CN109494054A - A kind of transformer core group fixing and mounting bracket - Google Patents

A kind of transformer core group fixing and mounting bracket Download PDF

Info

Publication number
CN109494054A
CN109494054A CN201811537218.5A CN201811537218A CN109494054A CN 109494054 A CN109494054 A CN 109494054A CN 201811537218 A CN201811537218 A CN 201811537218A CN 109494054 A CN109494054 A CN 109494054A
Authority
CN
China
Prior art keywords
transformer
transformer core
arc
mounting frame
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811537218.5A
Other languages
Chinese (zh)
Other versions
CN109494054B (en
Inventor
严桂娣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Tianli Ironcore Manufacturing Co ltd
Original Assignee
TAIZHOU TIANLI IRONCORE MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIZHOU TIANLI IRONCORE MANUFACTURING Co Ltd filed Critical TAIZHOU TIANLI IRONCORE MANUFACTURING Co Ltd
Priority to CN201811537218.5A priority Critical patent/CN109494054B/en
Publication of CN109494054A publication Critical patent/CN109494054A/en
Application granted granted Critical
Publication of CN109494054B publication Critical patent/CN109494054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/24Magnetic cores
    • H01F27/26Fastening parts of the core together; Fastening or mounting the core on casing or support
    • H01F27/266Fastening or mounting the core on casing or support

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

本发明创造公开了一种变压器铁芯组固定安装架,包括基座、变压器铁芯和安装架,所述基座上等距通过安装座安装有变压器铁芯,且变压器铁芯的顶部通过连接座连接有安装架。该变压器铁芯组固定安装架通过在相邻的两个变压器铁芯直接设有减震固定架,且减震固定架两侧的绝缘套分别套接在相邻的两个变压器铁芯上,从而对相邻的两个变压器铁芯之间进行相对固定,配合基座和安装架两端连接螺杆上通过固定套架连接的固定侧架对两侧变压器铁芯的外侧进行固定,从而实现对变压器铁芯整体进行固定,相比与传统的对变压器铁芯顶端和底端进行固定的固定方式,显著增强对变压器铁芯固定的稳定性,提高该变压器铁芯固定安装架的实用性。

The invention creates and discloses a fixed mounting frame for a transformer core group, which includes a base, a transformer core and a mounting frame. The base is equidistantly installed with the transformer core through the mounting base, and the top of the transformer core is connected by The seat is connected with a mounting bracket. The transformer iron core group fixing mounting frame is directly provided with a shock-absorbing fixing frame on two adjacent transformer iron cores, and the insulating sleeves on both sides of the shock-absorbing fixing frame are respectively sleeved on the two adjacent transformer iron cores. Thereby, the two adjacent transformer cores are relatively fixed, and the outer sides of the transformer cores on both sides are fixed with the fixed side frames connected by the fixed sleeves on the connecting screws at both ends of the base and the mounting frame, so as to realize the The transformer core is fixed as a whole. Compared with the traditional fixing method of fixing the top and bottom ends of the transformer core, the stability of the transformer core is significantly enhanced, and the practicability of the transformer core fixing bracket is improved.

Description

A kind of transformer core group fixing and mounting bracket
Technical field
The present invention relates to transformer core technical field, specially a kind of transformer core group fixing and mounting bracket.
Background technique
Iron core is main magnetic circuit part in transformer.It is usually higher by silicon content, surface be coated with insulated paint hot rolling or Cold-reduced silicon sheet closed assembly forms.Iron core and complete EM induction system is formed around coil on it.Power transformer transmission The size of power, depending on the material and cross-sectional area of iron core, traditional transformer core group mounting rack be mostly pass through upper frame and Chassis is fixed between the top and bottom end of transformer core group, and this traditional fixed form is relatively simple, Jin Jinshi Now transformer core group both ends are fixed, lacks and is fixed between iron core adjacent in transformer core group, it is fixed Stability it is poor.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of transformer core group fixing and mounting brackets.
In order to achieve the above object, the present invention is achieved by the following technical programs:
A kind of transformer core group fixing and mounting bracket, including pedestal, transformer core and mounting rack, it is equidistant on the pedestal Transformer core is installed by mounting base, and the top of transformer core is connected with mounting rack, the transformation by attachment base There are three device iron core is mounted equidistant altogether, and three transformer cores it is adjacent between any two be equipped with shock-absorbing fixing support, the pedestal and Connecting screw is connected with by fixture nut spiral between mounting rack both ends, and fixing sleeve is connected to fixing sleeve on connecting screw Frame, the outer helical of the fixed cage are connected with fixed side frame, wherein fixed side frame is socketed on transformer core, it is described to subtract Shaking fixed frame is to be formed by connecting by the first arc-shaped shock-absorbing frame and the second arc-shaped shock-absorbing frame by connecting rod spiral.
Preferably, the corresponding position spiral of the top of the mounting rack and transformer core is connected with connecting terminal, and The top two sides of mounting rack are symmetrically welded with lifting lug.
Preferably, there are two the fixed cage is fixedly attached altogether, and water of two fixed cages about transformer core Flat middle line is symmetrical, and the connecting screw hole for using through connecting screw is offered on fixed cage.
Preferably, the equal length of the first arc-shaped shock-absorbing frame and the second arc-shaped shock-absorbing frame, and the first arc-shaped shock-absorbing frame It is symmetrical about the vertical center line of connecting rod with the second arc-shaped shock-absorbing frame.
Preferably, the top of the first arc-shaped shock-absorbing frame and the second arc-shaped shock-absorbing frame passes through insulating base and is connected with insulation Set, and insulation sleeve is socketed on transformer core.
Preferably, the length and width of the pedestal and the length and width of mounting rack are equal, and pedestal and installation It is parallel to each other between frame.
The present invention have it is following the utility model has the advantages that
(1) the transformer core group fixing and mounting bracket is fixed by being directly provided with damping in two adjacent transformer cores Frame, and the insulation sleeve of shock-absorbing fixing support two sides is socketed in respectively on two adjacent transformer cores, thus to adjacent two Carried out between transformer core it is relatively fixed, cooperation pedestal consolidated on the connecting screw of mounting rack both ends by what fixed cage connected Determine side frame to being fixed on the outside of the transformer core of two sides, transformer core be integrally fixed to realize, compared to Traditional fixed form that transformer core top and bottom end are fixed significantly increases the stabilization fixed to transformer core Property, improve the practicability of the transformer core fixing and mounting bracket.
(2) the transformer core group fixing and mounting bracket is by being equipped with shock-absorbing fixing support, and shock-absorbing fixing support is equipped with the first arc Shape dynamic mount and the second arc-shaped shock-absorbing frame are formed by connecting by the way that connecting rod is opposite, the first arc-shaped shock-absorbing frame and the second arc-shaped shock-absorbing frame Can be to dual shock absorption buffer protection be carried out between two adjacent transformer cores, preventing from shaking in transport and assembling causes Transformer core damage.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is affixed side frame connecting structure schematic diagram of the invention;
Fig. 3 is shock-absorbing fixing support structural schematic diagram of the invention.
In figure: 1, pedestal;2, mounting base;3, transformer core;4, mounting rack;5, attachment base;6, connecting terminal;7, it hangs Ear;8, shock-absorbing fixing support;81, the first arc-shaped shock-absorbing frame;82, the second arc-shaped shock-absorbing frame;83, connecting rod;84, insulating base;85, absolutely Edge set;9, fixture nut;10, fixed cage;101, connecting screw hole;11, connecting screw;12, fixed side frame.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution: a kind of transformer core group fixing and mounting bracket, including base Seat 1, transformer core 3 and mounting rack 4 are equidistantly equipped with transformer core 3, and transformer core by mounting base 2 on pedestal 1 3 top is connected with mounting rack 4 by attachment base 5, there are three transformer core 3 is mounted equidistant altogether, and three transformer cores 3 Adjacent to be equipped with shock-absorbing fixing support 8 between any two, pedestal 1 and mounting rack are connected with by 9 spiral of fixture nut between 4 both ends Screw rod 11 is connect, and fixing sleeve is connected to fixed cage 10 on connecting screw 11, the outer helical of fixed cage 10 is connected with affixed side Frame 12, wherein fixed side frame 12 is socketed on transformer core 3, shock-absorbing fixing support 8 is by the first arc-shaped shock-absorbing frame 81 and second Arc-shaped shock-absorbing frame 82 is formed by connecting by 83 spiral of connecting rod.
