CN109371981A - Design method suitable for cyclotomy type combined foundation ditch support structure - Google Patents

Design method suitable for cyclotomy type combined foundation ditch support structure Download PDF

Info

Publication number
CN109371981A
CN109371981A CN201811449865.0A CN201811449865A CN109371981A CN 109371981 A CN109371981 A CN 109371981A CN 201811449865 A CN201811449865 A CN 201811449865A CN 109371981 A CN109371981 A CN 109371981A
Authority
CN
China
Prior art keywords
cyclotomy
foundation ditch
ring beam
type combined
design method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811449865.0A
Other languages
Chinese (zh)
Inventor
杨忠勇
廖少明
王坤
李兴峰
张磊
刘孟波
师印
杜俊黎
周文锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tongrong Civil Engineering Technology Co Ltd
63926 Troops Of Pla
Original Assignee
Shanghai Tongrong Civil Engineering Technology Co Ltd
63926 Troops Of Pla
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tongrong Civil Engineering Technology Co Ltd, 63926 Troops Of Pla filed Critical Shanghai Tongrong Civil Engineering Technology Co Ltd
Priority to CN201811449865.0A priority Critical patent/CN109371981A/en
Publication of CN109371981A publication Critical patent/CN109371981A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

The invention discloses a kind of design methods suitable for cyclotomy type combined foundation ditch support structure, stake diameter and spacing including determining fender post;Determine the insertion ratio of fender post;Determine the sectional dimension of ring beam;Determine the Equivalent Elasticity support coefficient K of ring beamh;Building enclosure horizontal displacement checking computations, ground settlement checking computations, overall stability checking computations, resistance to chloride ion checking computations are completed using Venus foundation pit software for calculation;The moment of flexure and shearing envelope diagram of building enclosure are determined using Venus foundation pit software for calculation;Space enclosing structure material and arrangement of reinforcement are determined according to the moment of flexure of building enclosure and shearing envelope diagram.Using a kind of Equivalent Elasticity support coefficient calculation method suitable for cyclotomy type ring beam provided by the invention, common foundation pit supporting construction can be converted by special-shaped foundation pit supporting construction and calculated, greatly reduce the design difficulty of such special-shaped foundation pit supporting construction.

