CN109488353A - 一种回采工作面超前支护系统及方法 - Google Patents
一种回采工作面超前支护系统及方法 Download PDFInfo
- Publication number
- CN109488353A CN109488353A CN201811237479.5A CN201811237479A CN109488353A CN 109488353 A CN109488353 A CN 109488353A CN 201811237479 A CN201811237479 A CN 201811237479A CN 109488353 A CN109488353 A CN 109488353A
- Authority
- CN
- China
- Prior art keywords
- grouting cable
- top plate
- stope
- truss
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
Abstract
本发明公开了一种回采工作面超前支护系统及方法,属于煤矿井开采技术领域。其技术方案为:一种回采工作面超前支护系统,包括超前加固支护系统;所述超前加固支护系统包括沿巷道延伸方向设置在顶板上的两排注浆锚索及两排注浆锚索桁架;沿巷道延伸方向的相邻多根注浆锚索通过注浆锚索桁架相连。一种回采工作面超前支护方法,沿巷道延伸方向,在顶板上设置两排注浆锚索和两排注浆锚索桁架,沿巷道延伸方向的相邻多根注浆锚索通过注浆锚索桁架相连。本发明的回采工作面超前支护系统及方法,相对于传统的回采工作面超前支护系统及方法,超前支护强度大大提高,且可提高生产效率、造价低廉、施工方便,具有很好的经济效益。
Description
技术领域
本发明涉及煤矿井开采技术领域,特别是涉及一种回采工作面超前支护系统及方法。
背景技术
井工开采的采煤过程中的支护一般分为两个阶段,第一阶段为挖掘巷道阶段的永久支护,第二阶段为回采阶段的超前支护。
传统支护方法中,第一阶段的支护是为了保证巷道空间的安全,不至于坍塌出现安全事故,通常采用普通锚索、锚杆、架棚等支护方式的其中一种或其混合。
第二阶段中,井工开采的采煤工作面上、下顺槽的超前支护是为了确保工作面上、下出口的畅通而采取的特殊支护。顶板未垮落前,采面压力呈悬臂式分布;垮落后呈拱形分布,无论呈何种形式的压力,均会使实体煤柱承压,如不采取超前支护有可能因压力致使煤体崩、垮堵塞上下安全出口。
在传统回采工作面超前支护系统中,回采阶段的超前支护一般采用单体液压支柱、超前支架等被动支护方式。回采期间,随着工作面的切眼推进,人员支、回单体液压支柱或操作超前支架,每班需2-3人操作,劳动强度大,一旦发生冲击地压、水害等灾害,受威胁人员较多。因此,目前使用单体液压支柱、液压支架作为回采工作面超前支护系统,虽然具有适应性广、支护强度高、安全可靠的优点,但是仍存在占用人员多、施工强度大等影响工作面安全高效生产问题。
目前采用的单体液压支柱、超前支架等反复支护顶板,加剧了对顶板完整性的破坏,使顶板下沉甚至出现顶板事故,容易存在安全隐患。因此,研究一种支护强度高、操作简单的回采工作面超前支护系统是今后采煤工作面在矿井开采中需要解决的问题。
发明内容
本发明提供了一种回采工作面超前支护系统及方法,相比于传统的回采工作面超前支护系统及方法,超前支护强度大大提高,且造价低廉、施工方便,具有很好的经济效益。
本发明的技术方案为:
一种回采工作面超前支护系统,包括超前加固支护系统;所述超前加固支护系统包括沿巷道延伸方向设置在顶板上的两排注浆锚索及两排注浆锚索桁架;沿巷道延伸方向的相邻多根注浆锚索通过注浆锚索桁架相连。
优选地,沿巷道延伸方向的相邻两根注浆锚索通过注浆锚索桁架相连;所述注浆锚索桁架为设有两个穿孔的工字钢;所述注浆锚索桁架的两个穿孔分别穿过巷道延伸方向的相邻两根注浆锚索后固定在顶板上;两排注浆锚索桁架呈三花布置在顶板上。
优选地,第一排注浆锚索桁架距巷帮0.4m,第二排注浆锚索桁架距巷帮2.5m。
优选地,所述回采工作面超前支护系统还包括矿压观测系统;所述矿压观测系统包括矿压在线观测系统、矿压人工观测点、顶板离层仪;所述矿压在线观测系统包括钻孔应力计、顶板位移传感器、锚索应力计;所述钻孔应力计、矿压人工观测点、顶板离层仪、顶板位移传感器、锚索应力计均沿巷道延伸方向间隔设置有多个。
