CN109272597A - A kind of new energy equipment monitoring and automatic tissue examination and repair system - Google Patents
A kind of new energy equipment monitoring and automatic tissue examination and repair system Download PDFInfo
- Publication number
- CN109272597A CN109272597A CN201810975870.9A CN201810975870A CN109272597A CN 109272597 A CN109272597 A CN 109272597A CN 201810975870 A CN201810975870 A CN 201810975870A CN 109272597 A CN109272597 A CN 109272597A
- Authority
- CN
- China
- Prior art keywords
- new energy
- energy equipment
- service personnel
- control centre
- subsystem
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/20—Checking timed patrols, e.g. of watchman
Abstract
The invention discloses a kind of monitoring of new energy equipment and automatic tissue examination and repair system, including control centre, the connecting pin of the control centre is equipped with register unit, overhauling project generation unit, human-computer interaction interface, service personnel's subsystem, Clock Subsystem and database, the database includes priority storage unit, and the connecting pin of the human-computer interaction interface is equipped with new energy equipment group.The device numbering that the present invention passes through the respective new energy equipment of the new energy equipment group of be good at maintenance of multiple service personnel in record service personnel's subsystem, in order to be overhauled according to the priority selection service personnel that is good at maintenance degree of the service personnel to current device, to reduce maintenance difficulty, overhaul efficiency is improved.
Description
Technical field
The present invention relates to field of new energy technologies, in particular to a kind of new energy equipment monitoring is overhauled with automatic tissue
System.
Background technique
New energy is also known as unconventional energy resource, refers to the various energy forms except traditional energy.Finger just starts to develop and use
Or actively study, need the energy promoted, such as solar energy, geothermal energy, wind energy, ocean energy, biomass energy and nuclear fusion energy
Deng.
With the development of the times with the progress of science and technology, the technical level of generation of electricity by new energy also promotes extensively, generation of electricity by new energy
Essential is exactly new energy equipment, due to having more part to belong in existing common new energy equipment
Outdoor installation is more easier to break down compared to indoor equipment, therefore equipment needs timing to overhaul, in order to guarantee equipment
It works normally, existing maintenance mode is the maintenance of timing artificial organ, overhauls tissue difficulty to lower, is mostly all devices
It is overhauled in one cycle, easy faulty equipments some in this way may break down since the time between overhauls(TBO) is too long, in addition
Some equipment for being not easy failure are then possible to overhaul simultaneously due to the time between overhauls(TBO) is too short there is a situation where wasting service personnel's manpower
Personnel maintenance when may be excessive due to overhauling project, and cause it is a certain forget the case where overhaul, can exist safely it is hidden
Suffer from.
Therefore, inventing a kind of monitoring of new energy equipment with automatic tissue examination and repair system, have very much must to solve the above problems
It wants.
Summary of the invention
The purpose of the present invention is to provide a kind of monitoring of new energy equipment and automatic tissue examination and repair system, pass through record
The generation of electricity by new energy of the respective new energy equipment group of be good at maintenance of multiple service personnel in service personnel's subsystem is set
Standby device numbering, in order to according to service personnel to current device be good at maintenance degree priority select service personnel into
Row maintenance improves overhaul efficiency, to solve the problems mentioned in the above background technology to reduce maintenance difficulty.
To achieve the above object, the invention provides the following technical scheme: a kind of monitoring of new energy equipment and automatic group
Examination and repair system, including control centre are knitted, the connecting pin of the control centre is equipped with register unit, overhauling project generation unit, people
Machine interactive interface, service personnel's subsystem, Clock Subsystem and database, the database include priority storage unit, institute
The connecting pin for stating human-computer interaction interface is equipped with new energy equipment group;
The control centre is used to receive the data information of new energy equipment group generation, to cooperate Clock Subsystem
The runing time of new energy equipment group is recorded, while receiving and executing user and being inputted by human-computer interaction interface
Instruction and according to log from trend service personnel's subsystem transmit instruct;
The human-computer interaction interface is used to input instruction to control centre and increases, stores in deletion or change database
Data;
Service personnel's subsystem is used to receive the instruction of control centre's sending and is set according to instruction to generation of electricity by new energy
Standby group is overhauled;
The Clock Subsystem is used to provide accurate synchronizing clock signals for control centre, to cooperate control centre pair
The runing time of new energy equipment group is recorded;
The database be used to store device category data in new energy equipment group, overhaul of the equipments demand data with
And time between overhaul;
When the new energy equipment group provides device category data, overhaul of the equipments demand data and maintenance interval
Between;
The unit of registering is for registering and the information that will register is sent to control centre for service personnel;
The overhauling project generation unit is for printing overhauling project memorandum table.
