CN109397723A - A kind of manufacture craft of guiding tube - Google Patents

A kind of manufacture craft of guiding tube Download PDF

Info

Publication number
CN109397723A
CN109397723A CN201811239118.4A CN201811239118A CN109397723A CN 109397723 A CN109397723 A CN 109397723A CN 201811239118 A CN201811239118 A CN 201811239118A CN 109397723 A CN109397723 A CN 109397723A
Authority
CN
China
Prior art keywords
guiding tube
mold
glue
winding
wrapping machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811239118.4A
Other languages
Chinese (zh)
Inventor
张权峰
张生学
陈海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Zhengfei Wood Industry Co Ltd
Original Assignee
Zhengzhou Zhengfei Wood Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Zhengfei Wood Industry Co Ltd filed Critical Zhengzhou Zhengfei Wood Industry Co Ltd
Priority to CN201811239118.4A priority Critical patent/CN109397723A/en
Publication of CN109397723A publication Critical patent/CN109397723A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/30Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
    • B29C70/38Automated lay-up, e.g. using robots, laying filaments according to predetermined patterns
    • B29C70/382Automated fiber placement [AFP]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/54Component parts, details or accessories; Auxiliary operations, e.g. feeding or storage of prepregs or SMC after impregnation or during ageing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/001Tubular films, sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Mechanical Engineering (AREA)
  • Robotics (AREA)
  • Moulding By Coating Moulds (AREA)

Abstract

A kind of manufacture craft of guiding tube, comprising the following steps: (1) Operational preparation: HF10-12K fiber, EM301 resin are got from warehouse;(2) mold, tooling prepare;(3) it dries yarn: taking the setting of 1 ingot yarn to be placed in 3# baking oven, set oven temperature, held for some time;(4) match glue: wiped clean beaker dries;Glue is prepared according to the proportion of EM301 resin system, 1kg resin is configured for the first time, it is stand-by to pour into wrapping machine glue groove;(5) it winds: successively being wound according to certain winding sequence;(6) rotation solidification;(7) it demoulds;(8) it processes;(9) it is put in storage: finished product inspection warehousing after passing will be completed the process.The present invention makes guiding tube using carbon fibre materials, compares with metal material in the prior art, and quality is lighter, and intensity is bigger;Using unique winding technology, makes side wall that netted hollow out be presented, further mitigate the weight of guiding tube.

