CN109457958A - Twin columns subsiding crack template and its installation method - Google Patents
Twin columns subsiding crack template and its installation method Download PDFInfo
- Publication number
- CN109457958A CN109457958A CN201811579671.2A CN201811579671A CN109457958A CN 109457958 A CN109457958 A CN 109457958A CN 201811579671 A CN201811579671 A CN 201811579671A CN 109457958 A CN109457958 A CN 109457958A
- Authority
- CN
- China
- Prior art keywords
- concrete
- template
- twin columns
- subsiding crack
- prefabricated permanent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention provides a kind of twin columns subsiding crack template and its installation methods, the present invention utilizes the prefabricated permanent template of split bolt fixing concrete of two rows of vertical directions, and polystyrene foam plate is pressed from both sides between two pieces of prefabricated permanent templates, the vertical connection of prefabricated permanent template carries out installation fixation using the method that steel plate welding plus bolt combine.This method not only simple process, reliable in quality, and greatly accelerate construction speed.Subsiding crack is formed using the indwelling arranged side by side of concrete prefabricated permanent template clamping polystyrene foam plate, the width of subsiding crack had both been ensure that, and had met the functional requirement of subsiding crack, and in turn avoided the trouble removed after concrete formation using plank sheathing.
Description
Technical field
The present invention relates to a kind of twin columns subsiding crack template and its installation methods.
Background technique
In the cast-in-place concrete constructions such as super-long structural concrete construction, to prevent because of differential settlement caused by building open
It mass defects, the design requirement such as splits and twin columns subsiding crack is generally set, therefore, the construction of subsiding crack is a routine and very heavy
The process wanted.
Traditional subsiding crack, which stays equipment, method mainly, following two kinds:
1, subsiding crack two sides are installed using plank sheathing, and seam inner template is removed after concrete formation.Due between subsiding crack
Distance is smaller, in addition lateral pressure acts in concreting process, molding rear pattern plate is removed very difficult.Stitch inner template often without
Method is removed.Lead to the functional requirement that not can guarantee subsiding crack in use process.
2, in pillar concrete construction, the materials such as cystosepiment are directly clogged in subsiding crack width range.Due to such material
Expect that intensity is lower, be easily destroyed or deform during concrete vibrating, it cannot be guaranteed that the effective width of subsiding crack is led to upper and lower
It is suitable, it is difficult to meet the functional requirement of subsiding crack.
From the above mentioned, if being stayed with conventional method, to set twin columns subsiding crack not only time-consuming, and quality is difficult to ensure.Especially
It is that conventional method, which is stayed, to be set subsiding crack difficulty of construction is big when twin columns are wider or section configuration is the compound sections such as the opposite sex, consumes
It is artificial more, certain difficulty is brought to rapid construction.
Summary of the invention
The purpose of the present invention is to provide a kind of twin columns subsiding crack template and its installation methods, are able to solve conventional method and stay
The problem of if difficulty of construction is big for subsiding crack, consumption is artificial more, brings certain difficulty to rapid construction.
To solve the above problems, the present invention provides a kind of twin columns subsiding crack template, comprising:
The twin columns exterior sheathing of the surrounding of concrete twin columns to be poured is set to, in the space that the twin columns exterior sheathing crosses
Middle position be provided with subsiding crack, the two sides of the subsiding crack are respectively the reserved place of the concrete twin columns to be poured
It sets;
Two split bolts and the split bolt hole being opened on the twin columns exterior sheathing, two split bolts pass through described
Split bolt hole and the two sides for being located at the subsiding crack;
Polystyrene foam plate and the permanent prefab-form of concrete, wherein the width direction of concrete twin columns to be poured
On the prefabricated permanent template of two block concretes the position of the subsiding crack is retained in after polystyrene foam plate is clamped in two sides side by side
It sets, two split bolts are close to the concrete prefabricated permanent template of respective side respectively, will clamp the two of polystyrene foam plate
The prefabricated permanent template of block concrete is further clipped between two split bolts.