优选地,所述钻孔应力计设置在巷帮上;所述所述矿压人工观测点设置在顶板或巷帮上;所述顶板离层仪、顶板位移传感器及锚索应力计设置在顶板上。
优选地,相邻两个钻孔应力计间隔距离为25m;相邻两个矿压人工观测点间隔距离为25m;相邻两个锚索应力计间隔距离为25m;相邻两个顶板离层仪间隔距离为25m;顶板位移传感器设置在相邻两个顶板离层仪的中间位置。
一种回采工作面超前支护方法,沿巷道延伸方向,在顶板上设置两排注浆锚索和两排注浆锚索桁架,沿巷道延伸方向的相邻多根注浆锚索通过注浆锚索桁架相连。
优选地,沿巷道延伸方向的相邻两根注浆锚索通过注浆锚索桁架相连;所述注浆锚索桁架为设有两个穿孔的工字钢;所述注浆锚索桁架的两个穿孔分别穿过巷道延伸方向的相邻两根注浆锚索后固定在顶板上;两排注浆锚索桁架呈三花布置在顶板上。
优选地,沿巷道延伸方向分别间隔设置多个矿压在线观测点、矿压人工观测点、顶板离层仪;所述矿压在线观测系统包括钻孔应力计、顶板位移传感器、锚索应力计。
优选地,在顶板位移传感器上设置预警值;当矿压人工观测点、顶板离层仪及顶板位移传感器检测到巷帮、顶底板移近量大于400mm或顶板离层超过巷道高度10%时,启动应急预警;应急预警后,及时人工重新支设超前支护,用单体液压支柱配金属铰接顶梁,单体液压支柱支设在金属铰接顶梁下方,以支撑顶板。
本发明的有益效果为:
1. 本发明的回采工作面超前支护系统及方法,相对于传统的回采工作面超前支护系统及方法,超前支护强度大大提高,且可提高生产效率、造价低廉、施工方便,具有很好的经济效益。
2. 通过增设矿压观测系统,减少了采煤工作面生产用人数,降低了工人劳动强度,同时也降低了灾害发生时受威胁人员数量,提高了施工的安全性。
附图说明
图1是本发明的局部剖面示意图。
图2是本发明的平面示意图。
附图标记说明:1-注浆锚索、2-注浆锚索桁架、3-锚带、4-顶板、5-底板、6-巷帮、7-普通锚索、8-锚杆、9-普通锚索桁架。
具体实施例
为了更好地理解本发明,下面用具体实施例来详细说明本发明的技术方案,但是本发明并不局限于此。
实施例1
如图1和2所示,本实施例提供了一种回采工作面超前支护系统,包括超前加固支护系统;所述超前加固支护系统包括沿巷道延伸方向设置在顶板4上的两排注浆锚索1及两排注浆锚索桁架2;沿巷道延伸方向的相邻两根注浆锚索1通过注浆锚索桁架2相连。所述注浆锚索桁架2为设有两个穿孔的工字钢;所述注浆锚索桁架2的两个穿孔分别穿过巷道延伸方向的相邻两根注浆锚索1后固定在顶板4上;两排注浆锚索桁架2呈三花布置在顶板4上。其中,第一排注浆锚索桁架2距巷帮60.4m,第二排注浆锚索桁架2距巷帮62.5m,注浆锚索桁架2长度为1.2m。
注浆锚索1采用Φ22*6000mm中空注浆锚索,超前工作面为80米,超前50米注浆。
在挖掘巷道过程中,在巷帮6及顶板4上铺设锚带3、普通锚索7及锚杆8,以对巷道进行支护。回采过程中,在巷道顶板4上沿巷道延伸方向安装两排注浆锚索1,并将注浆锚索桁架2通过两个穿孔分别穿过相邻两根注浆锚索1后安装在顶板4上以连接相邻两根注浆锚索1,由此可以对巷道提供可靠的支护。
两排注浆锚索桁架2呈三花布置,使注浆锚索桁架2在顶板4上局部形成三角形布置,支护更加牢固,提高了支护强度。
传统的回采工作面超前支护系统中,采用两排单体液压支柱配金属铰接顶梁对巷道进行支护,支柱间距0.8米,排距1.6米,支护强度为56.25KN/㎡。
本实施例采用桁架支护形式,代替传统的超前单体液压支柱配合金属铰接顶梁支护形式,在巷道超前50m范围内设置两排注浆锚索1和注浆锚索桁架2支护,支护强度为111.11KN/㎡,即本实施例的回采工作面超前支护系统的超前支护强度为原单体液压支柱支护强度的1.97倍,超前支护强度大大提高。
实施例2
本实施例与实施例1的区别之处在于:所述回采工作面超前支护系统还包括矿压观测系统;所述矿压观测系统包括矿压在线观测系统、矿压人工观测点、顶板离层仪;所述矿压在线观测系统包括钻孔应力计、顶板位移传感器、锚索应力计:
(1)钻孔应力计