Description

A kind of manufacture craft of guiding tube
Technical field
The present invention relates to a kind of manufacture craft, in particular to a kind of manufacture craft of guiding tube.
Background technique
The equal cylinder of guiding currently used for buoy storage uses aluminium alloy technique, and side wall is circular hole engraved structure, this structure Weight is big, and intensity is not high, is gradually eliminated.
Summary of the invention
The present invention changes the structure of original material and side wall, is replaced with a kind of new technique and solves the above-mentioned prior art The problem of.
To solve the problems of the prior art, the technical solution adopted in the present invention is as follows:
A kind of manufacture craft of guiding tube, comprising the following steps:
(1) HF10-12K fiber, EM301 resin Operational preparation: are got from warehouse;
(2) mold, tooling prepare: guiding tube mold, tooling are placed on specified die treatment area;Remove surface blot; Wrapping machine prepares;Mold placement: guiding tube mold is mounted on wrapping machine using crane and lifting rope;
(3) it dries yarn: taking 1 ingot yarn to erect and place in an oven, set oven temperature, held for some time;
(4) match glue: wiped clean beaker dries;Glue is prepared according to the proportion of EM301 resin system, is configured for the first time It is stand-by to pour into wrapping machine glue groove for 1kg resin;
(5) it winds: opening winding electromechanical source, open creel;It entrys: 1 ingot yarn being baked is placed on wrapping machine creel, Yarn rod position is adjusted, creel, glue groove, conductive filament head, silk mouth is then sequentially passed through, is finally fixed on guiding tube mold;Slowly draw Kinetodesma, while adjusting glue groove two sides dialing knob infiltrates fiber sufficiently, and the fiber sufficiently infiltrated is tied up in guiding tube mold On pole hole and spindle boundary position;The winding program woven in advance is successively wound according to certain winding sequence;
(6) rotation solidification: adjustment baking oven rotating tooling bracket to suitable position;It will guiding using the cooperation of 1#, 2# crane Cylinder mould tool, which hangs oneself to load from wrapping machine, to be come, and is moved on supporting tool, is recycled 3# crane that guiding tube mold is lifted into baking On case rotary tooling, installation mold starts to rotate;Baking oven rises to 100 DEG C with the heating rate of 1-3 DEG C/min, in 100-105 DEG C heat preservation 2 hours, 150 DEG C then are raised to the heating rate of 1-3 DEG C/min again, keeps the temperature 4 hours at 145-155 DEG C, rotation is solid Change, after the completion of solidification, stops rotating, furnace cooling, oven temperature is down to 70 DEG C hereinafter, baking oven can be removed mold;
(7) it demoulds: product being moved out of baking oven, is placed on supporting tool, remove clip;With grinder along envelope The cutting line of rabbet joint of head end cuts off product, and the network product of end socket part is deviate from, the resin clast of stack shell is cleared up;Winding arbor extraction press bayonet Position is installed by guiding tube stripper plate tooling;Product is lifted on winding arbor extraction press with crane, adjusts position, deviates from product;It will lead Draw in cylinder mould tool lifting to supporting tool, clears up resin clast, wiped clean is spare;
(8) process: measurement cut lengths are that cutting benchmark is cut with right end, each product are cut into 3 guidings Cylinder;It is polished after the completion of cutting with tissue paper;
(9) it is put in storage: finished product inspection warehousing after passing will be completed the process.
Further, mold in step (2), tooling prepare in wrapping machine preparation process are as follows: be placed in advance with PE film, be solid It is scheduled in glue groove;Adjust the length of wrapping machine working position, it is ensured that mold can be put into and can be fixed, and mark die is in wrapping machine The position of chuck.
Further, step (3) is dried in yarn: being set oven temperature as 80 DEG C, is kept the temperature 2-6 hour.
Further, step (4) prepares glue with the ratio in glue in EM301R: EM301C: EM301A=100: 85: 1, Configuration 1kg resin for the first time, after stirring 5min, it is stand-by to pour into wrapping machine glue groove, subsequent to supplement preparation every time as needed 500-1000g glue.
Further, in step (8) after the completion of cutting first with 80 mesh sand paper polishing flash, then beaten with 400 mesh sand paper thin by one Time.
