CN109537813A - 梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用 - Google Patents
梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用 Download PDFInfo
- Publication number
- CN109537813A CN109537813A CN201811352162.6A CN201811352162A CN109537813A CN 109537813 A CN109537813 A CN 109537813A CN 201811352162 A CN201811352162 A CN 201811352162A CN 109537813 A CN109537813 A CN 109537813A
- Authority
- CN
- China
- Prior art keywords
- ladder muscle
- protective layer
- transverse
- layer thickness
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/168—Spacers connecting parts for reinforcements and spacing the reinforcements from the form
Abstract
一种梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用,其特征在于包括以下步骤:a、制作若干梯子筋:使用Φ6mm盘螺钢筋加工制作:先将Φ6mm盘螺钢筋调直,然后按照图纸规格进行截取钢筋,b、安装梯子筋:钢筋混凝土剪力墙墙体的两侧设有模板,模板的外侧由木方支撑,模板的内侧设有纵横交叉的剪力墙竖向钢筋和横向钢筋;提供若干梯子筋,选择在剪力墙竖向钢筋和剪力墙横向钢筋的十字交叉点处放置梯子筋。本发明的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用具有梯子筋装置结构简单、制作方便,工程质量安全可靠,有效的控制剪力墙钢筋间距、保护层厚度及截面尺寸,从而使质量得到更有力的保障和能有效的提高观感的优点。
Description
技术领域
本发明涉及一种梯子筋,具体地说,是一种梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用。
背景技术
建设工程当中剪力墙钢筋绑扎间距控制绝大部分运用卷尺量取,然后通过利用粉笔在水平、竖向钢筋上画好刻度线进行定位绑扎,这种方法操作不但复杂,而且还浪费时间,并且在控制间距的情况下只要工人稍微马虎间距也无法满足要求。保护层厚度是通过双F卡(水泥条)绑扎于水平筋进行保护层控制,一般情况两根水平筋不在一个平面,会导致双F卡倾斜,从而保护层也得不到相应的保证。图1为已知的双钢筋F卡的结构示意图。
因此已知的剪力墙钢筋间距及保护层厚度控制方式存在着上述种种不便和问题。
发明内容
本发明的目的,在于提出一种作辅助作用的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用。
为实现上述目的,本发明的技术解决方案是:
一种梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用,其特征在于包括以下步骤:
a、制作若干梯子筋
使用Φ6mm盘螺钢筋加工制作:先将Φ6mm盘螺钢筋调直,然后按照图纸规格进行截取钢筋,其中:截取两根横向钢筋,若干根竖向钢筋,两根横向钢筋平行设置,若干根竖向钢筋相互等距离设置在两根横向钢筋之间,且与横向钢筋垂直焊接固定,形成梯子筋;
b、安装梯子筋
钢筋混凝土剪力墙墙体的两侧设有模板,模板的外侧由木方支撑,模板的内侧设有纵横交叉的剪力墙竖向钢筋和横向钢筋;提供若干梯子筋,选择在剪力墙竖向钢筋和剪力墙横向钢筋的十字交叉点处放置梯子筋,其中:使一个梯子筋的两根横向钢筋呈水平放置,另一个梯子筋的两根横向钢筋呈竖向放置,并用绑扎丝将剪力墙墙体竖向钢筋和横向钢筋绑扎以控制混凝土剪力墙墙体的厚度,绑扎完成后进行混凝土浇筑。
本发明的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述两根横向钢筋之间的宽度等于剪力墙墙体厚度减去2个保护层厚度,再减去2根竖向钢筋直径与2根横向钢筋直径之和。
采用上述技术方案后,本发明的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用具有以下优点:
1、梯子筋装置结构简单、制作方便;
2、工程质量安全可靠,作为辅助作用,可以有效的控制剪力墙钢筋间距、保护层厚度及截面尺寸,从而使质量得到更有力的保障;