在巷帮6上每25m布置一个钻孔应力计,类型为数字式,自动传输变化数据,可在地面进行分析,观测频率为实时观测。
(2)锚索应力计
每隔25m安设2个锚索应力计,监测顶板4来压情况,并设置预警值,进行实时预警,发现异常立即采取应急处理措施。
(3)顶板离层仪及顶板位移传感器
每隔25m左右布置一个顶板离层仪,并在顶板离层仪的中间增设一个顶板位移传感器,实时监测顶板4下沉及离层情况。在顶板位移传感器上设置预警值,进行实时预警,发现异常立即采取应急处理措施。
其中,顶板离层仪、顶板位移传感器及锚索应力计设置在巷道顶板4上。
(4)矿压人工观测点
每隔25m设置一个矿压人工观测点,根据工作面推进,超前工作面布置10个矿压人工观测点,进行编号管理,用木楔固定在巷道顶底板或巷帮6上。顶底板测点进行标注,量取巷道高度和宽度,根据数据变化得出顶底板移近量及两巷帮6移近量。观测频率为:超前100m的每班观测记录一次,超前200m每3天观测记录一次,超前300m每周观测记录一次。
其中,矿压人工观测点与顶板离层仪布置在一起,牌板共用一个,便于记录和观测。
应急处理措施:
现场备用单体液压支柱、铰接顶梁、木料等支护材料,数量要满足能够支设20m及以上超前支护的要求,确保应急情况下能够加强顶板4支护。
当矿压人工观测点、顶板离层仪、顶板位移传感器检测到巷帮6、顶底板移近量大于400mm或顶板4离层超过巷道高度10%时,启动应急预警。管理人员现场立即组织补齐超前支护,用单体液压支柱配金属铰接顶梁,单体液压支柱支设在金属铰接顶梁下方,以支撑顶板4。
通过顶板位移传感器配合人工观测和技术分析,检测到顶板4出现异响、漏矸等冒顶预兆时,必须将所有人员撤离,待压力稳定后,经盯班管理人员及安监员、班长检查及处理后,方准人员进入工作面工作。
巷道使用注浆锚索1替代单体液压支柱作为超前支护,三班安质员负责每班巡查巷道,顶板4出现异常情况时及时汇报,补强支护。
本发明的回采工作面超前支护系统通过注浆锚索1和注浆锚索桁架2对巷道进行超前加固支护,强度留有富余系数,然后在巷道内安设矿压观测系统,实时24小时在线监测,以确保出现异常情况时能够及时处理,在提高超前支护强度的同时,也减少了采煤工作面生产用人数,降低了工人劳动强度,且可提高生产效率、造价低廉、施工方便,具有很好的安全、经济效益。
以上所述,仅是本发明的较佳实施例,并非对本发明做任何形式上的限制,凡在本发明的精神和原则之内所做任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种回采工作面超前支护系统,其特征在于:
包括超前加固支护系统;
所述超前加固支护系统包括沿巷道延伸方向设置在顶板上的两排注浆锚索及两排注浆锚索桁架;
沿巷道延伸方向的相邻多根注浆锚索通过注浆锚索桁架相连。
2.如权利要求1所述的回采工作面超前支护系统,其特征在于:
沿巷道延伸方向的相邻两根注浆锚索通过注浆锚索桁架相连;
所述注浆锚索桁架为设有两个穿孔的工字钢;
所述注浆锚索桁架的两个穿孔分别穿过巷道延伸方向的相邻两根注浆锚索后固定在顶板上;
两排注浆锚索桁架呈三花布置在顶板上。
3.如权利要求1所述的回采工作面超前支护系统,其特征在于:第一排注浆锚索桁架距巷帮0.4m,第二排注浆锚索桁架距巷帮2.5m。
4.如权利要求1所述的回采工作面超前支护系统,其特征在于:
所述回采工作面超前支护系统还包括矿压观测系统;
所述矿压观测系统包括矿压在线观测系统、矿压人工观测点、顶板离层仪;
所述矿压在线观测系统包括钻孔应力计、顶板位移传感器、锚索应力计;
所述钻孔应力计、矿压人工观测点、顶板离层仪、顶板位移传感器、锚索应力计均沿巷道延伸方向间隔设置有多个。
5.如权利要求4所述的回采工作面超前支护系统,其特征在于:
所述钻孔应力计设置在巷帮上;
所述矿压人工观测点设置在顶板或巷帮上;
所述顶板离层仪、顶板位移传感器及锚索应力计设置在顶板上。
6.如权利要求4所述的回采工作面超前支护系统,其特征在于:
相邻两个钻孔应力计间隔距离为25m;
相邻两个矿压人工观测点间隔距离为25m;
相邻两个锚索应力计间隔距离为25m;
相邻两个顶板离层仪间隔距离为25m;
顶板位移传感器设置在相邻两个顶板离层仪的中间位置。
