CN109365870A - A kind of vertical drilling construction method - Google Patents

A kind of vertical drilling construction method Download PDF

Info

Publication number
CN109365870A
CN109365870A CN201811515357.8A CN201811515357A CN109365870A CN 109365870 A CN109365870 A CN 109365870A CN 201811515357 A CN201811515357 A CN 201811515357A CN 109365870 A CN109365870 A CN 109365870A
Authority
CN
China
Prior art keywords
workbench
rod
connecting rod
double leval
support rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811515357.8A
Other languages
Chinese (zh)
Inventor
贾成
贾成一
石晓冬
杨艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201811515357.8A priority Critical patent/CN109365870A/en
Publication of CN109365870A publication Critical patent/CN109365870A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • B25H1/0035Extensible supports, e.g. telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The present invention relates to a kind of vertical drilling construction methods, the auxiliary device of vertical drilling is made first, including double leval jib lifting device, workbench, baffle, belt, triatic stay, hand rod, the double leval jib lifting device includes column, upper connecting rod, lower link, support rod, base plate, pin shaft, the column of double leval jib lifting device, upper connecting rod, lower link and support rod are connected by pin shaft, and guarantee when being moved upwardly or downwardly upper connecting rod, support rod is in vertical direction and thereon, lower linkage, the lower end of column is connected on base plate, the workbench is mounted on the upper end of support rod, and surface is equipped with baffle on it;Triatic stay is connected to the lower end of support rod;Hand rod is connected to the upper end of upper connecting rod, its middle part is equipped with control switch, and electric drill is first fixed on workbench with belt by when construction, move the device into required boring sites in curing it is lower to, pressing hand rod rises workbench, presses control switch afterwards in place and completes boring work.

