machine 4 is located at 11 top of cutting drum portion;
Shovel board portion 2 is set in rack 101, and running part 5 is installed on 3 two sides of scratch board conveyor;
Rear support portion 6 is located at 10 lower part of electrical system;And rear support portion 6 is by being rotatably mounted on machine with rotation axis connection On frame 101;
Lubrication portion 7 is installed in rack 101 and between hydraulic system 8 and running part 5
The installation of running part 5 is connect with 101 bottom of rack for driving rack 101 to walk;
Hydraulic system 8 is installed in rack 101 and is fixedly connected with lubrication portion 7;
Water system 9 is installed in rack 101 and is fixedly connected with hydraulic system 8;
Electrical system 10 is installed in rack 101 and is fixedly connected with water system 9;
Two lateral wall roof-bolters 4 are set in rack 101, and two lateral wall roof-bolters 111 are symmetrically disposed on scratch board conveyor 3 or so Two sides, and two lateral wall roof-bolters 111 are located at 4 bottom of roofbolt machine.
The connection corresponding with the horizontal shaft type rock tunnel digging each oil site of windlass of lubrication portion 7, for being carried out to each oil site Lubrication.
Hydraulic system 8 and horizontal shaft type rock tunnel dig windlass each executive component and connects, for being each hydraulic to execute member Part provides power.
The connection corresponding with the horizontal shaft type rock tunnel digging each cooling point of windlass of water system 9, water system 9 are used for each cooling Point cools down.
10 horizontal shaft type rock tunnel of electrical system digs each motor of windlass and is correspondingly connected with, and each motor of electrical system 10 carries out Power supply.
Rear support portion 6 is provided with several bearing nails 61;
When horizontal shaft type rock tunnel digs windlass and enters tunnel and start to be excavated, first by two lateral wall roof-bolters 111 to horizontal shaft type The rock that rock tunnel digs windlass two sides is drilled and carries out suspension roof support, then with roofbolt machine 4 to horizontal shaft type rock tunnel The rock that road digs windlass two sides is drilled and carries out suspension roof support, then rear support portion 6 is rotated, and makes rear support portion 6 Bearing nail 61 hammers into horizontal shaft type rock tunnel and digs in the soil at windlass rear portion, and it is horizontal to play increase horizontal shaft type rock tunnel digging windlass Effect to thrust makes horizontal shaft type rock tunnel dig windlass and is easier to be crushed rock.Rack bar 14 pushes drum driven Bar 13 moves;Drum driven bar 13 is pushing roller catch bar 12 to rotate, then by pushing the flexible of roller catch bar 12 itself, It realizes the flexible of cutting drum portion 11 and advances;Make cutting drum portion 11 is more flexible to cut to rock;Shovel board portion 2 is arranged In in rack 101, and shovel board portion 2 is installed on 11 bottom of cutting drum portion, and the flexible of shovel board portion telescopic rod 21 can drive shovel board Portion 2 stretches, and the stone that cutting drum portion 11 is cut down is fallen in shovel board portion 2, then is transported to scraper plate transport by shovel board portion 2 On machine 3, stone is transported to 101 tail portion of rack and carries out clearing and retrieving by scratch board conveyor 3.
Protective plate 41,41 one end of protective plate and 4 other end of roofbolt machine are additionally provided in rack 101 in the present embodiment It is fixedly connected with rack 101, protective plate 41 is for blocking the soil or rock fallen down from tunnel top.
Preferred protective plate 41 and the horizontal sextant angle of rack 101 are 30-45 °, can make soil or rock effectively from protective plate 41 slide, and are unlikely to be deposited on protective plate 41.
Running part 5 is steel tracks chassis in the present embodiment, and running part 5 can bear the weight of rack 101, and with motivation Frame 101 is moved.
Roller catch bar 12, drum driven bar 13, rack bar 14 and shovel board portion telescopic rod 21 are hydraulically extensible cylinder, hydraulic System 8 is that roller catch bar 12, drum driven bar 13, rack bar 14 and shovel board portion telescopic rod 21 provide required move of stretching Power.
Although above the present invention is described in detail with a general description of the specific embodiments, On the basis of the present invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Cause This, these modifications or improvements, fall within the scope of the claimed invention without departing from theon the basis of the spirit of the present invention.

Claims (8)

1. a kind of horizontal shaft type rock tunnel digs windlass, which is characterized in that include: cutting mechanism, shovel board portion, scratch board conveyor, Roofbolt machine, running part, rear support portion, hydraulic system, two lateral wall roof-bolters and rack;
Cutting mechanism includes cutting drum portion, roller catch bar, drum driven bar and rack bar;
Cutting drum portion is for being crushed rock, and cutting drum portion is set in rack, roller catch bar one end and cutting The rotation connection of roller portion;The roller catch bar other end and the rotation of drum driven bar one end connect;The drum driven bar other end and machine Hack lever rotation connection;Rack bar is fixedly connected with hydraulic system;
Shovel board portion is set in rack, and shovel board portion is installed on cutting drum portion bottom, shovel board portion telescopic rod one end and shovel board Portion's rotation connection, the other end are fixedly connected with hydraulic system;
Scratch board conveyor is set in rack, and scratch board conveyor is connect with shovel board portion, and scratch board conveyor extends to rack tail Portion;
Roofbolt machine is fixedly installed in rack, and roofbolt machine is located above cutting drum portion;
Shovel board portion is set in rack, and running part is installed on scratch board conveyor two sides;
It rear support portion and is rotatably mounted in rack;
Running part installation is connect with bottom of the frame for driving rack to walk;
Two lateral wall roof-bolters are set in rack, and two lateral wall roof-bolters are symmetrically disposed at left and right sides of scratch board conveyor, and two Lateral wall roof-bolter is located at roofbolt motor spindle;
Hydraulic system is connect with roller catch bar, drum driven bar, rack bar and shovel board portion telescopic rod, and hydraulic system is rolling Cylinder catch bar, drum driven bar, rack bar and shovel board portion telescopic rod provide the required power that stretches.
2. a kind of horizontal shaft type rock tunnel according to claim 1 digs windlass, which is characterized in that the running part is steel Crawler body processed.
3. a kind of horizontal shaft type rock tunnel according to claim 1 digs windlass, which is characterized in that if rear support portion is provided with The Heavenly Stems and Earthly Branches hold nail.
4. a kind of horizontal shaft type rock tunnel according to claim 1 digs windlass, which is characterized in that horizontal shaft type rock tunnel is dug Windlass further includes having lubrication portion, and lubrication portion is installed in rack and between hydraulic system and running part, lubrication portion and cross Shaft type rock tunnel digs the corresponding connection of each oil site of windlass, for being lubricated to each oil site;Hydraulic system and lubrication Portion is fixedly connected.
5. a kind of horizontal shaft type rock tunnel according to claim 1 digs windlass, which is characterized in that horizontal shaft type rock tunnel is dug Windlass further includes having electrical system, and electrical system is dug each motor of windlass with horizontal shaft type rock tunnel and is correspondingly connected with, electrical system Each motor is powered;Electrical system is installed in rack and is fixedly connected with water system, and rear support portion is located at electrical system Lower part.
6. a kind of horizontal shaft type rock tunnel according to claim 1 digs windlass, which is characterized in that horizontal shaft type rock tunnel is dug Windlass further includes having water system, and water system is installed in rack and is fixedly connected with hydraulic system;Water system and horizontal shaft type rock Tunnel digs the corresponding connection of each cooling point of windlass, and water system is for cooling down to each cooling point.
7. a kind of horizontal shaft type rock tunnel according to claim 1 digs windlass, which is characterized in that be additionally provided in rack anti- Backplate, protective plate one end are fixedly connected with the roofbolt machine other end with rack, and protective plate is fallen down for blocking from tunnel top Soil or rock.
8. a kind of horizontal shaft type rock tunnel according to claim 7 digs windlass, which is characterized in that the water of protective plate and rack Flat angle is 30-45 °.
CN201910046491.6A 2019-01-18 2019-01-18 A kind of horizontal shaft type rock tunnel digging windlass Pending CN109555532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910046491.6A CN109555532A (en) 2019-01-18 2019-01-18 A kind of horizontal shaft type rock tunnel digging windlass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910046491.6A CN109555532A (en) 2019-01-18 2019-01-18 A kind of horizontal shaft type rock tunnel digging windlass

Publications (1)

Publication Number Publication Date
CN109555532A true CN109555532A (en) 2019-04-02

Family

ID=65873203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910046491.6A Pending CN109555532A (en) 2019-01-18 2019-01-18 A kind of horizontal shaft type rock tunnel digging windlass

Country Status (1)

Country Link
CN (1) CN109555532A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253158A (en) * 2020-10-26 2021-01-22 山西晟特恒采矿工程机械有限公司 Full-coal roadway cross shaft tunneling machine, control method and application
CN112253159A (en) * 2020-10-26 2021-01-22 山西晟特恒采矿工程机械有限公司 Transverse shaft digging and anchoring machine
CN116658072A (en) * 2023-07-25 2023-08-29 中铁十九局集团第六工程有限公司 Drilling equipment for loess tunnel

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1415579A (en) * 1972-10-02 1975-12-10 Bendix Corp Underground mining vehicle
CS505484A2 (en) * 1983-06-30 1990-08-14 Boehler Pneumatik Int Gmbh Device for guy holes boring and anchors location
JP2005240517A (en) * 2004-02-27 2005-09-08 West Japan Railway Co Rock bolt driving machine
CN200964860Y (en) * 2006-11-15 2007-10-24 三一重型装备有限公司 Dredging anchoring integral machine
CN101070758A (en) * 2006-05-10 2007-11-14 三一重型装备有限公司 Digging-drilling integrated digging-drilling machine
CN101153540A (en) * 2006-09-25 2008-04-02 贾民 Roadheader
CN101230781A (en) * 2007-01-24 2008-07-30 三一重型装备有限公司 Grubbing anchoring integrative grub-anchor winch
AU2008307023A1 (en) * 2007-10-01 2009-04-09 Zhendong Yan A track-mounted elevator top and side bolts and cables drilling machine
CN201314233Y (en) * 2008-11-07 2009-09-23 赵宇川 All-in-one machine of tunneling, anchoring, boring and shipping
WO2009129688A1 (en) * 2008-04-22 2009-10-29 Yan Zhendong Rock drivage and supporting construction drilling machine
WO2009155776A1 (en) * 2008-06-25 2009-12-30 Yan Zhendong A dilling, loading, transporting and anchoring integration machine for laneway in coal mine
CN102364048A (en) * 2011-10-11 2012-02-29 马晓山 Comprehensive mechanized rock roadway tunneling machine
CN102364053A (en) * 2011-11-07 2012-02-29 石家庄中煤装备制造股份有限公司 Heading-anchoring machine
CN102635353A (en) * 2012-04-06 2012-08-15 中铁隧道装备制造有限公司 Double-cantilever hard rock coal roadway heading and anchoring device
CN102808617A (en) * 2012-08-28 2012-12-05 马晓山 Comprehensive mechanical stone drift digging anchor machine
CN103590838A (en) * 2013-08-22 2014-02-19 襄阳忠良工程机械有限责任公司 Heading and loading machine for drilling and digging
CN104213831A (en) * 2014-08-16 2014-12-17 中国煤炭科工集团太原研究院有限公司 Anchor rod drill carriage integrating coal mine digging, supporting and transportation parallel fast operation
CN104533408A (en) * 2014-12-31 2015-04-22 闫振东 Large-width comprehensive coal road driving anchor machine with simultaneous drifting function
CN107165630A (en) * 2017-07-19 2017-09-15 山西天巨重工机械有限公司 A kind of colliery quick digging and anchoring all-in-one
CN108222928A (en) * 2018-01-19 2018-06-29 中国煤炭科工集团太原研究院有限公司 Simultaneous drifting, the anchor driving machine for realizing pick anchor parallel operations
CN207568489U (en) * 2017-12-20 2018-07-03 江苏中贵重工有限公司 A kind of protection mechanism and roofboltier

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1415579A (en) * 1972-10-02 1975-12-10 Bendix Corp Underground mining vehicle
CS505484A2 (en) * 1983-06-30 1990-08-14 Boehler Pneumatik Int Gmbh Device for guy holes boring and anchors location
JP2005240517A (en) * 2004-02-27 2005-09-08 West Japan Railway Co Rock bolt driving machine
CN101070758A (en) * 2006-05-10 2007-11-14 三一重型装备有限公司 Digging-drilling integrated digging-drilling machine
CN101153540A (en) * 2006-09-25 2008-04-02 贾民 Roadheader
CN200964860Y (en) * 2006-11-15 2007-10-24 三一重型装备有限公司 Dredging anchoring integral machine
CN101230781A (en) * 2007-01-24 2008-07-30 三一重型装备有限公司 Grubbing anchoring integrative grub-anchor winch
AU2008307023A1 (en) * 2007-10-01 2009-04-09 Zhendong Yan A track-mounted elevator top and side bolts and cables drilling machine
US20100119310A1 (en) * 2007-10-01 2010-05-13 Zhendong Yan crawler-type and height adjustment drilling machine for setting roof and side wall anchor bolts and anchor cables
WO2009129688A1 (en) * 2008-04-22 2009-10-29 Yan Zhendong Rock drivage and supporting construction drilling machine
WO2009155776A1 (en) * 2008-06-25 2009-12-30 Yan Zhendong A dilling, loading, transporting and anchoring integration machine for laneway in coal mine
CN201314233Y (en) * 2008-11-07 2009-09-23 赵宇川 All-in-one machine of tunneling, anchoring, boring and shipping
CN102364048A (en) * 2011-10-11 2012-02-29 马晓山 Comprehensive mechanized rock roadway tunneling machine
CN102364053A (en) * 2011-11-07 2012-02-29 石家庄中煤装备制造股份有限公司 Heading-anchoring machine
CN102635353A (en) * 2012-04-06 2012-08-15 中铁隧道装备制造有限公司 Double-cantilever hard rock coal roadway heading and anchoring device
CN102808617A (en) * 2012-08-28 2012-12-05 马晓山 Comprehensive mechanical stone drift digging anchor machine
CN103590838A (en) * 2013-08-22 2014-02-19 襄阳忠良工程机械有限责任公司 Heading and loading machine for drilling and digging
CN104213831A (en) * 2014-08-16 2014-12-17 中国煤炭科工集团太原研究院有限公司 Anchor rod drill carriage integrating coal mine digging, supporting and transportation parallel fast operation
CN104533408A (en) * 2014-12-31 2015-04-22 闫振东 Large-width comprehensive coal road driving anchor machine with simultaneous drifting function
CN107165630A (en) * 2017-07-19 2017-09-15 山西天巨重工机械有限公司 A kind of colliery quick digging and anchoring all-in-one
CN207568489U (en) * 2017-12-20 2018-07-03 江苏中贵重工有限公司 A kind of protection mechanism and roofboltier
CN108222928A (en) * 2018-01-19 2018-06-29 中国煤炭科工集团太原研究院有限公司 Simultaneous drifting, the anchor driving machine for realizing pick anchor parallel operations

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
朱光祖: "EBZ230掘进机在大断面岩巷掘进施工中的技术应用", 《山东工业技术》, no. 12 *
李钦彬;鄂宇;周明;: "机载式侧帮锚杆机的设计研究", 煤矿机械, vol. 31, no. 07, pages 16 - 17 *
漆泰岳;李斌;: "悬臂掘进机在复杂断面地铁隧道中的应用研究", 现代隧道技术, no. 04, pages 32 - 38 *
王中亮;王振虹;刘海泉;: "复杂条件下掘锚一体机快速成巷技术研究", 山东煤炭科技, vol. 1, no. 02, pages 317 - 322 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253158A (en) * 2020-10-26 2021-01-22 山西晟特恒采矿工程机械有限公司 Full-coal roadway cross shaft tunneling machine, control method and application
CN112253159A (en) * 2020-10-26 2021-01-22 山西晟特恒采矿工程机械有限公司 Transverse shaft digging and anchoring machine
CN116658072A (en) * 2023-07-25 2023-08-29 中铁十九局集团第六工程有限公司 Drilling equipment for loess tunnel
CN116658072B (en) * 2023-07-25 2023-09-29 中铁十九局集团第六工程有限公司 Drilling equipment for loess tunnel

Similar Documents

Publication Publication Date Title
CN106194171B (en) A kind of adaptivity digging all-in-one
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN109555532A (en) A kind of horizontal shaft type rock tunnel digging windlass
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
CN102808617A (en) Comprehensive mechanical stone drift digging anchor machine
CN106979015A (en) A kind of climbing control method of the high inclination-angle development machine with auxiliary climbing apparatus
CN206655700U (en) High inclination-angle development machine with auxiliary climbing apparatus
US10486717B2 (en) Hydro-electric site and method for constructing a penstock
CN109538224A (en) A kind of novel coal lane high-speed driving machine
CN107130656A (en) Mine underground bores anchor broken rock integrated digging formula loading machine
CN202645558U (en) Crawler-type single-head drilling rig coal cutter
CN102425415A (en) Gangue racking machine for half-coal rock roadway blasting driving
CN102817363A (en) Application of all-in-one machine for digging, drilling and anchoring in basement foundation pipe support engineering
CN104763327A (en) Pneumatic-hydraulic hybrid type laneway excavating drill jambo
CN106869956B (en) A kind of high inclination-angle development machine with auxiliary climbing apparatus
CN205742318U (en) A kind of milling digging machine of automatic material-absorbing
CN209494569U (en) A kind of novel coal lane high-speed driving machine
CN104564056A (en) Integrated tunneling and exploring machine
CN209025604U (en) A kind of high inclination-angle roadway bolt drill carriage
CN201952822U (en) Full-hydraulic excavating and anchor rod drilling machine
CN110952989A (en) Rock cracking type tunnel boring machine
CN202832553U (en) All-in-one milling and excavating machine for mines
RU2103507C1 (en) Method and cutter-loader machine for development of seam deposits of minerals
CN102191914A (en) Full-hydraulic integrated multipurpose cutting driller
CN205277425U (en) Pipeline formula rock drill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination