CN109405946B - Rail weighing apparatus system - Google Patents

Rail weighing apparatus system Download PDF

Info

Publication number
CN109405946B
CN109405946B CN201811508935.5A CN201811508935A CN109405946B CN 109405946 B CN109405946 B CN 109405946B CN 201811508935 A CN201811508935 A CN 201811508935A CN 109405946 B CN109405946 B CN 109405946B
Authority
CN
China
Prior art keywords
weighing apparatus
track
drainage
channel
receiving groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811508935.5A
Other languages
Chinese (zh)
Other versions
CN109405946A (en
Inventor
罗红福
魏翔
梁东
马召
孙乐乐
杨行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201811508935.5A priority Critical patent/CN109405946B/en
Publication of CN109405946A publication Critical patent/CN109405946A/en
Application granted granted Critical
Publication of CN109405946B publication Critical patent/CN109405946B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/02Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles
    • G01G19/04Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles for weighing railway vehicles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G21/00Details of weighing apparatus
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G23/00Auxiliary devices for weighing apparatus

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

The invention discloses a track weighing apparatus system, which comprises four weighing apparatus foundation pits, a drainage slag removal system and a first track weighing apparatus arranged in the four weighing apparatus foundation pits, wherein the drainage slag removal system is arranged in the four weighing apparatus foundation pits. The system has the advantages that the system is convenient and practical, the ground loading and delivering work is not influenced when the cinder is cleaned, a safe environment is provided for staff, and the labor intensity is greatly reduced.

