CN109555311A - Adjustable waterproof guide wall form board support construction and its operational method - Google Patents

Adjustable waterproof guide wall form board support construction and its operational method Download PDF

Info

Publication number
CN109555311A
CN109555311A CN201910019860.2A CN201910019860A CN109555311A CN 109555311 A CN109555311 A CN 109555311A CN 201910019860 A CN201910019860 A CN 201910019860A CN 109555311 A CN109555311 A CN 109555311A
Authority
CN
China
Prior art keywords
aluminum alloy
mould plate
alloy mould
absolute altitude
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910019860.2A
Other languages
Chinese (zh)
Inventor
贾毅
王业国
张宁
韩波
周春晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG JINCHENG CONSTRUCTION Co Ltd
Original Assignee
SHANDONG JINCHENG CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG JINCHENG CONSTRUCTION Co Ltd filed Critical SHANDONG JINCHENG CONSTRUCTION Co Ltd
Priority to CN201910019860.2A priority Critical patent/CN109555311A/en
Publication of CN109555311A publication Critical patent/CN109555311A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/075Tying means, the tensional elements of which are fastened or tensioned by other means
    • E04G17/0751One-piece elements
    • E04G17/0752One-piece elements fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G2017/0646Tying means; Spacers ; Devices for extracting or inserting wall ties made of a flat strip, e.g. of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention belongs to technical field of building construction, more particularly to a kind of adjustable waterproof guide wall form board support construction and its operational method, adjustable waterproof guide wall form board support construction includes aluminum alloy mould plate fixation kit, absolute altitude adjusting supporting device and bottom positioning device, aluminum alloy mould plate fixation kit is fixed in the positioning device of bottom by absolute altitude adjusting supporting device, the aluminum alloy mould plate fixation kit includes two group aluminum alloy templates and reinforces pulling-on piece, and the top sides rib of two group aluminum alloy templates is fixed by reinforcing pulling-on piece;The absolute altitude adjusting supporting device includes reinforcing nut, absolute altitude adjusting nut and carrying bolt bar;Bottom positioning device includes two groups of horizontal positioning elements and vertical setting element.The present invention also provides a kind of operational methods based on adjustable waterproof guide wall form board support construction, it can realize that waterproof leads the construction of wall synchronous body through the invention, solve the problems, such as it is secondary pour to stay set horizontal construction joint and easily cause leakage, substantially increase Construction Quality.

