CN109356231A - High-building construction water water-saving system - Google Patents
High-building construction water water-saving system Download PDFInfo
- Publication number
- CN109356231A CN109356231A CN201811363518.6A CN201811363518A CN109356231A CN 109356231 A CN109356231 A CN 109356231A CN 201811363518 A CN201811363518 A CN 201811363518A CN 109356231 A CN109356231 A CN 109356231A
- Authority
- CN
- China
- Prior art keywords
- water
- water tank
- construction
- tank
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/04—Domestic or like local pipe systems
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B5/00—Use of pumping plants or installations; Layouts thereof
- E03B5/02—Use of pumping plants or installations; Layouts thereof arranged in buildings
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/09—Component parts or accessories
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The present invention relates to a kind of high-building construction water water-saving system, construction water is piped to the water tank of construction site from water spot benefit of plugging into;Building top high building is provided with high water tank;A set of water supply pump group is set at tank outlet;Water supply pump group pipeline upper end is connected with high water tank;Flowing water Valve is arranged in high water tank bottom;Each floor is respectively provided with floor main valve;Flowing water Valve is connected by pipeline with floor main valve;Construction water is plugged into from floor main valve;It interconnects in low side in main vibration means for main pipe for supplying water road.High-building construction of the present invention water water-saving system, pressure of supply water are replaced by high water tank, can stable water supply pressure;Multiple high water tank series connection and main water supply pipe are in parallel, and catch pit is increased in pipeline low side, precipitating essence is carried out to sewage, it improves and uses water use efficiency, to guarantee peak period construction water amount and hydraulic pressure, high-building construction water waste, insufficient pressure can be effectively reduced or phenomenon of stopping work caused by cutting off the water.
Description
Technical field
The present invention relates to high-rise China Democratic National Construction Association's construction waters to use field, especially suitable skyscraper peak period construction and decoration work
Journey, in particular to a kind of high-building construction water water-saving system.
Background technique
With the continuous development of architectural engineering technology, demand of more and more cities to skyscraper increasingly increases, and
Present cost of labor constantly rises, and the increase of construction cost caused by shut-down is more increasing than regular meeting.
During high-building construction water, conventional way is the water pump using the high lift of big flow directly to each
Floor supplies water, line end hydraulic pressure is insufficient when this way often will cause the water use peak phase and the construction of part floor slowly or
It stops work, Many times, which use, to solve this problem increases water pump quantity, investment a larger increase construction cost of such equipment, simultaneously
Also it will increase the probability that water pump goes wrong, maintenance cost also correspondinglys increase.
Summary of the invention
In view of the deficiency of the prior art, the present invention provides one kind and makes full use of existing resource, reduces water system
The high-building construction of investment water water-saving system.
The technical solution used in the present invention is:
A kind of high-building construction water water-saving system,
Construction water is piped to the water tank of construction site from water spot benefit of plugging into;
Building top high building is provided with high water tank;
A set of water supply pump group is set at tank outlet;
Water supply pump group pipeline upper end is connected with high water tank;
Flowing water Valve is arranged in high water tank bottom;
Each floor is respectively provided with floor main valve;
Flowing water Valve is connected by pipeline with floor main valve;
Construction water is plugged into from floor main valve;
It interconnects in low side in main vibration means for main pipe for supplying water road.
The water supply pump group, which is taken, to be connected in parallel.
The water tank quantity is 2-10 group;Reserved opening is arranged in water tank bottom;Adjacent water tank by the way of being sequentially connected in series into
Row connection.
The high water tank is provided with level detecting device;
Pump group control system is connected with the level detecting device in high water tank.
The pump group that automatically turns in high water tank water level deficiency supplies water;
High water tank is to build existing fire water box or set water tank certainly.
High water tank on the high building is connected by pipeline.
The setting of water supply pipe low side is used to collect the catch pit of the waste water due to generating when main line is revealed or is vented.
The present invention compared with the prior art the utility model has the advantages that
High-building construction of the present invention water water-saving system, pressure of supply water are replaced by high water tank, can stable water supply pressure;It is multiple
High water tank series connection and main water supply pipe are in parallel, and increase catch pit in pipeline low side and carry out precipitating essence to sewage, improve
High-building construction water waste, pressure can be effectively reduced to guarantee peak period construction water amount and hydraulic pressure with water use efficiency
Insufficient or phenomenon of stopping work caused by cutting off the water.
High-building construction of the present invention water water-saving system makes full use of existing resource, reduces water system investment;It is high-order
Water tank water level detector signal feeds back to pump group control system and automatically turns on water system, stablizes main pipeline pressure of supply water;It catchments
Hole setting in water tank group or using existing water tank collection and purification and recycles to reach water-saving result.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of high-building construction water water-saving system of the present invention.