Description

Rail weighing apparatus system
Technical Field
The invention relates to the technical field of track weighing apparatus, in particular to a track weighing apparatus system.
Background
In the coal mine industry, a coal mine transporting and loading weighing system is called a track weighing system, a deep foundation pit track weighing device is adopted, but in the use process, partial coal foam is scattered during the coal loading of a track loading station, particularly, when the loading is overweight, manual shoveling is needed, and a large amount of foam coal invades into the weighing device pit base along the connecting joints at the two ends of the track weighing device in the process; if the rain weather is met, a great amount of rainwater is mixed with foam coal to invade the pit base of the track weighing apparatus, and when the rainfall is large, the pit base is quickly filled with the rainwater, so that the sensor and the communication cable of the weighing apparatus are submerged, and the weighing apparatus is misaligned. In the past, the main parts of the weighing apparatus pit base and the weighing apparatus are maintained by covering old belts, manually cleaning and manually pumping water at the joint of the weighing apparatus, but in rainy seasons, the workload of maintenance and cleaning is large, cleaning staff are difficult to stand straight in the pit base of the weighing apparatus, the working strength is high, potential safety hazards of collision exist, and the coal delivery work can be influenced in severe cases.
Disclosure of Invention
The technical problems to be solved by the invention are as follows: the existing track weighing apparatus system is large in maintenance and cleaning workload and working intensity, meanwhile, workers have potential safety hazards of collision in cleaning, and coal shipping work can be affected seriously.
In order to solve the technical problems, the invention provides the following technical scheme:
the utility model provides a track weighing apparatus system, includes four weighing apparatus foundation ditch, drainage scarfing cinder systems and sets up the first track weighing apparatus in four weighing apparatus foundation ditch, the drainage scarfing cinder system sets up in four weighing apparatus foundation ditch.
Preferably, the track weighing apparatus further comprises three weighing apparatus foundation pits and a second track weighing apparatus arranged on the three weighing apparatus foundation pits, wherein the three weighing apparatus foundation pits are arranged on one side of the four weighing apparatus foundation pits, the depth of the three weighing apparatus foundation pits is smaller than that of the four weighing apparatus foundation pits, and the three weighing apparatus foundation pits are communicated with the four weighing apparatus foundation pits through holes.
Preferably, one end of the through hole is arranged at the bottom end of the foundation pit of the three weighing machines, and the other end of the through hole is inclined towards the inclined lower direction of the pit base of the four weighing machines.
Preferably, the drainage slag removal system comprises a water pumping system, a slag receiving groove and a drainage ditch, wherein the water pumping system is arranged in the four-channel weighing apparatus foundation pit, the slag receiving groove is arranged at the joint of the first track weighing apparatus, the drainage ditch is arranged on one side of the four-channel weighing apparatus foundation pit, the water pumping system is connected to the drainage ditch through a drainage pipe, and one end of the slag receiving groove is connected to the drainage ditch.
Preferably, the inner walls of the four-channel weighing apparatus foundation pit, the drainage ditch and the three-channel weighing apparatus foundation pit are formed by concrete pouring.
Preferably, the notch department of slag receiving groove one end still is equipped with the high-pressure water pipe, be equipped with control gate valve on the high-pressure water pipe, the one end that the high-pressure water pipe kept away from the slag receiving groove is connected with the high-pressure water tank.
Preferably, the slag receiving groove is a U-shaped groove, and one end of the slag receiving groove, which is far away from the high-pressure water pipe, is inclined towards the oblique downward direction to form a drainage ditch.
Preferably, a sedimentation tank is arranged at the bottom of the foundation pit of the four weighing apparatus, and the drainage pump is arranged in the sedimentation tank.
Preferably, the water pumping system is an automatic water pumping system.
Preferably, the drainage ditch is connected to a cinder pool.
Compared with the prior art, the invention has the beneficial effects that:
1. through the setting of drainage scarfing cinder system for the water in the four weighing apparatus foundation ditch is discharged at regular intervals, only needs to carry out artifical clearance occasionally, and the work load reduces, reduces the potential safety hazard of collision.
2. The three-channel weighing apparatus foundation pit and the four-channel weighing apparatus foundation pit are communicated through the through holes, so that all accumulated water in the three-channel weighing apparatus foundation pit can naturally flow into the four-channel weighing apparatus foundation pit, and no accumulated water in the three-channel weighing apparatus foundation pit is thoroughly realized.
3. Through the setting of receiving the slag groove, realize the unrestrained cinder when loading to collect, and through the opening of control gate valve, wash away the cinder in the receiving the slag groove to the escape canal.
4. Through connecting the escape canal with the cinder pit for can not influence ground loading shipment work when clearing up cinder, more provide safe environment for the staff, very big alleviateed intensity of labour.
Drawings
FIG. 1 is a schematic diagram of a track weighing apparatus system according to an embodiment of the present invention;
in the figure: 1-three weighing apparatus foundation pits, 11-second track weighing apparatus, 2-four weighing apparatus foundation pits, 21-first track weighing apparatus, 22-sedimentation tank, 3-drainage slag removal system, 31-pumping system, 32-slag receiving tank, 33-drainage ditch, 4-through hole, 5-drainage pipe, 6-high-pressure water pipe, 61-control gate valve and 7-high-pressure water tank.
Detailed Description
In order to facilitate the understanding of the technical scheme of the present invention by those skilled in the art, the technical scheme of the present invention will be further described with reference to the accompanying drawings.