Description

Design method suitable for cyclotomy type combined foundation ditch support structure
Technical field
The invention belongs to foundation pit enclosure structures to design calculating field, be related to a kind of suitable for cyclotomy type combined foundation ditch support knot The design method of structure.
Background technique
Two-dimentional Vertical elastic foundation beam model is the commonly used theoretical calculation model of rectangle foundation pit Design of Retaining Structure, Theoretical basis is mature, calculates feasibility height, and the foundation pit software for calculation based on the theoretical model is also widely used, such as opens Star's foundation pit software for calculation etc..It can also be calculated with the theoretical model using the cylindrical foundation pit of Circle beam supporting system, it is crucial Point is to calculate the equivalent stiffness of ring beam and retaining wall.
For the calculation method of the equivalent stiffness of cylindrical foundation pit ring beam, " port engineering continuous underground wall structure is designed and is applied Work regulation " it has been given in (JTJ303-2003).But for cyclotomy type foundation pit supporting construction, it there is no the equivalent of unification at present Calculating method of stiffness causes it not calculated using two-dimentional Vertical elastic foundation beam model directly.
Therefore, a kind of Equivalent Elasticity support coefficient calculation method suitable for cyclotomy type ring beam is needed at present.
Summary of the invention
The object of the invention is in order to overcome the shortcomings of the prior art, providing a kind of suitable for cyclotomy type combination base The design method of pit supporting construction.
The purpose of the present invention can be achieved through the following technical solutions:
Cyclotomy type combined foundation ditch support structure includes fender post and supporter, and supporter is in cyclotomy type combined foundation ditch support knot It is ring beam form inside structure, stull and diagonal brace, the vertical 3.0~5.0m of spacing of ring beam is set in two cyclotomy coupling parts.
When being designed to supporting construction,
First according to the design and calculation method of conventional foundation pit, primarily determine the stake diameter of foundation pit enclosure stake, spacing, insertion than with And the sectional dimension of ring beam;
The Equivalent Elasticity support coefficient of ring beam is then determined according to following step:
It chooses half structure and acquires the ring beam internal force diagram under Uniform Load by Force Method Equation;
The softness factor expression formula of ring beam is obtained by integral calculation, and then obtains the Equivalent Elasticity support coefficient table of ring beam Up to formula, the Equivalent Elasticity support coefficient of ring beam is acquired;
Then it using two-dimentional Vertical elastic foundation beam model, is enclosed in the input relevant parameter completion of Venus foundation pit software for calculation Protection structure horizontal displacement checking computations, ground settlement checking computations, overall stability checking computations and resistance to chloride ion checking computations, checking computations pass through then defeated Building enclosure envelope diagram of internal force out, and arrangement of reinforcement calculating is carried out accordingly.If checking computations do not pass through, change foundation pit enclosure stake stake diameter, The above-mentioned calculating step of the parameters repetition such as sectional dimension of spacing, insertion ratio and ring beam.
Compared with prior art, the invention has the characteristics that:
(1) cyclotomy type combined foundation ditch support structure three-dimensional computational problem is reduced to two-dimensional plane problem to calculate, greatly Cyclotomy type combined foundation ditch support structure design difficulty and calculation amount are reduced greatly.
(2) a kind of calculation method of Equivalent Elasticity support coefficient based on the support of Force Method Equation cyclotomy type ring beam is proposed, Calculate theoretical mature, calculation method simplicity.
(3) Equivalent Elasticity support coefficient can be modified according to the diameter ratio of two cyclotomy, applied widely.
Detailed description of the invention
Fig. 1 is single cyclotomy type foundation pit supporting construction plan view.
Fig. 2 is to wait big double cyclotomy type combined foundation ditch support structural plans figures.
Big double cyclotomy type combined foundation ditch support structural perspectives such as Fig. 3 is.
Fig. 4 is not wait big double cyclotomy type combined foundation ditch support structural plans figures.
Fig. 5 is the flow diagram of the design method suitable for cyclotomy type combined foundation ditch support structure;
Fig. 6 is the half structure and basic structure schematic diagram for calculating Equivalent Elasticity support coefficient.
Fig. 7 is to be detached from body schematic diagram for calculating the calculating of Equivalent Elasticity support coefficient.
Description of symbols
Cyclotomy type combined foundation ditch support structure 1, fender post 10, supporter 20, stull 21, diagonal brace 22.
Specific embodiment
Technical solution provided by the invention is described further below in conjunction with specific embodiment and its attached drawing.In conjunction under Face explanation, advantages and features of the invention will be apparent from.
As shown in Figures 1 to 4, cyclotomy type foundation pit supporting construction may include single cyclotomy type foundation pit supporting construction and cyclotomy type Combined foundation ditch support structure;Wherein, cyclotomy type combined foundation ditch support structure may include equal big double cyclotomy type combined foundation ditch branch again Protection structure and etc. not big double cyclotomy type combined foundation ditch support structures.
Further, cyclotomy type combined foundation ditch support structure 1 includes fender post 10 and supporter 20, and supporter 20 is in cyclotomy type It is ring beam form inside combined foundation ditch support structure 1, stull 21 and diagonal brace 22 is set in two cyclotomy coupling parts.
In the present invention, vertical 3.0~5.0m of spacing of ring beam (i.e. supporter).
In the present invention, the fender post is cast-in-situ bored pile, and can be selected according to the level of ground water situation of construction site Apply or do not apply water-stop curtain.
