CN109296119B - Unit type curtain wall connecting mechanism - Google Patents
Unit type curtain wall connecting mechanism Download PDFInfo
- Publication number
- CN109296119B CN109296119B CN201811150758.8A CN201811150758A CN109296119B CN 109296119 B CN109296119 B CN 109296119B CN 201811150758 A CN201811150758 A CN 201811150758A CN 109296119 B CN109296119 B CN 109296119B
- Authority
- CN
- China
- Prior art keywords
- bolt
- hole
- wall
- vertical
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
一种单元式幕墙连接机构,包括预埋件、立柱和连接预埋件与立柱的连接组件,所述预埋件包括长条槽和可以在长条槽内移动的螺栓,所述连接组件上设有与所述螺栓配合的第一通孔,通过螺母把连接组件紧固在螺栓上。本发明安装、调节方便,并可以实现幕墙的三维调节功能,具有非常强的平面内变形性能,即幕墙在楼层反复变位作用下保持其墙体及连接部位不发生危及人身安全的破损的平面内变形能力。
A unitized curtain wall connection mechanism, comprising embedded parts, uprights, and connecting components connecting the embedded parts and the uprights, the embedded parts include long grooves and bolts that can move in the long grooves, and the connecting components are A first through hole matched with the bolt is provided, and the connection assembly is fastened on the bolt through a nut. The invention is easy to install and adjust, and can realize the three-dimensional adjustment function of the curtain wall, and has very strong in-plane deformation performance, that is, the curtain wall keeps its walls and connecting parts from damaged planes that endanger personal safety under the action of repeated floor displacement. Internal deformability.
Description
技术领域technical field
本发明涉及建筑幕墙,更具体地说是一种单元式幕墙连接机构。The invention relates to a building curtain wall, and more particularly to a unitized curtain wall connecting mechanism.
背景技术Background technique
目前随着人们对建筑物外观的美观性及使用功能要求的不断提高,建筑玻璃幕墙因其优良的外观效果、良好的采光和节能功效,以及由于建筑幕墙具有建设速度快、结构质量轻、易维护的特点,所以建筑幕墙被广泛的应用于建筑物装饰中。At present, with the continuous improvement of people's requirements for the appearance of buildings and their functional requirements, the architectural glass curtain wall is due to its excellent appearance, good lighting and energy-saving effects, and because of its fast construction speed, light structure and easy Maintenance characteristics, so the building curtain wall is widely used in building decoration.
单元式幕墙是近几年广泛应用于高层建筑,在工厂加工程度最高的一种类型幕墙,单元式幕墙中的幕墙单元在工厂内加工制作,易实现工业化生产,降低人工费用,控制单元质量;幕墙单元在工厂完成加工组装后运往工地进行吊装,其安装简单而且基本可以实现与建筑主体结构同步施工,从而缩短玻璃幕墙现场施工周期和工程施工周期,创造较大的社会效益和经济效益,使单元式幕墙的应用越来越普遍。The unitized curtain wall is a type of curtain wall that has been widely used in high-rise buildings in recent years and has the highest degree of processing in the factory. The curtain wall units in the unitized curtain wall are processed and manufactured in the factory, which is easy to realize industrial production, reduce labor costs, and control unit quality; After the curtain wall unit is processed and assembled in the factory, it is transported to the construction site for hoisting. Its installation is simple and it can basically achieve synchronous construction with the main structure of the building, thereby shortening the on-site construction period and engineering construction period of the glass curtain wall, creating greater social and economic benefits. The application of unitized curtain wall is becoming more and more common.
目前传统的玻璃幕墙一般都是采用固定安装结构,定位后很难调整玻璃幕墙的位移,影响单元玻璃幕墙的对插安装准确度。At present, the traditional glass curtain wall generally adopts a fixed installation structure, and it is difficult to adjust the displacement of the glass curtain wall after positioning, which affects the installation accuracy of the unit glass curtain wall.
发明内容SUMMARY OF THE INVENTION
本发明的目的是提供一种单元式幕墙连接机构,安装方便,并可以实现幕墙位置的调节功能。The purpose of the present invention is to provide a unitized curtain wall connecting mechanism, which is easy to install and can realize the function of adjusting the position of the curtain wall.
为达上述目的,本发明采用的技术方案如下:For reaching the above object, the technical scheme adopted in the present invention is as follows:
一种单元式幕墙连接机构,包括预埋件、立柱和连接预埋件与立柱的连接组件,所述预埋件包括长条槽和可以在长条槽内移动的连接螺栓,所述连接组件上设有与所述连接螺栓配合的第一通孔,通过螺母把连接组件紧固在连接螺栓上。A unitized curtain wall connection mechanism, comprising embedded parts, uprights, and connecting components connecting the embedded parts and the uprights, the embedded parts include long grooves and connecting bolts that can move in the long grooves, the connecting components A first through hole matched with the connecting bolt is arranged on the upper part, and the connecting assembly is fastened on the connecting bolt through a nut.