Advantages of the present invention: making guiding tube using carbon fibre materials, compares with metal material in the prior art, quality Lighter, intensity is bigger;Using unique winding technology, makes side wall that netted hollow out be presented, further mitigate the weight of guiding tube.
Detailed description of the invention
Fig. 1 is process flow chart of the invention;
Specific embodiment
A kind of manufacture craft of guiding tube, comprising the following steps:
(1) HF10-12K fiber, EM301 resin Operational preparation: are got from warehouse;
(2) mold, tooling prepare: guiding tube mold, tooling are placed on specified die treatment area;Remove surface blot; Wrapping machine prepares;Mold placement: guiding tube mold is mounted on wrapping machine using crane and lifting rope;
(3) it dries yarn: taking 1 ingot yarn to erect and place in an oven, set oven temperature, held for some time;
(4) match glue: wiped clean beaker dries;Glue is prepared according to the proportion of EM301 resin system, is configured for the first time It is stand-by to pour into wrapping machine glue groove for 1kg resin;
(5) it winds: opening winding electromechanical source, open creel;It entrys: 1 ingot yarn being baked is placed on wrapping machine creel, Yarn rod position is adjusted, creel, glue groove, conductive filament head, silk mouth is then sequentially passed through, is finally fixed on guiding tube mold;Slowly draw Kinetodesma, while adjusting glue groove two sides dialing knob infiltrates fiber sufficiently, and the fiber sufficiently infiltrated is tied up in guiding tube mold On pole hole and spindle boundary position;The winding program woven in advance is successively wound according to certain winding sequence;
(6) rotation solidification: adjustment baking oven rotating tooling bracket to suitable position;It will guiding using the cooperation of 1#, 2# crane Cylinder mould tool, which hangs oneself to load from wrapping machine, to be come, and is moved on supporting tool, is recycled 3# crane that guiding tube mold is lifted into baking On case rotary tooling, installation mold starts to rotate;Baking oven rises to 100 DEG C with the heating rate of 1-3 DEG C/min, in 100-105 DEG C heat preservation 2 hours, 150 DEG C then are raised to the heating rate of 1-3 DEG C/min again, keeps the temperature 4 hours at 145-155 DEG C, rotation is solid Change, after the completion of solidification, stops rotating, furnace cooling, oven temperature is down to 70 DEG C hereinafter, baking oven can be removed mold;
(7) it demoulds: product being moved out of baking oven, is placed on supporting tool, remove clip;With grinder along envelope The cutting line of rabbet joint of head end cuts off product, and the network product of end socket part is deviate from, the resin clast of stack shell is cleared up;Winding arbor extraction press bayonet Position is installed by guiding tube stripper plate tooling;Product is lifted on winding arbor extraction press with crane, adjusts position, deviates from product;It will lead Draw in cylinder mould tool lifting to supporting tool, clears up resin clast, wiped clean is spare;
(8) process: measurement cut lengths are that cutting benchmark is cut with right end, each product are cut into 3 guidings Cylinder;It is polished after the completion of cutting with tissue paper;
(9) it is put in storage: finished product inspection warehousing after passing will be completed the process.
Specific embodiment 1:
A kind of manufacture craft of guiding tube, comprising the following steps:
(1) HF10-12K fiber, EM301 resin Operational preparation: are got from warehouse;
(2) mold, tooling prepare: guiding tube mold, tooling are placed on specified die treatment area;Use 200mm*200mm Big cleaning calico dips acetone and wipes cylinder 2 times, each dosage 30-50ml, removes surface blot;Wrapping machine prepares: in advance It is placed with, is fixed in glue groove with PE film, adjust the length of wrapping machine working position, it is ensured that mold can be put into and can be fixed, mark Remember mold in the position of wrapping machine chuck, the mating silk mouth using 13mm internal diameter of wrapping machine;Mold placement: it using crane and hangs Guiding tube mold is mounted on wrapping machine by rope, and the cutting groove at barrel molds both ends with one circle of pressure sensitive adhesive tape fitting, prevents in advance Glue resin, which enters groove, when winding influences subsequent demoulding;
In this step, if mold, tooling dip hole sealing agent in mold cylinder for the first time in use, respectively with cleaning calico Surface, clip inner surface coat 3 times, each dosage 30-50ml, every minor tick 10-15min, are dipped later with cleaning calico de- Mould agent is dried after mould piece surface coats 3 times, each dosage 30-50ml, every minor tick 10-15min and last time is painted with At least 30min, the cleaning calico for dipping hole sealing agent and release agent cannot share;If mold, tooling are reused, need to only it divide Tu Fu not be release agent 2 times, each dosage 30-50ml;