Preferably, service personnel's subsystem includes multiple service personnel, and multiple service personnel are equipped with exclusive
In service personnel's mobile phone of current service personnel.
Preferably, service personnel's mobile phone passes through local area network and connect with control centre signal.
Preferably, the Clock Subsystem includes network time server.
Preferably, the network time server is connect by local area network with control centre signal.
Preferably, the database further includes data adding unit, data deletion unit and data changing unit.
Preferably, the new energy equipment group includes multiple new energy equipments, multiple generations of electricity by new energy
Equipment is equipped with the device numbering for being specific to current new energy equipment.
Preferably, the control centre is set as terminal, and the terminal is set as computer.
Preferably, the unit of registering is set as fingerprint attendance machine, and the overhauling project generation unit is set as printer.
Technical effect and advantage of the invention:
1, the present invention passes through the equipment that multiple new energy equipments included by new energy equipment group is exclusive
Number, device category data, overhaul of the equipments demand data and time between overhaul are input in control centre, are then inputted again
The generation of electricity by new energy of the respective new energy equipment group of be good at maintenance of multiple service personnel in service personnel's subsystem is set
Then standby device numbering is again dumped to above-mentioned two groups of data in database by control centre, in order to when some equipment
After runing time reaches time between overhaul, stored in control centre's reading database about the equipment device numbering,
It is multiple in the service personnel's subsystem stored in device category data, overhaul of the equipments demand data and priority storage unit
The device numbering of the respective new energy equipment of the new energy equipment group of be good at maintenance of service personnel, control centre are logical
The device numbering of the equipment is directly sent to be good at by the service personnel's mobile phone crossed in service personnel's subsystem repairs the equipment
Service personnel, the equipment that service personnel can need to be overhauled out according to device numbering and device category data screening, so as to
It is overhauled according to the priority selection service personnel that is good at maintenance degree of the service personnel to current device, to reduce inspection
Difficulty is repaired, overhaul efficiency is improved.
2, the present invention is by generating overhauling project memorandum table using overhauling project generation unit, in order to which service personnel can be with
It is overhauled one by one according to overhauling project memorandum table, to reduce service personnel's maintenance difficulty, can also prevent and a certain forget
The case where note is overhauled, while the present invention is overhauled compared to traditional timing artificial organ, has been reached according to device category
Difference flexibly and automatically organizes the effect of maintenance, and much sooner, easy faulty equipment will not occur may be due to maintenance week for maintenance
Phase is too long and breaks down, and the equipment that other is not easy failure is then possible to that waste maintenance people occurs because the time between overhauls(TBO) is too short
Member manpower the case where, while will not there is a situation where forget overhaul some new energy equipment so that maintenance effect it is more preferable,
Reduce the failure rate of new energy equipment;
3, after the completion of overhauling, maintenance situation can be forwarded in control centre by service personnel in the form of information, then
Control centre summarizes the data conversion storage into database, and technical staff can have access to database by human-computer interaction interface
The data content of middle storage, so that the operating condition to multiple new energy equipments in new energy equipment has more
It gets information about.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is service personnel's subsystem structure schematic diagram of the invention.
Fig. 3 is new energy equipment group structural schematic diagram of the invention.
In figure: 1 control centre, 2 human-computer interaction interfaces, 3 service personnel's subsystems, 4 Clock Subsystems, 5 databases, 6 are newly
Energy generating equipment group, 7 network time servers, 8 data adding units, 9 data delete unit, 10 data change units, 11
It registers unit, 12 overhauling project generation units, 13 priority storage units.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
The present invention provides a kind of new energy equipment as shown in Figs. 1-3 monitoring and automatic tissue examination and repair system, packets
Control centre 1 is included, the connecting pin of the control centre 1 is equipped with register unit 11, overhauling project generation unit 12, human-computer interaction circle
Face 2, service personnel's subsystem 3, Clock Subsystem 4 and database 5, the database 5 include priority storage unit 13, institute
The connecting pin for stating human-computer interaction interface 2 is equipped with new energy equipment group 6;
The control centre 1 is used to receive the data information of the generation of new energy equipment group 6, to cooperate clock subsystem
The runing time of 4 pairs of new energy equipment groups 6 of uniting records, while receiving and executing user and passing through human-computer interaction interface
2 input instructions and according to log from trend service personnel subsystem 3 transmit instruct;
The human-computer interaction interface 2 is used to input instruction to control centre 1 and increases, in deletion or change database 5
The data of storage;
Service personnel's subsystem 3 is used to receive the instruction of the sending of control centre 1 and according to instruction to generation of electricity by new energy
Equipment group 6 is overhauled;
The Clock Subsystem 4 is used to provide accurate synchronizing clock signals for control centre 1, to cooperate control centre
The runing time of 1 pair of new energy equipment group 6 records;
The database 5 is used to store device category data, the overhaul of the equipments demand data in new energy equipment group 6
And time between overhaul;
When the new energy equipment group 6 provides device category data, overhaul of the equipments demand data and maintenance interval
Between;
The unit 11 of registering is for registering and the information that will register is sent to control centre 1 for service personnel;
The overhauling project generation unit 12 is for printing overhauling project memorandum table.
As can be seen from the above embodiments: the present invention is by by multiple generations of electricity by new energy included by new energy equipment group 6
The exclusive device numbering of equipment, device category data, overhaul of the equipments demand data and time between overhaul are input to control
In center 1, the generation of electricity by new energy of respective the be good at maintenance of the multiple service personnel then inputted again in service personnel's subsystem 3 is set
Then above-mentioned two groups of data are dumped to database 5 by control centre 1 again by the device numbering of the new energy equipment of standby group 6
In, in order to be stored in 1 reading database 5 of control centre after the runing time of some equipment reaches time between overhaul
About being deposited in the device numbering of the equipment, device category data, overhaul of the equipments demand data and priority storage unit 13
The new energy of the respective new energy equipment group 6 of be good at maintenance of multiple service personnel in service personnel's subsystem 3 of storage
The device numbering of generating equipment, control centre 1 is by service personnel's mobile phone in service personnel's subsystem 3 directly by the equipment
Device numbering be sent to be good at repair the equipment service personnel, service personnel can be according to device numbering and device category
The equipment that data screening needs to be overhauled out, in order to the priority for being good at maintenance degree according to service personnel to current device
Selection service personnel overhauls, to reduce maintenance difficulty, improves overhaul efficiency.
Embodiment 2
Further, in above-described embodiment 1, service personnel's subsystem 3 includes multiple service personnel, multiple described
Service personnel is equipped with the service personnel's mobile phone for being specific to current service personnel;
Service personnel's mobile phone passes through local area network and connect with control centre 1 signal, in order to service personnel's hand
Machine and control centre 1 carry out the transmitting of data information by local area network;
The Clock Subsystem 4 includes network time server 7;
The network time server 7 is connect by local area network with control centre 1 signal, in order to which the network time takes
Business device 7 and control centre 1 pass through the transmitting that local area network carries out data information;
The database 5 further includes data adding unit 8, data deletion unit 9 and data changing unit 10, for increasing
Add, delete or change the data stored in database 5;
The new energy equipment group 6 includes multiple new energy equipments, and multiple new energy equipments are equal
Equipped with the device numbering for being specific to current new energy equipment;
The control centre 1 is set as terminal, and the terminal is set as computer.
The unit 11 of registering is set as fingerprint attendance machine, and the overhauling project generation unit 12 is set as printer.
Working principle of the present invention:
Referring to Figure of description 1, operator will be included by new energy equipment group 6 by human-computer interaction interface 2
The exclusive device numbering of multiple new energy equipments, device category data, overhaul of the equipments demand data and maintenance interval
Time is input in control centre 1, and the multiple service personnel then inputted again in service personnel's subsystem 3 are respectively good at maintenance
New energy equipment group 6 new energy equipment device numbering, then again by above-mentioned two groups of data by control centre 1
It dumps in database 5, Clock Subsystem 4 provides accurate synchronizing clock signals to control centre 1, to cooperate control centre
The runing time of 1 pair of new energy equipment 6 records, when the runing time of some equipment reaches maintenance interval
Between after, stored in 1 reading database 5 of control centre about the device numbering of the equipment, device category data, overhaul of the equipments need
Multiple service personnel in the service personnel's subsystem 3 stored in data and priority storage unit 13 are asked respectively to be good at dimension
The device numbering of the new energy equipment for the new energy equipment group 6 repaired, control centre pass through in service personnel's subsystem 3
Service personnel's mobile phone directly the device numbering of the equipment is sent to be good at repair the equipment service personnel, service personnel can
With the equipment for needing to be overhauled out according to device numbering and device category data screening, while being referred to overhaul of the equipments demand
Data are overhauled, while control centre 1 numbers above equipment, device category data and overhaul of the equipments demand data pass through inspection
It repairs project generation unit 12 and generates overhauling project memorandum table, service personnel can be examined one by one according to overhauling project memorandum table
It repairs, so that reducing service personnel overhauls difficulty, a certain the case where forgetting maintenance generation can also be prevented and improve service personnel
Effect is overhauled, service personnel can send maintenance to control centre 1 by service personnel's mobile phone and complete instruction after the completion of maintenance, so
Control centre 1 cooperates Clock Subsystem 4 to restart to count according to the time between overhaul of the equipment stored in database 5 afterwards
When, it is overhauled compared to traditional timing artificial organ, invention achieves the difference according to device category, flexible and automatic group
The effect of maintenance is knitted, is overhauled much sooner, while will not be there is a situation where forgeing to overhaul some new energy equipment, so that inspection
It repairs that effect is more preferable, reduces the failure rate of new energy equipment;
Referring to Figure of description 1, after the completion of maintenance, maintenance situation can be forwarded to control by service personnel in the form of information
In center 1 processed, then control centre 1 summarizes the data conversion storage into database 5, and technical staff can pass through man-machine friendship
The data content stored in database 5 is had access at mutual interface 2, to set to multiple generations of electricity by new energy in new energy equipment 6
Standby operating condition, which has, more to be got information about.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features,
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.
Claims (9)
1. a kind of new energy equipment monitoring and automatic tissue examination and repair system, including control centre (1), it is characterised in that: institute
The connecting pin for stating control centre (1) is equipped with unit (11) of registering, overhauling project generation unit (12), human-computer interaction interface (2), inspection
Personnel's subsystem (3), Clock Subsystem (4) and database (5) are repaired, the database (5) includes priority storage unit (13),
The connecting pin of the human-computer interaction interface (2) is equipped with new energy equipment group (6);
The control centre (1) is used to receive the data information of new energy equipment group (6) generation, to cooperate clock subsystem
System (4) records the runing time of new energy equipment group (6), while receiving and executing user and passing through human-computer interaction
The instruction and instruction is transmitted from trend service personnel subsystem (3) according to log that interface (2) inputs;
The human-computer interaction interface (2) is used to input instruction and increase, deletion or change database (5) to control centre (1)
The data of middle storage;
Service personnel's subsystem (3) is used to receive the instruction of control centre (1) sending and according to instruction to generation of electricity by new energy
Equipment group (6) is overhauled;
The Clock Subsystem (4) is used to provide accurate synchronizing clock signals for control centre (1), to cooperate control centre
(1) runing time of new energy equipment group (6) is recorded;
The database (5) is used to store device category data, the overhaul of the equipments demand data in new energy equipment group (6)
And time between overhaul;
The new energy equipment group (6) provides device category data, overhaul of the equipments demand data and time between overhaul;
The unit of registering (11) is used to register for service personnel and the information that will register is sent to control centre (1);
The overhauling project generation unit (12) is for printing overhauling project memorandum table.
2. a kind of new energy equipment monitoring according to claim 1 and automatic tissue examination and repair system, it is characterised in that:
Service personnel's subsystem (3) includes multiple service personnel, and multiple service personnel, which are equipped with, is specific to current maintenance people
Service personnel's mobile phone of member.
3. a kind of new energy equipment monitoring according to claim 2 and automatic tissue examination and repair system, it is characterised in that:
Service personnel's mobile phone passes through local area network and connect with control centre (1) signal.
4. a kind of new energy equipment monitoring according to claim 1 and automatic tissue examination and repair system, it is characterised in that:
The Clock Subsystem (4) includes network time server (7).
5. a kind of new energy equipment monitoring according to claim 4 and automatic tissue examination and repair system, it is characterised in that:
The network time server (7) is connect by local area network with control centre (1) signal.
6. a kind of new energy equipment monitoring according to claim 1 and automatic tissue examination and repair system, it is characterised in that:
The database (5) further includes data adding unit (8), data deletion unit (9) and data changing unit (10).
7. a kind of new energy equipment monitoring according to claim 1 and automatic tissue examination and repair system, it is characterised in that:
The new energy equipment group (6) includes multiple new energy equipments, and multiple new energy equipments are equipped with specially
Belong to the device numbering of current new energy equipment.
8. a kind of new energy equipment monitoring according to claim 1 and automatic tissue examination and repair system, it is characterised in that:
The control centre (1) is set as terminal, and the terminal is set as computer.
9. a kind of new energy equipment monitoring according to claim 1 and automatic tissue examination and repair system, it is characterised in that:
The unit of registering (11) is set as fingerprint attendance machine, and the overhauling project generation unit (12) is set as printer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810975870.9A CN109272597A (en) | 2018-08-24 | 2018-08-24 | A kind of new energy equipment monitoring and automatic tissue examination and repair system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810975870.9A CN109272597A (en) | 2018-08-24 | 2018-08-24 | A kind of new energy equipment monitoring and automatic tissue examination and repair system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109272597A true CN109272597A (en) | 2019-01-25 |
Family
ID=65154376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810975870.9A Pending CN109272597A (en) | 2018-08-24 | 2018-08-24 | A kind of new energy equipment monitoring and automatic tissue examination and repair system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109272597A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110907812A (en) * | 2019-11-26 | 2020-03-24 | 重庆望变电气(集团)股份有限公司 | Detection system and method for mechanical characteristics of circuit breaker |
CN116245331A (en) * | 2023-03-09 | 2023-06-09 | 国能江苏电力工程技术有限公司 | Power generation equipment maintenance method and device, storage medium and electronic equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102738899A (en) * | 2012-06-18 | 2012-10-17 | 南京协宏软件技术有限公司 | Power grid remote diagnosis and overhaul method based on 3G (3rd generation) network |
CN202771501U (en) * | 2012-03-19 | 2013-03-06 | 新疆维吾尔自治区风能研究所 | Intelligent system for inspection and maintenance of device on wind farm |
CN105447923A (en) * | 2014-09-26 | 2016-03-30 | 武汉光谷北斗地球空间信息产业股份有限公司 | Electric power circuit routing inspection system |
CN105761320A (en) * | 2016-01-27 | 2016-07-13 | 国家电网公司 | Power line inspection system |
CN106204784A (en) * | 2016-06-30 | 2016-12-07 | 北京海顿中科技术有限公司 | Safety guides intelligence and patrols point detection system |
CN106845791A (en) * | 2016-12-27 | 2017-06-13 | 国电南瑞科技股份有限公司 | A kind of subway equipment routing inspection method based on IMAQ |
CN107481349A (en) * | 2017-07-06 | 2017-12-15 | 北京万相融通科技股份有限公司 | A kind of station method for inspecting and its cruising inspection system |
-
2018
- 2018-08-24 CN CN201810975870.9A patent/CN109272597A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202771501U (en) * | 2012-03-19 | 2013-03-06 | 新疆维吾尔自治区风能研究所 | Intelligent system for inspection and maintenance of device on wind farm |
CN102738899A (en) * | 2012-06-18 | 2012-10-17 | 南京协宏软件技术有限公司 | Power grid remote diagnosis and overhaul method based on 3G (3rd generation) network |
CN105447923A (en) * | 2014-09-26 | 2016-03-30 | 武汉光谷北斗地球空间信息产业股份有限公司 | Electric power circuit routing inspection system |
CN105761320A (en) * | 2016-01-27 | 2016-07-13 | 国家电网公司 | Power line inspection system |
CN106204784A (en) * | 2016-06-30 | 2016-12-07 | 北京海顿中科技术有限公司 | Safety guides intelligence and patrols point detection system |
CN106845791A (en) * | 2016-12-27 | 2017-06-13 | 国电南瑞科技股份有限公司 | A kind of subway equipment routing inspection method based on IMAQ |
CN107481349A (en) * | 2017-07-06 | 2017-12-15 | 北京万相融通科技股份有限公司 | A kind of station method for inspecting and its cruising inspection system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110907812A (en) * | 2019-11-26 | 2020-03-24 | 重庆望变电气(集团)股份有限公司 | Detection system and method for mechanical characteristics of circuit breaker |
CN116245331A (en) * | 2023-03-09 | 2023-06-09 | 国能江苏电力工程技术有限公司 | Power generation equipment maintenance method and device, storage medium and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100547563C (en) | A kind of log-output method of debugged program, device and system | |
CN106850260A (en) | A kind of dispositions method and device of virtual resources management platform | |
CN101997709B (en) | Root alarm data analysis method and system | |
CN108920314A (en) | A kind of faulty hardware localization method, device, system and readable storage medium storing program for executing | |
CN107122262A (en) | Database intelligent backup system based on agent | |
CN101807816A (en) | Realization method and system of electric power data public access service interfaces in heterogeneous environment | |
CN103646104A (en) | Hard real-time fault diagnosis method and system | |
CN109272597A (en) | A kind of new energy equipment monitoring and automatic tissue examination and repair system | |
CN108345991A (en) | A kind of the feasibility study review system and reviewing method of fusion power grid multi-source information | |
CN108964986B (en) | Application-level double-active disaster recovery system of cooperative office system | |
CN107153950A (en) | A kind of workform management system based on workflow | |
CN109819048A (en) | Method of data synchronization, device, terminal and storage medium | |
CN105005518B (en) | The system and its processor and method of auto-polymerization redundant system transaction data | |
CN109542091A (en) | A kind of excavator breakdown maintenance and reliability data management system and its application | |
CN103617501A (en) | Operation maintenance method of substation | |
CN102088376B (en) | Communication monitoring system and method for integrated avionics system | |
CN106452911A (en) | City-wide disaster backup system | |
CN106254229A (en) | A kind of medical communication gateway | |
CN101170782A (en) | A method for parallel data transmission in mobile network management | |
CN105718602A (en) | Cloud system for work safety standardization of rural hydropower station | |
CN104765669B (en) | The synchronous new airport information system parallel test method for replicating AFTN messages | |
CN112102107A (en) | Method, device and equipment for generating report of power supply system | |
WO2024007426A1 (en) | K8s-based method combining disaster recovery drill failure prediction and pod scheduling | |
CN110351143A (en) | A kind of electric power communication resource management system, method, apparatus and readable storage medium storing program for executing | |
CN111062042A (en) | Automatic government affair data calling system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190125 |