CN109319522A - A kind of pit earthwork transport device - Google Patents

A kind of pit earthwork transport device Download PDF

Info

Publication number
CN109319522A
CN109319522A CN201811010220.7A CN201811010220A CN109319522A CN 109319522 A CN109319522 A CN 109319522A CN 201811010220 A CN201811010220 A CN 201811010220A CN 109319522 A CN109319522 A CN 109319522A
Authority
CN
China
Prior art keywords
belt conveyor
earthwork
hopper
foundation pit
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811010220.7A
Other languages
Chinese (zh)
Inventor
张春新
李彦凯
周亮
高旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
North China Metallurgical Construction Engineering Construction Co Ltd
Original Assignee
China Huaye Group Co Ltd
North China Metallurgical Construction Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huaye Group Co Ltd, North China Metallurgical Construction Engineering Construction Co Ltd filed Critical China Huaye Group Co Ltd
Priority to CN201811010220.7A priority Critical patent/CN109319522A/en
Publication of CN109319522A publication Critical patent/CN109319522A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/34Emptying devices
    • B65G65/40Devices for emptying otherwise than from the top
    • B65G65/42Devices for emptying otherwise than from the top using belt or chain conveyors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The present invention provides a kind of pit earthwork transport device, the transport device includes: the first belt conveyor, which is laterally extended along foundation pit substrate, and first belt conveyor extends at excavation slope;Hopper, the hopper are set to the end of first belt conveyor, positioned at the lower section of first belt conveyor, to receive the earthwork of the first belt conveyor transmission;Second belt conveyor, second belt conveyor is extended along excavation slope, one end is located at below the discharge port of the hopper, its other end extends to outside foundation pit, wherein, second belt conveyor extends to the part outside foundation pit, its bottom is provided with tourelle, it, which has, simplifies structure, under the substitution prior art in such a way that dump truck transports the earthwork, foundation pit substrate is avoided to generate disturbance, guarantees security of foundation ditch construction and construction environment, and it can be improved earthwork transportation efficiency, reduce transport construction noise.