Main component symbol description in attached drawing:
In figure:
1, water tank 2, high water tank
3, water supply pump group 4, floor main valve
5, it plugs into water spot.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1 it is found that a kind of high-building construction water water-saving system,
Construction water is piped to the water tank 1 of construction site from water spot benefit of plugging into;
Building top high building is provided with high water tank 2;
A set of water supply pump group 3 is set at tank outlet;
3 pipeline upper end of water supply pump group is connected with high water tank 3;
Flowing water Valve is arranged in 3 bottom of high water tank;
Each floor is respectively provided with floor main valve 4;
Flowing water Valve is connected by pipeline with floor main valve;
Construction water is plugged into from floor main valve;
It interconnects in low side in main vibration means for main pipe for supplying water road.
Valve can be closed in time when individual floor water delivery management breakages to guarantee the continuity of other floor water, it is high-order
Water tank can guarantee that water pressure is stablized in water supply line when having.
The lift of water supply pump group, which can meet, is transported to construction water from high water tank from Water-storage tank.
Flow is selected according to construction water peak period water;
Use the water period can appropriate close portion wheel cylinder group different;
Floor construction water will not cause when something goes wrong the problem of stopping work because of single water tank or pipeline.
The water supply pump group, which is taken, to be connected in parallel.
The water tank quantity is 2-10 group;Reserved opening is arranged in water tank bottom;Adjacent water tank by the way of being sequentially connected in series into
Row connection.
So that Water-storage tank quantity can be quicklyd increase when water consumption increase.
The high water tank is provided with level detecting device;
Pump group control system is connected with the level detecting device in high water tank.
The pump group that automatically turns in high water tank water level deficiency supplies water;
High water tank is to build existing fire water box or set water tank certainly.
High water tank is plugged into a little as building decoration engineering water.
High water tank on the high building is connected by pipeline.It can be expanded at any time when multiple high building spacing are smaller.
The setting of water supply pipe low side is used to collect the catch pit of the waste water due to generating when main line is revealed or is vented.It is useless
Water, by the utilization rate of water, into Water-storage tank, can be improved through pipeline, reduces construction cost after precipitation and purification.
High-building construction of the present invention water water-saving system, pressure of supply water are replaced by high water tank, can stable water supply pressure;
Multiple high water tank series connection and main water supply pipe are in parallel, and increase catch pit in pipeline low side and carry out precipitating essence to sewage,
Improve and use water use efficiency, to guarantee peak period construction water amount and hydraulic pressure, can effectively reduce high-building construction water waste,
Insufficient pressure or phenomenon of stopping work caused by cutting off the water.
High-building construction of the present invention water water-saving system makes full use of existing resource, reduces water system investment;It is high-order
Water tank water level detector signal feeds back to pump group control system and automatically turns on water system, stablizes main pipeline pressure of supply water;It catchments
Hole setting in water tank group or using existing water tank collection and purification and recycles to reach water-saving result.
Skyscraper building decoration engineering is in major structure of construction mostly and has bound, and inside builds, plasters, floor lid
Face and wall brick and ground tile paving need a large amount of construction waters, largely unstable with hydraulic pressure during water in order to solve the problems, such as to construct, this
Invention proposes the supply source using building high building fire-proof water tank (if any otherwise needing to set water tank certainly) as construction water, sufficiently benefit
Guarantee that pressure of supply water is stablized with the gravity of water flow, so as to reduce equipment investment, reduces construction cost.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention
Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention,
Belong within the scope of technical solution of the present invention.
Claims (7)
1. a kind of high-building construction water water-saving system, which is characterized in that
Construction water is piped to the water tank of construction site from water spot benefit of plugging into;
Building top high building is provided with high water tank;
A set of water supply pump group is set at tank outlet;
Water supply pump group pipeline upper end is connected with high water tank;
Flowing water Valve is arranged in high water tank bottom;
Each floor is respectively provided with floor main valve;
Flowing water Valve is connected by pipeline with floor main valve;
Construction water is plugged into from floor main valve;
It interconnects in low side in main vibration means for main pipe for supplying water road.
2. high-building construction water water-saving system according to claim 1, it is characterised in that: the water supply pump group is taken simultaneously
Connection connection.
3. high-building construction water water-saving system according to claim 1, it is characterised in that: the water tank quantity is 2-10
Group;Reserved opening is arranged in water tank bottom;Adjacent water tank is attached by the way of being sequentially connected in series.
4. high-building construction water water-saving system according to claim 1, it is characterised in that: the high water tank is provided with
Level detecting device;
Pump group control system is connected with the level detecting device in high water tank.
5. high-building construction water water-saving system according to claim 1, it is characterised in that: described in high water tank water level
Pump group is automatically turned on when insufficient to supply water;
High water tank is to build existing fire water box or set water tank certainly.
6. high-building construction water water-saving system according to claim 1, it is characterised in that: the high-order water on the high building
Case is connected by pipeline.
7. high-building construction water water-saving system according to claim 1, it is characterised in that:
The setting of water supply pipe low side is used to collect the catch pit of the waste water due to generating when main line is revealed or is vented.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811363518.6A CN109356231A (en) | 2018-11-16 | 2018-11-16 | High-building construction water water-saving system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811363518.6A CN109356231A (en) | 2018-11-16 | 2018-11-16 | High-building construction water water-saving system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109356231A true CN109356231A (en) | 2019-02-19 |
Family
ID=65345381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811363518.6A Pending CN109356231A (en) | 2018-11-16 | 2018-11-16 | High-building construction water water-saving system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109356231A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0803015A1 (en) * | 1994-11-15 | 1997-10-29 | Anatoli A. Berline | Water supply system |
CN103334472A (en) * | 2013-06-09 | 2013-10-02 | 李国庆 | Non-negative pressure variable frequency water supply equipment |
CN203795521U (en) * | 2014-01-14 | 2014-08-27 | 济南久昌机械设备有限公司 | Full-automatic pipe network direct-connection pressure-superposed water supply device |
CN205999979U (en) * | 2016-08-29 | 2017-03-08 | 新世纪建设集团有限公司 | A kind of job site Novel variable-frequency energy-saving water supply system |
CN206737034U (en) * | 2017-05-20 | 2017-12-12 | 青岛东捷建设工程有限公司 | High-building construction water supply system |
-
2018
- 2018-11-16 CN CN201811363518.6A patent/CN109356231A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0803015A1 (en) * | 1994-11-15 | 1997-10-29 | Anatoli A. Berline | Water supply system |
CN103334472A (en) * | 2013-06-09 | 2013-10-02 | 李国庆 | Non-negative pressure variable frequency water supply equipment |
CN203795521U (en) * | 2014-01-14 | 2014-08-27 | 济南久昌机械设备有限公司 | Full-automatic pipe network direct-connection pressure-superposed water supply device |
CN205999979U (en) * | 2016-08-29 | 2017-03-08 | 新世纪建设集团有限公司 | A kind of job site Novel variable-frequency energy-saving water supply system |
CN206737034U (en) * | 2017-05-20 | 2017-12-12 | 青岛东捷建设工程有限公司 | High-building construction water supply system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203919328U (en) | The circulating automatic spray curing system in bridge prefabrication field | |
CN101975087B (en) | Mine water overall treatment utilizing technology | |
JP6873444B2 (en) | A system that uses the energy storage pipes of multiple high-rise buildings to generate electricity | |
CN206438585U (en) | A kind of construction site wastewater recycling system | |
CN201543150U (en) | High-rise industrial building fire-fighting water supply system configuration structure | |
CN202596175U (en) | Building construction site water recovery system | |
CN202755380U (en) | Tee joint working well for long-distance large-pipe-diameter underground water delivery main pipe system | |
CN104294908A (en) | Intelligent type integrated airtight sewage lifting pump station | |
CN208981417U (en) | Indoor fire-fighting water supply system | |
CN107775786B (en) | Automatic spraying health preserving system and spraying method | |
CN104909482A (en) | Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof | |
CN204079660U (en) | The water cleaning systems of three-dimensional arrangement | |
CN109356231A (en) | High-building construction water water-saving system | |
CN209154960U (en) | Fire fighting water system for the construction of super highrise building stage | |
CN203383853U (en) | Buffering system for solving problem of insufficient drainage ability of tunnel central ditch | |
CN202348185U (en) | Self-supporting local circulation system | |
CN207016652U (en) | A kind of corrugated steel septic tank | |
CN205975799U (en) | Water supply pipe well with a plurality of suction pumps | |
CN203296162U (en) | Buried prefabricated pump station | |
CN202175988U (en) | Three-grille fire-fighting pool system | |
CN202755379U (en) | Communication section working well for long-distance large-pipe-diameter underground water delivery main pipe system | |
CN102979136B (en) | Non-energy consumption centralized utilization system of high-rise building waste water | |
CN104452891A (en) | Method for construction water level control water supply system | |
CN207376792U (en) | A kind of basement waterworks for firefighting | |
CN203361319U (en) | Intelligent integrated sewage closed lifting pump station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190219 |