(3) it dries yarn: taking 1 ingot yarn to erect and place in an oven, set oven temperature as 80 DEG C, keep the temperature 2-6 hour;
(4) match glue: wiped clean beaker dries;Glue is prepared according to the proportion of EM301 resin system, specially EM301R: EM301C: EM301A=100: 85: 1 ratio prepares glue, configures 1kg resin for the first time, after stirring 5min, It is stand-by to enter wrapping machine glue groove, subsequent can supplement every time as needed prepares 500-1000g glue, such by many experiments It is best with glue ratio effect;
(5) it winds: opening winding electromechanical source, open creel, manual mode;It entrys: 1 ingot yarn being baked is placed on winding On machine creel, yarn rod position is adjusted: yarn rod position being adjusted No. 2 or No. 3 tension positions, creel is then sequentially passed through, glue groove, leads Silk head, silk mouth, are finally fixed on guiding tube mold;Fiber is slowly pulled, while adjusting glue groove two sides dialing knob to make fiber Sufficiently infiltration ties up the fiber sufficiently infiltrated on guiding tube mold pole hole and spindle boundary position;The winding woven in advance Program is successively wound according to certain winding sequence;
This step notices that most interior and outermost spiral wound fiber needs sufficiently infiltration, fiber positive and negative two all infiltrating, Ensure that resin gel content is enough, is unlikely to the product after subsequent cure and starved phenomenon occur, and middle layer winding needs to control glue Content makes fiber treatment demifacet be soaked state by controlling spreading roller;
(6) rotation solidification: adjustment baking oven rotating tooling bracket to suitable position;Cooperated using crane by guiding tube mold It hangs oneself to load from wrapping machine and, be moved on supporting tool, recycle crane that guiding tube mold is lifted into baking oven rotation work It loads onto, installation mold, starts to rotate;Baking oven rises to 100 DEG C with the heating rate of 1-3 DEG C/min, small in 100-105 DEG C of heat preservation 2 When, 150 DEG C then are raised to the heating rate of 1-3 DEG C/min again, keeps the temperature 4 hours at 145-155 DEG C, rotation solidification has solidified Cheng Hou stops rotating, furnace cooling, and oven temperature is down to 70 DEG C hereinafter, baking oven can be removed mold;
(7) it demoulds: product being moved out of baking oven, is placed on supporting tool, remove clip;With grinder along envelope The cutting line of rabbet joint of head end cuts off product, and the network product of end socket part is deviate from, the resin clast of stack shell is cleared up;Winding arbor extraction press bayonet Position is installed by guiding tube stripper plate tooling;Product is lifted on winding arbor extraction press with crane, adjusts position, deviates from product;It will lead Draw in cylinder mould tool lifting to supporting tool, clears up resin clast, wiped clean is spare;
(8) process: measurement cut lengths are that cutting benchmark is cut with right end, each product are cut into 3 guidings Cylinder;It is polished after the completion of cutting with tissue paper;
(9) it is put in storage: finished product inspection warehousing after passing will be completed the process.
Specific embodiment 2
In winding step, the winding program woven in advance: spiral winding program, circumferential winding program, end ring is called Compensation program.
It is first positioned before operation spiral winding program: 1, first positioning Y-axis, on pole hole and spindle have a common boundary, circumferential direction winding 2-3 Circle, fixed winding initial position;2, X-axis is repositioned, records X axis coordinate at this time, and topmost mark in wrapping machine chuck vertical line. Second of spiral winding is equally wound since the coordinate value of this X-axis.
Circumferential direction winding notices that winding position and width, program are manually prepared.Since a mold can wind 3 guidings Tin, the position that a mold needs carry out circumferential winding shares at 12 (end ring is wound at 6, centre ring is wound at 6), circumferential direction winding By continuous whole winding design.End ring winding is by 10 layers of design, and intermediate ring winding is by 12 layers of design.Each circumferential direction winding position After the completion of circumferential direction winding, next winding position is transitted to using spiral winding, until all winding is completed for all circumferential positions.