In the present application, unless explicitly specified and limited otherwise, the terms "connected," "secured," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally formed; the device can be mechanically connected, electrically connected and communicated; can be directly connected or indirectly connected through an intermediate medium, and can be communicated with the inside of two elements or the interaction relationship of the two elements. The specific meaning of the terms in this application will be understood by those of ordinary skill in the art as the case may be.
Referring to fig. 1, the embodiment discloses a track weighing apparatus system, including three-channel weighing apparatus foundation ditch 1, four-channel weighing apparatus foundation ditch 2, drainage scarfing cinder system 3 and set up in four-channel weighing apparatus foundation ditch 2 and three-channel weighing apparatus foundation ditch 1's first track weighing apparatus 21 and second track weighing apparatus 11, three-channel weighing apparatus foundation ditch 1 sets up in one side of four-channel weighing apparatus foundation ditch 2, three-channel weighing apparatus foundation ditch 1's second track weighing apparatus 11 is directly fixed at three-channel weighing apparatus foundation ditch 1's hole bottom, four-channel weighing apparatus foundation ditch 2's interior first track weighing apparatus 21 passes through the support (not marked in the figure) to be fixed at four-channel weighing apparatus foundation ditch 2's hole bottom, first track weighing apparatus 21 and second track weighing apparatus 11 are all commercially available, in this embodiment, three-channel weighing apparatus foundation ditch 1's degree of depth is less than four-channel weighing apparatus foundation ditch 2's degree of depth, three-channel weighing apparatus foundation ditch 1 is in through hole 4 and four-channel weighing apparatus foundation ditch 2 looks ponding, further one end 4 sets up in three-channel weighing apparatus foundation ditch 1's bottom to three-channel weighing apparatus foundation ditch 2, and three-channel weighing apparatus foundation ditch 1's the other end is three-channel weighing apparatus foundation ditch 1, and all can be purchased in the market.
The drainage slag removal system 3 comprises a water pumping system 31, a slag receiving groove 32 and a drainage ditch 33, wherein the water pumping system 31 is arranged in the four-channel weighing apparatus foundation pit 2, and the water pumping system 31 is an automatic water pumping system, so that automatic operation can be realized, water in the four-channel weighing apparatus foundation pit 2 is discharged at random, manual cleaning is only needed occasionally, and the workload is reduced; the slag receiving groove 32 is arranged at the joint of the first track weighing apparatus 21, the drainage ditch 33 is arranged at the other side of the four weighing apparatus foundation pit 2 far away from the three weighing apparatus foundation pit 1, the pumping system 31 is connected to the drainage ditch 33 through the drainage pipe 5, one end of the slag receiving groove 32 is connected to the drainage ditch 33, in the embodiment, the drainage ditch 33 is connected to a cinder pool (not shown in the figure), so that ground loading and shipping work is not affected when cinder is cleaned, a safe environment is provided for workers, and the labor intensity is greatly reduced; the notch department of the other end of connect slag groove 32 still is connected with high-pressure water pipe 6, be equipped with control gate valve 61 on the high-pressure water pipe 6, the one end that high-pressure water pipe 6 kept away from connect slag groove 32 is connected with high-pressure water tank 7, will control gate valve 61's opening, just so can wash away the cinder that connects in the slag groove 32 to escape canal 33, further, connect slag groove 32 to be the U type groove, connect slag groove 32 to keep away from the one end of high-pressure water pipe 6 towards oblique below direction slant escape canal 33, can guarantee like this that the cinder that falls into in the slag groove 32 can automatically slide into escape canal 33, reduces artificial clearance.
Further, the inner walls of the three-channel weighing apparatus foundation pit 1, the four-channel weighing apparatus foundation pit 2 and the drainage ditch 33 are formed by concrete pouring.
Still further, four weighing apparatus foundation ditch 2 bottoms are equipped with square sedimentation tank 22, pump water system 31 sets up in sedimentation tank 22, can stand in sedimentation tank 22 when artifical clearance, need not bow back, and the work load reduces, reduces the potential safety hazard of collision.
The working principle of the invention is as follows: when water is accumulated in the three-channel weighing apparatus foundation pit 1, the water is discharged to the four-channel weighing apparatus foundation pit 2 through the through hole 4, when the water in the four-channel weighing apparatus foundation pit 2 meets the requirement of the water pumping system 31, the water pumping system 31 automatically opens to work, the water in the four-channel weighing apparatus foundation pit 2 is discharged into the drainage ditch 33, when more cinder invaded into the four-channel weighing apparatus foundation pit 2 is produced, manual cleaning is carried out, and a worker stands in the sedimentation tank 22, so that the bow back is not needed, the workload is reduced, and the potential safety hazard of collision is reduced; in addition, when the coal cinder is scattered by the truck, the coal cinder naturally falls into the cinder receiving groove 32 and slides into the drainage ditch 33 towards the obliquely lower direction, so that manual cleaning is reduced, when the coal cinder in the cinder receiving groove 32 is too thick, the coal cinder cannot automatically slide into the drainage ditch, the control gate valve 61 is opened, and the coal cinder in the cinder receiving groove 32 is flushed to the drainage ditch 33 by water through the high-pressure water pipe 6, so that the workload is greatly reduced; meanwhile, the drainage ditch 33 is connected to a cinder pool (not shown in the figure), so that ground loading and shipping work is not affected when cinder is cleaned, a safe environment is provided for workers, and labor intensity is greatly reduced.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
The above-described embodiments merely represent embodiments of the invention, the scope of the invention is not limited to the above-described embodiments, and it is obvious to those skilled in the art that several variations and modifications can be made without departing from the spirit of the invention, which are all within the scope of the invention.