3、能有效的提高观感。
附图说明
图1为已知的双钢筋F卡的结构示意图;
图2为本发明实施例的梯子筋的结构示意图。
图中:1水平支撑棍,2第1钢筋,3第2钢筋,4竖向钢筋,5横向钢筋。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
实施例1
本发明的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用,包括以下步骤:
a、制作若干梯子筋:使用Φ6mm盘螺钢筋加工制作:先将Φ6mm盘螺钢筋调直,然后按照图纸规格进行截取钢筋,其中:截取两根横向钢筋5,若干根竖向钢筋4,两根横向钢筋平行设置,若干根竖向钢筋相互等距离设置在两根横向钢筋之间,且与横向钢筋垂直焊接固定,形成梯子筋。两根横向钢筋之间的宽度等于剪力墙墙体厚度减去2个保护层厚度,再减去2根竖向钢筋直径与2根横向钢筋直径之和。
b、安装梯子筋。现请参阅图2,图2为本发明实施例的梯子筋的结构示意图。钢筋混凝土剪力墙墙体的两侧设有模板,模板的外侧由木方支撑,模板的内侧设有纵横交叉的剪力墙竖向钢筋和横向钢筋;提供若干梯子筋,选择在剪力墙竖向钢筋和剪力墙横向钢筋的十字交叉点处放置梯子筋,其中:使一个梯子筋的两根横向钢筋呈水平放置,另一个梯子筋的两根横向钢筋呈竖向放置,并用绑扎丝将剪力墙墙体竖向钢筋和横向钢筋绑扎以控制混凝土剪力墙墙体的厚度,绑扎完成后进行混凝土浇筑。
本发明具有实质性特点和显著的技术进步,本发明的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用方法,在施工时进行使用,操作简单,通过仪器检测,剪力墙钢筋间距及保护层厚度合格率满足业主方要求,同时也高于国家标准要求,质量有明显提高。
本发明的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用方法在蚌埠西湖观邸三期工程中运用,效果显著,得到了实施单位、监理单位和业主充分肯定。本项目属于开发商项目,项目通过开发商月、季度检查,检测合格率都满足开发商要求,使用方便且适用范围广,实践证明质量提高,得到了建设主管部门、建设单位、监理单位的充分肯定。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。
Claims (2)
1.一种梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用,其特征在于包括以下步骤:
a、制作若干梯子筋
使用Φ6mm盘螺钢筋加工制作:先将Φ6mm盘螺钢筋调直,然后按照图纸规格进行截取钢筋,其中:截取两根横向钢筋(5),若干根竖向钢筋(4),两根横向钢筋平行设置,若干根竖向钢筋相互等距离设置在两根横向钢筋之间,且与横向钢筋垂直焊接固定,形成梯子筋;
b、安装梯子筋
钢筋混凝土剪力墙墙体的两侧设有模板,模板的外侧由木方支撑,模板的内侧设有纵横交叉的剪力墙竖向钢筋和横向钢筋;提供若干梯子筋,选择在剪力墙竖向钢筋和剪力墙横向钢筋的十字交叉点处放置梯子筋,其中:使一个梯子筋的两根横向钢筋呈水平放置,另一个梯子筋的两根横向钢筋呈竖向放置,并用绑扎丝将剪力墙墙体竖向钢筋和横向钢筋绑扎以控制混凝土剪力墙墙体的厚度,绑扎完成后进行混凝土浇筑。
2.如权利要求1所述的梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用,其特征在于,所述两根横向钢筋之间的宽度等于剪力墙墙体厚度减去2个保护层厚度,再减去2根竖向钢筋直径与2根横向钢筋直径之和。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811352162.6A CN109537813A (zh) | 2018-11-14 | 2018-11-14 | 梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811352162.6A CN109537813A (zh) | 2018-11-14 | 2018-11-14 | 梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109537813A true CN109537813A (zh) | 2019-03-29 |
Family
ID=65847186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811352162.6A Pending CN109537813A (zh) | 2018-11-14 | 2018-11-14 | 梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109537813A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101353920A (zh) * | 2008-06-25 | 2009-01-28 | 江苏江都建设工程有限公司 | 高层剪力墙钢筋绑扎方法 |
CN202380642U (zh) * | 2011-12-29 | 2012-08-15 | 中建七局第三建筑有限公司 | 梯子筋 |
CN202767370U (zh) * | 2012-08-23 | 2013-03-06 | 北京城建北方建设有限责任公司 | 剪力墙钢筋定位框夹具 |
CN108590039A (zh) * | 2018-05-07 | 2018-09-28 | 五冶集团上海有限公司 | 一种控制剪力墙竖向钢筋间距的梯子筋及其使用方法 |
-
2018
- 2018-11-14 CN CN201811352162.6A patent/CN109537813A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101353920A (zh) * | 2008-06-25 | 2009-01-28 | 江苏江都建设工程有限公司 | 高层剪力墙钢筋绑扎方法 |
CN202380642U (zh) * | 2011-12-29 | 2012-08-15 | 中建七局第三建筑有限公司 | 梯子筋 |
CN202767370U (zh) * | 2012-08-23 | 2013-03-06 | 北京城建北方建设有限责任公司 | 剪力墙钢筋定位框夹具 |
CN108590039A (zh) * | 2018-05-07 | 2018-09-28 | 五冶集团上海有限公司 | 一种控制剪力墙竖向钢筋间距的梯子筋及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104809312B (zh) | 岩溶地区桩基持力层安全厚度计算方法 | |
CN105352884B (zh) | 测试混凝土与煤、岩或砼粘结强度的实验方法和构件 | |
CN102996143A (zh) | 一种隧道仰拱整幅浇筑的施工方法 | |
CN106638719A (zh) | 灌注桩成桩质量自动监测控制装置及方法 | |
Teng et al. | Surface subsidence characteristics of grout injection into overburden: case study of Yuandian No. 2 coalmine, China | |
CN105625292B (zh) | 软弱破碎岩体注浆加固效能三维空间数据采集方法 | |
CN103184871B (zh) | 一种保护重要水体的煤柱留设开采方法 | |
CN107299764A (zh) | 一种便于构造柱主筋定位的混凝土装置及施工方法 | |
CN209416230U (zh) | 一种楼板厚度测量装置 | |
CN109537813A (zh) | 梯子筋在剪力墙钢筋间距及保护层厚度控制中的应用 | |
CN202706023U (zh) | 用于连接框架梁和锚杆的封锚体结构 | |
CN103234826A (zh) | 片岩各向异性弹性模量测定方法 | |
CN107700460A (zh) | 一种高速铁路路基压实指标的无损测算方法 | |
CN204422109U (zh) | 一种用于监测混凝土应力的装置 | |
CN204252400U (zh) | 一种用于抗震框架顶层端节点的钢筋连接器 | |
CN204831309U (zh) | 一种用于预制结构控制点的测量装置 | |
CN102162291A (zh) | 一种标定抹灰层厚度进行抹灰的方法及组合定位构件 | |
CN206800401U (zh) | 灌注桩护筒定位及操作平台一体化装置 | |
CN103924591B (zh) | 一种拉力型锚索的设计方法 | |
CN203287131U (zh) | 钢筋拉应力的检测装置 | |
CN204023556U (zh) | 混凝土灌注桩钢筋笼保护层控制装置 | |
CN207215095U (zh) | 一种模板垂直度测量工具 | |
CN218714378U (zh) | 一种钢筋定位结构 | |
Jiang et al. | Study on soil improvement of TBM’s commencement and arrival in water-rich sand stratum | |
CN204266596U (zh) | 一种现浇混凝土板板厚预埋式控制器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190329 |
|
RJ01 | Rejection of invention patent application after publication |