7.一种回采工作面超前支护方法,其特征在于:沿巷道延伸方向,在顶板上设置两排注浆锚索和两排注浆锚索桁架,沿巷道延伸方向的相邻多根注浆锚索通过注浆锚索桁架相连。
8.如权利要求7所述的回采工作面超前支护方法,其特征在于:
沿巷道延伸方向的相邻两根注浆锚索通过注浆锚索桁架相连;
所述注浆锚索桁架为设有两个穿孔的工字钢;
所述注浆锚索桁架的两个穿孔分别穿过巷道延伸方向的相邻两根注浆锚索后固定在顶板上;
两排注浆锚索桁架呈三花布置在顶板上。
9.如权利要求7所述的回采工作面超前支护方法,其特征在于:沿巷道延伸方向分别间隔设置多个矿压在线观测点、矿压人工观测点、顶板离层仪;所述矿压在线观测系统包括钻孔应力计、顶板位移传感器、锚索应力计。
10.如权利要求9所述的回采工作面超前支护方法,其特征在于:
在顶板位移传感器上设置预警值;
当矿压人工观测点、顶板离层仪及顶板位移传感器检测到巷帮、顶底板移近量大于400mm或顶板离层超过巷道高度10%时,启动应急预警;
应急预警后,及时人工重新支设超前支护,用单体液压支柱配金属铰接顶梁,单体液压支柱支设在金属铰接顶梁下方,以支撑顶板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811237479.5A CN109488353A (zh) | 2018-10-23 | 2018-10-23 | 一种回采工作面超前支护系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811237479.5A CN109488353A (zh) | 2018-10-23 | 2018-10-23 | 一种回采工作面超前支护系统及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109488353A true CN109488353A (zh) | 2019-03-19 |
Family
ID=65692607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811237479.5A Pending CN109488353A (zh) | 2018-10-23 | 2018-10-23 | 一种回采工作面超前支护系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109488353A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236968A (zh) * | 2020-03-27 | 2020-06-05 | 天地科技股份有限公司 | 冲击地压巷道超前支护防冲方法 |
CN114352318A (zh) * | 2022-01-07 | 2022-04-15 | 国家能源集团宁夏煤业有限责任公司 | 用于综放工作面回风巷超前支护的方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU796416A1 (ru) * | 1979-03-06 | 1981-01-15 | Специальное Конструкторско-Тех-Нологическое Бюро Института Гео-Технической Механики Ah Украин-Ской Ccp | Обводна станци дл струговыхи СКРЕпЕРО-СТРугОВыХ уСТАНОВОК |
CN1594834A (zh) * | 2004-07-12 | 2005-03-16 | 中国矿业大学 | 一种控制煤岩顶帮变形的桁架支护技术 |
CN101344012A (zh) * | 2008-08-05 | 2009-01-14 | 山东省尤洛卡自动化装备股份有限公司 | 煤矿顶板动态监测系统 |
CN102121389A (zh) * | 2010-06-02 | 2011-07-13 | 中国矿业大学(北京) | 一种煤巷围岩冒顶垮帮的锚索桁架防治方法 |
CN102926768A (zh) * | 2012-11-15 | 2013-02-13 | 华北科技学院 | 一种巷道支护桁架及其安装方法 |