Claims (8)

1. A track scale system, characterized by: the system comprises four weighing apparatus foundation pits, a drainage slag removal system and a first track weighing apparatus arranged in the four weighing apparatus foundation pits, wherein the drainage slag removal system is arranged in the four weighing apparatus foundation pits;
the device comprises a four-channel foundation pit, a three-channel foundation pit, a first track weighing instrument, a second track weighing instrument and a third track weighing instrument, wherein the first track weighing instrument is arranged on the four-channel foundation pit;
the drainage slag removal system comprises a water pumping system, a slag receiving groove and a drainage ditch, wherein the water pumping system is arranged in a four-channel weighing apparatus foundation pit, the slag receiving groove is arranged at a joint of a first track weighing apparatus, the drainage ditch is arranged on one side of the four-channel weighing apparatus foundation pit, the water pumping system is connected to the drainage ditch through a drainage pipe, and one end of the slag receiving groove is connected to the drainage ditch.
2. A track scale system according to claim 1, wherein: one end of the through hole is arranged at the bottom end of the foundation pit of the three weighing machines, and the other end of the through hole is inclined towards the four pit bases of the weighing machines in the inclined lower direction.
3. A track scale system according to claim 1, wherein: and the inner walls of the four weighing apparatus foundation pits, the drainage ditches and the three weighing apparatus foundation pits are formed by concrete pouring.
4. A track scale system according to claim 1, wherein: the slag receiving device is characterized in that a high-pressure water pipe is further arranged at the notch of one end of the slag receiving groove, a control gate valve is arranged on the high-pressure water pipe, and a high-pressure water tank is connected to one end, far away from the slag receiving groove, of the high-pressure water pipe.
5. A track scale system as claimed in claim 4, wherein: the slag receiving groove is a U-shaped groove, and one end of the slag receiving groove, which is far away from the high-pressure water pipe, is inclined towards the oblique lower direction to form a drainage ditch.
6. A track scale system according to claim 1, wherein: and a sedimentation tank is arranged at the bottom of the foundation pit of the four weighing apparatus, and the water pumping system is arranged in the sedimentation tank.
7. A track scale system according to claim 1, wherein: the water pumping system is an automatic water pumping system.
8. A track scale system according to claim 1, wherein: the drainage ditch is connected to the cinder pool.
CN201811508935.5A 2018-12-11 2018-12-11 Rail weighing apparatus system Active CN109405946B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811508935.5A CN109405946B (en) 2018-12-11 2018-12-11 Rail weighing apparatus system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811508935.5A CN109405946B (en) 2018-12-11 2018-12-11 Rail weighing apparatus system

Publications (2)

Publication Number Publication Date
CN109405946A CN109405946A (en) 2019-03-01
CN109405946B true CN109405946B (en) 2023-12-26

Family

ID=65458325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811508935.5A Active CN109405946B (en) 2018-12-11 2018-12-11 Rail weighing apparatus system

Country Status (1)

Country Link
CN (1) CN109405946B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201917389U (en) * 2010-12-15 2011-08-03 余姚太平洋称重工程有限公司 Special ultra-large rail type electronic scale
CN203270369U (en) * 2013-05-14 2013-11-06 广东理文造纸有限公司 Penetrating-type dry net cleaning system for high-speed paper machine
CN103771668A (en) * 2014-02-26 2014-05-07 华瀚管道系统科技有限公司 Sewage distribution treatment system of urban drainage network
CN203927960U (en) * 2014-06-29 2014-11-05 叶青 Boiler slag tapping equipment
CN203965025U (en) * 2014-08-01 2014-11-26 武汉钢铁(集团)公司 track scale intelligent drainage device
CN204007823U (en) * 2014-06-06 2014-12-10 郑州恒科实业有限公司 Be convenient to clear up fixed, main and auxiliary type, the axle group formula axle weight scale of foundation ditch rubbish
CN204411871U (en) * 2014-12-09 2015-06-24 重庆甘泰环保设备有限公司 The breeding wastewater dreg-liquid separator of convenient cleaning filter screen
CN206279546U (en) * 2016-12-16 2017-06-27 天津圣业达地基加固工程有限公司 A kind of drainage of foundation pit system
CN206872576U (en) * 2017-07-05 2018-01-12 中国水利水电第十六工程局有限公司 Dam foundation ditch sewage disposal system
CN206945116U (en) * 2017-07-28 2018-01-30 贵州中南交通科技有限公司 It is a kind of to divulge information and the good shallow foundation pit weighing platform of vehicle weighbridge of drainage performance
CN207622846U (en) * 2017-12-15 2018-07-17 中储恒科物联网系统有限公司 A kind of truck scale structure of draining dredging
CN208998918U (en) * 2018-12-11 2019-06-18 淮南矿业(集团)有限责任公司 A kind of track weighing apparatus system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207047864U (en) * 2017-06-29 2018-02-27 山西国强高科股份有限公司 Dynamic and intelligent is weighed the dust-proof self-cleaning weighing platform foundation ditch of four stage composites
CN207627998U (en) * 2017-12-05 2018-07-20 上海市建设工程监理咨询有限公司 The drainage sedimentation device of deep basal pit
CN207570650U (en) * 2017-12-28 2018-07-03 河南沣悦电子科技有限公司 A kind of highway weighing apparatus installs foundation pit