The top of mounting rack 4 and the corresponding position spiral of transformer core 3 are connected with connecting terminal 6, and mounting rack 4 Top two sides are symmetrically welded with lifting lug 7, are lifted by being equipped with lifting lug 7 to transformer core group, fixed cage 10 There are two being fixedly attached altogether, and two fixed cages 10 are symmetrical about the horizontal central line of transformer core 3, and fixing sleeve The connecting screw hole 101 for using through connecting screw 11 is offered on frame 10, the first arc-shaped shock-absorbing frame 81 and the second arc subtract Shake the equal length of frame 82, and the vertical center line phase of the first arc-shaped shock-absorbing frame 81 and the second arc-shaped shock-absorbing frame 82 about connecting rod 83 Mutually symmetrical, the top of the first arc-shaped shock-absorbing frame 81 and the second arc-shaped shock-absorbing frame 82 passes through insulating base 84 and is connected with insulation sleeve 85, And insulation sleeve 85 is socketed on transformer core 3, the length and width of pedestal 1 and the length and width of mounting rack 4 are equal, and And be parallel to each other between pedestal 1 and mounting rack 4, connecting screw 11 is total to there are four spiral connections, and four connecting screws 11 are two-by-two Symmetric helix is fixed on the both ends of pedestal 1 and mounting rack 4.
When work, the transformer core group fixing and mounting bracket is in use, pedestal 1 and mounting rack 4 are respectively cooperating with 2 He of mounting base The bottom end of transformer core 3 and top is fixed in attachment base 5, while damping is equipped between two neighboring transformer core 3 Fixed frame 8, the insulation sleeve 85 connected on 8 two sides insulating base 84 of shock-absorbing fixing support are socketed in two adjacent transformer cores respectively On 3, to carry out to two two transformer cores 3 relatively fixed, while 8 ontology of shock-absorbing fixing support is subtracted by the first arc Shake frame 81 and the second arc-shaped shock-absorbing frame 82 are symmetrically formed by connecting, and can pass through the first arc-shaped shock-absorbing frame 81 and the second arc-shaped shock-absorbing frame 82 itself deformation carry out damping, buffering protection to the transformer cores 3 of 8 two sides of shock-absorbing fixing support.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1.一种变压器铁芯组固定安装架,包括基座(1)、变压器铁芯(3)和安装架(4),其特征在于:所述基座(1)上等距通过安装座(2)安装有变压器铁芯(3),且变压器铁芯(3)的顶部通过连接座(5)连接有安装架(4),所述变压器铁芯(3)共等距安装有三个,且三个变压器铁芯(3)相邻两两之间设有减震固定架(8),所述基座(1)和安装架(4)两端之间均通过固定螺母(9)螺旋连接有连接螺杆(11),且连接螺杆(11)上固定套接有固定套架(10),所述固定套架(10)的外侧螺旋连接有固定侧架(12),其中固定侧架(12)套接在变压器铁芯(3)上,所述减震固定架(8)是由第一弧形减震架(81)和第二弧形减震架(82)通过连接杆(83)螺旋连接而成。1. A transformer core group fixed mounting frame, comprising a base (1), a transformer core (3) and a mounting frame (4), characterized in that: the base (1) is equidistantly passed through the mounting base (1). 2) The transformer iron core (3) is installed, and the top of the transformer iron core (3) is connected with the mounting frame (4) through the connecting seat (5), and three transformer iron cores (3) are installed equidistantly, and The three transformer iron cores (3) are provided with shock-absorbing fixing frames (8) between adjacent pairs, and both ends of the base (1) and the mounting frame (4) are screwed together by fixing nuts (9). There is a connecting screw (11), and a fixed sleeve (10) is fixedly sleeved on the connecting screw (11), and a fixed side frame (12) is screwed on the outer side of the fixed sleeve (10), wherein the fixed side frame ( 12) Sleeve on the transformer iron core (3), the shock-absorbing fixing frame (8) is composed of the first arc-shaped shock-absorbing frame (81) and the second arc-shaped shock-absorbing frame (82) through the connecting rod (83) ) are screwed together. 2.根据权利要求1所述的变压器铁芯组固定安装架,其特征在于:所述安装架(4)的顶部与变压器铁芯(3)的对应位置处螺旋连接有接线端子(6),且安装架(4)的顶部两侧对称焊接有吊耳(7)。2. The transformer core group fixing mounting frame according to claim 1, wherein the top of the mounting frame (4) and the corresponding position of the transformer core (3) are screwed with terminals (6), And lifting ears (7) are symmetrically welded on both sides of the top of the mounting frame (4). 3.根据权利要求1所述的变压器铁芯组固定安装架,其特征在于:所述固定套架(10)共固定套接有两个,且两个固定套架(10)关于变压器铁芯(3)的水平中线相互对称,而且固定套架(10)上开设有用于贯穿连接螺杆(11)使用的连接螺孔(101)。3. The transformer core group fixing mounting frame according to claim 1, characterized in that: a total of two fixing sleeves (10) are fixedly sleeved, and the two fixing sleeves (10) are related to the transformer core The horizontal midlines of (3) are symmetrical with each other, and the fixing sleeve (10) is provided with a connecting screw hole (101) for penetrating the connecting screw (11). 4.根据权利要求1所述的变压器铁芯组固定安装架,其特征在于:所述第一弧形减震架(81)和第二弧形减震架(82)的长度相等,且第一弧形减震架(81)和第二弧形减震架(82)关于连接杆(83)的竖直中线相互对称。4. The transformer core group fixing mounting frame according to claim 1, characterized in that: the lengths of the first arc shock mount (81) and the second arc shock mount (82) are equal, and the first arc shock mount (81) and the second arc shock mount (82) have the same length An arc-shaped shock mount (81) and a second arc-shaped shock mount (82) are symmetrical to each other about the vertical centerline of the connecting rod (83). 5.根据权利要求1所述的变压器铁芯组固定安装架,其特征在于:所述第一弧形减震架(81)和第二弧形减震架(82)的顶端均通过绝缘座(84)连接有绝缘套(85),且绝缘套(85)套接在变压器铁芯(3)上。5. The transformer core group fixing mounting frame according to claim 1, wherein the top ends of the first arc-shaped shock absorber (81) and the second arc-shaped shock absorber (82) pass through insulating seats. (84) An insulating sleeve (85) is connected, and the insulating sleeve (85) is sleeved on the transformer iron core (3). 6.根据权利要求1所述的变压器铁芯组固定安装架,其特征在于:所述基座(1)的长度和宽度与安装架(4)的长度和宽度均相等,而且基座(1)与安装架(4)之间相互平行。6. The transformer core group fixing mounting frame according to claim 1, wherein the length and width of the base (1) are equal to the length and width of the mounting frame (4), and the base (1) ) and the mounting bracket (4) are parallel to each other.
CN201811537218.5A 2018-12-15 2018-12-15 Transformer core group fixed mounting frame Active CN109494054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811537218.5A CN109494054B (en) 2018-12-15 2018-12-15 Transformer core group fixed mounting frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811537218.5A CN109494054B (en) 2018-12-15 2018-12-15 Transformer core group fixed mounting frame