Description

Adjustable waterproof guide wall form board support construction and its operational method
Technical field
The present invention relates to a kind of adjustable waterproof guide wall form board support construction and its operational methods, belong to building construction technology Field.
Background technique
In architectural engineering, waterproof leads wall using the secondary construction method poured, i.e., after cast-in-place sheet metal forming again between conventional sanitation It pours building waterproofing and leads wall.It although ensure that the presentation quality of concrete using such form of construction work, but waterproof leads wall and Bars In Poured Concrete Slab Horizontal construction joint can be generated by connecing batch position, if water-proofing treatment is not in place, easily cause wall root leakage, metope to get damp, directly Influence the use of owner.
Meanwhile general accomodation ground absolute altitude is lower than adjacent ground, such as once installs waterproof guide wall form board, waterproof leads wall two The plate top mark height of side template is inconsistent, and template fixed form need to not be sought unity of standard using mould reinforcement technique is hung, concrete construction Quality is not easily controlled, and is easy to appear swollen mould, displacement and other issues.
Summary of the invention
According to the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is providing a kind of adjustable waterproof Guide wall form board support construction and its operational method realize the function that waterproof leads the freely adjustable absolute altitude of two side template of wall, and can So that waterproof leads wall concrete synchronous main body construction, to solve the above problems.
Adjustable waterproof guide wall form board support construction of the present invention, including aluminum alloy mould plate fixation kit, absolute altitude tune Support device and bottom positioning device are saved, aluminum alloy mould plate fixation kit is fixed on bottom by absolute altitude adjusting supporting device and positions On device, the aluminum alloy mould plate fixation kit includes two group aluminum alloy templates and reinforces pulling-on piece, two group aluminum alloy templates Top sides rib is fixed by reinforcing pulling-on piece;The absolute altitude adjusting supporting device includes reinforcing nut, absolute altitude adjusting nut and branch Staybolt bar, carrying bolt bar, which is connected through a screw thread, reinforces nut and absolute altitude adjusting nut, reinforces nut, absolute altitude adjusting nut point The two sides up and down of aluminum alloy mould plate bottom sides rib are not set;Bottom positioning device includes two groups of horizontal positioning elements and vertically determines Bit unit, carrying bolt bar are fixedly mounted on vertical setting element, and two groups of horizontal positioning elements are arranged in vertical setting element Bottom.
The aluminum alloy mould plate fixation kit further includes reinforcing pin and reinforcing selling sheet, and reinforcing pin, which is equipped with, to be reinforced It is equipped with pin hole on hole, aluminum alloy mould plate and reinforcing pulling-on piece, pin is reinforced and passes through aluminum alloy mould plate and reinforce the pin on pulling-on piece After nail hole, reinforces the reinforced hole that selling sheet is inserted on solid pin and be locked.
The carrying bolt bar is equipped with seal ring, extends infiltration path, provides the guarantee of sealing for this structure.
Two groups of horizontal positioning elements are arranged in parallel in vertical setting element bottom.
The invention also includes a kind of operational methods based on adjustable waterproof guide wall form board support construction, including following step It is rapid:
1., bottom positioning device is fixed on the external angle position that waterproof leads wall bottom beam forms, adjust the absolute altitude tune of two sides It saves nut aluminum alloy mould plate is placed on absolute altitude adjusting nut to proper height, and fixes locking aluminium alloy mould with reinforcing nut Plate;
2., pulling-on piece is reinforced in installation on the top sides rib of aluminum alloy mould plate, reinforce pin insertion and reinforce pulling-on piece and aluminium alloy It is fixed in the pin hole of template, it reinforces selling sheet and is inserted into the reinforced hole internal locking for reinforcing pin.
3., by pump truck casting concrete, so that bottom beam, Bars In Poured Concrete Slab to be poured and building waterproofing to be poured to be poured is led wall zone Disposal integral molding.
Toilet warterproof may be implemented through the invention and lead the construction of wall synchronous body, solve concrete secondary and pour to stay and set Horizontal construction joint easily causes the problem of leakage.
Compared with the prior art, the invention has the beneficial effects that:
1. adjustable waterproof guide wall form board support construction of the present invention, is mainly used for the construction that toilet warterproof leads wall, Achievable toilet warterproof leads the construction of wall synchronous body, solves concrete secondary and pours to stay and sets horizontal construction joint and easily cause leakage The problem of.
2. the present invention devises absolute altitude adjusting supporting device, realizing waterproof and leading the aluminum alloy mould plates of wall two sides freely to be adjusted The high function of feast-brand mark is constructed more flexible, it is easier to be controlled concrete construction quality, to the adaptable of construction environment, is applicable in model It encloses wider.
3. being provided with seal ring on carrying bolt bar, infiltration path is extended, provides sealing guarantee for this structure.
4. fixing-stable of the present invention, is connected firmly, there is swollen mould, the influences construction such as displacement in aluminum alloy mould plate when avoiding pouring The problem of quality.
5. the present apparatus in installation exercise, directly assembled can be used, be simple and efficient.The reinforcing spiral shell of absolute altitude adjusting supporting device Female, absolute altitude adjusting nut and aluminum alloy mould plate fixation kit can be used in turn, and saved material, environmental protection, reduced cost.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is A-A the schematic diagram of the section structure in Fig. 1;
Fig. 3 is B-B the schematic diagram of the section structure in Fig. 1.
In figure: 1, aluminum alloy mould plate;2, pulling-on piece is reinforced;3, pin is reinforced;4, selling sheet is reinforced;5, nut is reinforced;6, absolute altitude Adjusting nut;7, carrying bolt bar;8, seal ring;9, horizontal positioning element;10, vertical setting element;11, bottom beam forms; 12, bottom beam to be poured;13, Bars In Poured Concrete Slab to be poured;14, building waterproofing to be poured leads wall.
Specific embodiment
The present invention is described further below with reference to embodiment:
Embodiment one:
As shown in Figures 1 to 3, adjustable waterproof guide wall form board support construction of the present invention, including aluminum alloy mould plate are solid Determine component, absolute altitude adjusting supporting device and bottom positioning device, aluminum alloy mould plate fixation kit passes through absolute altitude adjusting supporting device It is fixed in the positioning device of bottom, aluminum alloy mould plate fixation kit includes two group aluminum alloy templates 1, reinforces pulling-on piece 2, reinforces pin 3 and selling sheet 4 is reinforced, the top sides ribs of two group aluminum alloy templates 1 is fixed by reinforcing pulling-on piece 2, reinforces pin 3 and is equipped with and reinforces It is equipped with pin hole on hole, aluminum alloy mould plate 1 and reinforcing pulling-on piece 2, pin 3 is reinforced and passes through aluminum alloy mould plate 1 and reinforce on pulling-on piece 2 Pin hole after, reinforce the reinforced hole that selling sheet 4 is inserted on solid pin 3 and be locked.Absolute altitude adjusting supporting device includes reinforcing spiral shell Mother 5, absolute altitude adjusting nut 6 and carrying bolt bar 7, carrying bolt bar 7 are equipped with seal ring 8, and carrying bolt bar 7 is connected by screw thread It connects and reinforces nut 5 and absolute altitude adjusting nut 6, reinforce nut 5, absolute altitude adjusting nut 6 is separately positioned on 1 bottom sides of aluminum alloy mould plate The two sides up and down of rib;Bottom positioning device includes two groups of horizontal positioning elements 9 and vertical setting element 10, and carrying bolt bar 7 welds It connects on vertical setting element 10, two groups of horizontal positioning elements 9 are arranged in parallel in vertical 10 bottom of setting element, bottom positioning dress It sets and is fixed on the external angle position that waterproof leads wall bottom beam forms 11.It can make to be poured to build bottom beam 12, wait pour through the invention Bars In Poured Concrete Slab 13 and building waterproofing to be poured lead the region disposal integral molding of wall 14, realize that toilet warterproof is led wall synchronous body and applied Work solves the problems, such as that concrete secondary pours to stay and sets horizontal construction joint and easily cause leakage.
Embodiment two:
A kind of operational method of adjustable waterproof guide wall form board support construction based on embodiment one, including following step are provided It is rapid:
1., bottom positioning device is fixed on to the external angle position that waterproof leads wall bottom beam forms 11, adjust the absolute altitude of two sides Aluminum alloy mould plate 1 is placed on absolute altitude adjusting nut 6 by adjusting nut 6 to proper height, and nut 5 is fixed to lock aluminium with reinforcing Alloy templates 1;
2., pulling-on piece 2 is reinforced in installation on the top sides rib of aluminum alloy mould plate 1, reinforce the insertion of pin 3 and reinforce pulling-on piece 2 and aluminium It is fixed in the pin hole of alloy templates 1, it reinforces selling sheet 4 and is inserted into the reinforced hole internal locking for reinforcing pin 3.
3., by pump truck casting concrete, so that bottom beam 12, Bars In Poured Concrete Slab to be poured 13 and building waterproofing to be poured to be poured is led wall 14 region disposal integral moldings.
Toilet warterproof may be implemented through the invention and lead the construction of wall synchronous body, solve concrete secondary and pour to stay and set Horizontal construction joint easily causes the problem of leakage, substantially increases Construction Quality.