Claims (5)

1. a kind of manufacture craft of guiding tube, which comprises the following steps:
(1) HF10-12K fiber, EM301 resin Operational preparation: are got from warehouse;
(2) mold, tooling prepare: guiding tube mold, tooling are placed on specified die treatment area;Remove surface blot;Winding Machine prepares;Mold placement: guiding tube mold is mounted on wrapping machine using crane and lifting rope;
(3) it dries yarn: taking 1 ingot yarn to erect and place in an oven, set oven temperature, held for some time;
(4) match glue: wiped clean beaker dries;Glue is prepared according to the proportion of EM301 resin system, configures 1kg tree for the first time It is stand-by to pour into wrapping machine glue groove for rouge;
(5) it winds: opening winding electromechanical source, open creel;It entrys: 1 ingot yarn being baked is placed on wrapping machine creel, adjust Then yarn rod position sequentially passes through creel, glue groove, conductive filament head, silk mouth, is finally fixed on guiding tube mold;It slowly pulls fine Dimension, while adjusting glue groove two sides dialing knob infiltrates fiber sufficiently, and the fiber sufficiently infiltrated is tied up in guiding tube mold pole hole On the position of spindle boundary;The winding program woven in advance is successively wound according to certain winding sequence;
(6) rotation solidification: adjustment baking oven rotating tooling bracket to suitable position;Using crane cooperation by guiding tube mold from twining It hangs oneself to load around machine and, be moved on supporting tool, recycle 3# crane that guiding tube mold is lifted into baking oven rotary tooling On, installation mold starts to rotate;Baking oven rises to 100 DEG C with the heating rate of 1-3 DEG C/min, keeps the temperature 2 hours at 100-105 DEG C, Then 150 DEG C are raised to the heating rate of 1-3 DEG C/min again, keep the temperature 4 hours at 145-155 DEG C, rotation solidification, solidification is completed Afterwards, it stops rotating, furnace cooling, oven temperature is down to 70 DEG C hereinafter, baking oven can be removed mold;
(7) it demoulds: product being moved out of baking oven, is placed on supporting tool, remove clip;With grinder along seal head end The cutting line of rabbet joint cut off product, the network product of end socket part is deviate from, the resin clast of stack shell is cleared up;Winding arbor extraction press bayonet position Guiding tube stripper plate tooling is installed;Product is lifted on winding arbor extraction press with 3# crane, adjusts position, deviates from product;It will guiding In cylinder mould tool lifting to supporting tool, resin clast is cleared up, wiped clean is spare;
(8) process: measurement cut lengths are that cutting benchmark is cut with right end, each product are cut into 3 guiding tubes;It cuts It is polished after the completion of cutting with tissue paper;
(9) it is put in storage: finished product inspection warehousing after passing will be completed the process.
2. the manufacture craft of guiding tube according to claim 1, which is characterized in that during mold, tooling prepare in step (2) Wrapping machine preparation process are as follows: be placed with, be fixed in glue groove with PE film in advance;Adjust the length of wrapping machine working position, it is ensured that mold It can be put into and can be fixed, mark die is in the position of wrapping machine chuck.
3. the manufacture craft of guiding tube according to claim 1, which is characterized in that step (3) dries yarn: setting oven temperature It is 80 DEG C, keeps the temperature 2-6 hour.
4. the manufacture craft of front and rear panel according to claim 1, which is characterized in that step (4), which is matched, presses EM301R in glue: EM301C: EM301A=100: 85: 1 ratio prepares glue, configures 1kg resin for the first time, after stirring 5min, pours into wrapping machine Glue groove is stand-by, and subsequent can supplement every time as needed prepares 500-1000g glue.
5. the manufacture craft of guiding tube according to claim 1, which is characterized in that first used after the completion of cutting in step (8) 80 mesh sand paper are polished flash, then are beaten with 400 mesh sand paper one time thin.
CN201811239118.4A 2018-10-24 2018-10-24 A kind of manufacture craft of guiding tube Withdrawn CN109397723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811239118.4A CN109397723A (en) 2018-10-24 2018-10-24 A kind of manufacture craft of guiding tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811239118.4A CN109397723A (en) 2018-10-24 2018-10-24 A kind of manufacture craft of guiding tube

Publications (1)

Publication Number Publication Date
CN109397723A true CN109397723A (en) 2019-03-01

Family

ID=65468826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811239118.4A Withdrawn CN109397723A (en) 2018-10-24 2018-10-24 A kind of manufacture craft of guiding tube

Country Status (1)

Country Link
CN (1) CN109397723A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112297465A (en) * 2020-09-02 2021-02-02 江苏新扬新材料股份有限公司 Large composite material rocket engine shell winding method
CN113085152A (en) * 2021-04-01 2021-07-09 湖南易净环保科技有限公司 Production method of electric power protection sleeve wound by fiber weaving
CN118399688A (en) * 2024-06-28 2024-07-26 常州碳科智能装备有限公司 Intelligent winding production line for end hoops of wind driven generator rotor