Publications (2)

Publication Number Publication Date
CN109494054A true CN109494054A (en) 2019-03-19
CN109494054B CN109494054B (en) 2023-12-22

Family

ID=65710401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811537218.5A Active CN109494054B (en) 2018-12-15 2018-12-15 Transformer core group fixed mounting frame

Country Status (1)

Country Link
CN (1) CN109494054B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109990003A (en) * 2019-04-23 2019-07-09 重庆大学 A high-load hydraulic lift bearing block

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2561905Y (en) * 2002-06-21 2003-07-23 钱文达 Tension soft frame screen door and window
CN102360839A (en) * 2011-11-08 2012-02-22 江苏正佰电气有限公司 Shockproof dry type transformer
JP2015032592A (en) * 2013-07-31 2015-02-16 株式会社ダイヘン Transformer
CN105529167A (en) * 2016-02-29 2016-04-27 河南森源电气股份有限公司 Filter reactor
CN205428655U (en) * 2016-03-15 2016-08-03 国网山东省电力公司菏泽供电公司 Transformer core group
CN206638612U (en) * 2017-04-01 2017-11-14 广州大冷王测控设备有限公司 A kind of thermal shock test chamber
CN207624488U (en) * 2017-12-02 2018-07-17 江苏中天伯乐达变压器有限公司 A kind of ocean platform dedicated transformer with buffer unit
CN209087534U (en) * 2018-12-15 2019-07-09 泰州市天力铁芯制造有限公司 A kind of transformer core group fixing and mounting bracket

