CN109412050A CN201811350415.6A CN201811350415A CN109412050A CN 109412050 A CN109412050 A CN 109412050A CN 201811350415 A CN201811350415 A CN 201811350415A CN 109412050 A CN109412050 A CN 109412050A
Authority
CN
China
Prior art keywords
temperature
indoor
switchgear house
outdoor
humidity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811350415.6A
Other languages
Chinese (zh)
Other versions
CN109412050B (en
Inventor
范强
邱继艳
戴宇
吕黔苏
徐长宝
李博文
姜海波
曾晓路
张历
顾威
古庭赟
林呈辉
桂军国
高吉普
罗显跃
陈沛龙
文贤馗
刘士勇
赵鹏程
扈克德
邵梦桥
辛明勇
肖小兵
郭玮
曹雷
徐梅梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201811350415.6A priority Critical patent/CN109412050B/en
Publication of CN109412050A publication Critical patent/CN109412050A/en
Application granted granted Critical
Publication of CN109412050B publication Critical patent/CN109412050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/56Cooling; Ventilation
    • H02B1/565Cooling; Ventilation for cabinets
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D27/00Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
    • G05D27/02Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/28Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The adjusting method of the invention discloses a kind of switchgear house environment adjustment system based on sensors optimum placement, it includes the adjusting method of sensors optimum placement and regulating system, the sensors optimum placement method are as follows: establish substation control buildings three-dimensional geometry simulation model using Ansys, switchgear house temperature field and moisture field simulation analysis are carried out to simulation model using Ansys, the temperature field under different height and moisture field distributed simulation figure are obtained, Temperature Humidity Sensor is chosen by analogous diagram and is layouted;The monitoring point distribution solved to indoor temperature and humidity is less and unreasonable, leads to the generation of accident;2. on control strategy, existing once environmental monitoring goes out not up to desired place, just will start all devices, entire environment is adjusted together.One is inaccurate, and two start unnecessary equipment, increases the working time of equipment, and energy consumption increases, and can not achieve the purpose of energy-saving and emission-reduction.

Description

The adjusting method of switchgear house environment adjustment system based on sensors optimum placement
Technical field
The invention belongs to automation field more particularly to a kind of distribution room environmental adjustings based on sensors optimum placement The adjusting method of system.
Background technique
There are many important power equipment and its systems for assembly in high-tension distribution chamber of converting room, there is harsh requirement for environment. Temperature is excessively high to may cause that equipment heating amount is excessive can not but to radiate, and in turn results in damage, system may also can go out because of high temperature The case where existing fluctuation of service.Phenomena such as moisture condensation, corrosion, can occur for excessively high humidity and a large amount of dust in air, lead to equipment The accidents such as aging, failure occur.For the aerial temperature and humidity for reducing switchgear house power equipment running environment, meet high-tension apparatus safety The ambient temperature and humidity index of operation, prevent dust accumulation, dew condensation phenomenon, solve high-tension distribution chamber of converting indoor equipment get rusty, problem of aging, prolong Long life period of equipment guarantees production safety, while reducing energy consumption, accomplishes energy-saving and emission-reduction, so needing to design reasonable environment Control system;Room temperature and humidity are monitored when implementing in the indoor Environment Controlling Strategy of switchgear house at present, It when temperature and humidity is undesirable, opens whole equipment (dehumidifier or blower) and is controlled, adjust indoor temperature and humidity, So that temperature and humidity drops in required range;Environment Controlling Strategy and method are primarily present following defect at present:
1. the monitoring point distribution of pair indoor temperature and humidity is less and unreasonable, it is although being received to the environment near monitoring point The control of system, it can be difficult to whether the temperature and humidity of complementary space also reaches requirement when guaranteeing that the monitoring point reaches requirement.? The place that does not monitor leads to the generation of accident it is possible to there is environment situation not up to standard;
2. on control strategy, exists once environmental monitoring goes out not up to desired place, just will start all devices, it is right together Entire environment is adjusted.One is inaccurate, makes the environment temperature in low temperature to make some part reach standard Become lower, can not achieve and specific aim control is carried out to the indoor space of distribution;Two start unnecessary equipment, increase The working time of equipment, energy consumption increase, and can not achieve the purpose of energy-saving and emission-reduction.
Summary of the invention
The technical problem to be solved by the present invention is providing the switchgear house environment adjustment system based on sensors optimum placement Adjusting method, to solve the above-mentioned prior art: the monitoring point distribution of 1. pairs of indoor temperature and humidities is less and unreasonable, although to prison Environment near measuring point receives the control of system, it can be difficult to when guaranteeing that the monitoring point reaches requirement, complementary space Whether temperature and humidity also reaches requirement.In the place not monitored it is possible to there is environment situation not up to standard, lead to the hair of accident It is raw;2. on control strategy, existing once environmental monitoring goes out not up to desired place, just will start all devices, together to entire Environment is adjusted.One is inaccurate, to become in the environment temperature of low temperature to make some part reach standard It is lower, it can not achieve and specific aim control is carried out to the indoor space of distribution;Two start unnecessary equipment, increase equipment Working time, energy consumption increase, can not achieve the purpose of energy-saving and emission-reduction.
The technical scheme is that
A kind of adjusting method of the switchgear house environment adjustment system based on sensors optimum placement, it includes sensor optimization The adjusting method of arrangement and regulating system, the sensors optimum placement method are as follows: establish substation control buildings three using Ansys Geometric simulation model is tieed up, switchgear house temperature field and moisture field simulation analysis are carried out to simulation model using Ansys, obtain different height Temperature field and moisture field distributed simulation figure under degree choose Temperature Humidity Sensor by analogous diagram and layout.
Include: using the method that Ansys establishes substation control buildings three-dimensional geometry simulation model
Step A, the modeling of acquisition substation control buildings needs parameter, and the model parameter including substation control buildings, ventilation is used Lower margin window number ndAnd parameter, ventilation fan number nfAnd parameter, number, place switchgear house position and the parameter of switchgear house switchgear; Switchgear house model parameter includes length L, width W, height H;Ventilation lower margin window parameter includes wall where ventilation lower margin window Plan-position, ventilation lower margin window resistance coefficient;Ventilation fan parameter includes wall plane position, ventilation fan stream where ventilation fan Amount;Substation control buildings external environment temperature parameter Tout, outside relative humidity parameter Dout;Substation control buildings interior wall wall temperature Parameter Twall, indoor environment temperature parameter Tin, indoor relative humidity parameter Din;Running environment requirement in substation control buildings Environment temperature maximum of T max, relative humidity maximum value Dmax;Switchgear house switch cabinet parameter includes single switch cabinet heating power Pk, switchgear porosity ξ;
Step B, the substation control buildings modeling acquired using step 1 needs parameter, establishes substation control buildings in Ansys Three-dimensional geometry simulation model;
Step C, simplified model;Ignoring ancillary equipment fluid flow in high voltage power distribution room influences, by switchgear house switchgear Heat source is set as plane heat source, and it is identical to set uniformity heat transfer property for high-tension distribution chamber of converting building enclosure;To obtain simplification Substation control buildings three-dimensional geometry simulation model.
Switchgear house temperature field and moisture field simulation analysis are carried out to simulation model using Ansys, obtained under different height The method in temperature field and moisture field distributed simulation figure are as follows:
Step D, to the full extent in performance switchgear house under the premise of fluid flow characteristics, the meter in switchgear house flow field is determined Calculate domain, using SST hexahedral meshes to simulation model computational domain carry out it is discrete, then to switchgear house include switchgear, blower, The local location of ventilation opening carries out auto grid plot, by carrying out local cypher processing to computational domain, after obtaining mesh refinement Number of meshes and number of nodes;
Step E, the switchgear house of step 1, ventilation lower margin window, ventilation fan, switchgear house switchgear, switchgear house indoor and outdoor are utilized The boundary condition and primary condition of environmental parameter setting simulation model;
Step F, solution strategies are set, and setting computation model is RNG k- ε turbulence model, and method for solving is simple calculation Method, solving precision are Second-order Up-wind lattice, and the number of iterations N and termination condition is arranged;Emulating termination condition is energy residual error less than 10‐7, or inlet and outlet flow error is less than 10‐4
Step G, start to emulate, until reaching emulation termination condition, obtain the temperature field under different height and moisture field point Cloth analogous diagram.
The method that Temperature Humidity Sensor is layouted is chosen by analogous diagram are as follows: chooses temperature field and the humidity of different height Field distribution analogous diagram, exists respectivelyHighest 4 points of temperature are chosen at H and minimum 4 points of temperature are made The acquisition that the representative temperature data in different height temperature sensitizing range is realized for temperature sensor installation point, exists respectively Highest 4 points of relative humidity and minimum 4 points of relative humidity are chosen at H as humidity sensor Device installation point realizes the acquisition of the representative relative humidity data in different height relative humidity sensitizing range.
The adjusting method of the regulating system includes:
Step 1, when smoke monitoring element monitoring have dense smoke when, substation control buildings temperature and humidity automatic control system hair Alarm signal out, while toxic and harmful gas in switch gear room is discharged with maximum wind velocity operation for automatic starting exhaust blower;Work as smog Monitoring element do not monitor to stop air draft when dense smoke, is transferred to normal temperature and humidity detection;
Step 2 works as TIt is indoor>=40 DEG C,TIt is outdoorAt >=40 DEG C, it is failure to actuate;Work as TIt is indoor>=40 DEG C,TIt is outdoor≤TIt is indoorWhen, and after holding 3-5 minutes, it opens high-tension distribution chamber of converting air exhauster and carries out room temperature lowering processing;
Step 3 works as TIt is indoor≥40℃、AndTIt is outdoor≤TIt is indoorWhen, open exhaust blower;Work as TIt is indoor≥ 40℃、When, andTIt is outdoor≤TIt is indoor, then exhaust blower and dehumidifier are opened;Work as TIt is indoor≥40℃、When, andTIt is outdoor≥TIt is indoor, then open dehumidifier and dehumidify;
Step 4 works as TIt is indoor40 DEG C of <,When, andThen open exhaust blower;Work as TIt is indoor40 DEG C of <,AndIt is then not turned on exhaust blower, starting dehumidifier dehumidifies;
Step 5 works as TIt is indoorAt 40 DEG C of <, such as outdoor water capacity is less than indoor water capacity, i.e. dOutdoor water capacity< dIndoor water capacity, then open Dynamic exhaust blower closes exhaust blower until indoor and outdoor water capacity is equal;
Step 6 works as TBuilding enclosure surface temperature> TDew-point temperature, then exhaust blower start-stop is not intervened, if TBuilding enclosure surface temperature< TDew-point temperature And exhaust blower is then forcibly closed after continuing 3-5 minutes.
The calculation method of outdoor water capacity and indoor water capacity are as follows:
Step A, with switchgear house room temperature TIt is indoor≤ A and indoor relative humidityTo control target, A is temperature valve Value, B are humidity threshold values;Real-time monitoring room air dry-bulb temperature TIndoor dry bulb, indoor air relative humidityOutdoor air Dry-bulb temperature TOutdoor dry bulbWith outdoor air relative humidity
Step B, the humid air calculated under corresponding dry-bulb temperature is saturated partial pressure,
PIt is saturated partial pressure=(5.96485+0.43432TDry-bulb temperature+0.01804TDry-bulb temperature 2+5.41671×10-5TDry-bulb temperature 3+6.9644 ×10-6TDry-bulb temperature 4)×102
Step C, according to air humidity content formulaIn real-time measurement air Under the conditions of dry-bulb temperature and wet-bulb temperature, available indoor and outdoor water capacity;
Step D, simultaneously according to water capacity dWater capacityCorresponding dew-point temperature is extrapolated, i.e.,
TBuilding enclosure surface temperature> TDew-point temperature
The invention has the advantages that:
The present invention obtains sensitive temperature and humidity measurement point according to simulation result, and Temperature and Humidity point is arranged in sensitive measurement point; Environmental control system is formed with cigarette sense monitoring point;Effectively ambient temperature and humidity is monitored, while configuration is more in switchgear house Fans and dehumidifier, and controlled, the decision logic of proposition is very easy to accomplish in terms of control.By to multiple devices Subitem control, according to the high monitoring point of temperature and humidity, start nearest equipment, may be implemented equipment independence, combination controlling party Formula improves the accuracy of environmental Kuznets Curves, reduces the working time of unnecessary equipment, realizes energy-saving and emission-reduction;
The present invention is configured with more set blowers and dehumidifier in switchgear house, according to the data of monitoring point, judges in conjunction with movement Logic can carry out subitem control to more Fans, dehumidifier, the exceeded environmental parameter provided according to monitoring point, and starting is nearest Blower or dehumidifier the different control modes such as be adjusted, thus have and be activated individually, start more Fans and dehumidifier, The accuracy controlling to spaces most in switchgear house may be implemented in this way.
It is less and unreasonable to the monitoring point distribution of indoor temperature and humidity to solve the prior art, although near to monitoring point Environment receives the control of system, it can be difficult to whether the temperature and humidity of complementary space when guaranteeing that the monitoring point reaches requirement Also reach requirement.In the place not monitored it is possible to there is environment situation not up to standard, lead to the generation of accident;2. controlling plan On slightly, exists once environmental monitoring goes out not up to desired place, just will start all devices, entire environment is adjusted together Section.One is inaccurate, to become lower in the environment temperature of low temperature to make some part reach standard, Bu Nengshi Specific aim control now is carried out to the indoor space of distribution;Two start unnecessary equipment, increase the working time of equipment, Energy consumption increases, and can not achieve the purpose of energy-saving and emission-reduction.
Specific embodiment