优选地,所述长条槽的侧面为卡口结构,所述螺栓与所述长条槽的侧面卡合。Preferably, the side surface of the elongated slot is a bayonet structure, and the bolt is engaged with the side surface of the elongated slot.
优选地,所述连接组件包括钢支座和设在钢支座上的支承组件;所述钢支座为直角钢结构,包括垂直壁和水平壁,所述第一通孔设在垂直壁上;所述支承组件通过螺栓穿过设在水平壁上的第二通孔固定。Preferably, the connection assembly includes a steel support and a support assembly disposed on the steel support; the steel support is a right-angle steel structure, including a vertical wall and a horizontal wall, and the first through hole is provided on the vertical wall ; The support assembly is fixed through the second through hole provided on the horizontal wall by bolts.
优选地,所述第一通孔为与水平壁垂直的长形孔;所述第二通孔为与垂直壁垂直的长形孔。Preferably, the first through hole is an elongated hole perpendicular to the horizontal wall; the second through hole is an elongated hole perpendicular to the vertical wall.
优选地,所述支承组件包括通过螺栓固定在第二通孔上的转接件和与转接件配合的挂件。Preferably, the support assembly includes an adapter fixed on the second through hole by bolts and a hanger matched with the adapter.
优选地,所述转接件为矩形框结构,所述挂件包括固定立柱的竖直框架和设在竖直框架上的U型框架,所述U型框架倒扣在所述矩形框结构上,所述U型框架的上壁上设有第一螺栓孔,通过螺栓穿过所述第一螺栓孔抵住所述转接件的上壁;所述U型框架的侧壁上设有第二螺栓孔,通过一螺栓把所述转接件抵在所述U型框架的另一侧壁上。Preferably, the adapter is a rectangular frame structure, and the pendant includes a vertical frame for fixing a column and a U-shaped frame arranged on the vertical frame, and the U-shaped frame is inverted on the rectangular frame structure, The upper wall of the U-shaped frame is provided with a first bolt hole, and the bolt passes through the first bolt hole to press against the upper wall of the adapter; the side wall of the U-shaped frame is provided with a second bolt A hole is used to press the adapter against the other side wall of the U-shaped frame through a bolt.
优选地,所述转接件左侧壁上设有与螺栓配合的长条凹槽。Preferably, the left side wall of the adapter is provided with a long groove which is matched with the bolt.
优选地,所述转接件右侧壁上设有弧形凸台结构。Preferably, an arc-shaped boss structure is provided on the right side wall of the adapter.
优选地,所述立柱包括铝合金阳竖框和铝合金阴竖框。Preferably, the column includes an aluminum alloy male mullion and an aluminum alloy female mullion.
优选地,所述挂件包括间隔设置的两个竖直板,所述铝合金阳竖框和铝合金阴竖框固定在两个竖直板之间。Preferably, the pendant includes two vertical plates arranged at intervals, and the aluminum alloy male mullion and the aluminum alloy female mullion are fixed between the two vertical plates.
与现有技术相比,本发明至少具有以下有益效果:Compared with the prior art, the present invention at least has the following beneficial effects:
本发明单元式幕墙连接机构,在混凝土内设有预埋件,通过卡口型长条槽可以在水平面上沿墙面方向调整幕墙的位置;通过钢支座上设置的长形孔可以调整幕墙前后和上下方向上的位置;通过U型框架的上壁上设有的调节螺栓实现高度方向的微调,可以大大提高幕墙的安装效率,也更加方便幕墙位置的调整。The unitized curtain wall connection mechanism of the invention has embedded parts in the concrete, and the position of the curtain wall can be adjusted along the wall surface on the horizontal plane through the bayonet-shaped elongated slot; the curtain wall can be adjusted through the elongated holes provided on the steel support. The position in the front and rear and up and down directions; the adjustment bolts provided on the upper wall of the U-shaped frame can realize the fine adjustment of the height direction, which can greatly improve the installation efficiency of the curtain wall and facilitate the adjustment of the position of the curtain wall.
附图说明Description of drawings
图1为一实施例的竖向剖面图;1 is a vertical cross-sectional view of an embodiment;
图2为图1的局部放大图;Fig. 2 is a partial enlarged view of Fig. 1;
图3为一实施例的横向剖面图。FIG. 3 is a transverse cross-sectional view of an embodiment.
具体实施方式Detailed ways
下面结合附图和实施例对本发明做进一步说明。The present invention will be further described below with reference to the accompanying drawings and embodiments.