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102211405A (en) * 2010-04-09 2011-10-12 航天材料及工艺研究所 Process for forming light-weight and high-pressure gas bottle made of composite material
US20120009069A1 (en) * 2010-07-09 2012-01-12 Erik Grove-Nielsen Method to manufacture a component of a composite structure
CN103398240A (en) * 2013-06-09 2013-11-20 哈尔滨工业大学 Shape memory polymer variable-stiffness tube and manufacturing method thereof
WO2015018819A1 (en) * 2013-08-09 2015-02-12 ontec automation GmbH Device and method for producing a net-like thread arrangement, and net-like thread arrangement
CN104441683A (en) * 2014-12-12 2015-03-25 国网辽宁省电力有限公司大连供电公司 Manufacturing method of insulating cylinder and pipe fitting made from fiber composite material
CN204305120U (en) * 2015-01-09 2015-04-29 昆山恒源鑫模塑科技有限公司 Protective sleeve
US20150258740A1 (en) * 2014-03-12 2015-09-17 Hyundai Motor Company Linerless pressure vessel by centrifugal forced weaving and method for manufacturing thereof
CN105459412A (en) * 2015-12-19 2016-04-06 胜利油田新大管业科技发展有限责任公司 Fiber-wound glass fiber reinforced plastic pipe fitting manufacturing equipment and manufacturing process
CN107139502A (en) * 2017-07-04 2017-09-08 湖北山叶环保科技股份有限公司 A kind of fiberglass tank body winding die body and fiberglass tank body fiber winding method
CN108597697A (en) * 2018-06-21 2018-09-28 江苏恒神股份有限公司 A kind of glass fiber composite material insulator and preparation method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102211405A (en) * 2010-04-09 2011-10-12 航天材料及工艺研究所 Process for forming light-weight and high-pressure gas bottle made of composite material
US20120009069A1 (en) * 2010-07-09 2012-01-12 Erik Grove-Nielsen Method to manufacture a component of a composite structure
CN103398240A (en) * 2013-06-09 2013-11-20 哈尔滨工业大学 Shape memory polymer variable-stiffness tube and manufacturing method thereof
WO2015018819A1 (en) * 2013-08-09 2015-02-12 ontec automation GmbH Device and method for producing a net-like thread arrangement, and net-like thread arrangement
US20150258740A1 (en) * 2014-03-12 2015-09-17 Hyundai Motor Company Linerless pressure vessel by centrifugal forced weaving and method for manufacturing thereof
CN104441683A (en) * 2014-12-12 2015-03-25 国网辽宁省电力有限公司大连供电公司 Manufacturing method of insulating cylinder and pipe fitting made from fiber composite material
CN204305120U (en) * 2015-01-09 2015-04-29 昆山恒源鑫模塑科技有限公司 Protective sleeve
CN105459412A (en) * 2015-12-19 2016-04-06 胜利油田新大管业科技发展有限责任公司 Fiber-wound glass fiber reinforced plastic pipe fitting manufacturing equipment and manufacturing process
CN107139502A (en) * 2017-07-04 2017-09-08 湖北山叶环保科技股份有限公司 A kind of fiberglass tank body winding die body and fiberglass tank body fiber winding method
CN108597697A (en) * 2018-06-21 2018-09-28 江苏恒神股份有限公司 A kind of glass fiber composite material insulator and preparation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112297465A (en) * 2020-09-02 2021-02-02 江苏新扬新材料股份有限公司 Large composite material rocket engine shell winding method
CN113085152A (en) * 2021-04-01 2021-07-09 湖南易净环保科技有限公司 Production method of electric power protection sleeve wound by fiber weaving
CN118399688A (en) * 2024-06-28 2024-07-26 常州碳科智能装备有限公司 Intelligent winding production line for end hoops of wind driven generator rotor

Similar Documents

Publication Publication Date Title
CN109397723A (en) A kind of manufacture craft of guiding tube
CN103079812A (en) Method and apparatus for handling sheet blanks
CN108219244B (en) PE pipe and processing method thereof
CN105564016B (en) A kind of lace tablecloth synchronization gold blocking press
CN205553548U (en) Synchronous gilt lithography apparatus of flower bud silk tablecloth
CN106140556A (en) A kind of packing bag production line point gum machine
CN112058588A (en) Combined coating device and method applied to coating machine
CN205467866U (en) Gilding press based on synchronous gilt printing technology of flower bud silk tablecloth
US6663033B2 (en) Automatic winder doffing and re-tubing
CN203644473U (en) Enamelling machine continuous felt-changing device
CN109533427A (en) Aquatic products baling press
CN210362702U (en) Paper rod winder
CN207988437U (en) A kind of building painting device
CN207969748U (en) sole welt device
CN113351456A (en) Preparation method of double-resistance photoelectric protection film and double-resistance photoelectric protection film
CN109454893A (en) A kind of novel carbon fiber pipe processing technique
CN207684646U (en) A kind of subregion is detachable to unload the uniform retracting device of line automatically
CN107175836B (en) The production method of beam warper glass pressure roller
JP2011073809A (en) Wind-up method of web and method of manufacturing functional film
DE3346785C3 (en) Method of making a thick glass lens with an aspherical lens surface
CN113019840B (en) Manufacturing process of synthetic polymer waterproof coiled material
CN216173617U (en) Automatic coating equipment for graphite pins
CN214637755U (en) Be applied to wire rod coating unit of coating machine
CN216579752U (en) PTP aluminium foil printing device convenient to adjust
CN212449853U (en) Coating processing mechanism capable of uniformly controlling coating thickness

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190301