CN109240088B - 一种电力网络通信延时的估计与补偿有限时间控制方法 - Google Patents
一种电力网络通信延时的估计与补偿有限时间控制方法 Download PDFInfo
- Publication number
- CN109240088B CN109240088B CN201811239552.2A CN201811239552A CN109240088B CN 109240088 B CN109240088 B CN 109240088B CN 201811239552 A CN201811239552 A CN 201811239552A CN 109240088 B CN109240088 B CN 109240088B
- Authority
- CN
- China
- Prior art keywords
- fuzzy
- node
- power
- finite time
- following
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/042—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Feedback Control In General (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811239552.2A CN109240088B (zh) | 2018-10-24 | 2018-10-24 | 一种电力网络通信延时的估计与补偿有限时间控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811239552.2A CN109240088B (zh) | 2018-10-24 | 2018-10-24 | 一种电力网络通信延时的估计与补偿有限时间控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109240088A CN109240088A (zh) | 2019-01-18 |
CN109240088B true CN109240088B (zh) | 2020-04-10 |
Family
ID=65081345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811239552.2A Active CN109240088B (zh) | 2018-10-24 | 2018-10-24 | 一种电力网络通信延时的估计与补偿有限时间控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109240088B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110082689B (zh) * | 2019-05-21 | 2021-12-03 | 闽江学院 | 一种能源互联网储能系统锂电池soc状态估计方法 |
CN110365045B (zh) * | 2019-07-09 | 2020-09-04 | 闽江学院 | 一种基于估计与补偿控制的风光互补发电系统的网络延时抑制方法 |
CN110456743B (zh) * | 2019-07-12 | 2022-03-15 | 西北工业大学 | 考虑通信延时的柔性制造系统分布式控制器设计方法 |
CN112147900B (zh) * | 2020-09-30 | 2022-04-26 | 苏州科技大学 | 全状态约束电力系统的有限时间自适应模糊跟踪控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101232180A (zh) * | 2008-01-24 | 2008-07-30 | 东北大学 | 一种配电系统负荷模糊建模装置及方法 |
CN106873558A (zh) * | 2017-03-22 | 2017-06-20 | 东北大学 | 一种非线性系统的模糊重复输出控制器及其控制方法 |
CN106877399A (zh) * | 2017-03-24 | 2017-06-20 | 上海电力学院 | 一种单相lcl型并网逆变器双环控制方法 |
KR20170079750A (ko) * | 2015-12-31 | 2017-07-10 | 이래오토모티브시스템 주식회사 | 전동식 조향 장치의 제어 장치 및 방법 |
CN106971238A (zh) * | 2017-03-10 | 2017-07-21 | 东华大学 | 基于T‑S模糊Elman神经网络的短期电力负荷预测方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8190299B2 (en) * | 2006-07-19 | 2012-05-29 | Rovnyak Steven M | Integrated and optimized distributed generation and interconnect system controller |
US7832511B2 (en) * | 2006-10-20 | 2010-11-16 | Ford Global Technologies | Hybrid electric vehicle control system and method of use |
-
2018
- 2018-10-24 CN CN201811239552.2A patent/CN109240088B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101232180A (zh) * | 2008-01-24 | 2008-07-30 | 东北大学 | 一种配电系统负荷模糊建模装置及方法 |
KR20170079750A (ko) * | 2015-12-31 | 2017-07-10 | 이래오토모티브시스템 주식회사 | 전동식 조향 장치의 제어 장치 및 방법 |
CN106971238A (zh) * | 2017-03-10 | 2017-07-21 | 东华大学 | 基于T‑S模糊Elman神经网络的短期电力负荷预测方法 |
CN106873558A (zh) * | 2017-03-22 | 2017-06-20 | 东北大学 | 一种非线性系统的模糊重复输出控制器及其控制方法 |
CN106877399A (zh) * | 2017-03-24 | 2017-06-20 | 上海电力学院 | 一种单相lcl型并网逆变器双环控制方法 |
Non-Patent Citations (3)
Title |
---|