Description

A kind of vertical drilling construction method
Technical field
The present invention relates to a kind of vertical drilling construction methods, belong to building engineering construction field.
Background technique
In Building Construction especially when carrying out decorative engineering construction, it will usually encounter floor indoors The case where drilling on plate, structure soffit, in the prior art, when drilling usually require first to set up a rack platform, then Construction personnel is upper according to said method to construct to bore operation is carried out on the platform taken, because needing construction personnel station hand on platform It holds electric drill and carries out high altitude operation, large labor intensity, construction efficiency is low.
Summary of the invention
The present invention is in view of the shortcomings of the prior art, propose a kind of a kind of easy to operate, vertical drilling construction party easy to use Method.
The technical problem to be solved in the present invention is that providing a kind of vertical drilling construction method, vertical drilling is made first Auxiliary device, described device include double leval jib lifting device, workbench, baffle, belt, triatic stay, hand rod, and described four Connecting rod lifting device includes column, upper connecting rod, lower link, support rod, base plate, pin shaft, lower end and institute in the support rod It respectively bores there are two pitch-row identical circular hole the upper end for stating column;It is connected on base plate in the lower end of the column, described vertical The lower end of column is equipped with reinforcing rod, and the other end of the reinforcing rod is connected on base plate;It is connected below the base plate There are 2 universal wheels;A circular hole is respectively bored at the both ends of the lower link, is respectively drilled in one end of the upper connecting rod and medium position One circular hole, and guarantee that the pitch-row of two circular holes is identical with the pitch-row of two circular holes on the lower link in the upper connecting rod;Institute Column, upper connecting rod, lower link and the support rod for stating double leval jib lifting device are connected by pin shaft corresponding with opened circular hole thereon Integrally, and guarantee when the top for pressing the upper connecting rod with hand is moved upwardly or downwardly, the support rod exists Vertical direction carries out downward or upward movement;The workbench is mounted on the upper of the support rod of 2 double leval jib lifting devices End is connected with stiffened panel at workbench bottom both ends and it is connected with double leval jib lifting device, in the work The upper surface of platform is equipped with baffle;2 belts are respectively connected in the upper surface of the workbench and the medial surface of baffle;It is described Triatic stay is connected to the lower end of the support rod of 2 double leval jib lifting devices;The hand rod is connected to 2 double leval jibs and promotes dress The upper end for the upper connecting rod set, and control switch is installed in the middle part of hand rod;Electric drill is first placed on workbench when construction Above and with belt by electric drill fixation, then control switch is connected with conducting wire with the electric drill, keeps control switch controllable Vertical drilling auxiliary device is finally moved to the lower to pressing hand rod downwards with hand of required boring sites in curing by the movement of electric drill Increase workbench, control switch is pressed after being moved to required boring sites in curing and completes boring work.
Beneficial good effect of the invention: operation of the present invention is simple, constructs convenient and efficient, can effectively improve high-altitude The construction efficiency of vertical drilling, labor intensity are low.
Detailed description of the invention
Fig. 1: assembling schematic diagram of the present invention
Fig. 2: double leval jib lifting device structural schematic diagram
Specific embodiment
Embodiment one: referring to Fig. 1, Fig. 2, the present invention relates to a kind of vertical drilling construction methods, first production vertical drilling Auxiliary device, described device includes double leval jib lifting device 1, workbench 2, baffle 3, belt 4, triatic stay 7, hand rod 8, the double leval jib lifting device 1 includes column 1-1, upper connecting rod 1-5, lower link 1-6, support rod 1-7, base plate 1-3, pin Axis 1-8 is respectively bored in the lower end of the support rod 1-7 and the upper end of the column 1-1 there are two the identical circular hole of pitch-row;Described The lower end of column 1-1 is connected on base plate 1-3, is equipped with reinforcing rod 1-2, the reinforcing rod in the lower end of the column 1-1 The other end of 1-2 is connected on base plate 1-3;2 universal wheel 1-4 are connected with below the base plate 1-3, described A circular hole is respectively bored at the both ends of lower link 1-6, is respectively drilled with a circular hole in one end of the upper connecting rod 1-5 and medium position, and Guarantee that the pitch-row of upper two circular holes of the upper connecting rod 1-5 is identical with the pitch-row of upper two circular holes of the lower link 1-6;Described four Column 1-1, upper connecting rod 1-5, lower link 1-6 and the support rod 1-7 of connecting rod lifting device 1 pass through corresponding with opened circular hole thereon Pin shaft 1-8 be connected, and guarantee when being moved upwardly or downwardly with the top that hand presses the upper connecting rod 1-5 When, the support rod 1-7 carries out downward or upward movement in vertical direction;The workbench 2 is mounted on 2 double leval jibs The upper end of 1 support rod 1-7 of lifting device is connected with stiffened panel 6 for itself and double leval jib at the 2 bottom both ends of workbench Lifting device 1 is connected, and is equipped with baffle 3 in the upper surface of the workbench 2;In the upper surface of the workbench 2 2 belts 4 are respectively connected with the medial surface of baffle 3;The triatic stay 7 is connected to the support rod of 2 double leval jib lifting devices 1 The lower end of 1-7;The hand rod 8 is connected to the upper end of the upper connecting rod 1-5 of 2 double leval jib lifting devices 1, and in hand rod 8 Middle part is equipped with control switch 9;First electric drill 5 is placed on workbench 2 and with belt 4 by 5 fixation of electric drill when construction, Control switch 9 is connected with conducting wire with the electric drill 5 then, control switch 9 is made to can control the movement of electric drill 5, it finally will be vertical The auxiliary device of drilling be moved to required boring sites in curing it is lower to, pressed downwards with hand hand rod 8 make workbench 2 rise, when The completion boring work of control switch 9 is pressed after being moved to required boring sites in curing.
The above shows and describes the basic principle, main features and advantages of the invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, under the premise of not departing from essence spirit of the invention and range, various changes and improvements may be made to the invention, Nailing equipment can also be placed on workbench as described in the invention and completes the vertical nailing work in high-altitude, these change and change Into both falling in the range of claimed invention.The claimed scope of the invention is by appended claims and its equivalent Object defines.

Claims (3)

1. a kind of vertical drilling construction method, makes the auxiliary device of vertical drilling first, described device includes that double leval jib is promoted Device (1), workbench (2), baffle (3), belt (4), triatic stay (7), hand rod (8), the double leval jib lifting device It (1) include column (1-1), upper connecting rod (1-5), lower link (1-6), support rod (1-7), base plate (1-3), pin shaft (1-8), The lower end of the support rod (1-7) and the upper end of the column (1-1) are respectively bored there are two the identical circular hole of pitch-row;In the column The lower end of (1-1) is connected on base plate (1-3), is equipped with reinforcing rod (1-2) in the lower end of the column (1-1), described to add The other end of strong bar (1-2) is connected on base plate (1-3);A circular hole is respectively bored at the both ends of the lower link (1-6), in institute The one end and medium position for stating upper connecting rod (1-5) are respectively drilled with a circular hole, and guarantee upper two circular holes of the upper connecting rod (1-5) Pitch-row is identical with the pitch-row of upper two circular holes of the lower link (1-6);The column (1-1) of the double leval jib lifting device (1), on Connecting rod (1-5), lower link (1-6) and support rod (1-7) are linked to be one by pin shaft (1-8) corresponding with opened circular hole thereon Body, and guarantee the support rod when the top for pressing the upper connecting rod (1-5) with hand is moved upwardly or downwardly (1-7) carries out downward or upward movement in vertical direction;The workbench (2) is mounted on 2 double leval jib lifting devices (1) upper end of support rod (1-7) is connected with stiffened panel (6) for itself and double leval jib promotion at the workbench (2) bottom both ends Device (1) is connected, and is equipped with baffle (3) in the upper surface of the workbench (2);In the upper of the workbench (2) The medial surface of surface and baffle (3) respectively connects 2 belts (4);The triatic stay (7) is connected to 2 double leval jib lifting devices (1) lower end of support rod (1-7);The hand rod (8) is connected to the upper connecting rod (1-5) of 2 double leval jib lifting devices (1) Upper end, and control switch (9) are installed in the middle part of hand rod (8);Electric drill (5) is first placed on workbench (2) when construction It goes up and uses belt (4) by electric drill (5) fixation, control switch (9) is connected with conducting wire with the electric drill (5) then, makes to control System switch (9) can control the movement of electric drill (5), and finally the auxiliary device of vertical drilling is moved under required boring sites in curing To pressing hand rod (8) downwards with hand rises workbench (2), presses control switch after being moved to required boring sites in curing (9) boring work is completed.
2. a kind of vertical drilling construction method as described in claim 1, it is characterized in that: below the base plate (1-3) It is connected with 2 universal wheels (1-4).
3. a kind of vertical drilling construction method as claimed in claim 1 or 2, it is characterized in that: can also on the workbench (2) The vertical nailing work in high-altitude is completed to place nailing equipment.
CN201811515357.8A 2018-12-11 2018-12-11 A kind of vertical drilling construction method Pending CN109365870A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811515357.8A CN109365870A (en) 2018-12-11 2018-12-11 A kind of vertical drilling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811515357.8A CN109365870A (en) 2018-12-11 2018-12-11 A kind of vertical drilling construction method

Publications (1)

Publication Number Publication Date
CN109365870A true CN109365870A (en) 2019-02-22

Family

ID=65373316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811515357.8A Pending CN109365870A (en) 2018-12-11 2018-12-11 A kind of vertical drilling construction method

Country Status (1)

Country Link
CN (1) CN109365870A (en)

Similar Documents

Publication Publication Date Title
CN201664775U (en) Long-distance drilling device of top plate
CN206677242U (en) A kind of boring device of top plate
CN109365873A (en) It is a kind of to utilize double leval jib transmission device overhead horizontal drilling construction method
CN204736279U (en) Plank flattens, drilling equipment
CN107790787A (en) The lengthening support that a kind of packaged type electric drill drills vertically upward
CN206088957U (en) Shear fork type lifting device
CN109365870A (en) A kind of vertical drilling construction method
CN109365875A (en) A kind of overhead horizontal drilling construction method
CN201664847U (en) Device for remotely drilling and riveting on top board
CN207990051U (en) One kind is removable can to fix mining lifting support
CN213827159U (en) A simple drilling device for ceiling hanging holes
CN207142723U (en) A kind of multi-functional jack base
CN205057125U (en) Indoor roof bar planting drilling tool
CN206319628U (en) One kind building assembled wallboard fitting machine
CN202528152U (en) Vertical operation rack
CN204689544U (en) Transformer device multi-direction synthetic lifting appliance
CN210791563U (en) Lever device for drilling roof hanger hole in building
CN212526172U (en) Electric hammer operation extension operating device
CN204912844U (en) A bracket for roof drilling
CN208645241U (en) Moving lift type positions drilling aid
CN207161006U (en) A kind of automatic workover rig rail mounted travelling block
CN208514617U (en) A kind of perforating device for non-woven fabrics
CN107473089A (en) A kind of building curtain wall plate installation and transportation device
CN206824913U (en) One kind, which is ascended a height, assembles device
CN205466211U (en) Electronic hydraulic manipulator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190222

WD01 Invention patent application deemed withdrawn after publication