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2561905Y (en) * 2002-06-21 2003-07-23 钱文达 Tension soft frame screen door and window
CN102360839A (en) * 2011-11-08 2012-02-22 江苏正佰电气有限公司 Shockproof dry type transformer
JP2015032592A (en) * 2013-07-31 2015-02-16 株式会社ダイヘン Transformer
CN105529167A (en) * 2016-02-29 2016-04-27 河南森源电气股份有限公司 Filter reactor
CN205428655U (en) * 2016-03-15 2016-08-03 国网山东省电力公司菏泽供电公司 Transformer core group
CN206638612U (en) * 2017-04-01 2017-11-14 广州大冷王测控设备有限公司 A kind of thermal shock test chamber
CN207624488U (en) * 2017-12-02 2018-07-17 江苏中天伯乐达变压器有限公司 A kind of ocean platform dedicated transformer with buffer unit
CN209087534U (en) * 2018-12-15 2019-07-09 泰州市天力铁芯制造有限公司 A kind of transformer core group fixing and mounting bracket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109990003A (en) * 2019-04-23 2019-07-09 重庆大学 A high-load hydraulic lift bearing block

Also Published As

Publication number Publication date
CN109494054B (en) 2023-12-22

Similar Documents

Publication Publication Date Title
CN209087534U (en) A kind of transformer core group fixing and mounting bracket
CN109494054A (en) A kind of transformer core group fixing and mounting bracket
CN107611890A (en) Mother metal tool for converter station valve hall
CN207338089U (en) A kind of electric power transformer
CN102931591A (en) S-shaped flexible damping connecting device for substations
CN117542609A (en) Modularized electronic transformer convenient to assemble
CN104505788A (en) A large-span suspended pipe busbar multi-hanging point combination fitting and its installation method
CN206421905U (en) Power transformation transformer group
CN201956145U (en) Equalizing ring for triplet strain insulator-string
CN202076110U (en) Quake-proof supporting structure of dry-type transformer
CN101976809A (en) Strain iron tower drainage system for power transmission line
CN102001578A (en) Multilayer coil integral hoisting device
CN201853872U (en) A conductive rod with an intermediate shield
CN208797977U (en) A kind of router in security system use
CN219760523U (en) Cable support frame
CN217508143U (en) A power transmission line protection device
CN217522501U (en) A mobile retractable cable rack
CN204734198U (en) Bed with spring damping mechanism
CN218123127U (en) An Amorphous Residual Current Transformer
CN215578115U (en) Long service life's inductance coil for accurate electronic engineering
CN218866848U (en) Convenient mounting rack of power transformer
CN210838450U (en) Superstrong loss prevention's high performance grading ring
CN202917823U (en) S-shaped flexible damping connecting device for substations
CN208622908U (en) A kind of filter convenient for fixed installation
CN222214934U (en) High-voltage preassembled transformer substation with stable transfer structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241105

Address after: 225500 No. 1, Zone B, Third Industrial Concentration Zone, Liangxu Street, Jiangyan District, Taizhou City, Jiangsu Province

Patentee after: Taizhou Jimeite Transformer Manufacturing Co.,Ltd.

Country or region after: China

Address before: 225500 Jiangcun, Liangxu Town, Jiangyan District, Taizhou City, Jiangsu Province

Patentee before: TAIZHOU TIANLI IRONCORE MANUFACTURING Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250210

Address after: 225500 Liangxu Street Jiangcun community, Jiangyan District, Taizhou City, Jiangsu Province

Patentee after: TAIZHOU TIANLI IRONCORE MANUFACTURING Co.,Ltd.

Country or region after: China

Address before: 225500 No. 1, Zone B, Third Industrial Concentration Zone, Liangxu Street, Jiangyan District, Taizhou City, Jiangsu Province

Patentee before: Taizhou Jimeite Transformer Manufacturing Co.,Ltd.

Country or region before: China