CN109274038A - Wall walks the generation method that hole is taken in the connection of top - Google Patents
Wall walks the generation method that hole is taken in the connection of top Download PDFInfo
- Publication number
- CN109274038A CN109274038A CN201811306976.6A CN201811306976A CN109274038A CN 109274038 A CN109274038 A CN 109274038A CN 201811306976 A CN201811306976 A CN 201811306976A CN 109274038 A CN109274038 A CN 109274038A
- Authority
- CN
- China
- Prior art keywords
- pipe
- hole
- wall
- connection
- walks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/36—Installations of cables or lines in walls, floors or ceilings
- H02G3/38—Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts
- H02G3/381—Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts in ceilings
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/36—Installations of cables or lines in walls, floors or ceilings
- H02G3/38—Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts
- H02G3/386—Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts in walls
Abstract
The invention discloses the generation method that a kind of wall walks to take over hole in the connection of top, pre-buried pipe is connect at adapter tube hole with the pipe for being mounted on in-situ layer on wall;The adapter tube pore size is arranged as follows: the width * height * depth that hole is taken over when 1~2 root canal is set as 50*100*50;The width * height * depth that hole is taken over when 3 root canal is set as 100*100*100;The width * height * depth for taking over hole when 4 root canal out is set as 100*100*100, and tube spacing should be greater than 25mm.Working efficiency and accuracy can be improved in the present invention.
Description
Technical field
The present invention relates to the pre-buried reserved field of architectural electricity profession, especially a kind of wall walks the life that hole is taken in the connection of top
At method.
Background technique
The connection of equipment room needs to be drawn by the way that project is practical on existing wall, and the Accessory Members such as locknut need work people
Member is added manually.The position of wall under sill bolt wall or laminated floor slab, wall top adapter tube need to manually draw corresponding adapter tube
Hole.The adapter tube its corresponding pipe arrangement in hole is cumbersome, is difficult to carry out the locking of position in solid space.This process is time-consuming
Long and repetition operation, is unfavorable for production operation.
Summary of the invention
The technical problem to be solved by the present invention is to connect in the connection of top in view of the shortcomings of the prior art, providing a kind of wall and walking
The generation method of pore improves working efficiency and accuracy.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: a kind of wall is walked in the connection of top and takes over hole
Generation method, on wall pre-buried pipe be mounted on the pipe of in-situ layer and connect taking at hole;The adapter tube pore size according to
Following method setting: the width * height * depth that hole is taken over when 1~2 root canal is set as 50*100*50;Hole is taken over when 3 root canal
Width * height * depth is set as 100*100*100;The width * height * depth for taking over hole when 4 root canal out is set as 100*100*
100, tube spacing is greater than 25mm.
In the vertical direction, the adapter tube hole is set at the top of wall;In the horizontal direction, the adapter tube hole is set to wall
In the middle part of body.
Two respective interfaces of equipment that top connection is walked in selection extend vertical tube, and vertical tube is straight up until floor is existing
A layer part is poured, the vertical tube of two sections of arrival floor in-situ layers is connected with each other.
Pre-buried pipe and the pipe and pipe that are mounted on in-situ layer are logical in vertically and horizontally junction on wall
Cross elbow connection.
Distance of the pipe when the in-situ layer fitting depth and pipe of laminated floor slab are in wall apart from wall surface >=
15mm。
Pipe is connect with wire box, and is managed and latched with wire box junction setting locknut;The size of locknut the lock size and pipe
Matching.
Pvc pipe, PC pipe are corresponding to be combined with PC locknut lock;JDG pipe is corresponding to be combined with JDG locknut lock;KBG pipeline is corresponding
It is combined with KBG locknut lock.
The height of the wire box is set as beyond pre-erection 40mm.
Pre-buried pipe is connect with the pipe for being mounted on in-situ layer by the straight tube being set in adapter tube hole on wall.
Compared with prior art, the advantageous effect of present invention is that: the present invention can according to selected device carry out it is most short
The connection in path, when wall type is sill bolt wall, wall top automatically generates adapter tube hole in corresponding position;Pipeline radical has change
When change, it need to only change the parameter for having variation;Pipeline connection, the generation of locknut, to take over the generation in hole be all ginseng according to setting
Number automatically generates, and working efficiency and accuracy can be improved.
Detailed description of the invention
Fig. 1 is that the present invention walks top connection and adapter tube hole generates schematic diagram.
Specific embodiment
Such as Fig. 1, hole is taken at the top of wall, position side placed in the middle.
Wall type is the partition wall or sill bolt wall under laminated floor slab.
The connection of equipment and equipment meets the principle of optimal path and smooth vertical and horizontal arrangement official road, and optimal path at this time is
Refer to that two respective interfaces of equipment for walking top connection by selection extend vertical pipe straight up until floor in-situ layer portion
Divide 7, the pipeline of two sections of arrival floor in-situ layers connects automatically again, and pipeline is being generated with connection in horizontal direction vertically
Elbow.
Pipeline laminated floor slab in-situ layer fitting depth and pipeline in wall in when spacing apart from wall surface not
It obtains and is less than 15mm.
The height of wire box can be set to be higher by 40mm than pre-erection 8, such as precast floor slab is 60mm thick, the height of wire box
Degree can be set to 100mm.Pipeline wall vertical direction vertically upward, pipeline laminated floor slab in-situ layer and wall handover
Production elbow in place generates adapter tube hole in wall bottom.
Pipeline passes through wall middle position from wall portals from wire box, to wall top position.
The generation of pipeline: the material of pipeline is settable with size, and the pipeline automatically generated connects automatically according to the parameter of setting
It connects.
The generation of elbow: pipeline is connect with pipeline on floor by elbow on wall.
The requirement of adapter tube pore size: the width * height * depth of size, emergency light connection, the connection of Fire Alarm Button, extensively
The connection broadcast, the connection of fire hydrant button, when 1~2 root canal, can be set to 100*100*100, and when 3 root canal can be set to
150*100*100, when 4 root canal, can be set to 200*100*100, and tube spacing is greater than 25mm.
Hole site is taken over to require: vertical direction, at the top of wall;Horizontal direction, among wall.
Straight tube: settable option, in upper butt hole, pre-buried pipeline and the pipe for being mounted on in-situ layer on connecting wall
Road.
Locknut: wire box automatically generates locknut lock with pipeline junction and combines, and size is consistent with pipeline.PVC pipeline, PC pipe
Road corresponds to the lock combination of PC locknut, and JDG pipeline corresponds to the lock combination of JDG locknut, and KBG pipeline corresponds to the lock combination of KBG locknut.
Claims (9)
1. a kind of wall walks the generation method for taking over hole in the connection of top, which is characterized in that pre-buried pipe and be mounted on existing on wall
The pipe for pouring layer connects at adapter tube hole;The adapter tube pore size is arranged as follows: the width * in hole is taken over when 1~2 root canal
Height * depth is set as 50*100*50;The width * height * depth that hole is taken over when 3 root canal is set as 100*100*100;4 out
The width * height * depth that hole is taken over when pipe is set as 100*100*100, and tube spacing is greater than 25mm.
2. wall according to claim 1 walks the generation method for taking over hole in the connection of top, which is characterized in that in vertical direction
On, the adapter tube hole is set at the top of wall;In the horizontal direction, the adapter tube hole is set in the middle part of wall.
3. wall according to claim 1 walks the generation method for taking over hole in the connection of top, which is characterized in that selection is walked top and connected
The two respective interfaces of equipment connect extend vertical tube, and vertical tube is straight up until floor in-situ layer part, two sections of arrival
The vertical tube of floor in-situ layer is connected with each other.
4. wall according to claim 1 walks the generation method for taking over hole in the connection of top, which is characterized in that pre-buried on wall
Pipe pass through elbow in vertically and horizontally junction with the pipe and pipe for being mounted on in-situ layer and connect.
5. wall according to claim 1 walks the generation method for taking over hole in the connection of top, which is characterized in that the pipe is folded
When the in-situ layer fitting depth and pipe for closing floor are in wall distance apart from wall surface >=15mm.
6. wall according to claim 1 walks the generation method for taking over hole in the connection of top, which is characterized in that pipe connects with wire box
It connects, and manages and latched with wire box junction setting locknut;The locknut lock size is matched with the size of pipe.
7. wall according to claim 6 walks the generation method for taking over hole in the connection of top, which is characterized in that pvc pipe, PC pipe
It is corresponding to be combined with PC locknut lock;JDG pipe is corresponding to be combined with JDG locknut lock;KBG pipeline is corresponding to be combined with KBG locknut lock.
8. wall according to claim 6 walks the generation method for taking over hole in the connection of top, which is characterized in that the wire box
Height is set as beyond pre-erection 40mm.
9. wall according to claim 1 walks the generation method for taking over hole in the connection of top, which is characterized in that pre-buried on wall
Pipe be mounted on in-situ layer pipe by be set to take over hole in straight tube connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811306976.6A CN109274038A (en) | 2018-11-05 | 2018-11-05 | Wall walks the generation method that hole is taken in the connection of top |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811306976.6A CN109274038A (en) | 2018-11-05 | 2018-11-05 | Wall walks the generation method that hole is taken in the connection of top |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109274038A true CN109274038A (en) | 2019-01-25 |
Family
ID=65192797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811306976.6A Pending CN109274038A (en) | 2018-11-05 | 2018-11-05 | Wall walks the generation method that hole is taken in the connection of top |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109274038A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204089102U (en) * | 2014-10-28 | 2015-01-07 | 成都市第四建筑工程公司 | The spool of light aggregate concrete hollow partition board and floor built-in pipe syndeton |
CN204960122U (en) * | 2015-09-09 | 2016-01-13 | 文登蓝岛建筑工程有限公司 | Prefabricated integrated PVC line box SIP wall body |
CN107386427A (en) * | 2017-07-19 | 2017-11-24 | 远大住宅工业(杭州)有限公司 | The electric preburied component of prefabricated elements, assembled and electric distribution method |
CN207268033U (en) * | 2017-06-16 | 2018-04-24 | 三能集成房屋股份有限公司 | A kind of spool mounting structure at prefabricated panel node |
CN207475125U (en) * | 2017-11-28 | 2018-06-08 | 苏州嘉盛远大建筑工业有限公司 | A kind of docking structure of the electrical set aside pre-embedded pipeline of assembled |
CN108709019A (en) * | 2018-06-25 | 2018-10-26 | 成都市第六建筑工程公司 | The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components |
-
2018
- 2018-11-05 CN CN201811306976.6A patent/CN109274038A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204089102U (en) * | 2014-10-28 | 2015-01-07 | 成都市第四建筑工程公司 | The spool of light aggregate concrete hollow partition board and floor built-in pipe syndeton |
CN204960122U (en) * | 2015-09-09 | 2016-01-13 | 文登蓝岛建筑工程有限公司 | Prefabricated integrated PVC line box SIP wall body |
CN207268033U (en) * | 2017-06-16 | 2018-04-24 | 三能集成房屋股份有限公司 | A kind of spool mounting structure at prefabricated panel node |
CN107386427A (en) * | 2017-07-19 | 2017-11-24 | 远大住宅工业(杭州)有限公司 | The electric preburied component of prefabricated elements, assembled and electric distribution method |
CN207475125U (en) * | 2017-11-28 | 2018-06-08 | 苏州嘉盛远大建筑工业有限公司 | A kind of docking structure of the electrical set aside pre-embedded pipeline of assembled |
CN108709019A (en) * | 2018-06-25 | 2018-10-26 | 成都市第六建筑工程公司 | The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421826B (en) | A kind of assembled integral vacuum toilet and its method of construction | |
CN203514570U (en) | Square bar keel partition wall | |
CN103321436A (en) | Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof | |
CN104420480B (en) | The method for arranging of Collapsible Loess District comprehensive pipe network and structure | |
CN107780559A (en) | A kind of construction method of heat-insulation and heat-preservation gypsum partition wall | |
CN109274038A (en) | Wall walks the generation method that hole is taken in the connection of top | |
CN204651834U (en) | The pre-buried structure of electric pipeline in a kind of brick wall | |
CN107882124A (en) | Toilet | |
CN209907850U (en) | Layered flue for high-rise building | |
CN204645162U (en) | A kind of installation node of plumbing integration module | |
CN109274037A (en) | Wall walks the generation method of butt hole in the connection of top | |
CN209227867U (en) | Laminated floor slab, Homofloor drainage system and house | |
CN204387499U (en) | The water power piping network installation device of indoor integrated finishing | |
CN206034694U (en) | Big module light sound insulation bearing interior wall wall body | |
CN109322487A (en) | On wall equipment connect with walking in butt hole generation method | |
CN205688651U (en) | One is novel assures masonry | |
CN208563528U (en) | Kitchen ground behind a kind of ground and food and drink with discharge structure | |
CN209907844U (en) | Bathroom falls board area and does wet subregion stagnant water steel sheet device futilely | |
CN208685813U (en) | A kind of plug-in parapet connecting node construction of clear-water concrete | |
CN205654084U (en) | Gypsum wall body mould | |
CN219280830U (en) | Washbowl wall drainage structures | |
CN206530084U (en) | A kind of bathroom bottom plate | |
CN104947935B (en) | Construction method of combined kitchen and bathroom | |
CN205875405U (en) | Unit formula building | |
CN104763023B (en) | A kind of supply and drain water system of plumbing integration module and building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190125 |