Description

A kind of pit earthwork transport device
Technical field
The present invention relates to building foundation pit technical field of construction equipment, specifically, being related to a kind of pit earthwork transport device.
Background technique
Pit earthwork operation is generallyd use after backacter carries out digging and is set again by dump truck as transport It is standby to transport the earthwork outside foundation pit.
In long-term construction and practice, it has been found that, above-mentioned this foundation ditch excavation method in the prior art and soil Square transportation resources has following technical problem;
1) dump truck transports the earthwork, needs to carry out traveling operation in foundation pit, and dump truck adds the soil of its transport The weight of side travels operation in foundation pit substrate surface repeatedly and is easy to generate disturbance to foundation pit base earthwork;On the other hand, a large amount of soil In square transport, effect is transported to improve, it usually needs more dump trucks above-mentioned transport repeatedly in foundation pit, however this Also a degree of influence caused by the construction safety in foundation pit simultaneously.
2) dump truck transport the earthwork during, on the one hand due in foundation pit dust it is more, on the other hand then due to transporting The earthwork falls off from dump truck during the defeated earthwork, causes to raise a large amount of dust inside foundation pit in this way, make to construction environment At influence, the efficiency of earthwork transportation is also more or less affected;In addition, along with the noise of dump truck transport is excessive, into one Step ground pollutes construction area;
It is not difficult to find out that not only efficiency is lower in such a way that dump truck transports the earthwork, and the environment of construction area is made At all various influences.
In view of this, should be improved to the prior art, to solve the above-mentioned technical problems in the prior art.
Summary of the invention
In order to solve the above-mentioned technical problem the present invention makes, a kind of with structure is simplified the purpose is to provide, and takes For in such a way that dump truck transports the earthwork, foundation pit substrate being avoided to generate disturbance under the prior art, guarantee security of foundation ditch construction And construction environment, and can be improved earthwork transportation efficiency, reduce the pit earthwork transport device of transport construction noise.
To achieve the goals above, the present invention provides a kind of pit earthwork transport device, the transport device includes: One belt conveyor, first belt conveyor extend to foundation pit along foundation pit substrate horizontal extension, first belt conveyor At side slope;Hopper, the hopper are set to the end of first belt conveyor, positioned at first belt conveyor Lower section, to receive the earthwork of the first belt conveyor transmission;Second belt conveyor, second belt conveyor is along foundation pit Side slope is extended, and one end is located at below the discharge port of the hopper, and the other end extends to outside foundation pit, wherein described Second belt conveyor extends to the part outside foundation pit, and bottom is provided with tourelle.
Preferably, agitating shaft and motor can be set on the hopper, the agitating shaft can be located at the material feeding The discharge outlet of bucket, the motor can drive the agitating shaft to rotate.
As described above with practice it is found that in pit earthwork transport device of the present invention, by being set to base The first horizontally extending belt conveyor of pit foundation bottom surface, the earthwork transportation that backacter in foundation pit is excavated is extremely At hopper, hopper receives earthwork transport from the first belt conveyor, and by motor drive agitating shaft with by hopper The interior earthwork is smashed, then by transporting along the second belt conveyor that excavation slope extends to outside foundation pit;In addition in the second skin The setting idler wheel of the section bottom outside foundation pit is extended to conveyer, the conevying efficiency of the earthwork can be improved.In conclusion of the invention The pit earthwork transport device, which has, simplifies structure, it is easy to accomplish, replace and soil is transported by dump truck under the prior art The mode of side is respectively completed earthwork transportation and the earthwork in foundation pit by the first belt conveyor and the second belt conveyor and goes out to cheat fortune Defeated work avoids foundation pit substrate from generating disturbance, guarantees security of foundation ditch construction and construction environment, and can be improved earthwork transportation Efficiency reduces transport construction noise.
Detailed description of the invention
Fig. 1 is schematic diagram, shows the structure of pit earthwork transport device described in one embodiment of the present of invention.
Specific embodiment
The embodiment of pit earthwork transport device of the present invention described below with reference to the accompanying drawings.This field it is common Technical staff will recognize, without departing from the spirit and scope of the present invention, can use a variety of different modes pair Described embodiment is modified.Therefore, attached drawing and description are regarded as illustrative in nature, rather than are wanted for limiting right The protection scope asked.In addition, in the present specification, attached drawing is drawn not in scale, and identical appended drawing reference indicates identical Part.
Fig. 1 is schematic diagram, shows the structure of pit earthwork transport device described in one embodiment of the present of invention.Such as Shown in Fig. 1, the pit earthwork transport device as described in the examples of the invention include the first belt conveyor 1, hopper 2 with And second belt conveyor 3.
It is horizontally extending at excavation slope 4 specifically, the first belt conveyor 1 is set in foundation pit, first At the earthwork transportation to excavation slope 4 that belt conveyor 1 is used to dig out backacter in foundation pit.
First belt conveyor 1, which is located at below the end at excavation slope 4, is provided with hopper 2, and hopper 2 is for receiving The earthwork that first belt conveyor 1 transports.Agitating shaft 22 and motor are provided at the discharge port 21 of hopper 2, agitating shaft 22 exists It is rotated under motor driven, the earthwork in hopper 2 is smashed.
Second belt conveyor 3 is extended along excavation slope 4, and one end is located at 21 lower section of discharge port of hopper 2, The other end extends to outside foundation pit, and the earthwork after what is drawn off from 2 discharge port 21 of hopper smash drops down onto the second belt conveyor 3 On belt, then it is transported to outside foundation pit by the second belt conveyor 3.In addition, the second belt conveyor 3 extends to the portion outside foundation pit Point, bottom is provided with tourelle 5, and tourelle 5 can allow the second belt conveyor 3 according to earthwork discharging situation It is mobile, to improve earthwork transportation efficiency.
As described above with practice it is found that in pit earthwork transport device of the present invention, by being set to base The first horizontally extending belt conveyor of pit foundation bottom surface, the earthwork transportation that backacter in foundation pit is excavated is extremely At hopper, hopper receives earthwork transport from the first belt conveyor, and by motor drive agitating shaft with by hopper The interior earthwork is smashed, then by transporting along the second belt conveyor that excavation slope extends to outside foundation pit;In addition in the second skin The setting idler wheel of the section bottom outside foundation pit is extended to conveyer, the conevying efficiency of the earthwork can be improved.In conclusion of the invention The pit earthwork transport device, which has, simplifies structure, it is easy to accomplish, replace and soil is transported by dump truck under the prior art The mode of side is respectively completed earthwork transportation and the earthwork in foundation pit by the first belt conveyor and the second belt conveyor and goes out to cheat fortune Defeated work avoids foundation pit substrate from generating disturbance, guarantees security of foundation ditch construction and construction environment, and can be improved earthwork transportation Efficiency reduces transport construction noise.
Describe pit earthwork transport device according to the present invention in an illustrative manner above with reference to attached drawing.But It will be appreciated by those skilled in the art that can also not departed from for the pit earthwork transport device that aforementioned present invention is proposed Various improvement are made on the basis of the content of present invention.Therefore, protection scope of the present invention should be by appended claims Content determines.