Claims (5)

1. a kind of adjustable waterproof guide wall form board support construction, it is characterised in that: including aluminum alloy mould plate fixation kit, absolute altitude tune Support device and bottom positioning device are saved, aluminum alloy mould plate fixation kit is fixed on bottom by absolute altitude adjusting supporting device and positions On device, the aluminum alloy mould plate fixation kit includes two group aluminum alloy templates (1) and reinforces pulling-on piece (2), two group aluminum alloys The top sides rib of template (1) is fixed by reinforcing pulling-on piece (2);The absolute altitude adjusting supporting device includes reinforcing nut (5), mark Top adjustment nut (6) and carrying bolt bar (7), carrying bolt bar (7), which is connected through a screw thread, reinforces nut (5) and absolute altitude adjusting spiral shell Female (6), reinforcing nut (5), absolute altitude adjusting nut (6) are separately positioned on the two sides up and down of aluminum alloy mould plate (1) bottom sides rib;Bottom Portion's positioning device includes two groups of horizontal positioning elements (9) and vertical setting element (10), and carrying bolt bar (7) is fixedly mounted on perpendicular To on setting element (10), two groups of horizontal positioning elements (9) are arranged in vertical setting element (10) bottom.
2. adjustable waterproof guide wall form board support construction according to claim 1, it is characterised in that: the aluminium alloy mould Plate fixation kit further includes reinforcing pin (3) and reinforcing selling sheet (4), reinforces pin (3) and is equipped with reinforced hole, aluminum alloy mould plate (1) and in reinforcing pulling-on piece (2) it is equipped with pin hole, pin (3) is reinforced and passes through aluminum alloy mould plate (1) and reinforce on pulling-on piece (2) After pin hole, reinforces the reinforced hole that selling sheet (4) are inserted on solid pin (3) and be locked.
3. adjustable waterproof guide wall form board support construction according to claim 1, it is characterised in that: the carrying bolt Bar (7) is equipped with seal ring (8).
4. adjustable waterproof guide wall form board support construction according to claim 1, it is characterised in that: described two groups are horizontal Setting element (9) is arranged in parallel in vertical setting element (10) bottom.
5. a kind of operational method based on adjustable waterproof guide wall form board support construction, which comprises the following steps:
1., bottom positioning device is fixed on to the external angle position that waterproof leads wall bottom beam forms (11), adjust the absolute altitude tune of two sides It saves nut (6) aluminum alloy mould plate (1) is placed on absolute altitude adjusting nut (6) to proper height, and fixed with nut (5) are reinforced It locks aluminum alloy mould plate (1);
2., on the top sides rib of aluminum alloy mould plate (1) installation reinforce pulling-on piece (2), reinforce pin (3) insertion reinforce pulling-on piece (2) It is fixed in the pin hole of aluminum alloy mould plate (1), reinforces selling sheet (4) and be inserted into the reinforced hole internal locking for reinforcing pin (3).
3., by pump truck casting concrete, so that bottom beam to be poured (12), Bars In Poured Concrete Slab to be poured (13) and building waterproofing to be poured is led wall (14) region disposal integral molding.
CN201910019860.2A 2019-01-09 2019-01-09 Adjustable waterproof guide wall form board support construction and its operational method Withdrawn CN109555311A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910019860.2A CN109555311A (en) 2019-01-09 2019-01-09 Adjustable waterproof guide wall form board support construction and its operational method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910019860.2A CN109555311A (en) 2019-01-09 2019-01-09 Adjustable waterproof guide wall form board support construction and its operational method

Publications (1)

Publication Number Publication Date
CN109555311A true CN109555311A (en) 2019-04-02

Family

ID=65872778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910019860.2A Withdrawn CN109555311A (en) 2019-01-09 2019-01-09 Adjustable waterproof guide wall form board support construction and its operational method

Country Status (1)

Country Link
CN (1) CN109555311A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439266A (en) * 2019-07-29 2019-11-12 中建一局集团第三建筑有限公司 Waterproof reverse-edge aluminum alloy hanging die and method for constructing waterproof reverse edge by using same
CN110984570A (en) * 2019-12-06 2020-04-10 中冶天工集团有限公司 A kind of kitchen and bathroom anti-sill hanging formwork system support and positioning member and formwork method
CN112392156A (en) * 2020-11-25 2021-02-23 中国五冶集团有限公司 Main body structure and waterstop synchronous construction method
CN114319863A (en) * 2022-02-21 2022-04-12 中铁十六局集团城市建设发展有限公司 Basement guide wall template supporting system and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439266A (en) * 2019-07-29 2019-11-12 中建一局集团第三建筑有限公司 Waterproof reverse-edge aluminum alloy hanging die and method for constructing waterproof reverse edge by using same
CN110439266B (en) * 2019-07-29 2024-02-13 中建一局集团第三建筑有限公司 Waterproof reverse edge aluminum alloy hanging die and method for constructing waterproof reverse edge by using same
CN110984570A (en) * 2019-12-06 2020-04-10 中冶天工集团有限公司 A kind of kitchen and bathroom anti-sill hanging formwork system support and positioning member and formwork method
CN112392156A (en) * 2020-11-25 2021-02-23 中国五冶集团有限公司 Main body structure and waterstop synchronous construction method
CN114319863A (en) * 2022-02-21 2022-04-12 中铁十六局集团城市建设发展有限公司 Basement guide wall template supporting system and construction method thereof

Similar Documents

Publication Publication Date Title
CN109555311A (en) Adjustable waterproof guide wall form board support construction and its operational method
CN205934703U (en) A high damping shock insulation rubber bearing mounting structure for cast -in -place bridge
CN110485713B (en) Roofing cornice and escape canal once only pour template reinforcing apparatus
CN105386517B (en) A kind of prefabricated luffer boards and its installation method of floaing
CN109025262A (en) A kind of molding construction method of concrete flanging one-time-concreting
CN110485707A (en) Wall column formwork blocks levelling device and its construction method
CN106988340A (en) The construction method that reserved steel bar in cast-in-place concrete bottom plate is accurately positioned, installed
CN106149877B (en) Concrete frame structure prefabricated post and the docking structure and method at beam slab node
CN209469002U (en) Adjustable waterproof guide wall form board support construction
CN106149878B (en) Concrete frame structure prefabricated post and the connection structure and method at beam slab node
CN217420505U (en) Flanging one-step pouring forming formwork supporting device
CN209571794U (en) In a kind of shear wall direct-burried distribution box with can turnover type fix device
CN110005200B (en) Construction process for concrete pouring compaction of horizontal hidden beam
CN209190965U (en) A kind of adjustable prefabricated board die
CN208072425U (en) A kind of template for roadbed arched framework side slope concrete structure construction
CN219855138U (en) Precast pile shaping groove
CN113073840A (en) Concrete reversed ridge accurate positioning die and reversed ridge construction method
CN112459474A (en) Method for supporting single post of post-cast strip PVC pipe mould plain concrete
CN208168161U (en) A kind of fabricated shear wall reinforcing bar posting
CN218952796U (en) Adjustable kitchen and bathroom hanging die positioning and fixing device
CN218576591U (en) Raft plate steel bar erection punching rib type cushion block template
CN206468002U (en) Beam sides template reinforcing device
CN206091288U (en) Concrete post -cast strip is propped up and is established device
CN210828327U (en) Template reinforcing apparatus is once only pour in roofing eaves mouth and escape canal
CN209990152U (en) Opening-closing type pouring opening structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190402