CN103422871A (zh) * | 2013-08-23 | 2013-12-04 | 中国矿业大学(北京) | 一种特大断面开切眼顶板控制的桁架锚索布置方法 |
CN103470289A (zh) * | 2013-09-25 | 2013-12-25 | 大同煤矿集团有限责任公司 | 极近距离煤层开采支护方法 |
CN203978443U (zh) * | 2014-04-30 | 2014-12-03 | 贵州永润煤业有限公司 | 一种沿空留巷的支护装置 |
CN104533483A (zh) * | 2014-12-24 | 2015-04-22 | 中国矿业大学(北京) | 一种巷道全空间预应力桁架锚索锚杆协同支护方法 |
CN105370304A (zh) * | 2015-12-07 | 2016-03-02 | 平顶山天安煤业股份有限公司 | 高应力强扰动煤层沿空留巷多级加固方法 |
CN105484757A (zh) * | 2015-12-18 | 2016-04-13 | 中国神华能源股份有限公司 | 一种治理综采工作面顺槽底鼓的方法和结构 |
CN106523003A (zh) * | 2016-09-27 | 2017-03-22 | 北京科技大学 | 一种适于深部开采巷道的刚柔耦合吸能支护技术 |
CN106894833A (zh) * | 2017-01-23 | 2017-06-27 | 山东科技大学 | 深部不稳定覆岩下沿空掘巷非均称支护结构及施工方法 |
-
2018
- 2018-10-23 CN CN201811237479.5A patent/CN109488353A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU796416A1 (ru) * | 1979-03-06 | 1981-01-15 | Специальное Конструкторско-Тех-Нологическое Бюро Института Гео-Технической Механики Ah Украин-Ской Ccp | Обводна станци дл струговыхи СКРЕпЕРО-СТРугОВыХ уСТАНОВОК |
CN1594834A (zh) * | 2004-07-12 | 2005-03-16 | 中国矿业大学 | 一种控制煤岩顶帮变形的桁架支护技术 |
CN101344012A (zh) * | 2008-08-05 | 2009-01-14 | 山东省尤洛卡自动化装备股份有限公司 | 煤矿顶板动态监测系统 |
CN102121389A (zh) * | 2010-06-02 | 2011-07-13 | 中国矿业大学(北京) | 一种煤巷围岩冒顶垮帮的锚索桁架防治方法 |
CN102926768A (zh) * | 2012-11-15 | 2013-02-13 | 华北科技学院 | 一种巷道支护桁架及其安装方法 |
CN103422871A (zh) * | 2013-08-23 | 2013-12-04 | 中国矿业大学(北京) | 一种特大断面开切眼顶板控制的桁架锚索布置方法 |
CN103470289A (zh) * | 2013-09-25 | 2013-12-25 | 大同煤矿集团有限责任公司 | 极近距离煤层开采支护方法 |
CN203978443U (zh) * | 2014-04-30 | 2014-12-03 | 贵州永润煤业有限公司 | 一种沿空留巷的支护装置 |
CN104533483A (zh) * | 2014-12-24 | 2015-04-22 | 中国矿业大学(北京) | 一种巷道全空间预应力桁架锚索锚杆协同支护方法 |
CN105370304A (zh) * | 2015-12-07 | 2016-03-02 | 平顶山天安煤业股份有限公司 | 高应力强扰动煤层沿空留巷多级加固方法 |
CN105484757A (zh) * | 2015-12-18 | 2016-04-13 | 中国神华能源股份有限公司 | 一种治理综采工作面顺槽底鼓的方法和结构 |
CN106523003A (zh) * | 2016-09-27 | 2017-03-22 | 北京科技大学 | 一种适于深部开采巷道的刚柔耦合吸能支护技术 |
CN106894833A (zh) * | 2017-01-23 | 2017-06-27 | 山东科技大学 | 深部不稳定覆岩下沿空掘巷非均称支护结构及施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236968A (zh) * | 2020-03-27 | 2020-06-05 | 天地科技股份有限公司 | 冲击地压巷道超前支护防冲方法 |
CN111236968B (zh) * | 2020-03-27 | 2022-01-18 | 天地科技股份有限公司 | 冲击地压巷道超前支护防冲方法 |
CN114352318A (zh) * | 2022-01-07 | 2022-04-15 | 国家能源集团宁夏煤业有限责任公司 | 用于综放工作面回风巷超前支护的方法 |
CN114352318B (zh) * | 2022-01-07 | 2023-10-24 | 国家能源集团宁夏煤业有限责任公司 | 用于综放工作面回风巷超前支护的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108194088B (zh) | 一种软顶煤层无爆破切顶卸压沿空留巷方法 | |
CN103924975B (zh) | 一种用于采煤过程中的保水方法 | |
US5542788A (en) | Method and apparatus for monitoring mine roof support systems | |
AU2017421071B2 (en) | Three-aspect integrated monitoring method for strata control | |
CN111305876A (zh) | 深部巷道锚固-劈裂注浆-水力压裂卸压协同控制方法 | |
CN105807312B (zh) | 基于微震监测的煤矿顶板岩体垂直分带确定方法 | |
CN103775084B (zh) | 大倾角、大采高综采设备过地质构造破碎带施工工艺 | |
CN105971606A (zh) | 一种巨厚煤层长壁工作面开采方法 | |
CN205013013U (zh) | 适用于上软下硬地层的暗挖车站支护结构 | |
CN102966354A (zh) | 一种厚煤层坚硬顶板长壁工作面无煤柱开采方法 | |
CN109209293A (zh) | 一种石门揭突出煤层的综合防突施工方法 | |
CN103808633A (zh) | 一种采动破碎岩体水砂运移试验系统及监测方法 | |
CN103758529A (zh) | 一种煤矿沿空留巷巷旁支护方法 | |
CN109488353A (zh) | 一种回采工作面超前支护系统及方法 | |
CN107862106B (zh) | 无煤柱沿空放顶成巷可行性判别方法 | |
CN109387244A (zh) | 一种矿山断层稳定性的智能监测方法和系统 | |
CN110792450B (zh) | 一种确定注浆锚索超前支护的方法 | |
CN109707441B (zh) | 一种采空区干式充填矿柱回收方法 | |
CN113530566A (zh) | 一种冲击地压卸压解危方法 | |
CN112922598A (zh) | 一种通过切顶卸压减小沿空掘巷顶板压力的方法 | |
Qin et al. | Stability and control of retracement channels in thin seam working faces with soft roof | |
CN111677514B (zh) | 顶板弱化方法 | |
CN211819514U (zh) | 采空塌陷区自动监测预警系统 | |
CN116575923B (zh) | 一种隧道围岩变形综合治理方法 | |
CN109056751A (zh) | 一种顺层边坡加固方法及加固构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |