Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
It is a kind of schematic flow diagram of production monitoring method provided in an embodiment of the present invention referring to Fig. 1, Fig. 1, in the implementation
It in example, is illustrated by taking the triggering of the angle of terminal as an example, here, terminal can be the mobile terminals such as smart phone, tablet computer.
As shown in Figure 1, in this embodiment, the treatment process of terminal may comprise steps of:
S101: according to the protective load or transformer capacity of preset time period enterprise to be monitored, the enterprise to be monitored is determined
Estimated electricity consumption of the industry in the preset time period.
Here, preset time period can be set according to actual needs, such as setting preset time period is 24 hours etc. one day.
Similarly, enterprise to be monitored also can be set according to actual needs, such as enterprise to be monitored is arranged as one or more maximum discharge enterprises
Industry etc..
Specifically, judge whether enterprise to be monitored is the enterprise for needing protective load, if so, according to enterprise to be monitored
Protective load determines that enterprise to be monitored in the estimated electricity consumption of preset time period, otherwise, holds according to the transformer of enterprise to be monitored
Amount, determines enterprise to be monitored in the estimated electricity consumption of preset time period.
S102: the enterprise to be monitored is obtained in the practical electricity consumption of the preset time period by power information acquisition system
Amount.
Here, enterprise to be monitored is acquired in the electricity consumption of above-mentioned preset time period by power information acquisition system, will adopted
The electricity consumption of collection as enterprise to be monitored above-mentioned preset time period practical electricity consumption.In order to reduce error, can repeatedly lead to
It crosses power information acquisition system and acquires enterprise to be monitored in the electricity consumption of above-mentioned preset time period, calculate the electricity consumption of multi collect
Average value, using the average value as enterprise to be monitored above-mentioned preset time period practical electricity consumption.
S103: according to the estimated electricity consumption and the practical electricity consumption, judge the enterprise to be monitored described default
Whether the period produces in violation of rules and regulations.
Specifically, calculate above-mentioned practical electricity consumption and it is expected that electricity consumption ratio, exist the ratio as enterprise to be monitored
The violation coefficient of production value of calculating is compared by the violation coefficient of production value of above-mentioned preset time period with preset threshold, according to
Comparison result judges whether enterprise to be monitored produces in violation of rules and regulations in above-mentioned preset time period.For example, violation coefficient of production value is β, in advance
If threshold value is 1,1.25 and 1.5, as β≤1, judge that enterprise to be monitored produces in above-mentioned preset time period without violation, as 1 < β
When≤1.25, judges that enterprise to be monitored slightly produces in violation of rules and regulations in above-mentioned preset time period, as 1.25 < β≤1.5, judge wait supervise
It controls enterprise to produce in violation of rules and regulations in above-mentioned preset time period moderate, as β > 1.5, judges enterprise to be monitored in above-mentioned preset time period weight
Degree produces in violation of rules and regulations.
S104: it if the enterprise to be monitored produces in violation of rules and regulations in the preset time period, is acquired by the power information
System obtains the enterprise to be monitored in the load condition of the preset time period.
Here, by taking preset time period is 24 hours one day as an example, when enterprise produces in violation of rules and regulations, from power information acquisition system
The middle load for obtaining integral point of the enterprise on the same day, for example, 0 point, 1 point, 2 points ... 23 points of load, specific acquisition modes can be with
It is arranged according to the actual situation.
S105: fitting the enterprise to be monitored in the load curve of the preset time period according to the load condition,
And the period that the enterprise to be monitored produces in violation of rules and regulations in the preset time period is determined according to the load curve.
Specifically, load curve is fitted according to the load condition of the enterprise obtained in power information acquisition system, according to
Load curve can find out the load biggish period, and the load biggish period is the time that can be identified as enterprise and produce in violation of rules and regulations
Section, and then enterprise can be arrived during this period of time and collected evidence.
It is evidenced from the above discussion that production monitoring method of the embodiment of the present invention, holds according to the protective load of enterprise or transformer
Amount determines that in the estimated electricity consumption of preset time period, the practical electricity consumption of enterprise is obtained by power information acquisition system for enterprise,
Judge whether enterprise produces in violation of rules and regulations according to above-mentioned estimated electricity consumption and practical electricity consumption, if production further determines that enterprise in violation of rules and regulations
The period that industry produces in violation of rules and regulations provides effective means for the production behavior that relevant departments monitor maximum discharge enterprise, solves existing
Technology lacks effective means and is monitored to the production activity of maximum discharge enterprise, causes haze problem that cannot solve, and causes each
The problem of planting disease, and influencing communications and transportation meets actual needs.
In addition, in a specific example, the protective load or transformer according to preset time period enterprise to be monitored
Capacity determines that the enterprise to be monitored includes: in the estimated electricity consumption of the preset time period
Judge whether the enterprise to be monitored is the enterprise for needing protective load;
If the enterprise to be monitored is the enterprise for needing protective load, according to the protective load of the enterprise to be monitored,
Determine the enterprise to be monitored in the estimated electricity consumption of the preset time period;
If the enterprise to be monitored is the enterprise for not needing protective load, held according to the transformer of the enterprise to be monitored
Amount, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
Specifically, if the enterprise to be monitored is the enterprise for needing protective load, according to expression formula Ee=T × PsIt determines
Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein T indicates the preset time period, PsIndicate institute
State the protective load of enterprise to be monitored.
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S is determined
Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates the transformer of the enterprise to be monitored
Capacity.
It is described according to the estimated electricity consumption and the practical electricity consumption in addition, in a specific example, described in judgement
In the preset time period, in violation of rules and regulations whether production includes: for enterprise to be monitored
According to the ratio of the practical electricity consumption and the estimated electricity consumption, determine the enterprise to be monitored described default
The violation coefficient of production value of period;
According to the violation coefficient of production value and preset threshold, judge that the enterprise to be monitored is in the preset time period
No violation production.
Here, according to expression formulaDetermine the enterprise to be monitored in the violation coefficient of production of the preset time period
Value β, wherein ErIndicate above-mentioned practical electricity consumption, EeIndicate above-mentioned estimated electricity consumption.Specifically, preset threshold can be according to reality
Situation setting, above-mentioned violation coefficient of production value is compared with preset threshold, judges that enterprise to be monitored exists according to comparison result
Whether above-mentioned preset time period produces in violation of rules and regulations, and treatment process is simple, and processing result is accurate, is suitble to application.
In addition, determining the enterprise to be monitored described according to the load curve described in a specific example
Preset time period is in violation of rules and regulations after the period of production, further includes:
Send warning message to default monitor terminal, the warning message carry the enterprise to be monitored identity and
The period of the violation production.
Here, determining enterprise's production in violation of rules and regulations, and determining that after the period of production, corresponding information is sent in violation of rules and regulations for enterprise
It to default monitor terminal, reminds monitoring personnel to carry out respective handling in time, the production row of maximum discharge enterprise is monitored for relevant departments
To provide effective means, strong support is provided for haze control, wherein default monitor terminal can be according to practical feelings
Condition setting, such as be set as monitoring personnel mobile phone etc..
In addition, in a specific example, if the enterprise to be monitored is the enterprise for needing protective load, according to expression
Formula Ee=T × PsDetermine the enterprise to be monitored in the estimated electricity consumption E of the preset time periode, wherein T indicates described default
Period, PsIndicate the protective load of the enterprise to be monitored;
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S is determined
Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates the transformer of the enterprise to be monitored
Capacity.
Here, for 24 hours one day,
The above method in order to better understand, the application example of a production monitoring method of the present invention detailed below.
It in conjunction with above-mentioned each embodiment, in the present embodiment, is illustrated by taking certain maximum discharge enterprise as an example, this explanation is simultaneously
It is not limited to be constituted to the present invention program.
The transformer capacity S of the maximum discharge enterprise is 400kVA, and it does not need protective load, acquires system from power information
System show that the practical electricity consumption on the enterprise same day is 1689.47kWh.
According to formulaCalculate the estimated electricity consumption of enterprise's same day
Measure Ee, can obtain EeFor 960kWh.
According to formulaThe violation coefficient of production β for calculating enterprise, can obtain β to go out is 1.76.It is determined according to the size of β value
Whether enterprise produces in violation of rules and regulations, as shown in table 1.
Whether the corresponding enterprise of 1 β value of table produces in violation of rules and regulations
Violation coefficient of production β |
Whether enterprise produces in violation of rules and regulations |
β≤1 |
It does not produce in violation of rules and regulations |
1<β≤1.25 |
It is slight to produce in violation of rules and regulations |
1.25<β≤1.5 |
Moderate produces in violation of rules and regulations |
Β>1.5 |
Severe produces in violation of rules and regulations |
As shown in Table 1, there are severes to produce in violation of rules and regulations for the enterprise.The enterprise is obtained from power information acquisition system in integral point
Load it is as shown in table 2,
Load of 2 enterprise of table in integral point
Moment |
Load (kW) |
0:00 |
152.12 |
1:00 |
148.35 |
2:00 |
155.21 |
3:00 |
154.32 |
4:00 |
142.05 |
5:00 |
120.41 |
6:00 |
15.42 |
7:00 |
12.49 |
8:00 |
14.22 |
9:00 |
14.63 |
10:00 |
12.34 |
11:00 |
12.32 |
12:00 |
13.25 |
13:00 |
14.01 |
14:00 |
14.51 |
15:00 |
15.32 |
16:00 |
15.47 |
17:00 |
14.89 |
18:00 |
15.21 |
19:00 |
15.03 |
20:00 |
147.21 |
21:00 |
150.21 |
22:00 |
156.25 |
23:00 |
151.71 |
The load curve fitted is as shown in Fig. 2, as shown in Figure 2, the load of the enterprise biggish period is 0:00-
Thus 5:00 and 20:00-23:00 can determine that the enterprise carries out violation production using night, on related governmental departments are optional
It states and collects evidence in the period to enterprise.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Corresponding to production monitoring method described in foregoing embodiments, Fig. 3 shows a kind of life provided in an embodiment of the present invention
Produce the schematic block diagram of monitoring device.The each unit that the production monitoring devices 300 of the present embodiment include is corresponding for executing Fig. 1
Each step in embodiment does not repeat herein referring specifically to the associated description in the corresponding embodiment of Fig. 1 and Fig. 1.This implementation
The production monitoring devices 300 of example include estimated electricity consumption determination unit 301, practical electricity consumption obtaining unit 302, production is sentenced in violation of rules and regulations
Disconnected unit 303, load condition obtaining unit 304 and violation production time section determination unit 305.
Wherein, it is contemplated that electricity consumption determination unit 301, for according to preset time period enterprise to be monitored protective load or change
Depressor capacity determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.Practical electricity consumption obtaining unit
302, for obtaining the enterprise to be monitored in the practical electricity consumption of the preset time period by power information acquisition system.It disobeys
Rule production judging unit 303, for judging that the enterprise to be monitored exists according to the estimated electricity consumption and the practical electricity consumption
Whether the preset time period produces in violation of rules and regulations.Load condition obtaining unit 304, if for the enterprise to be monitored described default
Period produces in violation of rules and regulations, then obtains the enterprise to be monitored in the preset time period by the power information acquisition system
Load condition.Violation production time section determination unit 305, exists for fitting the enterprise to be monitored according to the load condition
The load curve of the preset time period, and determine the enterprise to be monitored in the preset time period according to the load curve
The period of production in violation of rules and regulations.
It is evidenced from the above discussion that production monitoring devices of the embodiment of the present invention, hold according to the protective load of enterprise or transformer
Amount determines that in the estimated electricity consumption of preset time period, the practical electricity consumption of enterprise is obtained by power information acquisition system for enterprise,
Judge whether enterprise produces in violation of rules and regulations according to above-mentioned estimated electricity consumption and practical electricity consumption, if production further determines that enterprise in violation of rules and regulations
The period that industry produces in violation of rules and regulations provides effective means for the production behavior that relevant departments monitor maximum discharge enterprise, solves existing
Technology lacks effective means and is monitored to the production activity of maximum discharge enterprise, causes haze problem that cannot solve, and causes each
The problem of planting disease, and influencing communications and transportation meets actual needs.
Referring to fig. 4, Fig. 4 be another embodiment of the present invention provides another production monitoring devices schematic block diagram.This
The production monitoring devices 400 of embodiment include estimated electricity consumption determination unit 401, practical electricity consumption obtaining unit 402, in violation of rules and regulations life
Produce judging unit 403, load condition obtaining unit 404, violation production time section determination unit 405 and alarm unit 406.