In the present invention, bottom of foundation ditch carries out back cover using cast-in-place concrete, and can select dry back cover according to site condition Or underwater back cover.
As shown in figure 5, the design method proposed by the present invention suitable for cyclotomy type combined foundation ditch support structure, including it is as follows Process:
(1) stake diameter, spacing and the insertion ratio of foundation pit enclosure stake are determined, and determines the sectional dimension (b × h) of ring beam;
Firstly, determine foundation pit geometry and size according to requirements, and according to the design and calculation method of conventional foundation pit, Primarily determine stake diameter, the spacing, the sectional dimension of insertion ratio and ring beam of foundation pit enclosure stake.
(2) the Equivalent Elasticity support coefficient K of ring beam is determinedh
(2.1) it chooses half structure and acquires the ring beam internal force diagram under Uniform Load by Force Method Equation;
The unknown counter-force in statically indeterminate structure is acquired by following Force Method Equations (1), and acquires the ring of structure by formula (2) Beam internal force diagram;
Wherein,
X1、X2: Force Method Equation fundamental unknown variables;
δij: basic structure is in unit force XjAlong X under=1 independent roleiDisplacement (the i=1,2 in direction;J=1,2);
ΔiP: basic structure is under external load independent role along XiThe displacement (i=1,2) in direction;
It is basic structure respectively in unit force XiMoment of flexure, shearing, axle power point under=1 independent role Cloth (i=1,2);
M(α)q、Q(α)q、N(α)qIt is that moment of flexure, shearing, axle power of the basic structure under external load independent role are distributed respectively;
M (α), Q (α), N (α) are that moment of flexure, shearing, axle power of the former half structure under external load independent role are distributed respectively;
(2.2) the softness factor expression formula of ring beam is calculated by integral formula (3), and then obtains the equivalent bullet of ring beam Property support coefficient expression formula;
It is acquired by following integral formulas (3) in α0Place acts on the radial deformation δ that a unit force generates, then the equivalent bullet of ring beam Property support coefficient Kh=1/ δ.
Wherein,
δ: former half structure is in α0Place acts on the radial deformation that a unit force generates;
Respectively basic structure is in α0Place acts on moment of flexure, the axle power, shearing point that a unit force obtains Cloth;I: ring beam cross sectional moment of inertia can pass throughIt calculates, bh is the sectional dimension of ring beam;
E: modulus of elasticity of concrete;
G: concrete shearing modulus;
A: ring beam area of section;
R: Circle beam supporting system diameter;
K: the coefficient related with cross sectional shape quoted because shearing stress is uniform along cross-sectional distribution has k for rectangular section =1.2;
(3) using two-dimentional Vertical elastic foundation beam model, inputted in Venus foundation pit software for calculation fender post stake diameter, The Equivalent Elasticity support coefficient K for the ring beam being calculated in spacing, insertion ratio and step (2.2)h, it is horizontal to carry out building enclosure Checking Displacement, ground settlement checking computations, overall stability checking computations, resistance to chloride ion checking computations, checking computations, which pass through, thens follow the steps (4), Checking computations do not pass through the ginsengs such as the stake diameter of then return step (1) change foundation pit enclosure stake, spacing, the sectional dimension of insertion ratio and ring beam It counts and repeats the above steps;
Checking computations can reduce fender post spacing by increasing stake diameter, insertion ratio not by illustrating supporting construction insufficient rigidity Or one or more of sectional dimension for increasing ring beam is to improve rigidity.
(4) moment of flexure and shearing envelope diagram of building enclosure are determined using Venus foundation pit software for calculation;
(5) space enclosing structure material and arrangement of reinforcement are determined according to the moment of flexure of building enclosure and shearing envelope diagram.
The present invention mainly calculates support equivalent stiffness, Internal force of support structure, after calculating Internal force of support structure, arrangement of reinforcement meter It calculates identical as ordinary construction.
Further, step (2) KhCalculated value be only applicable to the identical situation of two cyclotomy type diameters, when two cyclotomy types It, need to be to K when diameter differencehIt is modified, correction value Kh'=mKh, m carries out value as follows:
When another ratio r cut diameter of a circle and calculate cyclotomy diameter=3, m takes 0.6, when 1 < r < 3, by linear interpolation Carry out value;As r=0.3, m takes 1.6, when 0.3 < r < 1, carries out value by linear interpolation.
The Equivalent Elasticity support coefficient K of ring beam described in 6 pairs of steps (2) with reference to the accompanying drawinghCalculation method make into one Walk explanation.
As shown in Figure 6 and Figure 7, the half structure for calculating Equivalent Elasticity support coefficient is secondary statically indeterminate structure, is selected X1、X2For two unknown counter-forces of basic structure, X1、X2It can be obtained by solve system of equation (1).
Wherein, coefficient δ11、δ12、δ21、δ22、Δ1P、Δ2PIt can be acquired by formula (4) (5).
Wherein,
Q: the evenly load value on ring beam is acted on;
θ: the central angle size of the non-circular arc segment section of half structure;
L: the non-arc section length of half structure;
Acquire X1、X2Afterwards, structural internal force M (α), N (α), Q (α) can be acquired according to formula (2), in which:
Finally, being acquired according to formula (3) in α0Place acts on the radial deformation δ that a unit force generates, then Kh=1/ δ.
It, need to be to K for not equal big double cyclotomy type combined foundation ditchhIt is modified, Kh'=mKh, m taken as follows Value:
d2/d1When=1, m=1.0, d2/d1When=3, m=0.6,1 < d2/d1When < 3, value is carried out by linear interpolation;d2/d1 When=0.3, m=1.6,0.3 < d2/d1When < 1.0, value is carried out by linear interpolation.
Foregoing description is only the description to present pre-ferred embodiments, is not any restriction to the scope of the invention.Appoint Any change or modification what those skilled in the art makes according to the technology contents of the disclosure above should all regard For equivalent effective embodiment, the range of technical solution of the present invention protection is belonged to.

Claims (9)

1. a kind of design method suitable for cyclotomy type combined foundation ditch support structure, it is characterised in that: the cyclotomy type combines base Pit supporting construction includes fender post and supporter, and the supporter is ring beam shape in cyclotomy type combined foundation ditch support inside configuration Stull and diagonal brace is arranged in two cyclotomy coupling parts in formula, the supporter;
The design method includes at least following procedure:
(1) stake diameter, spacing and the insertion ratio of foundation pit enclosure stake are determined, and determines the sectional dimension of ring beam;
(2) the Equivalent Elasticity support coefficient K of ring beam is determinedh
(3) building enclosure horizontal displacement checking computations, ground settlement checking computations, overall stability are completed using Venus foundation pit software for calculation Checking computations, resistance to chloride ion checking computations;
(4) moment of flexure and shearing envelope diagram of building enclosure are determined using Venus foundation pit software for calculation;
(5) space enclosing structure material and arrangement of reinforcement are determined according to the moment of flexure of building enclosure and shearing envelope diagram.
2. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 1, feature exist In: the fender post is cast-in-situ bored pile, and can select to apply or do not apply sealing according to the level of ground water situation of construction site Curtain.
3. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 1, feature exist In: the vertical spacing of the supporter is 3.0~5.0m.
4. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 1, feature exist In: bottom of foundation ditch carries out back cover using cast-in-place concrete, and can select dry back cover or underwater back cover according to site condition.
5. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 1, feature exist In: the Equivalent Elasticity support coefficient K of step (2) described ring beamhCalculating steps are as follows:
(2.1) it chooses half structure and acquires the ring beam internal force diagram under Uniform Load by Force Method Equation;
(2.2) the softness factor expression formula of ring beam is obtained by integral calculation, and then obtains the Equivalent Elasticity support coefficient of ring beam Expression formula.
6. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 5, feature exist In: in step (2.1) the unknown counter-force in statically indeterminate structure is acquired by following Force Method Equations (1), and acquired by formula (2) Structural internal force figure;
Wherein,
X1、X2: Force Method Equation fundamental unknown variables;
δij: basic structure is in unit force XjAlong X under=1 independent roleiDisplacement (the i=1,2 in direction;J=1,2);
ΔiP: basic structure is under external load independent role along XiThe displacement (i=1,2) in direction;
It is basic structure respectively in unit force XiMoment of flexure under=1 independent role,
Shearing, axle power distribution (i=1,2);
M(α)q、Q(α)q、N(α)qIt is moment of flexure of the basic structure under external load independent role respectively, cuts
Power, axle power distribution;
M (α), Q (α), N (α) be respectively moment of flexure of the former half structure under external load independent role, shearing,
Axle power distribution.
7. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 6, feature exist In: coefficient δ11、δ12、δ21、δ22、Δ1P、Δ2PIt is acquired by following formula (4) (5);
Wherein,
Q: the evenly load value on ring beam is acted on;
θ: the central angle size of the non-circular arc segment section of half structure;
L: the non-arc section length of half structure.
8. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to claim 7, feature exist In: in step (2.2), acquired by following integral formulas (3) in α0Place acts on the radial deformation δ that a unit force generates, then ring The Equivalent Elasticity support coefficient K of beamh=1/ δ.
9. a kind of design method suitable for cyclotomy type combined foundation ditch support structure according to any one of claims 1 to 8, It is characterized in that: the KhCalculated value be only applicable to the identical situation of two cyclotomy type diameters need to be to K when the two diameter differenceh It is modified, correction value Kh'=mKh, m carries out value as follows:
When another ratio r cut diameter of a circle and calculate cyclotomy diameter=3, m takes 0.6, when 1 < r < 3, by linear interpolation progress Value;As r=0.3, m takes 1.6, when 0.3 < r < 1, carries out value by linear interpolation.
CN201811449865.0A 2018-11-30 2018-11-30 Design method suitable for cyclotomy type combined foundation ditch support structure Pending CN109371981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811449865.0A CN109371981A (en) 2018-11-30 2018-11-30 Design method suitable for cyclotomy type combined foundation ditch support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811449865.0A CN109371981A (en) 2018-11-30 2018-11-30 Design method suitable for cyclotomy type combined foundation ditch support structure

Publications (1)

Publication Number Publication Date
CN109371981A true CN109371981A (en) 2019-02-22

Family

ID=65375271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811449865.0A Pending CN109371981A (en) 2018-11-30 2018-11-30 Design method suitable for cyclotomy type combined foundation ditch support structure

Country Status (1)

Country Link
CN (1) CN109371981A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114970016A (en) * 2022-05-13 2022-08-30 安徽省城建设计研究总院股份有限公司 Pi-shaped support inclined strut displacement calculation method, Pi-shaped support design method and support method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009197503A (en) * 2008-02-22 2009-09-03 Ksk:Kk Support material for sheet pile
CN101615212A (en) * 2009-07-28 2009-12-30 武汉理工大学 A kind of campshed-Nei Zhi supporting system simplified design calculation method
CN104947681A (en) * 2015-07-07 2015-09-30 中建三局第二建设工程有限责任公司 Super large super deep basement ground pit construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009197503A (en) * 2008-02-22 2009-09-03 Ksk:Kk Support material for sheet pile
CN101615212A (en) * 2009-07-28 2009-12-30 武汉理工大学 A kind of campshed-Nei Zhi supporting system simplified design calculation method
CN104947681A (en) * 2015-07-07 2015-09-30 中建三局第二建设工程有限责任公司 Super large super deep basement ground pit construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
胡兴国,吴莹: "《结构力学》", 28 February 2007, 武汉理工大学出版社 *
马海旭: "深基坑双半圆环形支撑体系承载特性与结构优化研究", 《中国优秀硕士学位论文全文库》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114970016A (en) * 2022-05-13 2022-08-30 安徽省城建设计研究总院股份有限公司 Pi-shaped support inclined strut displacement calculation method, Pi-shaped support design method and support method

Similar Documents

Publication Publication Date Title
CN106815424B (en) Design method and system for cast-in-place reinforced concrete pipe ditch
CN107590357B (en) Method for judging stability of tunnel in different construction stages
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN106088102A (en) Lattice combined steel plate pile cement-soil composite pile and construction method thereof
CN105350639B (en) A kind of facade intersects grid structure peripheral frame and its installation method
CN103628572A (en) Project beam-column joint for reverse building method
CN109371981A (en) Design method suitable for cyclotomy type combined foundation ditch support structure
CN110468849B (en) Method for treating surface height difference of support supporting system in ultra-deep foundation pit in mountain urban area
CN102979102A (en) Open-excavation sequential-operation deformation-control design method for deep and large circular foundation ditch in soft soil areas
CN207267986U (en) A kind of foundation pit subregion supporting construction for exempting from isolation structure
CN203080536U (en) Foundation pit guard structure
CN103526782B (en) Diaphragm wall body of wall horizontal displacement monitoring method
CN104005414A (en) Method for constructing large-diameter reinforced concrete cast-in-place pile supporting stand column
CN116150862A (en) Automatic modeling method for dykes and dams, electronic equipment and computer readable storage medium
CN114197757B (en) BIM-based tree column node reinforcement arrangement structure and construction method
CN205591202U (en) A reinforcing pile for soft soil foundation
CN106759373B (en) A kind of calculation method of long-short pile combined support structure
CN206220558U (en) Old City Wall door opening ruggedized construction
CN106088105A (en) A kind of assembled foundation ditch Bracing Systems
CN110528536A (en) A kind of combined support structure for the non-isometrical bicircular arcs foundation pit in stratum that makes a variation
CN207362855U (en) A kind of ultra-deep foundation pit supporting construction
CN111046468A (en) Underground comprehensive pipe gallery anti-seismic design method
CN204252608U (en) Assembling movable pond
CN206245466U (en) A kind of girder steel without diaphragm plate and steel pipe column rigid joint
CN114622545A (en) Closed-width underground continuous wall reinforcement cage matching manufacturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222