Claims (2)

1. a kind of pit earthwork transport device, which is characterized in that the transport device includes:
First belt conveyor, first belt conveyor extend along foundation pit substrate horizontal extension, first belt conveyor To excavation slope;
Hopper, the hopper are set to the end of first belt conveyor, under first belt conveyor Side, to receive the earthwork of the first belt conveyor transmission;
Second belt conveyor, second belt conveyor are extended along excavation slope, and one end is located at the hopper Below discharge port, the other end is extended to outside foundation pit, wherein
Second belt conveyor extends to the part outside foundation pit, and bottom is provided with tourelle.
2. pit earthwork transport device as described in claim 1, which is characterized in that be provided on the hopper agitating shaft and Motor, the agitating shaft are located at the discharge outlet of the hopper, the rotation of agitating shaft described in the motor driven.
CN201811010220.7A 2018-08-31 2018-08-31 A kind of pit earthwork transport device Pending CN109319522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811010220.7A CN109319522A (en) 2018-08-31 2018-08-31 A kind of pit earthwork transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811010220.7A CN109319522A (en) 2018-08-31 2018-08-31 A kind of pit earthwork transport device

Publications (1)

Publication Number Publication Date
CN109319522A true CN109319522A (en) 2019-02-12

Family

ID=65264623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811010220.7A Pending CN109319522A (en) 2018-08-31 2018-08-31 A kind of pit earthwork transport device

Country Status (1)

Country Link
CN (1) CN109319522A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109677864A (en) * 2019-02-27 2019-04-26 中铁十二局集团有限公司 A kind of portable belt conveyer and " it " font earthwork digging method
CN111395437A (en) * 2020-03-26 2020-07-10 中国一冶集团有限公司 Deep foundation pit earthwork transportation device and construction method
CN113602828A (en) * 2021-10-09 2021-11-05 徐州永凯新型材料科技有限公司 Building foundation ditch earthwork conveyer
CN117068797A (en) * 2023-08-18 2023-11-17 中国十七冶集团有限公司 Lateral banking device for rapid highway construction and application method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4020956A (en) * 1975-07-18 1977-05-03 Herman Van Hille Live bottom pit for a solid waste disposal system
JP2000129716A (en) * 1998-10-29 2000-05-09 Kajima Corp Method and equipment for transporting excavated earth and sand in open-cutting work using the mountain retaining beam method
CN202846745U (en) * 2012-10-24 2013-04-03 洪泽凌坤新材料有限公司 Transverse stirring and feeding device
CN104695497A (en) * 2014-12-30 2015-06-10 无锡三和重工机械有限公司 Earthmoving machine construction technology for large earth and rock engineering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4020956A (en) * 1975-07-18 1977-05-03 Herman Van Hille Live bottom pit for a solid waste disposal system
JP2000129716A (en) * 1998-10-29 2000-05-09 Kajima Corp Method and equipment for transporting excavated earth and sand in open-cutting work using the mountain retaining beam method
CN202846745U (en) * 2012-10-24 2013-04-03 洪泽凌坤新材料有限公司 Transverse stirring and feeding device
CN104695497A (en) * 2014-12-30 2015-06-10 无锡三和重工机械有限公司 Earthmoving machine construction technology for large earth and rock engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109677864A (en) * 2019-02-27 2019-04-26 中铁十二局集团有限公司 A kind of portable belt conveyer and " it " font earthwork digging method
CN111395437A (en) * 2020-03-26 2020-07-10 中国一冶集团有限公司 Deep foundation pit earthwork transportation device and construction method
CN113602828A (en) * 2021-10-09 2021-11-05 徐州永凯新型材料科技有限公司 Building foundation ditch earthwork conveyer
CN117068797A (en) * 2023-08-18 2023-11-17 中国十七冶集团有限公司 Lateral banking device for rapid highway construction and application method thereof

Similar Documents

Publication Publication Date Title
CN109319522A (en) A kind of pit earthwork transport device
US9638415B2 (en) Method for transportation and agitation of refinery solids waste
JP2867235B2 (en) Self-propelled soil improvement machine
US10683178B2 (en) Systems and methods for processing earthen slurries
KR100902364B1 (en) Shield tunneling device and its method
EP2346617A2 (en) Apparatus and method for reclaiming material
CN210973503U (en) Vertical shaft single rope turnover skip
CN215213586U (en) Mine shaft bottom powder recovery system of skip pit
JPH01502439A (en) mobile pump device
CN115138673B (en) Movable soil pesticide pollution restoration agent mixed spraying machine for planting base
CN205989690U (en) A kind of body of tipper carriage of transport grinding coagulation soil
CN206886034U (en) A kind of belt earth-retaining device during shield-tunneling construction
CN105697016A (en) System and method for rapidly conveying and processing matched gangue at rear part of coal mine rock tunnel integrated excavator
JP5366652B2 (en) Soil reforming equipment and soil reforming method
CN214651185U (en) Heavy grade inclined shaft conveyer belt type feeding system
JP2837602B2 (en) Sediment transport system for shield method
CN220885659U (en) Transfer platform of roadway repairing machine and coal gangue treatment device comprising same
JPH01315593A (en) Earth removal treatment equipment using shield method
JP5206363B2 (en) Sediment transport method and sediment transport system
CN212040953U (en) Sand washing machine for sand making
TWM627335U (en) Vertical conveying equipment
CN203783154U (en) Loading locomotive for wall surface construction
JPH05331876A (en) Sediment conveying device in vertical shaft
JP2000230250A (en) Soil improving machine
JP2003105801A (en) Self-propelled type soil improvement machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212

RJ01 Rejection of invention patent application after publication