Wherein, it is contemplated that electricity consumption determination unit 401, practical electricity consumption obtaining unit 402, in violation of rules and regulations production judging unit 403,
Load condition obtaining unit 404 and violation production time section determination unit 405 are referring specifically to the corresponding embodiment of Fig. 3 and Fig. 3
In estimated electricity consumption determination unit 301, practical electricity consumption obtaining unit 302, produce judging unit 303 in violation of rules and regulations, load condition obtains
The associated description for obtaining unit 304 and violation production time section determination unit 305, does not repeat herein.
Further, the estimated electricity consumption determination unit 401 includes enterprise's judging unit 4011, the determining list of the first electricity
Member 4012 and the second electricity determination unit 4013.
Wherein, enterprise's judging unit 4011, for judging whether the enterprise to be monitored is the enterprise for needing protective load.
First electricity determination unit 4012, if being the enterprise for needing protective load for the enterprise to be monitored, according to described wait supervise
The protective load for controlling enterprise, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.Second electricity determines
Unit 4013, if being the enterprise for not needing protective load for the enterprise to be monitored, according to the change of the enterprise to be monitored
Depressor capacity determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
Further, the violation production judging unit 403 includes violation coefficient of production value determination unit 4031 and production
Judging unit 4032.
Wherein, violation coefficient of production value determination unit 4031, for according to the practical electricity consumption and the estimated electricity consumption
The ratio of amount determines the enterprise to be monitored in the violation coefficient of production value of the preset time period.Judging unit 4032 is produced,
For judging whether the enterprise to be monitored disobeys in the preset time period according to the violation coefficient of production value and preset threshold
Rule production.
Further, alarm unit 406, for sending warning message to default monitor terminal, the warning message is carried
The period of the identity of the enterprise to be monitored and violation production.
Further, the first electricity determination unit 4012, if being the enterprise for needing protective load for the enterprise to be monitored
Industry, then according to expression formula Ee=T × PsDetermine the enterprise to be monitored in the estimated electricity consumption E of the preset time periode, wherein
T indicates the preset time period, PsIndicate the protective load of the enterprise to be monitored.Second electricity determination unit 4013, is used for
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S determines described wait supervise
Enterprise is controlled in the estimated electricity consumption E of the preset time periode, wherein S indicates the transformer capacity of the enterprise to be monitored.
It is evidenced from the above discussion that the embodiment of the present invention determines that enterprise exists according to the protective load or transformer capacity of enterprise
The estimated electricity consumption of preset time period obtains the practical electricity consumption of enterprise by power information acquisition system, according to above-mentioned estimated
Electricity consumption and practical electricity consumption judge whether enterprise produces in violation of rules and regulations, if production further determines that enterprise produced in violation of rules and regulations in violation of rules and regulations
Period provides effective means for the production behavior that relevant departments monitor maximum discharge enterprise, solves the prior art and lack effectively
Means are monitored the production activity of maximum discharge enterprise, cause haze problem that cannot solve, and cause various diseases, and influence
The problem of communications and transportation, meets actual needs.
It is a kind of schematic block diagram of terminal device provided by one embodiment of the present invention referring to Fig. 5, Fig. 5.As shown in figure 5,
The terminal device 5 of the embodiment includes: processor 50, memory 51 and is stored in the memory 51 and can be at the place
The computer program 52 run on reason device 50, such as production monitoring program.The processor 50 executes the computer program 52
Step in the above-mentioned each production monitoring embodiment of the method for Shi Shixian, such as step 101 shown in FIG. 1 is to 105.Alternatively, described
Processor 50 realizes the function of each unit in above-mentioned each Installation practice when executing the computer program 52, such as shown in Fig. 4
The function of unit 401 to 406.
The computer program 52 can be divided into one or more module/units, and one or more of modules/
Unit is stored in the memory 51, and is executed by the processor 50, to complete the present invention.One or more of moulds
Block/unit can be the series of computation machine program instruction section that can complete specific function, the instruction segment by describe it is described based on
Implementation procedure of the calculation machine program 52 in the terminal device 5.For example, the computer program 52 can be divided into estimated use
When electricity determination unit, practical electricity consumption obtaining unit, violation production judging unit, load condition obtaining unit, violation produce
Between section determination unit and alarm unit, each unit concrete function is as follows:
According to the protective load or transformer capacity of preset time period enterprise to be monitored, determine the enterprise to be monitored in institute
State the estimated electricity consumption of preset time period;
The enterprise to be monitored is obtained in the practical electricity consumption of the preset time period by power information acquisition system;
According to the estimated electricity consumption and the practical electricity consumption, judge the enterprise to be monitored in the preset time period
Whether produce in violation of rules and regulations;
If the enterprise to be monitored produces in violation of rules and regulations in the preset time period, obtained by the power information acquisition system
The enterprise to be monitored is obtained in the load condition of the preset time period;
The enterprise to be monitored is fitted in the load curve of the preset time period according to the load condition, and according to
The load curve determines the period that the enterprise to be monitored produces in violation of rules and regulations in the preset time period.
Further, the protective load or transformer capacity according to preset time period enterprise to be monitored, determine described in
Enterprise to be monitored includes: in the estimated electricity consumption of the preset time period
Judge whether the enterprise to be monitored is the enterprise for needing protective load;
If the enterprise to be monitored is the enterprise for needing protective load, according to the protective load of the enterprise to be monitored,
Determine the enterprise to be monitored in the estimated electricity consumption of the preset time period;
If the enterprise to be monitored is the enterprise for not needing protective load, held according to the transformer of the enterprise to be monitored
Amount, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
Further, described according to the estimated electricity consumption and the practical electricity consumption, judge that the enterprise to be monitored exists
In violation of rules and regulations whether production includes: the preset time period
According to the ratio of the practical electricity consumption and the estimated electricity consumption, determine the enterprise to be monitored described default
The violation coefficient of production value of period;
According to the violation coefficient of production value and preset threshold, judge that the enterprise to be monitored is in the preset time period
No violation production.
Further, determine the enterprise to be monitored in the preset time period violation according to the load curve described
After the period of production, further includes:
Send warning message to default monitor terminal, the warning message carry the enterprise to be monitored identity and
The period of the violation production.
Further, if the enterprise to be monitored is the enterprise for needing protective load, according to expression formula Ee=T × PsReally
Estimated electricity consumption E of the fixed enterprise to be monitored in the preset time periode, wherein T indicates the preset time period, PsIt indicates
The protective load of the enterprise to be monitored;
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S is determined
Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates the transformer of the enterprise to be monitored
Capacity.
Above scheme determines enterprise in the estimated use of preset time period according to the protective load or transformer capacity of enterprise
Electricity obtains the practical electricity consumption of enterprise by power information acquisition system, according to above-mentioned estimated electricity consumption and practical electricity consumption
Judge whether enterprise produces in violation of rules and regulations, is relevant departments if production further determines that the period of enterprise's production in violation of rules and regulations in violation of rules and regulations
The production behavior of monitoring maximum discharge enterprise provides effective means, solves the prior art and lacks effective means to maximum discharge enterprise
The problem of production activity is monitored, and is caused haze problem that cannot solve, is caused various diseases, and influence communications and transportation, it is full
Foot actual needs.
The terminal device 5 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The production monitoring terminal device may include, but be not limited only to, processor 50, memory 51.Those skilled in the art can be with
Understand, Fig. 5 is only the example of terminal device 5, does not constitute the restriction to terminal device 5, may include than illustrate it is more or
Less component perhaps combines certain components or different components, such as the production monitoring terminal device can also include
Input-output equipment, network access equipment, bus etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 51 can be the internal storage unit of the terminal device 5, such as the hard disk or interior of terminal device 5
It deposits.The memory 51 is also possible to the External memory equipment of the terminal device 5, such as be equipped on the terminal device 5
Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge
Deposit card (Flash Card) etc..Further, the memory 51 can also both include the storage inside list of the terminal device 5
Member also includes External memory equipment.The memory 51 is used to store the computer program and the production monitoring terminal is set
Standby required other programs and data.The memory 51, which can be also used for temporarily storing, have been exported or will export
Data.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function
Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing
The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also
To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list
Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to restrict the invention.Above system
The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with
It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute
The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as
Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately
A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device
Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or
In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation
All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program
Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on
The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation
Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium
It may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry the computer program code
Dish, CD, computer storage, read-only memory (Read-Only Memory, ROM), random access memory (Random
Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the meter
The content that calculation machine readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice,
Such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and electricity
Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.