参照图1-3所示,为本发明提出的一种单元式幕墙连接机构,包括预埋件1、立柱2和连接组件3,预埋件1是提前预埋在混凝土内的,立柱与幕墙固定在一起,连接组件是连接预埋件与立柱的组件,预埋件1包括长条槽11和连接螺栓12,连接螺栓在长条槽内移动,在连接组件3上还设有第一通孔31,当调整好连接螺栓的位置和钢支座32调整到位后,就可以通过螺母把钢支座紧固在连接螺栓12上。Referring to Figures 1-3, a unitary curtain wall connection mechanism proposed by the present invention includes embedded parts 1,
如图2所示,在本实施例中,长条槽11的侧面为卡口结构,螺栓头则是与该卡扣结构卡合,如此设计使其的可靠性更强。As shown in FIG. 2 , in this embodiment, the side surface of the
在本实施例中,连接组件3包括钢支座32和设在钢支座上的支承组件33;钢支座32为直角钢结构,包括垂直壁和水平壁,其中第一通孔31设在垂直壁上,安装时用螺母把垂直壁固定在预埋件上,可以在长条槽内调整好位置再固定螺母;在水平壁上还设了第二通孔321,通过螺栓固定支承组件。In this embodiment, the
在本实施例中,为了使在竖直方向上可以调整幕墙,第一通孔31为与水平壁垂直的长形孔;第二通孔321为与垂直壁垂直的长形孔。如此钢支座就可以在前后和上下两个方向上调整位置,从而调整立柱的位置,以达到调整幕墙的位置。这样再加上长条槽的设置,本结构就可以上下、前后和左右三个方向上调整幕墙的位置。In this embodiment, in order to adjust the curtain wall in the vertical direction, the first through
如图2所示,在本实施例中,支承组件33包括转接件331和与挂件332,通过采用螺栓穿过第二通孔,把转接件固定在钢支座上,挂件332与转接件固定配合,转接件331是一个矩形框结构,它的一条侧面固定在钢支座的水平壁上,挂件332包括竖直框架3321和U型框架3322,竖直框架是用来固定立柱的,通过螺栓固定;U型框架3322与竖直框架是通过焊接的方式固定为一体,并且U型框架的两个侧壁与底壁是相互垂直的,这样U型框架的腔内也是一个矩形,这个矩形的长和宽都是比转接件331的长宽大的。U型框架倒扣在转接件上,如此U型框架的底壁就与转接件的顶壁相对,U型框架的两个侧壁分别与转接件的两个侧壁相对。在U型框架3322的底壁上设有第一螺栓孔33221,通过螺栓穿过第一螺栓孔抵住转接件的上壁,在U型框架的一个侧壁上设有第二螺栓孔33222,通过另一个螺栓穿过第二螺栓孔把转接件331抵住U型框架的另一侧壁上,这样挂件也就固定在了转接件上,通过调整第一螺栓孔上的螺栓就可以进一步微调挂件在垂直方向上的高度,也就是调整立柱和幕墙的高度。As shown in FIG. 2 , in this embodiment, the
在本实施例中,立柱2包括铝合金阳竖框21和铝合金阴竖框22。挂件上的竖直框架3321包括两个间隔一体设置的竖直板,铝合金阳竖框和铝合金阴竖框固定在两个竖直板之间,铝合金阳竖框通过螺栓固定在一个竖直板上,铝合金阴竖框通过螺栓固定在另一个竖直板上。为了固定的稳定性,在两个竖直板上都分别设一个U型框架,同时在另一个U型框架处也设另一个转接件,如此就有两个固定点,增加了固定的强度。In this embodiment, the
在本实施例中,转接件331左侧壁上设有长条凹槽3311,它与穿过第二螺栓孔的螺栓配合,起到限位和固定作用。在转接件331右侧壁上设有弧形凸台结构,这样使得连接组件在外力的作用下具有一定的翻转能力,使整个单元式幕墙体系具有适应变形的能力,具有非常强的平面内变形性能,即幕墙在楼层反复变位作用下保持其墙体及连接部位不发生危及人身安全的破损的平面内变形能力。In this embodiment, a
上述通过具体实施例对本发明进行了详细的说明,这些详细的说明仅仅限于帮助本领域技术人员理解本发明的内容,并不能理解为对本发明保护范围的限制。本领域技术人员在本发明构思下对上述方案进行的各种润饰、等效变换等均应包含在本发明的保护范围。The present invention has been described in detail above through specific embodiments. These detailed descriptions are only intended to help those skilled in the art to understand the content of the present invention, and should not be construed as limiting the protection scope of the present invention. Various modifications, equivalent transformations, etc. performed by those skilled in the art on the above solutions under the concept of the present invention shall be included in the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811150758.8A CN109296119B (en) | 2018-09-29 | 2018-09-29 | Unit type curtain wall connecting mechanism |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811150758.8A CN109296119B (en) | 2018-09-29 | 2018-09-29 | Unit type curtain wall connecting mechanism |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109296119A CN109296119A (en) | 2019-02-01 |
| CN109296119B true CN109296119B (en) | 2020-07-24 |
Family
ID=65161335
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811150758.8A Expired - Fee Related CN109296119B (en) | 2018-09-29 | 2018-09-29 | Unit type curtain wall connecting mechanism |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109296119B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113250352A (en) * | 2021-04-26 | 2021-08-13 | 浙江佰朝建筑装饰工程有限公司 | Stone curtain wall and glass curtain wall connecting structure |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2024908A (en) * | 1978-07-04 | 1980-01-16 | Norcros Investments Ltd | Curtain walling assembly |
| CN203022174U (en) * | 2012-12-03 | 2013-06-26 | 沈阳远大铝业工程有限公司 | Unit curtain wall switching connection adjusting device |
| CN203654533U (en) * | 2013-11-29 | 2014-06-18 | 江苏苏鑫装饰(集团)公司 | Connecting device of unit curtain walls |
| CN107503458A (en) * | 2017-08-11 | 2017-12-22 | 无锡恒尚装饰工程有限公司 | Curtain wall pendant mounting structure |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6170214B1 (en) * | 1998-06-09 | 2001-01-09 | Kenneth Treister | Cladding system |
| CN201962832U (en) * | 2011-03-02 | 2011-09-07 | 上海江河幕墙系统工程有限公司 | Non-welded upright post adaptor for frame curtain wall |
-
2018
- 2018-09-29 CN CN201811150758.8A patent/CN109296119B/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2024908A (en) * | 1978-07-04 | 1980-01-16 | Norcros Investments Ltd | Curtain walling assembly |
| CN203022174U (en) * | 2012-12-03 | 2013-06-26 | 沈阳远大铝业工程有限公司 | Unit curtain wall switching connection adjusting device |
| CN203654533U (en) * | 2013-11-29 | 2014-06-18 | 江苏苏鑫装饰(集团)公司 | Connecting device of unit curtain walls |
| CN107503458A (en) * | 2017-08-11 | 2017-12-22 | 无锡恒尚装饰工程有限公司 | Curtain wall pendant mounting structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109296119A (en) | 2019-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108086571B (en) | Edge-closing drop-stage suspended ceiling | |
| CN104120811B (en) | A kind of metal decking unit curtain wall system | |
| CN205502335U (en) | Adjustable curtain articulates system | |
| CN203320865U (en) | Stand column for aluminium material protective fence | |
| CN205000586U (en) | Decorative board leveling piece | |
| CN206815621U (en) | Large cantilever Glass Rib ornamental strip cell curtain wall | |
| CN203160475U (en) | Dismountable back bolt stone curtain wall | |
| CN206346360U (en) | A kind of horizontal sunshade grill unit formula curtain wall of large cantilever | |
| CN202148665U (en) | Dry-hanging installation system for facade stones | |
| CN215106409U (en) | Mounting support for unit body plate | |
| CN205348693U (en) | Horizontal big moulding of stone material curtain | |
| CN201687147U (en) | Glass handrail | |
| CN217150768U (en) | Modular green plant wall for building | |
| CN213062597U (en) | Indoor furred ceiling is with convenient to detach's aluminium veneer mechanism | |
| CN204609059U (en) | Cell cube curtain wall sunk type suspension member syndeton | |
| CN113175135B (en) | A large slab stone hoisting system with unit modular assembly | |
| CN109296119A (en) | A unitized curtain wall connecting mechanism | |
| CN209891633U (en) | An angle splicing profile | |
| CN211774933U (en) | A curtain wall installation pendant | |
| CN217000561U (en) | Integral type guardrail structure | |
| CN218622818U (en) | Hang unit stone material curtain system that articulates futilely | |
| CN222083959U (en) | A decorative line installation structure | |
| CN205477143U (en) | Point window formula structure of energy -saving frame curtain | |
| CN223689162U (en) | Adjustable hanging structure of high-rise inclined unit curtain wall | |
| CN211007518U (en) | Unit type decoration modeling column system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 518000 floor 20, Junzi Plaza, 3076 Qiaoxiang Road, Futian District, Shenzhen, Guangdong Patentee after: Shenzhen Jiaxin Construction Group Co.,Ltd. Address before: 518000 Gentleman Plaza, 3076 Qiaoxiang Road, Futian District, Shenzhen City, Guangdong Province, 19-20 floors Patentee before: SHENZHEN GASU ADORN DESIGN ENGINEERING Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200724 |