The purpose of the present invention is designing reasonable environmental control system, temperature, the relative humidity of indoor environment are controlled, is prolonged Long life period of equipment.The temperature and relative humidity distribution situation of switchgear house are obtained by emulation, determines sensitive measurement point.At this On the basis of, environmental control system measures room temperature, outdoor temperature, indoor cigarette sense, indoor humidity, outside humidity, leads to Appropriate control strategy is crossed, judges to adjust the state that switchgear house environmental parameter reaches setting whether dehumidifier, exhaust blower movement. Wind turbine and dehumidifier carry out subitem control, according to the high monitoring point of temperature and humidity, start nearest blower, dehumidifier is adjusted Section.
When fire acousto-optic alarm monitoring has dense smoke situation, system issues alarm signal at once, while automatic starting exhaust blower is with most Big wind speed operation, toxic and harmful gas in switch gear room is discharged before the deadline.When fire acousto-optic alarm is restored normally, then to stop Only air draft is transferred to the normal temperature and humidity detection of switch gear room.
Real-time monitoring indoor and outdoor temperature and humidity
Space is determined on the basis of numerical simulation calculated result according to the sensitive measurement point that Numerical Simulation Results determine The relationship of each state point temperature and relative humidity and sensitive measurement point, is obtained: T using temperature and relative humidity correction valueRoom temperature= TSensitive measuring point+ΔTAmendment,Correction value size is determined according to temperature point and humidity measuring point.With high pressure Switchgear house room temperature TIt is indoor≤ A and indoor relative humidityTo control target, real-time monitoring room air dry bulb temperature Spend TIndoor dry bulb, indoor air relative humidityOutdoor air dry-bulb temperature TOutdoor dry bulb, outdoor air relative humidity And calculate the humid air saturation partial pressure under corresponding dry-bulb temperature in real time by control system, that is,
PIt is saturated partial pressure=(5.96485+0.43432TDry-bulb temperature+0.01804TDry-bulb temperature 2+5.41671×10-5TDry-bulb temperature 3+6.9644 ×10-6TDry-bulb temperature 4)×102
According to air humidity content:In real-time measurement air dry-bulb temperature Under the conditions of wet-bulb temperature, indoor and outdoor water capacity can be obtained indirectly.Meanwhile according to water capacity dWater capacityIt can extrapolate corresponding Dew-point temperature TDew point, it is desirable that indoor building enclosure surface temperature necessarily is greater than dew-point temperature, i.e. TBuilding enclosure surface temperature> TDew-point temperature, such as This just can ensure that wall surface does not generate condensed water.
Control strategy
1) general requirement of high-tension distribution chamber of converting environmental Kuznets Curves: room temperature and wet is realized by rationally controlling ventiduct roadbed Degree control, it is ensured that high-tension distribution chamber of converting workspace temperature T and relative humidity RH are no more than the threshold value A of setting, B, while requiring high pressure Switchgear house air humidity content is less than outdoor air water capacity, i.e. dIt is indoor≤dIt is outdoor, in order to avoid power control cabinet wall surface condensation, need to detect Power control cabinet sensitizing range temperature, while guaranteeing that wall surface temperature is higher than wall surface air dew point temperature, i.e. TWall surface≥TAir dew point temperature.With A=40 DEG C B=85% is setting value explanation.
It 2) is that cannot achieve room air dehumidification process if only by high voltage power distribution indoor and outdoor replacement aeration.Consider The wet heating processes such as indoor machine cabinet radiates and the factors such as exterior wall heat transfer, and room temperature air condition change procedure is usually, That is indoor air relative humidity is usually lower than outside relative humidity, but indoor and outdoor water capacity is divulged information after a period of time Inevitable equal after ventilation, in the case that heat dissipation capacity is little indoors, indoor and outdoor relative humidity also tends to be equal.In consideration of it, Under normal circumstances, there is no condensed waters on high-tension distribution chamber of converting interior building enclosure surface.Consider that day and night temperature is big, ventilation situation Under, outdoor temp humid air is possible to generate condensed water, it is therefore desirable in real-time monitoring room when contacting indoor low temperature wall surface Outer temperature and humidity and indoor enclosed structure wall surface temperature, the conjunction of room temperature and humidity is realized by tapping mode ventilation time Reason control.Table 1 is that the movement of normal control judges information summary sheet, according to this table, starts nearest air draft when that should act Machine and dehumidifier are acted.
The movement of 1 normal control of table judges information summary sheet
3) work as TIt is indoor>=40 DEG C,TIt is outdoorAt >=40 DEG C, it is failure to actuate;Work as TIt is indoor>=40 DEG C,TIt is outdoor ≤TIt is indoorWhen, to avoid blower frequent movement, it is desirable that the condition is used as control condition after continuing 3-5 minutes, opens at this time high Switchgear house exhaust blower is pressed to carry out room temperature lowering processing.It can be required according to field control, rationally design the temperature for closing exhaust blower Control threshold, such as control threshold when 35 DEG C of room temperature or equal indoor and outdoor temperature can be set, while comparing room Inside and outside relative humidity, if relative humidity is higher than 85%, stops divulging information during aeration-cooling, if indoor relatively wet Degree continues to 85% or more, then needs to open auxiliary dehumidifier and dehumidify.
If 4) TIt is indoor40 DEG C of <,When, andExhaust blower can then be opened;If TIt is indoor< 40 ℃、AndIt is then not turned on exhaust blower, needs to intervene auxiliary dehumidifier at this time and dehumidifies.
If 5) TIt is indoor≥40℃、When, andTIt is outdoor≤TIt is indoor, then exhaust blower can be opened;Such as Fruit TIt is indoor≥40℃、When, andTIt is outdoor≤TIt is indoor, then exhaust blower and dehumidifier can be opened;If TIt is indoor≥40℃、When, andTIt is outdoor≥TIt is indoor, then can open dehumidifier and dehumidify.
6) work as TIt is indoorAt 40 DEG C of <, such as outdoor water capacity is less than indoor water capacity, i.e. dOutdoor water capacity< dIndoor water capacity, then start row Blower, difference need to be reached less than 0.5% by being approximately equal to until indoor and outdoor water capacity is equal, at this;Close exhaust blower.To avoid blower Frequent movement, then the condition continues 3~5 minutes.
7) the enclosed structure surface temperature for monitoring sensitive spot, if TBuilding enclosure surface temperature> TDew-point temperature, then do not intervene exhaust blower and open Stop acting, if TBuilding enclosure surface temperature< TDew-point temperature, then need to forcibly close exhaust blower, while considering that intervention auxiliary dehumidifier is removed It is wet.To avoid blower frequent movement, then the condition continues 3~5 minutes.