T-S Fuzzy Control of Uncertain Nonlinear Networked Control Systems;Weihua Deng;《2009 International Conference on Advanced Computer Control》;20090316;第36-40页 * |
基于T-S模糊模型的非线性互联大系统的鲁棒控制与滤波;钟智雄;《中国博士学位论文全文数据库-信息科技辑》;20170215(第02期);第I140-9页 * |
基于模糊控制的电网综合补偿系统研究;杨杰;《华北电力技术》;20020228(第02期);第8-10页 * |
Also Published As
Publication number | Publication date |
---|---|
CN109240088A (zh) | 2019-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109240088B (zh) | 一种电力网络通信延时的估计与补偿有限时间控制方法 | |
Li et al. | A hybrid adaptive fuzzy control for a class of nonlinear MIMO systems | |
Cai et al. | A sufficiently smooth projection operator | |
CN108829065B (zh) | 基于事件触发的分布式发电系统时滞输出协同控制方法 | |
Hua et al. | Model following controller design for large-scale systems with time-delay interconnections and multiple dead-zone inputs | |
CN106873558B (zh) | 一种非线性系统的模糊重复输出控制器及其控制方法 | |
Meng et al. | Consensus of multiagents in switching networks using input-to-state stability of switched systems | |
CN103716013A (zh) | 变参数比例自适应滤波器 | |
CN109314390A (zh) | 获取直流电力网潮流的等量电导补偿型全局线性对称方法 | |
CN109189146A (zh) | 一种基于有限时间模糊滑膜控制的光伏系统最大功率追踪方法 | |
Verriest et al. | Advances in optimal control of differential systems with the state suprema | |
CN110365045B (zh) | 一种基于估计与补偿控制的风光互补发电系统的网络延时抑制方法 | |
Duff et al. | Approximation of stability regions for large-scale time-delay systems using model reduction techniques | |
CN113515066B (zh) | 一种非线性多智能体系统动态事件触发控制方法 | |
CN110095985A (zh) | 一种观测器设计方法和抗干扰控制系统 | |
Ragavendiran et al. | A new SPARLS algorithm for tuning power system stabilizer | |
CN112731801B (zh) | 一种对称死区非线性的自适应动态面输出反馈控制方法 | |
CN108958022B (zh) | 非线性主-从时延系统的时滞相关有限时间同步控制方法 | |
CN110320804B (zh) | 一种非仿射动力学系统的控制方法 | |
CN106897944B (zh) | 支路传输功率的解耦方法 | |
CN109417291B (zh) | 获取直流电力网潮流的均衡电导补偿型全局线性对称方法 | |
CN110032171B (zh) | 一种基于截止频率控制回路设计方法 | |
CN110011421B (zh) | 一种自我触发的能源互联网电力路由器网络控制方法 | |
Gao et al. | Adaptive homo‐backstepping tracking control for strict‐feedback systems in presence of unknown dead‐zones | |
CN114326372B (zh) | 一种位置伺服系统的非光滑反馈最佳跟踪控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220926 Address after: Room 203, Building 2, Phase 1, E-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province, 230601 Patentee after: Hefei Jiuzhou Longteng scientific and technological achievement transformation Co.,Ltd. Address before: 200 xiyuangong Road, Shangjie Town, Minhou County, Fuzhou City, Fujian Province Patentee before: MINJIANG University |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221024 Address after: Room 1003, 10th Floor, No. 88, Wanchuang Road, Tangjiawan Town, High-tech Zone, Zhuhai City, Guangdong Province, 519000 Patentee after: Guangdong Runyuan Energy Technology Co.,Ltd. Address before: Room 203, Building 2, Phase 1, E-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province, 230601 Patentee before: Hefei Jiuzhou Longteng scientific and technological achievement transformation Co.,Ltd. |