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201917389U (en) * 2010-12-15 2011-08-03 余姚太平洋称重工程有限公司 Special ultra-large rail type electronic scale
CN203270369U (en) * 2013-05-14 2013-11-06 广东理文造纸有限公司 Penetrating-type dry net cleaning system for high-speed paper machine
CN103771668A (en) * 2014-02-26 2014-05-07 华瀚管道系统科技有限公司 Sewage distribution treatment system of urban drainage network
CN204007823U (en) * 2014-06-06 2014-12-10 郑州恒科实业有限公司 Be convenient to clear up fixed, main and auxiliary type, the axle group formula axle weight scale of foundation ditch rubbish
CN203927960U (en) * 2014-06-29 2014-11-05 叶青 Boiler slag tapping equipment
CN203965025U (en) * 2014-08-01 2014-11-26 武汉钢铁(集团)公司 track scale intelligent drainage device
CN204411871U (en) * 2014-12-09 2015-06-24 重庆甘泰环保设备有限公司 The breeding wastewater dreg-liquid separator of convenient cleaning filter screen
CN206279546U (en) * 2016-12-16 2017-06-27 天津圣业达地基加固工程有限公司 A kind of drainage of foundation pit system
CN206872576U (en) * 2017-07-05 2018-01-12 中国水利水电第十六工程局有限公司 Dam foundation ditch sewage disposal system
CN206945116U (en) * 2017-07-28 2018-01-30 贵州中南交通科技有限公司 It is a kind of to divulge information and the good shallow foundation pit weighing platform of vehicle weighbridge of drainage performance
CN207622846U (en) * 2017-12-15 2018-07-17 中储恒科物联网系统有限公司 A kind of truck scale structure of draining dredging
CN208998918U (en) * 2018-12-11 2019-06-18 淮南矿业(集团)有限责任公司 A kind of track weighing apparatus system

Also Published As

Publication number Publication date
CN109405946A (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN110410143B (en) Reverse slope tunnel construction drainage system
CN104532813B (en) A kind of aquatic building operation platform and erection method, using method
CN109680677A (en) A kind of construction of diaphragm wall technique
CN105201513A (en) Shaft construction method for rail transit
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN113338983A (en) Large-diameter mud-water balance pipe jacking construction method suitable for high-water-level rock geology
CN106049501A (en) Construction method for conveying concrete downwards with large drop
CN111550259B (en) A kind of construction method of small section and long distance soft rock tunnel
CN109405946B (en) Rail weighing apparatus system
CN106498962B (en) Shallow underground water collecting and drainage system and construction method
CN106351272A (en) Washing device for milling wheels of slot milling machine
CN201072026Y (en) Drainage shunting structure of dry method red mud yard
CN110512485A (en) A kind of ready-package road water collector and construction method
CN117188971A (en) Pore-forming construction method suitable for slide-resistant pile impact drill
CN218970034U (en) Side slope protection drainage mechanism with flow dividing structure
CN101353216B (en) Drainage water diffluence method for dry red mud disposal and drainage water diffluence structure thereof
CN110529118B (en) Method for treating abandoned open-pit basin of mine by long-distance pipeline conveying mortar
EP3943671A1 (en) Method and system of dredging of a channel or duct
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN111764937B (en) Construction method for ore unloading chamber support of under 40m slipping system engineering
CN111852482B (en) Construction method of ore crusher foundation of slip-breaking system engineering below 40m
CN205475580U (en) Drainage positioner is salvageed to underground pipe line leak source
KELSON The Construction of Silvan Dam, Melbourne Water-Supply.
CN209817968U (en) Lifting suspension type storage device for underground operation pipe rods
CN210395451U (en) Connecting device for basement pile foundation construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant