CN109409764A - Production monitoring method and terminal device - Google Patents

Production monitoring method and terminal device Download PDF

Info

Publication number
CN109409764A
CN109409764A CN201811326213.8A CN201811326213A CN109409764A CN 109409764 A CN109409764 A CN 109409764A CN 201811326213 A CN201811326213 A CN 201811326213A CN 109409764 A CN109409764 A CN 109409764A
Authority
CN
China
Prior art keywords
enterprise
monitored
preset time
time period
electricity consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811326213.8A
Other languages
Chinese (zh)
Inventor
马浩
王立斌
陶鹏
吴宏波
张洋瑞
冯波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Marketing Service Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, State Grid Hebei Energy Technology Service Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811326213.8A priority Critical patent/CN109409764A/en
Publication of CN109409764A publication Critical patent/CN109409764A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is suitable for production management technical field, provides a kind of production monitoring method and terminal device, which comprises according to the protective load or transformer capacity of preset time period enterprise to be monitored, determine enterprise in the estimated electricity consumption of preset time period;Enterprise is obtained in the practical electricity consumption of preset time period by power information acquisition system;Electricity consumption and practical electricity consumption on the estimation, judge whether enterprise produces in violation of rules and regulations in preset time period;If producing in violation of rules and regulations, enterprise is obtained in the load condition of preset time period by power information acquisition system;Enterprise is fitted in the load curve of preset time period according to load condition, and the period that enterprise produces in violation of rules and regulations in preset time period is determined according to load curve, prior art shortage effective means is solved to be monitored the production activity of maximum discharge enterprise, cause haze problem that cannot solve, cause various diseases, and the problem of influencing communications and transportation, meet actual needs.