Implementation process
Switchgear house Environment Controlling Strategy of the invention the following steps are included:
1) sensors optimum placement is determined and is surveyed according to the distribution situation in high-tension distribution chamber of converting temperature field and relative humidity field Amount point position.
The sensors optimum placement method are as follows: establish substation control buildings three-dimensional geometry simulation model using Ansys, benefit Switchgear house temperature field and moisture field simulation analysis carried out to simulation model with Ansys, obtains temperature field under different height and wet Field distribution analogous diagram is spent, Temperature Humidity Sensor is chosen by analogous diagram and is layouted.
Include: using the method that Ansys establishes substation control buildings three-dimensional geometry simulation model
Step A, the modeling of acquisition substation control buildings needs parameter, and the model parameter including substation control buildings, ventilation is used Lower margin window number ndAnd parameter, ventilation fan number nfAnd parameter, number, place switchgear house position and the parameter of switchgear house switchgear; Switchgear house model parameter includes length L, width W, height H;Ventilation lower margin window parameter includes wall where ventilation lower margin window Plan-position, ventilation lower margin window resistance coefficient;Ventilation fan parameter includes wall plane position, ventilation fan stream where ventilation fan Amount;Substation control buildings external environment temperature parameter Tout, outside relative humidity parameter Dout;Substation control buildings interior wall wall temperature Parameter Twall, indoor environment temperature parameter Tin, indoor relative humidity parameter Din;Running environment requirement in substation control buildings Environment temperature maximum of T max, relative humidity maximum value Dmax;Switchgear house switch cabinet parameter includes single switch cabinet heating power Pk, switchgear porosity ξ;
Step B, the substation control buildings modeling acquired using step 1 needs parameter, establishes substation control buildings in Ansys Three-dimensional geometry simulation model;
Step C, simplified model;Ignoring ancillary equipment fluid flow in high voltage power distribution room influences, by switchgear house switchgear Heat source is set as plane heat source, and it is identical to set uniformity heat transfer property for high-tension distribution chamber of converting building enclosure;To obtain simplification Substation control buildings three-dimensional geometry simulation model.
Switchgear house temperature field and moisture field simulation analysis are carried out to simulation model using Ansys, obtained under different height The method in temperature field and moisture field distributed simulation figure are as follows:
Step D, to the full extent in performance switchgear house under the premise of fluid flow characteristics, the meter in switchgear house flow field is determined Calculate domain, using SST hexahedral meshes to simulation model computational domain carry out it is discrete, then to switchgear house include switchgear, blower, The local location of ventilation opening carries out auto grid plot, by carrying out local cypher processing to computational domain, after obtaining mesh refinement Number of meshes and number of nodes;
Step E, the switchgear house of step 1, ventilation lower margin window, ventilation fan, switchgear house switchgear, switchgear house indoor and outdoor are utilized The boundary condition and primary condition of environmental parameter setting simulation model;
Step F, solution strategies are set, and setting computation model is RNG k- ε turbulence model, and method for solving is simple calculation Method, solving precision are Second-order Up-wind lattice, and the number of iterations N and termination condition is arranged;Emulating termination condition is energy residual error less than 10‐7, or inlet and outlet flow error is less than 10‐4
Step G, start to emulate, until reaching emulation termination condition, obtain the temperature field under different height and moisture field point Cloth analogous diagram.
The method that Temperature Humidity Sensor is layouted is chosen by analogous diagram are as follows: chooses temperature field and the humidity of different height Field distribution analogous diagram, exists respectivelyHighest 4 points of temperature are chosen at H and minimum 4 points of temperature are made The acquisition that the representative temperature data in different height temperature sensitizing range is realized for temperature sensor installation point, exists respectively Highest 4 points of relative humidity and minimum 4 points of relative humidity are chosen at H as humidity sensor Device installation point realizes the acquisition of the representative relative humidity data in different height relative humidity sensitizing range.
2) indoor cigarette sense monitoring site is in the geometry middle position of indoor ceiling.
3) temperature-humidity sensor real-time monitoring indoor and outdoor temperature and humidity is utilized, and is transmitted to this automatic regulating system.
4) Threshold of Temperature And Humidity being arranged according to system, through the automatic logic judgment of system, take corresponding control exhaust blower with The start and stop measure of dehumidifier guarantees that the indoor temperature and humidity of switchgear house is in suitable state.
Advantages of the present invention:
Real-time monitoring indoor and outdoor temperature and humidity
The premise that environmental Kuznets Curves are realized is that accurate and necessary monitoring is carried out to environmental parameter.Pass through high voltage power distribution room temperature The simulation result of field and relative humidity field, determines sensitive measurement point.And temperature, humidity, cigarette sense test point are set in measurement point, it is real When monitoring indoor and outdoor temperature and humidity and cigarette sense, the foundation acted to environmental control system offer.
Reasonable effective control logic
Monitoring according to sensitive measurement point to indoor and outdoor temperature and humidity, takes corresponding control mode to control in switchgear house Temperature and humidity reach target value.Control strategy, as movement decision logic, provides different controls according to the different situations of temperature and humidity Mode processed is adjusted environment whether controlling the movement of blower, dehumidifier.
The subitem control of blower, dehumidifier
More set blowers and dehumidifier are configured in switchgear house, it, can be in conjunction with movement decision logic according to the data of monitoring point Subitem control is carried out to more Fans, dehumidifier, the exceeded environmental parameter provided according to monitoring point starts nearest blower or removes Wet machine such as is adjusted, thus has and be activated individually, starts more Fans and dehumidifier at the different control modes, in this way can be real Now to the accuracy controlling in spaces most in switchgear house.

Claims (6)

1. a kind of adjusting method of the switchgear house environment adjustment system based on sensors optimum placement, it includes sensor optimization cloth Set the adjusting method with regulating system, it is characterised in that: the sensors optimum placement method are as follows: establish power transformation using Ansys It stands switchgear house three-dimensional geometry simulation model, switchgear house temperature field and moisture field simulation analysis is carried out to simulation model using Ansys, The temperature field under different height and moisture field distributed simulation figure are obtained, Temperature Humidity Sensor is chosen by analogous diagram and is layouted.
2. a kind of adjusting method of the environment automatic regulating system of substation control buildings according to claim 1, feature It is: includes: using the method that Ansys establishes substation control buildings three-dimensional geometry simulation model
Step A, the modeling of acquisition substation control buildings needs parameter, and lower margin is used in the model parameter including substation control buildings, ventilation Window number ndAnd parameter, ventilation fan number nfAnd parameter, number, place switchgear house position and the parameter of switchgear house switchgear;Distribution Room model parameter includes length L, width W, height H;Ventilation lower margin window parameter includes wall plane where ventilation lower margin window Position, ventilation lower margin window resistance coefficient;Ventilation fan parameter includes wall plane position, ventilation fan flow where ventilation fan;Become Power station distribution outdoor environment temperature parameter Tout, outside relative humidity parameter Dout;Substation control buildings interior walls temperature parameter Twall, indoor environment temperature parameter Tin, indoor relative humidity parameter Din;Running environment requires environment in substation control buildings Temperature maximum Tmax, relative humidity maximum value Dmax;Switchgear house switch cabinet parameter includes single switch cabinet heating power Pk, open Close cabinet porosity ξ;
Step B, the substation control buildings modeling acquired using step 1 needs parameter, establishes substation control buildings three-dimensional in Ansys Geometric simulation model;
Step C, simplified model;Ignoring ancillary equipment fluid flow in high voltage power distribution room influences, by switchgear house switchgear heat source It is set as plane heat source, it is identical to set uniformity heat transfer property for high-tension distribution chamber of converting building enclosure;To obtain simplified change Power station switchgear house three-dimensional geometry simulation model.
3. a kind of adjusting method of the environment automatic regulating system of substation control buildings according to claim 1, feature It is: switchgear house temperature field and moisture field simulation analysis is carried out to simulation model using Ansys, obtain the temperature under different height The method of field and moisture field distributed simulation figure are as follows:
Step D, to the full extent in performance switchgear house under the premise of fluid flow characteristics, the calculating in switchgear house flow field is determined Domain, it is discrete in computational domain progress to simulation model using SST hexahedral meshes, then include switchgear to switchgear house, blower, lead to The local location in air port carries out auto grid plot, by carrying out local cypher processing to computational domain, after obtaining mesh refinement Number of meshes and number of nodes;
Step E, the switchgear house of step 1, ventilation lower margin window, ventilation fan, switchgear house switchgear, switchgear house indoor and outdoor surroundings are utilized The boundary condition and primary condition of parameter setting simulation model;
Step F, solution strategies are set, and setting computation model is RNG k- ε turbulence model, and method for solving is simple algorithm, is asked Solution precision is Second-order Up-wind lattice, and the number of iterations N and termination condition is arranged;Emulating termination condition is energy residual error less than 10-7, or into Rate of discharge error is less than 10-4
Step G, start to emulate, until reaching emulation termination condition, the temperature field and humidity field distribution obtained under different height is imitated True figure.
4. a kind of adjusting method of the environment automatic regulating system of substation control buildings according to claim 1, feature It is: the method that Temperature Humidity Sensor is layouted is chosen by analogous diagram are as follows: choose temperature field and the moisture field of different height Distributed simulation figure, exists respectivelyHighest 4 points of temperature are chosen at H and minimum 4 points of temperature are made The acquisition that the representative temperature data in different height temperature sensitizing range is realized for temperature sensor installation point, exists respectivelyHighest 4 points of relative humidity and minimum 4 points of relative humidity are chosen at H as humidity sensor Device installation point realizes the acquisition of the representative relative humidity data in different height relative humidity sensitizing range.
5. a kind of adjusting method of the environment automatic regulating system of substation control buildings according to claim 1, feature Be: the adjusting method of the regulating system includes:
Step 1, when smoke monitoring element monitoring have dense smoke when, substation control buildings temperature and humidity automatic control system issue accuse Alert signal, while toxic and harmful gas in switch gear room is discharged with maximum wind velocity operation for automatic starting exhaust blower;Work as smoke monitoring Element do not monitor to stop air draft when dense smoke, is transferred to normal temperature and humidity detection;
Step 2 works as TIt is indoor>=40 DEG C,TIt is outdoorAt >=40 DEG C, it is failure to actuate;Work as TIt is indoor>=40 DEG C,TIt is outdoor ≤TIt is indoorWhen, and after holding 3-5 minutes, it opens high-tension distribution chamber of converting air exhauster and carries out room temperature lowering processing;
Step 3 works as TIt is indoor≥40℃、AndTIt is outdoor≤TIt is indoorWhen, open exhaust blower;Work as TIt is indoor≥40℃、When, andTIt is outdoor≤TIt is indoor, then exhaust blower and dehumidifier are opened;Work as TIt is indoor≥40℃、 When, andTIt is outdoor≥TIt is indoor, then open dehumidifier and dehumidify;
Step 4 works as TIt is indoor40 DEG C of <,When, andThen open exhaust blower;Work as TIt is indoor40 DEG C of <,AndIt is then not turned on exhaust blower, starting dehumidifier dehumidifies;
Step 5 works as TIt is indoorAt 40 DEG C of <, such as outdoor water capacity is less than indoor water capacity, i.e. dOutdoor water capacity< dIndoor water capacity, then start row Blower closes exhaust blower until indoor and outdoor water capacity is equal;
Step 6 works as TBuilding enclosure surface temperature> TDew-point temperature, then exhaust blower start-stop is not intervened, if TBuilding enclosure surface temperature< TDew-point temperatureAnd it holds Exhaust blower is then forcibly closed after 3-5 minutes continuous.
6. a kind of adjusting method of the environment automatic regulating system of substation control buildings according to claim 5, feature It is: the calculation method of outdoor water capacity and indoor water capacity are as follows: step A, with switchgear house room temperature TIt is indoor≤ A and indoor phase To humidityTo control target, A is threshold temperature, and B is humidity threshold values;Real-time monitoring room air dry-bulb temperature TIndoor dry bulb, indoor air relative humidityOutdoor air dry-bulb temperature TOutdoor dry bulbWith outdoor air relative humidity
Step B, the humid air calculated under corresponding dry-bulb temperature is saturated partial pressure,
PIt is saturated partial pressure=(5.96485+0.43432TDry-bulb temperature+0.01804TDry-bulb temperature 2+5.41671×10-5TDry-bulb temperature 3+6.9644×10-6TDry-bulb temperature 4)×102
Step C, according to air humidity content formulaIn real-time measurement air dry bulb Under the conditions of temperature and wet-bulb temperature, available indoor and outdoor water capacity;
Step D, simultaneously according to water capacity dWater capacityCorresponding dew-point temperature is extrapolated, i.e.,
TBuilding enclosure surface temperature> TDew-point temperature
CN201811350415.6A 2018-11-14 2018-11-14 Adjusting method of distribution room environment adjusting system based on sensor optimal arrangement Active CN109412050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811350415.6A CN109412050B (en) 2018-11-14 2018-11-14 Adjusting method of distribution room environment adjusting system based on sensor optimal arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811350415.6A CN109412050B (en) 2018-11-14 2018-11-14 Adjusting method of distribution room environment adjusting system based on sensor optimal arrangement

Publications (2)

Publication Number Publication Date
CN109412050A true CN109412050A (en) 2019-03-01
CN109412050B CN109412050B (en) 2020-07-31

Family

ID=65473295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811350415.6A Active CN109412050B (en) 2018-11-14 2018-11-14 Adjusting method of distribution room environment adjusting system based on sensor optimal arrangement

Country Status (1)

Country Link
CN (1) CN109412050B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110109497A (en) * 2019-04-10 2019-08-09 焦作华飞电子电器股份有限公司 High aititude, the interior circulation pressure stabilizing stable control method of low temperature environment electric control gear
CN110764470A (en) * 2019-08-31 2020-02-07 华南理工大学 10kV power distribution room temperature and humidity sensor optimized point distribution method
CN111854136A (en) * 2020-07-31 2020-10-30 威垦机电(广州)科技有限公司 Device and method for preventing moisture condensation at air outlet by using reheater
CN113553788A (en) * 2021-07-23 2021-10-26 中国航发贵阳发动机设计研究所 Simulation calculation method for ventilation capacity of aircraft engine lubricating system
CN116578146A (en) * 2023-07-06 2023-08-11 南京欧控自动化有限公司 Intelligent electrical cabinet control system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235613A (en) * 2013-04-03 2013-08-07 天津大学 System and method for actively controlling precision machine tool temperature fields
CN204358855U (en) * 2014-12-12 2015-05-27 苏州工业园区设计研究院股份有限公司 A kind of basement Intelligent dehumidifying system
CN105222269A (en) * 2015-09-16 2016-01-06 唐棣 A kind of substation control system and control method
CN105666244A (en) * 2016-01-06 2016-06-15 北京工业大学 Method for reducing number of boring bar thermal elongation error temperature measurement points of numerical-control boring machine under thermal effect
KR20180063662A (en) * 2016-12-02 2018-06-12 주식회사 효림테크 Distributing board having function of sensing high temperature of multi area
CN108334028A (en) * 2018-01-31 2018-07-27 湖北文理学院 A kind of determination method of the one-dimensional optimum temperature measuring point of machine tool chief axis
CN108536896A (en) * 2018-02-28 2018-09-14 青岛昌盛日电太阳能科技股份有限公司 Calculation Method of Temperature Field in a kind of photovoltaic DC-to-AC converter
CN108681357A (en) * 2018-05-29 2018-10-19 贵州电网有限责任公司 A kind of temperature and humidity controlsystem and control method of substation control buildings

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235613A (en) * 2013-04-03 2013-08-07 天津大学 System and method for actively controlling precision machine tool temperature fields
CN204358855U (en) * 2014-12-12 2015-05-27 苏州工业园区设计研究院股份有限公司 A kind of basement Intelligent dehumidifying system
CN105222269A (en) * 2015-09-16 2016-01-06 唐棣 A kind of substation control system and control method
CN105666244A (en) * 2016-01-06 2016-06-15 北京工业大学 Method for reducing number of boring bar thermal elongation error temperature measurement points of numerical-control boring machine under thermal effect
KR20180063662A (en) * 2016-12-02 2018-06-12 주식회사 효림테크 Distributing board having function of sensing high temperature of multi area
CN108334028A (en) * 2018-01-31 2018-07-27 湖北文理学院 A kind of determination method of the one-dimensional optimum temperature measuring point of machine tool chief axis
CN108536896A (en) * 2018-02-28 2018-09-14 青岛昌盛日电太阳能科技股份有限公司 Calculation Method of Temperature Field in a kind of photovoltaic DC-to-AC converter
CN108681357A (en) * 2018-05-29 2018-10-19 贵州电网有限责任公司 A kind of temperature and humidity controlsystem and control method of substation control buildings

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
贾鹤鸣等: "微型植物工厂温度传感器优化布置仿真研究", 《科技创新与生产力》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110109497A (en) * 2019-04-10 2019-08-09 焦作华飞电子电器股份有限公司 High aititude, the interior circulation pressure stabilizing stable control method of low temperature environment electric control gear
CN110764470A (en) * 2019-08-31 2020-02-07 华南理工大学 10kV power distribution room temperature and humidity sensor optimized point distribution method
CN111854136A (en) * 2020-07-31 2020-10-30 威垦机电(广州)科技有限公司 Device and method for preventing moisture condensation at air outlet by using reheater
CN113553788A (en) * 2021-07-23 2021-10-26 中国航发贵阳发动机设计研究所 Simulation calculation method for ventilation capacity of aircraft engine lubricating system
CN116578146A (en) * 2023-07-06 2023-08-11 南京欧控自动化有限公司 Intelligent electrical cabinet control system
CN116578146B (en) * 2023-07-06 2023-09-22 南京欧控自动化有限公司 Intelligent electrical cabinet control system

Also Published As

Publication number Publication date
CN109412050B (en) 2020-07-31

Similar Documents

Publication Publication Date Title
CN109412050A (en) The adjusting method of switchgear house environment adjustment system based on sensors optimum placement
CN206257781U (en) A kind of laboratory multistage ventilated energy-saving control system
SE0702099A1 (en) Dehumidifying ventilation and control of air flow in confined spaces
CN109358677B (en) Temperature and humidity sensor distribution method of automatic environment adjusting system of transformer substation distribution room
EP3781878A1 (en) Systems and methods for adjusting mitigation thresholds
CN205407047U (en) Dampproofing dehydrating unit in transformer substation hyperbaric chamber
CN212108911U (en) Intelligent control system for ventilation air conditioner of factory building
US20230375201A1 (en) Method and system for controlling a ventilation system to prevent infiltration of pollutants through a building envelope
CN113899519A (en) Indoor airplane test micro-pressure control system and control method
CN209544952U (en) A kind of environment automatic regulating system of substation control buildings
CN106091277A (en) A kind of monitoring air-conditioner controlled based on intelligent power saving
CN209147369U (en) A kind of monitoring device of air treatment system
CN111854136A (en) Device and method for preventing moisture condensation at air outlet by using reheater
CN205747349U (en) A kind of air-conditioning monitoring and controlling system
CN103423839B (en) A kind of method and system solving radiation-type air conditioner system geomantic omen road coordinated signals
Gupton Jr HVAC controls: Operation and maintenance
CN109378745A (en) A kind of the environment automatic regulating system and adjusting method of substation control buildings
CN208537993U (en) A kind of novel transformer substation intelligent comprehensive dehumidification system
CN204026886U (en) A kind of high hot and cold stress indoor climate analogue means
CN214174947U (en) Constant temperature and humidity control system of detection room
CN206420105U (en) One kind is used for industrial premises VMC humidity temperature self-checking device
Davidsson et al. Decentralized ventilation unit for window frame integration
CN214668738U (en) Experimental device for be used for simulating elimination of wall dewfall
JP5525370B2 (en) Dry environment maintenance system and dry environment maintenance method
CN107229297B (en) Remote monitoring method for environment of transformer substation and switch station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant