CN109548540A - Water jet is installed on 100 meters of multiple groups conjunction (60-100) or more roof - Google Patents
Water jet is installed on 100 meters of multiple groups conjunction (60-100) or more roof Download PDFInfo
- Publication number
- CN109548540A CN109548540A CN201710956420.0A CN201710956420A CN109548540A CN 109548540 A CN109548540 A CN 109548540A CN 201710956420 A CN201710956420 A CN 201710956420A CN 109548540 A CN109548540 A CN 109548540A
- Authority
- CN
- China
- Prior art keywords
- water
- tank
- meters
- water jet
- builds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 61
- 238000003915 air pollution Methods 0.000 claims abstract description 3
- 239000000463 material Substances 0.000 claims abstract 2
- 239000008399 tap water Substances 0.000 claims abstract 2
- 235000020679 tap water Nutrition 0.000 claims abstract 2
- 230000000694 effects Effects 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 239000000443 aerosol Substances 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G15/00—Devices or methods for influencing weather conditions
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Atmospheric Sciences (AREA)
- Environmental Sciences (AREA)
- Building Environments (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
60-100 seat height buildings, high 100 meters of layer or more could install water jet, they act on and are " multiple groups conjunction " " internet " working principle, to save material, improve urban environment, improve haze sky and air pollution.Solve urban water shortage situation, improve people's health, I found that and investigate meteorological department's data: 100 meters of -1500 meters of days have in vain in the case where cloud all can rainfall, I am using installing water jet under conditions of speaking of in the existing Resource Design in city title.100 meters or more high buildings have air in supporting movement at a distance from ground, I first builds weldering tank using the position of roof plane whereby, dress builds water pump, water pipe, A-frame in tank, then water jet is installed on A-frame again, tank builds up and then tap water is sent into tank by water pipe, after tank full (about 85%), water pump, water pipe, A-frame, water jet are connected again, are then powered into water pump.
Description
The our times people of various countries are faced with the same starting point, and temperature is gradually increasing year by year on the earth, generate big aerosol
Haze is than more serious.Earth continental plate serious water shortage, air quality is too poor to bring adverse effect to the people of other countries, these because
Caused by what element is actually? we can be experienced by face, city automobile tail gas, factory's chemical contamination, urban population
Intensively, urban afforestation causes insufficient water sources etc. to affect the health of the people of various countries with water.If any one city is serious
Water shortage will aggravate air pollution, cause haze.It can be seen that above-mentioned factor this how to solve? how people's health is concerned about, this
Expect that we go to study, go to find, goes to create.
I am using installing water jet under conditions of speaking of in the existing Resource Design in city title.100 meters or more high buildings
It supporting, moving with there is air at a distance from ground, I first builds weldering tank using the position of roof plane whereby, in tank
Dress builds water pump, water pipe, A-frame, then water jet is installed on A-frame again, tank builds up and then originally
Water is sent into tank by water pipe, after tank full (about 85%), then water pump, water pipe, A-frame, water jet phase chain
It connects, is then powered into water pump, monitor is mounted on roof highest point (can see the water flow in pond), monitors and pays close attention to work
Make situation.Huge pressure can be generated when work, just as aerial parabolic, strength can not be estimated.Water jet is rotated just as water is in sky
Middle dancing forms steam, by aerial cloud absorption.
The design needs 500 meters -800 meters of distance interval between the Lou Yulou in city, it acts on same time service
In the case that middle formation steam, wind-force, wind direction push mutually, it is above I be exactly in this way reduce city spending, be conducive to
The development of happiness of mankind.
Additional information: city selects 60 100 meters of -100 seat height story heights or more that could install water jet, its effect
The pressure of " multiple groups conjunction " " internet " working principle.Why not I are selected in level land or hilltop hills and do this experiment, because it
There is no the strength of the high symmetrical convection current of set air, they can't be the pressure in air.
Detailed description of the invention
Fig. 1 is high building, and 100 meters or more high buildings install water jet, and roof must reach building standard design and construction.Roof
Safety measure wants secure, is adapted to fit tank weight standard, whether qualified understands building construction quality.
Fig. 2 is tank, needs to install tank on roof, specific size, depending on the area of this building roof,
For the safety in building, the height of tank will be controlled at 0.6 meter -0.7 meter, in order to mitigate weight, the surrounding steel plate of tank
Be welded, floor space is formed with plastic cloth weldbonding, it is desirable that should not water exudation, guarantee implement building safety measure effect, surrounding
Steel plate can not be taken away after being finished, and when next time is used, plastic cloth re-replaces new plastic.
Fig. 3 is water pump, in order to reach bubbler pressure effect, so water pump cooperation water pipe, water jet work.
Fig. 4 is water pipe, and water pipe is the connection bridge for connecting water pump, water jet.
Fig. 5 is water jet, when water is rotated ejection water by water jet, generates huge pressure in air, is formed
Steam.
Fig. 6 is that multiple groups close 60-100, and 100 meters or more are upstairs installed water jet, their effect is " mutual " multiple groups conjunction "
The pressure of networking " working principle, 500 meters -800 meters are spaced between Lou Yulou, forms steam in same time service.
Fig. 7 is electric wire, and electricity is supplied with water pump main power.
Fig. 8 is A-frame, and the major function of support water pipe, water jet, A-frame must reach 6 meters or more high, is sprayed
Water out is just effective.
Claims (3)
- It is to save material, it can improve city 1. being closed using multiple groups and installing water jet on 60-100 100 meters or more roofs City's environment improves haze weather and air pollution, solves Urban Water Shortage Problem of Cities, improves people's health.
- 2.100 meters or more high buildings have air in supporting movement at a distance from ground, I is first built using the position of roof plane whereby Tank, dress builds water pump, water pipe, A-frame in tank, then water jet is installed on A-frame again, tank It builds up and then tap water is sent into tank by water pipe, after tank full (about 85%), then water pump, water pipe, three Angle support, water jet are connected, and are then powered into water pump, monitor are mounted on roof highest point, it can be seen that the water in pond Flow.
- 3. the design needs 500 meters -800 meters of distance interval between the Lou Yulou in city, it is acted in same time service Form steam.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710956420.0A CN109548540A (en) | 2017-09-26 | 2017-09-26 | Water jet is installed on 100 meters of multiple groups conjunction (60-100) or more roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710956420.0A CN109548540A (en) | 2017-09-26 | 2017-09-26 | Water jet is installed on 100 meters of multiple groups conjunction (60-100) or more roof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109548540A true CN109548540A (en) | 2019-04-02 |
Family
ID=65864222
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710956420.0A Pending CN109548540A (en) | 2017-09-26 | 2017-09-26 | Water jet is installed on 100 meters of multiple groups conjunction (60-100) or more roof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109548540A (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103212260A (en) * | 2013-04-22 | 2013-07-24 | 成都鹏伟建材有限公司 | Emergent method for relieving dust-haze |
| CN103759385A (en) * | 2014-01-08 | 2014-04-30 | 郝明学 | Air purification system and air purification method |
| CN203609994U (en) * | 2013-12-10 | 2014-05-28 | 于宗军 | Haze removing device based on high-rise building and fire-fighting system |
| CN106890519A (en) * | 2017-02-24 | 2017-06-27 | 深圳市华业航空科技有限公司 | A kind of intelligent automatic defrosting haze system and method |
-
2017
- 2017-09-26 CN CN201710956420.0A patent/CN109548540A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103212260A (en) * | 2013-04-22 | 2013-07-24 | 成都鹏伟建材有限公司 | Emergent method for relieving dust-haze |
| CN203609994U (en) * | 2013-12-10 | 2014-05-28 | 于宗军 | Haze removing device based on high-rise building and fire-fighting system |
| CN103759385A (en) * | 2014-01-08 | 2014-04-30 | 郝明学 | Air purification system and air purification method |
| CN106890519A (en) * | 2017-02-24 | 2017-06-27 | 深圳市华业航空科技有限公司 | A kind of intelligent automatic defrosting haze system and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113553792B (en) | A Numerical Simulation and Dangerous Situation Prediction Method for the Whole Process of Mountain Disasters | |
| Serban et al. | Assessment of wind energy potential based on Weibull and Rayleigh distribution models | |
| Jacobson et al. | A roadmap for repowering California for all purposes with wind, water, and sunlight | |
| Tabrizi et al. | Performance and safety of rooftop wind turbines: Use of CFD to gain insight into inflow conditions | |
| Lu et al. | Wind power evaluation and utilization over a reference high-rise building in urban area | |
| CN111652975B (en) | Method and system for assessing available solar energy resources in urban buildings | |
| dos Santos et al. | Limitations in solar module azimuth and tilt angles in building integrated photovoltaics at low latitude tropical sites in Brazil | |
| CN101865689B (en) | A Salt Tidal Prediction Method for Watershed | |
| Şen | Innovative methodologies in renewable energy: A review | |
| Platonova et al. | Simulation of energy input to solar panels | |
| Horan et al. | A geospatial assessment of the rooftop decarbonisation potential of industrial and commercial zoned buildings: An example of Irish cities and regions | |
| Kosović et al. | Impact of atmospheric turbulence on performance and loads of wind turbines: Knowledge gaps and research challenges | |
| CN101441683A (en) | Prediction method of city rainstorm flood evolvement process | |
| Al-Kodmany | Sustainable tall buildings: toward a comprehensive design approach | |
| CN109548540A (en) | Water jet is installed on 100 meters of multiple groups conjunction (60-100) or more roof | |
| Agharabi et al. | Optimal location of microturbines in low-rise building blocks for sustainable wind energy utilization (case study: Qazvin city) | |
| Zhang et al. | Hydrological impacts of climate change on streamflow of Dongliao River watershed in Jilin Province, China | |
| Cheng et al. | Refined numerical simulation in wind resource assessment | |
| Cao et al. | Preliminary assessment of the wind power resource around the thousand-meter scale megatall building | |
| Blengini | Floating photovoltaic systems: state of art, feasibility study in Florida and computational fluid dynamic analysis on hurricane resistance | |
| Dadioti | Numerical wind resource assessment in urban environments | |
| Radonjic et al. | Comparison of near-field CFD and CALPUFF modelling results around a backup diesel generating station | |
| Paton et al. | A metropolitan wind resource assessment for Bangkok, Thailand part 2: GIS analysis and technical wind resource potential | |
| Maklad | Generation of an annual typical daily wind speed for heights equal and less than 10 meters for urban armidale nsw, australia | |
| David et al. | GIS-based analysis of renewable energy potentials in urban space |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190402 |
|
| WD01 | Invention patent application deemed withdrawn after publication |