Further, in the above-mentioned methods, the indwelling equivalent width of the thickness of the polystyrene foam plate and subsiding crack.
Further, in the above-mentioned methods, the height of the polystyrene foam plate and concrete twin columns to be poured
It is highly identical.
Further, in the above-mentioned methods, the height of the concrete prefabricated permanent template and Concrete Double to be poured
The height of column is identical.
Further, in the above-mentioned methods, it is welded with steel plate on the concrete prefabricated permanent template, is opened on the steel plate
Equipped with bolt hole, the permanent prefab-form of two block concretes in the short transverse of concrete twin columns to be poured passes through bolt and spiral shell
The cooperation of keyhole is attached.
Further, in the above-mentioned methods, the height of the prefabricated permanent template of every block concrete is 1200~1800mm.
Further, in the above-mentioned methods, two-way concrete slab is provided in the prefabricated permanent template of every block concrete.
Further, in the above-mentioned methods, the width of the prefabricated permanent template of every block concrete is than Concrete Double to be poured
The width of pillar in column reduces 15mm.
Further, in the above-mentioned methods, the prefabricated permanent template of every block concrete with a thickness of 50mm.
Another side according to the present invention provides a kind of installation method of above-mentioned twin columns subsiding crack template, comprising:
In the surrounding of concrete twin columns to be poured, twin columns exterior sheathing is set;
In the space that the twin columns exterior sheathing crosses with the line of ink marker pop-up subsiding crack position, with reserve it is concrete prefabricated forever
The position of long template and polystyrene foam plate;
Split bolt hole is drilled out on the twin columns exterior sheathing of the two sides of the line of ink marker with electric drill, by two to drawing spiral shell
Bolt passes through the split bolt hole and is located at the two sides of the subsiding crack;
In the close subsiding crack side of a wherein split bolt, it is close to one piece that the split bolt installs wherein side
The permanent prefab-form of concrete;
The filled polystyrene cystosepiment in the subsiding crack;
In the close subsiding crack side of another split bolt, be close to the split bolt be slowly inserted into one piece of the other side it is mixed
The solidifying prefabricated permanent template of soil;
The consistent concrete of height is poured in concrete prefabricated permanent template two sides.
Compared with prior art, cast-in-place concrete twin columns subsiding crack formwork structure of the invention, including it is concrete prefabricated forever
Long template and polystyrene foam plate;Concrete prefabricated permanent template is retained in after polystyrene foam plate is clamped in two sides side by side
Subsiding crack position.Using the prefabricated permanent template of split bolt fixing concrete of two rows of vertical directions, and it is prefabricated permanent at two pieces
Polystyrene foam plate, the method that the vertical connection of prefabricated permanent template is combined using steel plate welding plus bolt are pressed from both sides between template
Carry out installation fixation.This method not only simple process, reliable in quality, and greatly accelerate construction speed.It is pre- using concrete
Permanent template clamping polystyrene foam plate processed indwelling arranged side by side forms subsiding crack, both ensure that the width of subsiding crack, it is heavy to meet
The functional requirement for dropping seam, in turn avoids the trouble removed after concrete formation using plank sheathing.
Detailed description of the invention
Fig. 1 is the structure chart of the twin columns subsiding crack template of one embodiment of the invention;
Fig. 2 be Fig. 1 along A-A to sectional view;
In figure, 1- concrete twin columns, 2- twin columns exterior sheathing, 3- split bolt, 4- polystyrene foam plate, 5- concrete is pre-
Permanent template processed, 6- steel plate, 7- bolt.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
As illustrated in fig. 1 and 2, the present invention provides a kind of twin columns subsiding crack template, comprising:
The twin columns exterior sheathing of the surrounding of concrete twin columns to be poured is set to, in the space that the twin columns exterior sheathing crosses
Middle position be provided with subsiding crack, the two sides of the subsiding crack are respectively the reserved place of the concrete twin columns to be poured
It sets;
Two split bolts and the split bolt hole being opened on the twin columns exterior sheathing, two split bolts pass through described
Split bolt hole and the two sides for being located at the subsiding crack;
Polystyrene foam plate and the permanent prefab-form of concrete, wherein the width direction of concrete twin columns to be poured
On the permanent prefab-form of two block concretes, the position of the subsiding crack is retained in after polystyrene foam plate is clamped in two sides side by side
It sets, two split bolts are close to the concrete prefabricated permanent template of respective side respectively, will clamp the two of polystyrene foam plate
The prefabricated permanent template of block concrete is further clipped between two split bolts.
Here, as shown in Figure 1, concrete twin columns 1 to be poured surrounding install twin columns exterior sheathing 2, and with to draw spiral shell
Bolt 3 fixes two sides twin columns exterior sheathing 2, is stayed after polystyrene foam plate 4 is clamped side by side in two sides with concrete prefabricated permanent template 5
It sets in the position of subsiding crack.The polystyrene foam plate being clipped in the middle is protected using the concrete prefabricated permanent template 5 of two sides
4, it can be not easy to be damaged and ensure that the indwelling success of subsiding crack in concreting process.It is poured in concrete twin columns 1
After the completion, the concrete prefabricated permanent template 5 and polystyrene foam plate 4 being retained in pillar do not need to take out.
Cast-in-place concrete twin columns subsiding crack formwork structure of the invention, including concrete prefabricated permanent template and polystyrene
Cystosepiment;Concrete prefabricated permanent template is retained in subsiding crack position after polystyrene foam plate is clamped in two sides side by side.It utilizes
The prefabricated permanent template of split bolt fixing concrete of two rows of vertical directions, and polyphenyl second is pressed from both sides between two pieces of prefabricated permanent templates
The vertical connection of alkene cystosepiment, prefabricated permanent template carries out installation fixation using the method that steel plate welding plus bolt combine.It should
Method not only simple process, reliable in quality, and greatly accelerate construction speed.It is poly- using the clamping of concrete prefabricated permanent template
The indwelling arranged side by side of styrenic foams plate forms subsiding crack, both ensure that the width of subsiding crack, and had met the functional requirement of subsiding crack, again
Avoid the trouble removed after concrete formation using plank sheathing.
In one embodiment of twin columns subsiding crack template of the invention, the thickness of the polystyrene foam plate and staying for subsiding crack
Set equivalent width.
In one embodiment of twin columns subsiding crack template of the invention, the height of the polystyrene foam plate is mixed with to be poured
The height of solidifying soil twin columns is identical.
In one embodiment of twin columns subsiding crack template of the invention, the height of the concrete prefabricated permanent template with wait pour
Concrete twin columns height it is identical.
In one embodiment of twin columns subsiding crack template of the invention, it is welded with steel plate on the concrete prefabricated permanent template,
Bolt hole, the permanent prefab-form of two block concretes in the short transverse of concrete twin columns to be poured are offered on the steel plate
It is attached by the cooperation of bolt and bolt hole, realizes that concrete prefabricated permanent template short transverse carries out spreading.
Here, the short transverse connection of the concrete prefabricated permanent template is fixed using steel plate welding blending bolt.
As shown in Fig. 2, the concrete permanent template can be made several pieces according to pillar height, upper and lower connection is used
Steel plate welding blending bolt is fixed.Specific practice is that steel plate is arranged in the joint of the prefabricated permanent template 5 of upper and lower two block concrete
6, and stayed in steel plate two sides and set bolt hole, when template connects high, the steel plate of upper and lower two pieces of permanent templates is welded, and make bolt hole
After matching, the bolt 7 for penetrating M12, which tightens nut, to be fixed.
In one embodiment of twin columns subsiding crack template of the invention, the height of every prefabricated permanent template of block concrete is 1200~
1800mm。
Here, for carrying and easy for installation, the piecemeal height of concrete prefabricated permanent template convenient for prefabricated permanent template
Depending on its pillar height, height general control is advisable at 1.8 meters, when as too big such as piecemeal, will lead to the prefabricated permanent mould of every block concrete
The weight and area of plate are excessive, are not easy to install.
In one embodiment of twin columns subsiding crack template of the invention, two-way steel is provided in every prefabricated permanent template of block concrete
Muscle.
The installation method of above-mentioned twin columns subsiding crack template includes:
1) production of concrete prefabricated permanent template: according to the section configuration and size of pillar, with C25 or more microlith coagulation
Soil is prefabricated into the concrete prefabricated permanent template of 50mm thickness, the length of concrete prefabricated permanent template depending on pillar height,
In view of template carrying with it is easy for installation, general every segment length is that 1200~1800mm is advisable, and width subtracts than the width of pillar
Small 15mm;Match 4 two-way concrete slab of φ in prefabricated permanent template, steel plate is set in end when production, steel plate two sides set bolt hole.
2) cast-in-place concrete twin columns exterior sheathing is installed: the installation method of twin columns exterior sheathing is conventional mould Method for Installation.
3) subsiding crack situation template two sides snap the line: by the subsiding crack position of design requirement, in mounted pillar surrounding
The correct position of subsiding crack is popped up in template with the line of ink marker, then respectively stays 50mm wide to pop up two lines of ink marker in subsiding crack two sides, that is, is reserved
The position of concrete prefabricated permanent template and polystyrene foam plate.
4) split bolt hole is bored on the twin columns exterior sheathing of subsiding crack two sides: after the pop-up line of ink marker, with electric drill outside the line of ink marker of two sides
Split bolt hole is drilled out along the vertical direction, and pitch-row is depending on the width of pillar, generally between 400~600mm.
5) fixation of the concrete prefabricated permanent template in subsiding crack side: first subsiding crack two sides split bolt is successively installed
It is good, then, first in the close subsiding crack side of a wherein split bolt, it is close to the split bolt installs wherein side one
The vertical connector of the permanent prefab-form of block concrete, the permanent prefab-form of concrete adds the method for bolt to carry out paragraph by paragraph using steel plate
Installation.Permanent prefab-form installation top mark height should be not less than concreting face absolute altitude.
6) filled polystyrene cystosepiment in subsiding crack: by the subsiding crack width of design requirement, select thickness compatible
Polystyrene foam plate is close to permanent prefab-form and is installed.
7) installation of subsiding crack other side permanent template: after the installation is completed to polystyrene foam plate, can be at another
The close subsiding crack side of split bolt is close to the prefabricated permanent template of a block concrete of the split bolt installation other side, is mixed
In the solidifying prefabricated permanent template installation process of soil, Ying Chuizhi is slowly inserted into, and prevents damaging or destroying for polystyrene foam plate.Installation
After it is conscientiously checked, next procedure can be carried out after meeting the requirements.
8) subsiding crack two sides concreting: to ensure that staying for subsiding crack sets quality, when the concreting of subsiding crack two sides,
By the principle progress of " thin layer circulation, symmetrically pour ", both when concreting to subsiding crack two sides, concrete prefabricated permanent template
The height of the newly-laid concrete of two sides should be consistent as far as possible, utilizes the mutual of concrete prefabricated permanent template two sides concrete lateral pressure
Effect, it can be ensured that subsiding crack template is not bent, does not tilt, position is correct, the smooth beauty of line mouth.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the invention is also intended to include including these modification and variations.
Claims (10)
1. a kind of twin columns subsiding crack template characterized by comprising
Be set to the twin columns exterior sheathing of the surrounding of concrete twin columns to be poured, in the space that the twin columns exterior sheathing crosses in
Meta position, which installs, is equipped with subsiding crack, and the two sides of the subsiding crack are respectively the reserved location of the concrete twin columns to be poured;
Two split bolts and the split bolt hole being opened on the twin columns exterior sheathing, two split bolts pass through described pair of drawing
Bolt hole and the two sides for being located at the subsiding crack;
Polystyrene foam plate and the permanent prefab-form of concrete, wherein in the width direction of concrete twin columns to be poured
The prefabricated permanent template of two block concretes is retained in the position of the subsiding crack after polystyrene foam plate is clamped in two sides side by side,
Two split bolts are close to the concrete prefabricated permanent template of respective side respectively, and two pieces for clamping polystyrene foam plate are mixed
The solidifying prefabricated permanent template of soil is further clipped between two split bolts.
2. twin columns subsiding crack template as described in claim 1, which is characterized in that the thickness of the polystyrene foam plate and heavy
The indwelling equivalent width of seam drops.
3. twin columns subsiding crack template as described in claim 1, which is characterized in that the height of the polystyrene foam plate with to
The height of the concrete twin columns poured is identical.
4. twin columns subsiding crack template as described in claim 1, which is characterized in that the height of the concrete prefabricated permanent template
It is identical as the height of concrete twin columns to be poured.
5. twin columns subsiding crack template as described in claim 1, which is characterized in that welded on the concrete prefabricated permanent template
There is steel plate, bolt hole is offered on the steel plate, two block concretes in the short transverse of concrete twin columns to be poured are permanent
Prefab-form is attached by the cooperation of bolt and bolt hole.
6. twin columns subsiding crack template as described in claim 1, which is characterized in that the height of every prefabricated permanent template of block concrete
For 1200~1800mm.
7. twin columns subsiding crack template as described in claim 1, which is characterized in that setting in every prefabricated permanent template of block concrete
There is two-way concrete slab.
8. twin columns subsiding crack template as described in claim 1, which is characterized in that the width of every prefabricated permanent template of block concrete
Width than the pillar in concrete twin columns to be poured reduces 15mm.
9. twin columns subsiding crack template as described in claim 1, which is characterized in that the thickness of every prefabricated permanent template of block concrete
For 50mm.
10. a kind of installation method of twin columns subsiding crack template as described in any one of claims 1 to 9, which is characterized in that packet
It includes:
In the surrounding of concrete twin columns to be poured, twin columns exterior sheathing is set;
The position of subsiding crack is popped up, with the line of ink marker in the space that the twin columns exterior sheathing crosses to reserve concrete prefabricated permanent mould
The position of plate and polystyrene foam plate;
Split bolt hole is drilled out on the twin columns exterior sheathing of the two sides of the line of ink marker with electric drill, two split bolts are worn
It crosses the split bolt hole and is located at the two sides of the subsiding crack;
In the close subsiding crack side of a wherein split bolt, it is close to the split bolt and installs one piece of wherein side mixed
The solidifying permanent prefab-form of soil;
The filled polystyrene cystosepiment in the subsiding crack;
In the close subsiding crack side of another split bolt, it is close to the block concrete that the split bolt is slowly inserted into the other side
Prefabricated permanent template;
The consistent concrete of height is poured in concrete prefabricated permanent template two sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811579671.2A CN109457958A (en) | 2018-12-24 | 2018-12-24 | Twin columns subsiding crack template and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811579671.2A CN109457958A (en) | 2018-12-24 | 2018-12-24 | Twin columns subsiding crack template and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109457958A true CN109457958A (en) | 2019-03-12 |
Family
ID=65614458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811579671.2A Pending CN109457958A (en) | 2018-12-24 | 2018-12-24 | Twin columns subsiding crack template and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109457958A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112627510A (en) * | 2020-12-11 | 2021-04-09 | 上海宝冶集团有限公司 | Structural deformation joint synchronous construction formwork reinforcing device and construction method |
CN113389373A (en) * | 2021-07-14 | 2021-09-14 | 中国建筑第八工程局有限公司 | Double-column formwork reinforcing device at deformation joint and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817376A (en) * | 2012-08-07 | 2012-12-12 | 中国建筑第六工程局有限公司 | Settlement joint template system for big-volume slabstone concrete and settlement joint construction method |
CN203373964U (en) * | 2013-06-28 | 2014-01-01 | 中建七局第二建筑有限公司 | Formwork structure of settlement joint of cast-in-place concrete wall |
CN203782577U (en) * | 2014-03-06 | 2014-08-20 | 上海建工二建集团有限公司 | Template assembly for anti-collision wall settlement joint construction |
CN104727446A (en) * | 2013-12-21 | 2015-06-24 | 中建四局第三建筑工程有限公司 | Construction method of large aluminum alloy formwork at settlement joint |
CN209523471U (en) * | 2018-12-24 | 2019-10-22 | 上海建工七建集团有限公司 | Twin columns subsiding crack template |
-
2018
- 2018-12-24 CN CN201811579671.2A patent/CN109457958A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817376A (en) * | 2012-08-07 | 2012-12-12 | 中国建筑第六工程局有限公司 | Settlement joint template system for big-volume slabstone concrete and settlement joint construction method |
CN203373964U (en) * | 2013-06-28 | 2014-01-01 | 中建七局第二建筑有限公司 | Formwork structure of settlement joint of cast-in-place concrete wall |
CN104727446A (en) * | 2013-12-21 | 2015-06-24 | 中建四局第三建筑工程有限公司 | Construction method of large aluminum alloy formwork at settlement joint |
CN203782577U (en) * | 2014-03-06 | 2014-08-20 | 上海建工二建集团有限公司 | Template assembly for anti-collision wall settlement joint construction |
CN209523471U (en) * | 2018-12-24 | 2019-10-22 | 上海建工七建集团有限公司 | Twin columns subsiding crack template |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112627510A (en) * | 2020-12-11 | 2021-04-09 | 上海宝冶集团有限公司 | Structural deformation joint synchronous construction formwork reinforcing device and construction method |
CN113389373A (en) * | 2021-07-14 | 2021-09-14 | 中国建筑第八工程局有限公司 | Double-column formwork reinforcing device at deformation joint and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
SA520412648B1 (en) | Prefabricated insulated building panel with at least one cured cementitious layer bonded to insulation | |
CN108915734A (en) | A kind of corrugated steel-Combined concrete supporting construction and its construction method | |
CN105040970A (en) | High formwork system of comprehensive gymnasium and construction method thereof | |
CN105484151B (en) | The construction and its construction method connected between a kind of enhancing precast concrete segment | |
CN108908662B (en) | Chiseling-free construction mold for prefabricated hollow slab beam | |
CN109457958A (en) | Twin columns subsiding crack template and its installation method | |
CN208267118U (en) | A kind of embedded part system and the curtain wall for cladding concrete segment curtain wall | |
CN109162296A (en) | Single side formwork system and the construction method poured using system progress exterior wall | |
CN106245931A (en) | The underpinning device of load bearing wall and construction method in brick mix structure | |
CN105965672B (en) | A kind of fabricated shear wall model structure unitary mould | |
CN107083804B (en) | A kind of wall structure column joint bar construction method | |
CN209523471U (en) | Twin columns subsiding crack template | |
CN111608312A (en) | Tensioning node of T-beam wing plate under post-tensioning method with bonded prestressed rib plate and construction method | |
CN208763208U (en) | Additional closure connection reinforcing bar without support assembled integral beam-column node structure | |
CN105839851B (en) | Using the construction method for the prefabricated frame trestle that segmentation connection is formed | |
CN203373964U (en) | Formwork structure of settlement joint of cast-in-place concrete wall | |
CN107882243B (en) | A kind of cassette ceiling and construction method of concrete-filled rectangular steel tube waffle beam structure | |
CN215055314U (en) | Reinforced formwork pouring system for enlarged cross section of concrete frame beam bottom | |
CN206376575U (en) | The anchor ear connecting node of new increasing steel beam and former reinforced column | |
CN215052265U (en) | Reinforced concrete thin wall body reinforced structure | |
CN214696850U (en) | Steel form for construction of constructional column at junction of longitudinal and transverse walls of house | |
CN212025812U (en) | Concrete road surface pull rod false joint construction equipment | |
CN106939616A (en) | Steel plate structure and assembled soil nail wall | |
CN107119808A (en) | Induce crack structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |