CN109457759A - The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay - Google Patents

The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay Download PDF

Info

Publication number
CN109457759A
CN109457759A CN201811368613.5A CN201811368613A CN109457759A CN 109457759 A CN109457759 A CN 109457759A CN 201811368613 A CN201811368613 A CN 201811368613A CN 109457759 A CN109457759 A CN 109457759A
Authority
CN
China
Prior art keywords
reservoir
pressure gauge
pipeline
solenoid valve
control cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811368613.5A
Other languages
Chinese (zh)
Inventor
钱铮炫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Qingyang Water Treatment Equipment Science And Technology Co Ltd
Original Assignee
Anhui Qingyang Water Treatment Equipment Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Qingyang Water Treatment Equipment Science And Technology Co Ltd filed Critical Anhui Qingyang Water Treatment Equipment Science And Technology Co Ltd
Priority to CN201811368613.5A priority Critical patent/CN109457759A/en
Publication of CN109457759A publication Critical patent/CN109457759A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
    • E03B7/077Arrangement of backflow preventing devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Structural Engineering (AREA)
  • Control Of Non-Positive-Displacement Pumps (AREA)

Abstract

The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay, including steady flow compensation tank, the first main flow conduit, the first distance-transmission pressure gauge, pump assembly and reservoir, steady flow compensation tank passes through first pipe respectively and the second main flow conduit is connect with reservoir and municipal network pipeline, and the first solenoid valve and the second distance-transmission pressure gauge are respectively equipped in the first pipe and second pipe, and the reservoir is connect by second pipe with municipal network pipeline, and second solenoid valve is equipped on second pipe.After the inspection to the actual hydraulic pressure needed when user's use of the first distance-transmission pressure gauge, signal can be will test and be respectively transmitted to municipal network pipeline and electric frequency control cabinet, when municipal network pipeline conveying hydraulic pressure is not up to hydraulic pressure actually required, water in reservoir first can be got supply resident and used by pump assembly, after municipal network pipeline hydraulic pressure meets the hydraulic pressure that actual use needs, pump machine will switch, and convey municipal network pipeline to resident and convey water, effectively avoid electric energy loss caused by signal transmission delay.

Description

The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay
Technical field
The invention mainly relates to the technical fields of secondary water-supply, and in particular to can utmostly reduce loss, reduce delay The secondary water-supply equipment of property.
Background technique
Secondary water-supply refers to that unit or personal city public water supply or self-built facility supply water are stored, pressurizeed, and passes through pipe Road is again for user or personal form, and therefore, secondary water-supply is the unique selection mode of high-floor feedwater, and whether secondary water-supply facility It is directly related to secondary water-supply water quality, hydraulic pressure and water supply security by the superiority and inferiority of regulation construction, design and construction, just with the people Often stable life is closely related.
In existing secondary water supply system, main process is: resident needs to use water, and remote transmitting water meter can will receive Signal is transmitted to municipal network pipeline and goes out, and after municipal network pipeline receives signal, carries out sending water process, meanwhile, while sending water, it can incite somebody to action The signal received is transmitted in the system in frequency-conversion control cabinet, and frequency-conversion control cabinet judges reality output and preset pressure Value controls the revolving speed of pump machine rotor, to achieve the purpose that water supply according to the drop of pressure value.
In the operating system of above-mentioned secondary water-supply, it may occur that two technical problems, first is that carrying out long distance in network signal When from conveying, time delay can be generated, causing to supply water, it is slack to occur to make, and hydraulic pressure cannot reach pressure actually required within first time Power, it may occur that the phenomenon that insufficient water;Second is that supply equipment during the work time, due to signal transmission time delay, cause Frequency-conversion control cabinet has occurred corresponding electric energy loss, increases the use cost of secondary water-supply equipment when controlling pump machine work.
Constant-pressure secondary water supply equipment auto sleep control system is pumped in one frequency one of application text --- -201310722387.7 In, a kind of completely new secondary water supply system is provided, when the pressure of city planting ductwork changes, adjust automatically sets suspend mode Frequency values enable water pump reasonably to start or stop, and reduce power consumption.
The completely new water system that above-mentioned application text provides mainly reasonably is turned off and on to subtract by control water pump The purpose of small electric energy loss, but this mode of operation have seriously affected the service life of water pump under prolonged operation, Moreover, it is impossible to meet avoid the problem that information transmission time delay during signal transmission.
Summary of the invention
The secondary water-supply equipment that invention broadly provides one kind can utmostly reduce loss, reduces time delay, to Mentioned above in the background art, existing secondary water-supply equipment is solved, in signal transmitting, the time delay problem of generation, together When as caused by time delay the technical issues of electric energy loss.
The technical solution that solution above-mentioned technical problem of the present invention uses are as follows: can utmostly reduce loss, reduce time delay Secondary water-supply equipment, including steady flow compensation tank, the first main flow conduit and frequency-conversion control cabinet, the steady flow compensation tank and the first mainstream Pump assembly is installed between pipeline, the first distance-transmission pressure gauge is fixed on first main flow conduit, the steady flow compensation tank is logical It crosses the second main flow conduit to connect with municipal reservoir, and second main flow conduit is equipped with the second distance-transmission pressure gauge;
The supply equipment includes underground conservation pool, and the underground conservation pool is connect by first pipe with the steady flow compensation tank, And the first pipe is equipped with the first solenoid valve;The reservoir passes through multiple second pipes of crossing and connect with municipal reservoir, The second pipe is equipped with second solenoid valve;
Municipal network pipeline is connect with the first distance-transmission pressure gauge signal, and the municipal network pipeline electrically connects with the frequency-conversion control cabinet It connects;
First distance-transmission pressure gauge, the first solenoid valve and the second distance-transmission pressure gauge, second solenoid valve respectively with frequency-conversion control cabinet It is electrically connected.
Preferably, in the reservoir, it is equipped with active carbon filter plate.
Preferably, the lower section of the active carbon filter plate on the reservoir inner wall, is fixed with liquid level detector, described Liquid level detector is connect with frequency-conversion control cabinet signal.
Preferably, one upper side of underground conservation pool is uniformly fixed with three second pipes in horizontal direction, and each The level height of second pipe described in root is higher than the height of active carbon filter plate.
Compared with prior art, the invention has the benefit that the present invention has rational design, high degree of automation works as user When needing with water, the water that can be controlled by frequency-conversion control cabinet in pump machine extraction underground conservation pool is conveyed, when the first teletransmission pressure The hydraulic pressure and the second distance-transmission pressure gauge of the municipal network pipeline conveying that power table will test and resident need actual hydraulic pressure to be used to keep When consistent, the closing of the first solenoid valve can will be controlled by frequency-conversion control cabinet, thus, it can be ensured that there is no delays with water by resident Property, simultaneously as pump machine is at work, supplies water to municipal network pipeline to convey by reservoir and supply water, to can avoid the second teletransmission The real output value of pressure gauge differs larger with nominal output values, and in turn, avoidable there is a phenomenon where pump machine electric energy losses.
Detailed explanation is carried out to the present invention below with reference to attached drawing and specific embodiment.
Detailed description of the invention
Fig. 1 is right side structure schematic diagram of the invention;
Fig. 2 is left side structure schematic diagram of the invention;
Fig. 3 is the first main flow conduit structural schematic diagram;
Fig. 4 is the structural schematic diagram of underground conservation pool of the invention;
Fig. 5 is overall structure flow chart of the invention;
Fig. 6 is the circuit control flow chart of frequency-conversion control cabinet of the invention.
In figure: 1- steady flow compensation tank;11- inlet;12- first pipe;The first solenoid valve of 12a-;The second main flow pipe of 2- Road;The first distance-transmission pressure gauge of 21-;3- pump machine;4- reservoir;41- active carbon filter plate;42- second pipe;The second electromagnetism of 42a- Valve;43 level sensors;5- frequency-conversion control cabinet;The second main flow conduit of 6-;The second distance-transmission pressure gauge of 6a-.
Specific embodiment
To facilitate the understanding of the present invention, the present invention is described more fully below with reference to relevant drawings, attached drawing In give several embodiments of the invention, but the present invention can be realized by different forms, however it is not limited to text institute The embodiment of description, opposite, it theses embodiments are provided so that more thorough and comprehensive to present disclosure.
It should be noted that it can directly on the other element when element is referred to as " being fixedly arranged on " another element There may also be elements placed in the middle, and when an element is considered as " connection " another element, it can be directly to separately One element may be simultaneously present centering elements, term as used herein "vertical", "horizontal", "left" and "right" And similar statement is for illustrative purposes only.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The meaning that technical staff usually connects is identical, and term knowledge as used herein in the specification of the present invention is in order to describe to have The purpose of the embodiment of body, it is not intended that in the limitation present invention, term " and or " used herein includes one or more phases Any and all combinations of the listed item of pass.
Attached drawing 1-6 is please referred to, the secondary water-supply equipment that can utmostly reduce loss, reduce time delay, including current stabilization are mended Tank 1, the first main flow conduit 2 and frequency-conversion control cabinet 5 are repaid, pump machine is installed between the steady flow compensation tank 1 and the first main flow conduit 2 Group, the first distance-transmission pressure gauge 21 is fixed on first main flow conduit 2, and the steady flow compensation tank 1 passes through the second main flow conduit 6 It is connect with municipal reservoir, and second main flow conduit 6 is equipped with the second distance-transmission pressure gauge 6a;
The supply equipment includes underground conservation pool 4, and the underground conservation pool 4 passes through first pipe 12 and the steady flow compensation tank 1 Connection, and the first pipe 12 is equipped with the first solenoid valve 12a;The reservoir 4 crosses second pipe 42 and city by multiple The connection of political affairs reservoir, the second pipe 42 are equipped with second solenoid valve 42a;
Municipal network pipeline is connect with 21 signal of the first distance-transmission pressure gauge, and 5 electricity of the municipal network pipeline and the frequency-conversion control cabinet Property connection;First distance-transmission pressure gauge 21, the first solenoid valve 12a and the second distance-transmission pressure gauge 6a, second solenoid valve 42a distinguish It is electrically connected with frequency-conversion control cabinet 5.
Active carbon filter plate 41 please be equipped with emphatically referring to attached drawing 4, in the reservoir 4.Pass through active carbon filter plate 41 Effect can be filtered the water entered in reservoir, so as to effectively ensure cleaning, the health of resident's water.
The lower section of the active carbon filter plate 41 on 4 inner wall of reservoir, is fixed with liquid level detector 42, the liquid Bit detector 42 is connect with 5 signal of frequency-conversion control cabinet.In the present embodiment, by the effect of liquid level detector 42, it can avoid water Position is excessively high and overflows, meanwhile, by the effect of liquid level detector 42, liquid level signal can be transmitted on frequency-conversion control cabinet 5, thus Inflow can be controlled by 5 moment of frequency-conversion control cabinet.
4 one upper side of underground conservation pool is uniformly fixed with three second pipes 42, and each institute in horizontal direction The level height for stating second pipe 42 is higher than the height of active carbon filter plate 41.
Embodiment, when needing to provide for resident with water, the first distance-transmission pressure gauge 21 can measure resident water supply needs Actual hydraulic pressure, and the data measured is respectively transmitted to municipal network pipeline and frequency-conversion control cabinet 5, municipal network pipeline can be according to receiving Signal, water supply start operation.
When frequency-conversion control cabinet 5 upon receipt of the signals, the signal of receiving can be handled, and by the signal of receiving turn It changes electric signal into, is transmitted in pump machine 3, control pump machine is started to work, and when frequency-conversion control cabinet 5 controls the work of pump machine 3, can be controlled automatically The first solenoid valve 12a opening is made, while the first solenoid valve 12a is opened, the second distance-transmission pressure gauge 6a can moment detection municipal administration Network management conveying water is transported to the hydraulic pressure in steady flow compensation tank 1, and the signal that will test timely is transmitted to frequency-conversion control cabinet 5 It is interior.
When the hydraulic pressure of municipal network pipeline conveying water reaches hydraulic pressure actually required with user, frequency-conversion control cabinet 5 will be received The data that detect of the first distance-transmission pressure gauge 21 and the data that detect of the second distance-transmission pressure gauge 6a compare, when the two number When according to equal or the first distance-transmission pressure gauge 21 measured value less than the second distance-transmission pressure gauge 6a, frequency-conversion control cabinet 5 can be from master control Make the first solenoid valve 12 closing, at this moment, will stop using reservoir 4 supply water, using municipal network pipeline input water supply water from And can guarantee pump machine 3 during the work time, the phenomenon that being constantly in zero loss work, not only avoid electric energy loss, meanwhile, The phenomenon that also avoiding time delay caused by signal transmits.
When frequency-conversion control cabinet 5, which controls the first solenoid valve 12a, closes, frequency-conversion control cabinet 5 can control second solenoid valve simultaneously 42a is opened, and when second solenoid valve 42a is opened, municipal network pipeline can be filled the water by three second pipes 42 into reservoir 4, While water filling, when the water level in reservoir 4 is apart from active carbon filter plate 20CM or so, what level sensor 43 will test Liquid level signal is transmitted in frequency-conversion control cabinet 5, and frequency-conversion control cabinet 5 will control second solenoid valve 42a closing, so as to strictly control Moisture storage capacity in reservoir processed.
Certain embodiment of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (4)

1.可最大程度减少损耗、降低延时性的二次供水设备,包括稳流补偿罐(1)、第一主流管道(2)和变频控制柜(5),所述稳流补偿罐(1)和第一主流管道(2)之间安装有泵机组,所述第一主流管道(2)上固定有第一远传压力表(21),其特征在于,所述稳流补偿罐(1)通过第二主流管道(6)与市政蓄水池连接,且所述第二主流管道(6)上设有第二远传压力表(6a);1. The secondary water supply equipment that can minimize the loss and reduce the delay, including the steady flow compensation tank (1), the first mainstream pipeline (2) and the frequency conversion control cabinet (5). The steady flow compensation tank (1) A pump unit is installed between ) and the first mainstream pipeline (2), and a first remote pressure gauge (21) is fixed on the first mainstream pipeline (2), characterized in that the steady flow compensation tank (1) ) is connected to the municipal reservoir through the second main flow pipeline (6), and the second main flow pipeline (6) is provided with a second remote pressure gauge (6a); 该供水设备包括地下蓄水池(4),所述地下蓄水池(4)通过第一管道(12)与所述稳流补偿罐(1)连接,且所述第一管道(12)上设有第一电磁阀(12a);所述蓄水池(4)通过多个过第二管道(42)与市政蓄水池连接,所述第二管道(42)上设有第二电磁阀(42a);The water supply equipment comprises an underground water storage tank (4), the underground water storage tank (4) is connected with the steady flow compensation tank (1) through a first pipeline (12), and the first pipeline (12) is connected to the A first solenoid valve (12a) is provided; the reservoir (4) is connected to the municipal reservoir through a plurality of second pipelines (42), and a second solenoid valve is provided on the second pipeline (42). (42a); 市政网管与所述第一远传压力表(21)信号连接,且所述市政网管与所述变频控制柜(5)电性连接;The municipal network management is signally connected to the first remote pressure gauge (21), and the municipal network management is electrically connected to the frequency conversion control cabinet (5); 所述第一远传压力表(21)、第一电磁阀(12a)与第二远传压力表(6a)、第二电磁阀(42a)分别与变频控制柜(5)电性连接。The first remote pressure gauge (21), the first solenoid valve (12a), the second remote pressure gauge (6a), and the second solenoid valve (42a) are respectively electrically connected to the frequency conversion control cabinet (5). 2.根据权利要求1所述的可最大程度减少损耗、降低延时性的二次供水设备,其特征在于,所述蓄水池(4)内,设有活性炭过滤板(41)。2 . The secondary water supply equipment according to claim 1 , which can minimize the loss and reduce the time delay, characterized in that, an activated carbon filter plate ( 41 ) is arranged in the reservoir ( 4 ). 3.根据权利要求3所述的可最大程度减少损耗、降低延时性的二次供水设备,其特征在于,所述活性炭过滤板(41)的下方,所述蓄水池(4)内壁上,固定有液位检测器(43),所述液位检测器(43)与变频控制柜(5)信号连接。3. The secondary water supply equipment capable of reducing loss to the greatest extent and reducing time delay according to claim 3, characterized in that, below the activated carbon filter plate (41), on the inner wall of the reservoir (4) , a liquid level detector (43) is fixed, and the liquid level detector (43) is signal-connected with the frequency conversion control cabinet (5). 4.根据权利要求1或3所述的可最大程度减少损耗、降低延时性的二次供水设备,其特征在于,所述地下蓄水池(4)一侧上方,水平方向上均匀固定有三根第二管道(42),且每一根所述第二管道(42)的水平高度高于活性炭过滤板(41)的高度。4. The secondary water supply equipment according to claim 1 or 3, which can reduce the loss to the greatest extent and reduce the time delay, characterized in that, above one side of the underground reservoir (4), there are evenly fixed in the horizontal direction. There are three second pipes (42), and the horizontal height of each of the second pipes (42) is higher than the height of the activated carbon filter plate (41).
CN201811368613.5A 2018-11-16 2018-11-16 The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay Pending CN109457759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811368613.5A CN109457759A (en) 2018-11-16 2018-11-16 The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811368613.5A CN109457759A (en) 2018-11-16 2018-11-16 The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay

Publications (1)

Publication Number Publication Date
CN109457759A true CN109457759A (en) 2019-03-12

Family

ID=65610764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811368613.5A Pending CN109457759A (en) 2018-11-16 2018-11-16 The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay

Country Status (1)

Country Link
CN (1) CN109457759A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203222846U (en) * 2013-05-03 2013-10-02 王润明 Non-negative-pressure water supply device for municipal pipe network
CN203452130U (en) * 2013-08-20 2014-02-26 北京同力华盛环保科技有限公司 Non-negative-pressure secondary water supply system
CN207700284U (en) * 2017-10-31 2018-08-07 安徽舜禹水务股份有限公司 Totally-enclosed Intelligent pipe net laminating water service system
CN209509073U (en) * 2018-11-16 2019-10-18 安徽清扬水处理设备科技有限公司 The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203222846U (en) * 2013-05-03 2013-10-02 王润明 Non-negative-pressure water supply device for municipal pipe network
CN203452130U (en) * 2013-08-20 2014-02-26 北京同力华盛环保科技有限公司 Non-negative-pressure secondary water supply system
CN207700284U (en) * 2017-10-31 2018-08-07 安徽舜禹水务股份有限公司 Totally-enclosed Intelligent pipe net laminating water service system
CN209509073U (en) * 2018-11-16 2019-10-18 安徽清扬水处理设备科技有限公司 The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay

Similar Documents

Publication Publication Date Title
CN209414198U (en) A kind of water pump assembly monitoring system
CN201679037U (en) Secondary constant pressure water supply device
US11079775B1 (en) Flow monitoring device and system
CN103809569B (en) A kind of control system prepared for Fructus Maydis oil
CN203203757U (en) Pressurizing test device of heat exchange device
CN209509073U (en) The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay
CN110424493A (en) A kind of cooling water emergence watering system and method
CN105630018B (en) A safety control device and system for drinking water supply waterway
CN109457759A (en) The secondary water-supply equipment that loss can utmostly be reduced, reduce time delay
CN107313477A (en) Full-automatic non-negative pressure supply equipment monitoring system
CN105332848B (en) A kind of water supply network online monitoring instrument self-generating device and application
CN107447813A (en) A kind of residential area water management system
CN103255808A (en) Integrated ultra-silence water supply device
CN105809926A (en) Remote fluid transportation self-powered wireless sensing and monitoring device and monitoring method
CN212248059U (en) Secondary water supply equipment cabinet
CN202595802U (en) Water supply system
CN103499987B (en) For the pH value supervisory system of water treatment of power plant
CN203405739U (en) PH Value Monitoring System for Power Plant Water Treatment
CN204062503U (en) A kind of intelligent radio controller with plumbing detector and pipe-line system thereof
CN203334358U (en) Variable-frequency integrated box type water supply station for oil and gas field yard
CN203096833U (en) Ultra-silence non-negative pressure water supply device
CN208280219U (en) A kind of wisdom water supply pump house
CN207622215U (en) A kind of heat pump unit output control system
CN206361320U (en) A kind of constant temperature antiseptic petroleum pipeline of Internet of Things
CN207298390U (en) Gas pipeline distribution pressure remote monitoring alarm device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190312

WD01 Invention patent application deemed withdrawn after publication