Description

Production monitoring method and terminal device
Technical field
The invention belongs to production management technical field more particularly to a kind of production monitoring method and terminal devices.
Background technique
In recent years, winter haze takes place frequently, and totally unfavorable influence is caused to human health and communications and transportation.To mitigate mist The measures of vehicle restriction, the halt production of maximum discharge enterprise etc. have been put into effect in haze degree, various regions successively.But there is the part maximum discharge enterprise to be Economic interests are pursued, after receiving halt production notice, violation production is carried out still by the way of hidden.Due to maximum discharge number of the enterprise Numerous and its production process concealment is high, and relevant departments lack effective means and supervise to the production activity of maximum discharge enterprise Control, causes haze problem that cannot solve, causes various diseases, and influence communications and transportation.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of production monitoring method and terminal devices, to solve the prior art Lack effective means to be monitored the production activity of maximum discharge enterprise, cause haze problem that cannot solve, causes various Disease, and the problem of influence communications and transportation.
The first aspect of the embodiment of the present invention provides a kind of production monitoring method, comprising:
According to the protective load or transformer capacity of preset time period enterprise to be monitored, determine the enterprise to be monitored in institute State the estimated electricity consumption of preset time period;
The enterprise to be monitored is obtained in the practical electricity consumption of the preset time period by power information acquisition system;
According to the estimated electricity consumption and the practical electricity consumption, judge the enterprise to be monitored in the preset time period Whether produce in violation of rules and regulations;
If the enterprise to be monitored produces in violation of rules and regulations in the preset time period, obtained by the power information acquisition system The enterprise to be monitored is obtained in the load condition of the preset time period;
The enterprise to be monitored is fitted in the load curve of the preset time period according to the load condition, and according to The load curve determines the period that the enterprise to be monitored produces in violation of rules and regulations in the preset time period.
The second aspect of the embodiment of the present invention provides a kind of production monitoring devices, comprising:
It is expected that electricity consumption determination unit, for being held according to the protective load or transformer of preset time period enterprise to be monitored Amount, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period;
Practical electricity consumption obtaining unit, for obtaining the enterprise to be monitored described pre- by power information acquisition system If the practical electricity consumption of period;
Production judging unit in violation of rules and regulations, for according to the estimated electricity consumption and the practical electricity consumption, judgement to be described wait supervise Whether control enterprise produces in violation of rules and regulations in the preset time period;
Load condition obtaining unit passes through if producing in violation of rules and regulations for the enterprise to be monitored in the preset time period The power information acquisition system obtains the enterprise to be monitored in the load condition of the preset time period;
Violation production time section determination unit, for fitting the enterprise to be monitored described according to the load condition The load curve of preset time period, and determine the enterprise to be monitored in the preset time period violation according to the load curve The period of production.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in In the memory and the computer program that can run on the processor, when the processor executes the computer program It realizes such as the step of the above method.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, realizes when the computer program is executed by processor such as the step of the above method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the embodiment of the present invention is according to the security personnel of enterprise Load or transformer capacity determine that enterprise in the estimated electricity consumption of preset time period, is looked forward to by power information acquisition system The practical electricity consumption of industry judges whether enterprise produces in violation of rules and regulations according to above-mentioned estimated electricity consumption and practical electricity consumption, if in violation of rules and regulations Production further determines that the period that enterprise produces in violation of rules and regulations, and the production behavior for monitoring maximum discharge enterprise for relevant departments has provided Effect means solve prior art shortage effective means and are monitored to the production activity of maximum discharge enterprise, haze problem is caused to obtain Less than solution, the problem of causing various diseases, and influence communications and transportation, meet actual needs.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is a kind of schematic flow diagram of production monitoring method provided in an embodiment of the present invention;
Fig. 2 is the schematic diagram of enterprise's load curve provided in an embodiment of the present invention;
Fig. 3 is a kind of production monitoring devices schematic block diagram provided in an embodiment of the present invention;
Fig. 4 be another embodiment of the present invention provides a kind of production monitoring devices schematic block diagram;
Fig. 5 is a kind of schematic block diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
It is a kind of schematic flow diagram of production monitoring method provided in an embodiment of the present invention referring to Fig. 1, Fig. 1, in the implementation It in example, is illustrated by taking the triggering of the angle of terminal as an example, here, terminal can be the mobile terminals such as smart phone, tablet computer. As shown in Figure 1, in this embodiment, the treatment process of terminal may comprise steps of:
S101: according to the protective load or transformer capacity of preset time period enterprise to be monitored, the enterprise to be monitored is determined Estimated electricity consumption of the industry in the preset time period.
Here, preset time period can be set according to actual needs, such as setting preset time period is 24 hours etc. one day. Similarly, enterprise to be monitored also can be set according to actual needs, such as enterprise to be monitored is arranged as one or more maximum discharge enterprises Industry etc..
Specifically, judge whether enterprise to be monitored is the enterprise for needing protective load, if so, according to enterprise to be monitored Protective load determines that enterprise to be monitored in the estimated electricity consumption of preset time period, otherwise, holds according to the transformer of enterprise to be monitored Amount, determines enterprise to be monitored in the estimated electricity consumption of preset time period.
S102: the enterprise to be monitored is obtained in the practical electricity consumption of the preset time period by power information acquisition system Amount.
Here, enterprise to be monitored is acquired in the electricity consumption of above-mentioned preset time period by power information acquisition system, will adopted The electricity consumption of collection as enterprise to be monitored above-mentioned preset time period practical electricity consumption.In order to reduce error, can repeatedly lead to It crosses power information acquisition system and acquires enterprise to be monitored in the electricity consumption of above-mentioned preset time period, calculate the electricity consumption of multi collect Average value, using the average value as enterprise to be monitored above-mentioned preset time period practical electricity consumption.
S103: according to the estimated electricity consumption and the practical electricity consumption, judge the enterprise to be monitored described default Whether the period produces in violation of rules and regulations.
Specifically, calculate above-mentioned practical electricity consumption and it is expected that electricity consumption ratio, exist the ratio as enterprise to be monitored The violation coefficient of production value of calculating is compared by the violation coefficient of production value of above-mentioned preset time period with preset threshold, according to Comparison result judges whether enterprise to be monitored produces in violation of rules and regulations in above-mentioned preset time period.For example, violation coefficient of production value is β, in advance If threshold value is 1,1.25 and 1.5, as β≤1, judge that enterprise to be monitored produces in above-mentioned preset time period without violation, as 1 < β When≤1.25, judges that enterprise to be monitored slightly produces in violation of rules and regulations in above-mentioned preset time period, as 1.25 < β≤1.5, judge wait supervise It controls enterprise to produce in violation of rules and regulations in above-mentioned preset time period moderate, as β > 1.5, judges enterprise to be monitored in above-mentioned preset time period weight Degree produces in violation of rules and regulations.
S104: it if the enterprise to be monitored produces in violation of rules and regulations in the preset time period, is acquired by the power information System obtains the enterprise to be monitored in the load condition of the preset time period.
Here, by taking preset time period is 24 hours one day as an example, when enterprise produces in violation of rules and regulations, from power information acquisition system The middle load for obtaining integral point of the enterprise on the same day, for example, 0 point, 1 point, 2 points ... 23 points of load, specific acquisition modes can be with It is arranged according to the actual situation.
S105: fitting the enterprise to be monitored in the load curve of the preset time period according to the load condition, And the period that the enterprise to be monitored produces in violation of rules and regulations in the preset time period is determined according to the load curve.
Specifically, load curve is fitted according to the load condition of the enterprise obtained in power information acquisition system, according to Load curve can find out the load biggish period, and the load biggish period is the time that can be identified as enterprise and produce in violation of rules and regulations Section, and then enterprise can be arrived during this period of time and collected evidence.
It is evidenced from the above discussion that production monitoring method of the embodiment of the present invention, holds according to the protective load of enterprise or transformer Amount determines that in the estimated electricity consumption of preset time period, the practical electricity consumption of enterprise is obtained by power information acquisition system for enterprise, Judge whether enterprise produces in violation of rules and regulations according to above-mentioned estimated electricity consumption and practical electricity consumption, if production further determines that enterprise in violation of rules and regulations The period that industry produces in violation of rules and regulations provides effective means for the production behavior that relevant departments monitor maximum discharge enterprise, solves existing Technology lacks effective means and is monitored to the production activity of maximum discharge enterprise, causes haze problem that cannot solve, and causes each The problem of planting disease, and influencing communications and transportation meets actual needs.
In addition, in a specific example, the protective load or transformer according to preset time period enterprise to be monitored Capacity determines that the enterprise to be monitored includes: in the estimated electricity consumption of the preset time period
Judge whether the enterprise to be monitored is the enterprise for needing protective load;
If the enterprise to be monitored is the enterprise for needing protective load, according to the protective load of the enterprise to be monitored, Determine the enterprise to be monitored in the estimated electricity consumption of the preset time period;
If the enterprise to be monitored is the enterprise for not needing protective load, held according to the transformer of the enterprise to be monitored Amount, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
Specifically, if the enterprise to be monitored is the enterprise for needing protective load, according to expression formula Ee=T × PsIt determines Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein T indicates the preset time period, PsIndicate institute State the protective load of enterprise to be monitored.
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S is determined Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates the transformer of the enterprise to be monitored Capacity.
It is described according to the estimated electricity consumption and the practical electricity consumption in addition, in a specific example, described in judgement In the preset time period, in violation of rules and regulations whether production includes: for enterprise to be monitored
According to the ratio of the practical electricity consumption and the estimated electricity consumption, determine the enterprise to be monitored described default The violation coefficient of production value of period;
According to the violation coefficient of production value and preset threshold, judge that the enterprise to be monitored is in the preset time period No violation production.
Here, according to expression formulaDetermine the enterprise to be monitored in the violation coefficient of production of the preset time period Value β, wherein ErIndicate above-mentioned practical electricity consumption, EeIndicate above-mentioned estimated electricity consumption.Specifically, preset threshold can be according to reality Situation setting, above-mentioned violation coefficient of production value is compared with preset threshold, judges that enterprise to be monitored exists according to comparison result Whether above-mentioned preset time period produces in violation of rules and regulations, and treatment process is simple, and processing result is accurate, is suitble to application.
In addition, determining the enterprise to be monitored described according to the load curve described in a specific example Preset time period is in violation of rules and regulations after the period of production, further includes:
Send warning message to default monitor terminal, the warning message carry the enterprise to be monitored identity and The period of the violation production.
Here, determining enterprise's production in violation of rules and regulations, and determining that after the period of production, corresponding information is sent in violation of rules and regulations for enterprise It to default monitor terminal, reminds monitoring personnel to carry out respective handling in time, the production row of maximum discharge enterprise is monitored for relevant departments To provide effective means, strong support is provided for haze control, wherein default monitor terminal can be according to practical feelings Condition setting, such as be set as monitoring personnel mobile phone etc..
In addition, in a specific example, if the enterprise to be monitored is the enterprise for needing protective load, according to expression Formula Ee=T × PsDetermine the enterprise to be monitored in the estimated electricity consumption E of the preset time periode, wherein T indicates described default Period, PsIndicate the protective load of the enterprise to be monitored;
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S is determined Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates the transformer of the enterprise to be monitored Capacity.
Here, for 24 hours one day,
The above method in order to better understand, the application example of a production monitoring method of the present invention detailed below.
It in conjunction with above-mentioned each embodiment, in the present embodiment, is illustrated by taking certain maximum discharge enterprise as an example, this explanation is simultaneously It is not limited to be constituted to the present invention program.
The transformer capacity S of the maximum discharge enterprise is 400kVA, and it does not need protective load, acquires system from power information System show that the practical electricity consumption on the enterprise same day is 1689.47kWh.
According to formulaCalculate the estimated electricity consumption of enterprise's same day Measure Ee, can obtain EeFor 960kWh.
According to formulaThe violation coefficient of production β for calculating enterprise, can obtain β to go out is 1.76.It is determined according to the size of β value Whether enterprise produces in violation of rules and regulations, as shown in table 1.
Whether the corresponding enterprise of 1 β value of table produces in violation of rules and regulations
Violation coefficient of production β Whether enterprise produces in violation of rules and regulations
β≤1 It does not produce in violation of rules and regulations
1<β≤1.25 It is slight to produce in violation of rules and regulations
1.25<β≤1.5 Moderate produces in violation of rules and regulations
Β>1.5 Severe produces in violation of rules and regulations
As shown in Table 1, there are severes to produce in violation of rules and regulations for the enterprise.The enterprise is obtained from power information acquisition system in integral point Load it is as shown in table 2,
Load of 2 enterprise of table in integral point
Moment Load (kW)
0:00 152.12
1:00 148.35
2:00 155.21
3:00 154.32
4:00 142.05
5:00 120.41
6:00 15.42
7:00 12.49
8:00 14.22
9:00 14.63
10:00 12.34
11:00 12.32
12:00 13.25
13:00 14.01
14:00 14.51
15:00 15.32
16:00 15.47
17:00 14.89
18:00 15.21
19:00 15.03
20:00 147.21
21:00 150.21
22:00 156.25
23:00 151.71
The load curve fitted is as shown in Fig. 2, as shown in Figure 2, the load of the enterprise biggish period is 0:00- Thus 5:00 and 20:00-23:00 can determine that the enterprise carries out violation production using night, on related governmental departments are optional It states and collects evidence in the period to enterprise.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Corresponding to production monitoring method described in foregoing embodiments, Fig. 3 shows a kind of life provided in an embodiment of the present invention Produce the schematic block diagram of monitoring device.The each unit that the production monitoring devices 300 of the present embodiment include is corresponding for executing Fig. 1 Each step in embodiment does not repeat herein referring specifically to the associated description in the corresponding embodiment of Fig. 1 and Fig. 1.This implementation The production monitoring devices 300 of example include estimated electricity consumption determination unit 301, practical electricity consumption obtaining unit 302, production is sentenced in violation of rules and regulations Disconnected unit 303, load condition obtaining unit 304 and violation production time section determination unit 305.
Wherein, it is contemplated that electricity consumption determination unit 301, for according to preset time period enterprise to be monitored protective load or change Depressor capacity determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.Practical electricity consumption obtaining unit 302, for obtaining the enterprise to be monitored in the practical electricity consumption of the preset time period by power information acquisition system.It disobeys Rule production judging unit 303, for judging that the enterprise to be monitored exists according to the estimated electricity consumption and the practical electricity consumption Whether the preset time period produces in violation of rules and regulations.Load condition obtaining unit 304, if for the enterprise to be monitored described default Period produces in violation of rules and regulations, then obtains the enterprise to be monitored in the preset time period by the power information acquisition system Load condition.Violation production time section determination unit 305, exists for fitting the enterprise to be monitored according to the load condition The load curve of the preset time period, and determine the enterprise to be monitored in the preset time period according to the load curve The period of production in violation of rules and regulations.
It is evidenced from the above discussion that production monitoring devices of the embodiment of the present invention, hold according to the protective load of enterprise or transformer Amount determines that in the estimated electricity consumption of preset time period, the practical electricity consumption of enterprise is obtained by power information acquisition system for enterprise, Judge whether enterprise produces in violation of rules and regulations according to above-mentioned estimated electricity consumption and practical electricity consumption, if production further determines that enterprise in violation of rules and regulations The period that industry produces in violation of rules and regulations provides effective means for the production behavior that relevant departments monitor maximum discharge enterprise, solves existing Technology lacks effective means and is monitored to the production activity of maximum discharge enterprise, causes haze problem that cannot solve, and causes each The problem of planting disease, and influencing communications and transportation meets actual needs.
Referring to fig. 4, Fig. 4 be another embodiment of the present invention provides another production monitoring devices schematic block diagram.This The production monitoring devices 400 of embodiment include estimated electricity consumption determination unit 401, practical electricity consumption obtaining unit 402, in violation of rules and regulations life Produce judging unit 403, load condition obtaining unit 404, violation production time section determination unit 405 and alarm unit 406.
Wherein, it is contemplated that electricity consumption determination unit 401, practical electricity consumption obtaining unit 402, in violation of rules and regulations production judging unit 403, Load condition obtaining unit 404 and violation production time section determination unit 405 are referring specifically to the corresponding embodiment of Fig. 3 and Fig. 3 In estimated electricity consumption determination unit 301, practical electricity consumption obtaining unit 302, produce judging unit 303 in violation of rules and regulations, load condition obtains The associated description for obtaining unit 304 and violation production time section determination unit 305, does not repeat herein.
Further, the estimated electricity consumption determination unit 401 includes enterprise's judging unit 4011, the determining list of the first electricity Member 4012 and the second electricity determination unit 4013.
Wherein, enterprise's judging unit 4011, for judging whether the enterprise to be monitored is the enterprise for needing protective load. First electricity determination unit 4012, if being the enterprise for needing protective load for the enterprise to be monitored, according to described wait supervise The protective load for controlling enterprise, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.Second electricity determines Unit 4013, if being the enterprise for not needing protective load for the enterprise to be monitored, according to the change of the enterprise to be monitored Depressor capacity determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
Further, the violation production judging unit 403 includes violation coefficient of production value determination unit 4031 and production Judging unit 4032.
Wherein, violation coefficient of production value determination unit 4031, for according to the practical electricity consumption and the estimated electricity consumption The ratio of amount determines the enterprise to be monitored in the violation coefficient of production value of the preset time period.Judging unit 4032 is produced, For judging whether the enterprise to be monitored disobeys in the preset time period according to the violation coefficient of production value and preset threshold Rule production.
Further, alarm unit 406, for sending warning message to default monitor terminal, the warning message is carried The period of the identity of the enterprise to be monitored and violation production.
Further, the first electricity determination unit 4012, if being the enterprise for needing protective load for the enterprise to be monitored Industry, then according to expression formula Ee=T × PsDetermine the enterprise to be monitored in the estimated electricity consumption E of the preset time periode, wherein T indicates the preset time period, PsIndicate the protective load of the enterprise to be monitored.Second electricity determination unit 4013, is used for If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S determines described wait supervise Enterprise is controlled in the estimated electricity consumption E of the preset time periode, wherein S indicates the transformer capacity of the enterprise to be monitored.
It is evidenced from the above discussion that the embodiment of the present invention determines that enterprise exists according to the protective load or transformer capacity of enterprise The estimated electricity consumption of preset time period obtains the practical electricity consumption of enterprise by power information acquisition system, according to above-mentioned estimated Electricity consumption and practical electricity consumption judge whether enterprise produces in violation of rules and regulations, if production further determines that enterprise produced in violation of rules and regulations in violation of rules and regulations Period provides effective means for the production behavior that relevant departments monitor maximum discharge enterprise, solves the prior art and lack effectively Means are monitored the production activity of maximum discharge enterprise, cause haze problem that cannot solve, and cause various diseases, and influence The problem of communications and transportation, meets actual needs.
It is a kind of schematic block diagram of terminal device provided by one embodiment of the present invention referring to Fig. 5, Fig. 5.As shown in figure 5, The terminal device 5 of the embodiment includes: processor 50, memory 51 and is stored in the memory 51 and can be at the place The computer program 52 run on reason device 50, such as production monitoring program.The processor 50 executes the computer program 52 Step in the above-mentioned each production monitoring embodiment of the method for Shi Shixian, such as step 101 shown in FIG. 1 is to 105.Alternatively, described Processor 50 realizes the function of each unit in above-mentioned each Installation practice when executing the computer program 52, such as shown in Fig. 4 The function of unit 401 to 406.
The computer program 52 can be divided into one or more module/units, and one or more of modules/ Unit is stored in the memory 51, and is executed by the processor 50, to complete the present invention.One or more of moulds Block/unit can be the series of computation machine program instruction section that can complete specific function, the instruction segment by describe it is described based on Implementation procedure of the calculation machine program 52 in the terminal device 5.For example, the computer program 52 can be divided into estimated use When electricity determination unit, practical electricity consumption obtaining unit, violation production judging unit, load condition obtaining unit, violation produce Between section determination unit and alarm unit, each unit concrete function is as follows:
According to the protective load or transformer capacity of preset time period enterprise to be monitored, determine the enterprise to be monitored in institute State the estimated electricity consumption of preset time period;
The enterprise to be monitored is obtained in the practical electricity consumption of the preset time period by power information acquisition system;
According to the estimated electricity consumption and the practical electricity consumption, judge the enterprise to be monitored in the preset time period Whether produce in violation of rules and regulations;
If the enterprise to be monitored produces in violation of rules and regulations in the preset time period, obtained by the power information acquisition system The enterprise to be monitored is obtained in the load condition of the preset time period;
The enterprise to be monitored is fitted in the load curve of the preset time period according to the load condition, and according to The load curve determines the period that the enterprise to be monitored produces in violation of rules and regulations in the preset time period.
Further, the protective load or transformer capacity according to preset time period enterprise to be monitored, determine described in Enterprise to be monitored includes: in the estimated electricity consumption of the preset time period
Judge whether the enterprise to be monitored is the enterprise for needing protective load;
If the enterprise to be monitored is the enterprise for needing protective load, according to the protective load of the enterprise to be monitored, Determine the enterprise to be monitored in the estimated electricity consumption of the preset time period;
If the enterprise to be monitored is the enterprise for not needing protective load, held according to the transformer of the enterprise to be monitored Amount, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
Further, described according to the estimated electricity consumption and the practical electricity consumption, judge that the enterprise to be monitored exists In violation of rules and regulations whether production includes: the preset time period
According to the ratio of the practical electricity consumption and the estimated electricity consumption, determine the enterprise to be monitored described default The violation coefficient of production value of period;
According to the violation coefficient of production value and preset threshold, judge that the enterprise to be monitored is in the preset time period No violation production.
Further, determine the enterprise to be monitored in the preset time period violation according to the load curve described After the period of production, further includes:
Send warning message to default monitor terminal, the warning message carry the enterprise to be monitored identity and The period of the violation production.
Further, if the enterprise to be monitored is the enterprise for needing protective load, according to expression formula Ee=T × PsReally Estimated electricity consumption E of the fixed enterprise to be monitored in the preset time periode, wherein T indicates the preset time period, PsIt indicates The protective load of the enterprise to be monitored;
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula Ee=10% × T × S is determined Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates the transformer of the enterprise to be monitored Capacity.
Above scheme determines enterprise in the estimated use of preset time period according to the protective load or transformer capacity of enterprise Electricity obtains the practical electricity consumption of enterprise by power information acquisition system, according to above-mentioned estimated electricity consumption and practical electricity consumption Judge whether enterprise produces in violation of rules and regulations, is relevant departments if production further determines that the period of enterprise's production in violation of rules and regulations in violation of rules and regulations The production behavior of monitoring maximum discharge enterprise provides effective means, solves the prior art and lacks effective means to maximum discharge enterprise The problem of production activity is monitored, and is caused haze problem that cannot solve, is caused various diseases, and influence communications and transportation, it is full Foot actual needs.
The terminal device 5 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The production monitoring terminal device may include, but be not limited only to, processor 50, memory 51.Those skilled in the art can be with Understand, Fig. 5 is only the example of terminal device 5, does not constitute the restriction to terminal device 5, may include than illustrate it is more or Less component perhaps combines certain components or different components, such as the production monitoring terminal device can also include Input-output equipment, network access equipment, bus etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 51 can be the internal storage unit of the terminal device 5, such as the hard disk or interior of terminal device 5 It deposits.The memory 51 is also possible to the External memory equipment of the terminal device 5, such as be equipped on the terminal device 5 Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge Deposit card (Flash Card) etc..Further, the memory 51 can also both include the storage inside list of the terminal device 5 Member also includes External memory equipment.The memory 51 is used to store the computer program and the production monitoring terminal is set Standby required other programs and data.The memory 51, which can be also used for temporarily storing, have been exported or will export Data.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to restrict the invention.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium It may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry the computer program code Dish, CD, computer storage, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the meter The content that calculation machine readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice, Such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and electricity Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of production monitoring method characterized by comprising
According to the protective load or transformer capacity of preset time period enterprise to be monitored, determine the enterprise to be monitored described pre- If the estimated electricity consumption of period;
The enterprise to be monitored is obtained in the practical electricity consumption of the preset time period by power information acquisition system;
According to the estimated electricity consumption and the practical electricity consumption, judge the enterprise to be monitored the preset time period whether It produces in violation of rules and regulations;
If the enterprise to be monitored produces in violation of rules and regulations in the preset time period, institute is obtained by the power information acquisition system Enterprise to be monitored is stated in the load condition of the preset time period;
The enterprise to be monitored is fitted in the load curve of the preset time period according to the load condition, and according to described Load curve determines the period that the enterprise to be monitored produces in violation of rules and regulations in the preset time period.
2. production monitoring method as described in claim 1, which is characterized in that described according to preset time period enterprise to be monitored Protective load or transformer capacity determine that the enterprise to be monitored includes: in the estimated electricity consumption of the preset time period
Judge whether the enterprise to be monitored is the enterprise for needing protective load;
If the enterprise to be monitored is the enterprise for needing protective load, according to the protective load of the enterprise to be monitored, determine Estimated electricity consumption of the enterprise to be monitored in the preset time period;
If the enterprise to be monitored is the enterprise for not needing protective load, according to the transformer capacity of the enterprise to be monitored, Determine the enterprise to be monitored in the estimated electricity consumption of the preset time period.
3. production monitoring method as described in claim 1, which is characterized in that described according to the estimated electricity consumption and the reality Border electricity consumption judges whether in violation of rules and regulations production includes: in the preset time period for the enterprise to be monitored
According to the ratio of the practical electricity consumption and the estimated electricity consumption, determine the enterprise to be monitored in the preset time The violation coefficient of production value of section;
According to the violation coefficient of production value and preset threshold, judge whether the enterprise to be monitored disobeys in the preset time period Rule production.
4. production monitoring method as described in claim 1, which is characterized in that described according to load curve determination Enterprise to be monitored is after the preset time period in violation of rules and regulations period of production, further includes:
Warning message is sent to default monitor terminal, the warning message carries the identity of the enterprise to be monitored and described The period of production in violation of rules and regulations.
5. production monitoring method as claimed in claim 2, which is characterized in that further include:
If the enterprise to be monitored is the enterprise for needing protective load, according to expression formula Ee=T × PsDetermine the enterprise to be monitored Estimated electricity consumption E of the industry in the preset time periode, wherein T indicates the preset time period, PsIndicate the enterprise to be monitored Protective load;
If the enterprise to be monitored is the enterprise for not needing protective load, according to expression formula EeDescribed in=10% × T × S is determined Estimated electricity consumption E of the enterprise to be monitored in the preset time periode, wherein S indicates that the transformer of the enterprise to be monitored holds Amount.
6. a kind of production monitoring devices characterized by comprising
It is expected that electricity consumption determination unit, for the protective load or transformer capacity according to preset time period enterprise to be monitored, really Estimated electricity consumption of the fixed enterprise to be monitored in the preset time period;
Practical electricity consumption obtaining unit, for obtaining the enterprise to be monitored when described default by power information acquisition system Between section practical electricity consumption;
Production judging unit in violation of rules and regulations, for judging the enterprise to be monitored according to the estimated electricity consumption and the practical electricity consumption Whether industry produces in violation of rules and regulations in the preset time period;
Load condition obtaining unit, if being produced in violation of rules and regulations for the enterprise to be monitored in the preset time period, by described Power information acquisition system obtains the enterprise to be monitored in the load condition of the preset time period;
Violation production time section determination unit, for fitting the enterprise to be monitored described default according to the load condition The load curve of period, and determine that the enterprise to be monitored produces in violation of rules and regulations in the preset time period according to the load curve Period.
7. production monitoring devices as claimed in claim 6, which is characterized in that described to expect that electricity consumption determination unit includes:
Enterprise's judging unit, for judging whether the enterprise to be monitored is the enterprise for needing protective load;
First electricity determination unit, if being the enterprise for needing protective load for the enterprise to be monitored, according to described wait supervise The protective load for controlling enterprise, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period;
Second electricity determination unit, if being the enterprise for not needing protective load for the enterprise to be monitored, according to it is described to The transformer capacity for monitoring enterprise, determines the enterprise to be monitored in the estimated electricity consumption of the preset time period.
8. production monitoring devices as claimed in claim 6, which is characterized in that the violation produces judging unit and includes:
Violation coefficient of production value determination unit is determined for the ratio according to the practical electricity consumption and the estimated electricity consumption Violation coefficient of production value of the enterprise to be monitored in the preset time period;
Judging unit is produced, for judging the enterprise to be monitored in institute according to the violation coefficient of production value and preset threshold State whether preset time period produces in violation of rules and regulations.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 5 when executing the computer program The step of any one the method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of any one of such as claim 1 to 5 of realization the method.
CN201811326213.8A 2018-11-08 2018-11-08 Production monitoring method and terminal device Pending CN109409764A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811326213.8A CN109409764A (en) 2018-11-08 2018-11-08 Production monitoring method and terminal device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811326213.8A CN109409764A (en) 2018-11-08 2018-11-08 Production monitoring method and terminal device

Publications (1)

Publication Number Publication Date
CN109409764A true CN109409764A (en) 2019-03-01

Family

ID=65472598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811326213.8A Pending CN109409764A (en) 2018-11-08 2018-11-08 Production monitoring method and terminal device

Country Status (1)

Country Link
CN (1) CN109409764A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209595A (en) * 2020-04-21 2020-05-29 国网四川省电力公司电力科学研究院 Power utilization information matching and data processing method for pollution-related enterprises
CN111210103A (en) * 2019-11-27 2020-05-29 江苏三希科技股份有限公司 Emergency supervision method, system, terminal and storage medium based on electric quantity working condition
CN111523794A (en) * 2020-04-21 2020-08-11 国网四川省电力公司电力科学研究院 Environment-friendly management and control measure response studying and judging method based on power utilization characteristics of pollution emission enterprises
CN111524032A (en) * 2020-04-21 2020-08-11 国网四川省电力公司电力科学研究院 Environment-friendly response quantification method and device based on enterprise electricity consumption data

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095996A (en) * 2015-07-29 2015-11-25 国网上海市电力公司 Pollution discharge prediction method based on industrial user electricity consumption data
CN105825298A (en) * 2016-03-14 2016-08-03 梁海东 Electric network metering early-warning system and method based on load characteristic pre-estimation
CN107911387A (en) * 2017-12-08 2018-04-13 国网河北省电力有限公司电力科学研究院 Power information acquisition system account logs in the monitoring method with abnormal operation extremely
CN108022043A (en) * 2017-11-30 2018-05-11 北京汇通金财信息科技有限公司 Abnormal electricity consumption behavior identification method and device and central server
CN108734216A (en) * 2018-05-22 2018-11-02 广东工业大学 Classification of power customers method, apparatus and storage medium based on load curve form
CN108761199A (en) * 2018-05-21 2018-11-06 河南星火源科技有限公司 Monitoring system and method is transported in the start and stop of contamination type enterprise

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095996A (en) * 2015-07-29 2015-11-25 国网上海市电力公司 Pollution discharge prediction method based on industrial user electricity consumption data
CN105825298A (en) * 2016-03-14 2016-08-03 梁海东 Electric network metering early-warning system and method based on load characteristic pre-estimation
CN108022043A (en) * 2017-11-30 2018-05-11 北京汇通金财信息科技有限公司 Abnormal electricity consumption behavior identification method and device and central server
CN107911387A (en) * 2017-12-08 2018-04-13 国网河北省电力有限公司电力科学研究院 Power information acquisition system account logs in the monitoring method with abnormal operation extremely
CN108761199A (en) * 2018-05-21 2018-11-06 河南星火源科技有限公司 Monitoring system and method is transported in the start and stop of contamination type enterprise
CN108734216A (en) * 2018-05-22 2018-11-02 广东工业大学 Classification of power customers method, apparatus and storage medium based on load curve form

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111210103A (en) * 2019-11-27 2020-05-29 江苏三希科技股份有限公司 Emergency supervision method, system, terminal and storage medium based on electric quantity working condition
CN111209595A (en) * 2020-04-21 2020-05-29 国网四川省电力公司电力科学研究院 Power utilization information matching and data processing method for pollution-related enterprises
CN111523794A (en) * 2020-04-21 2020-08-11 国网四川省电力公司电力科学研究院 Environment-friendly management and control measure response studying and judging method based on power utilization characteristics of pollution emission enterprises
CN111209595B (en) * 2020-04-21 2020-08-11 国网四川省电力公司电力科学研究院 Power utilization information matching and data processing method for pollution-related enterprises
CN111524032A (en) * 2020-04-21 2020-08-11 国网四川省电力公司电力科学研究院 Environment-friendly response quantification method and device based on enterprise electricity consumption data
CN111524032B (en) * 2020-04-21 2020-11-10 国网四川省电力公司电力科学研究院 Environment-friendly response quantification method and device based on enterprise electricity consumption data
CN111523794B (en) * 2020-04-21 2020-11-24 国网四川省电力公司电力科学研究院 Environment-friendly management and control measure response studying and judging method based on power utilization characteristics of pollution emission enterprises

Similar Documents

Publication Publication Date Title
CN109409764A (en) Production monitoring method and terminal device
CN108564181A (en) Electrical equipment fault detects and method for maintaining and terminal device
CN109446017A (en) A kind of alarm algorithm generation method, monitoring system and terminal device
CN109446041B (en) Server pressure early warning method and system and terminal equipment
CN109447496A (en) Electricity stealing determination method and terminal device
CN109522054B (en) Data center energy consumption equipment scheduling method and device
CN108295408A (en) Fire extinguisher monitoring and managing method, system and terminal device
CN103617561A (en) System and method for evaluating state of secondary equipment of power grid intelligent substation
CN109492394A (en) The recognition methods of abnormal traffic request and terminal device
CN109447288A (en) Multiple-energy-source operation management method and terminal device
CN109066974A (en) Substation&#39;s status information capture method and device
CN108181546A (en) Localization method, positioning device and the terminal device of distribution network failure
CN109800130A (en) A kind of apparatus monitoring method, device, equipment and medium
CN106406500A (en) Method and system for controlling power consumption of servers in whole cabinet
CN109272237A (en) A kind of recognition methods of multiplexing electric abnormality, system and terminal device
CN109634802A (en) Process monitoring method and terminal device
CN113326585A (en) Energy efficiency abnormity early warning method and device for gas-fired boiler and computer equipment
CN108183814A (en) The malfunction elimination method and apparatus of the communication channel of power information acquisition system
CN114899849A (en) Load scheduling method, device, equipment and storage medium for energy storage equipment
CN109325603A (en) Failed request processing method, device and terminal device
CN109376051A (en) Detect the method and terminal device of mobile device application program power consumption
CN109363660A (en) Rhythm of the heart method and server based on BP neural network
CN113159463A (en) Traffic monitoring method and device
CN110505655A (en) Data command processing method, storage medium and bluetooth shield
CN109695976A (en) A kind of method, system and the terminal device of powering device management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211008

Address after: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Applicant after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Applicant after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050011 no.238, TIYU South Street, Yuhua District, Shijiazhuang City, Hebei Province

Applicant before: STATE GRID HEBEI ELECTRIC POWER Research Institute

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301