CN109208604A - The method for clearing up sea sand in PHC pipe pile core - Google Patents

The method for clearing up sea sand in PHC pipe pile core Download PDF

Info

Publication number
CN109208604A
CN109208604A CN201710537717.3A CN201710537717A CN109208604A CN 109208604 A CN109208604 A CN 109208604A CN 201710537717 A CN201710537717 A CN 201710537717A CN 109208604 A CN109208604 A CN 109208604A
Authority
CN
China
Prior art keywords
pipe pile
core
phc
sea sand
overcover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710537717.3A
Other languages
Chinese (zh)
Inventor
陈知胜
赵宇清
徐文兵
郑栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710537717.3A priority Critical patent/CN109208604A/en
Publication of CN109208604A publication Critical patent/CN109208604A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to the live pouring concrete for building stake with mould-pipe or other moulds or similar concrete-pile field, the method for sea sand in specially a kind of cleaning PHC pipe pile core.A method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows: a. preparation of construction;B. it blocks;C. intubation and reinforcing bar;D. it fills the water;E. it rinses;F. it detects;G. it drains.The present invention saves operating personnel, reduces labor intensity, and construction efficiency is high.

Description

The method for clearing up sea sand in PHC pipe pile core
Technical field
The present invention relates to the live pouring concrete that stake is built with mould-pipe or other moulds or similar concrete-pile fields, specifically For a kind of method of sea sand in cleaning PHC pipe pile core.
Background technique
Island or coastal area earth's surface soil property are with sand, flour sand, sandy silt, sand gravel, silty clay and recent shape At coral limestone etc. based on.PHC tubular pole is used as in the engineering of ground, either using hammering or the construction party of static pressure Case requires to send PHC tubular pole to the stake top absolute altitude of design, and stake top absolute altitude is substantially below ground surface absolute altitude.Work progress In be difficult that sea sand is avoided to enter inside PHC tubular pole, and PHC tubular pole and basic junction are substantially all and require stake in-core certain depth Distributing bar and casting concrete will be arranged in range, to guarantee that PHC tubular pole and basis preferably link together or play resistance to plucking Effect.And the sea sand cleaning of stake in-core is just at a problem for having to solve.
The sea sand of PHC pipe pile in-core, which is generallyd use, in previous engineering practice holds semicircle frequently with construction personnel The easy cleaning of cleaning tool bit by bit such as shovel, Luoyang Spade.If PHC tubular pole quantity is few, some manpowers are suitably put into slightly Micro- consumption some times can complete.But in the large number of heavy construction of PHC tubular pole, if still simple, routine using these Method needs to put into a large amount of labour, consumption a large amount of time, unit in charge of construction either in terms of the duration or in terms of cost It is all unbearable, so being badly in need of a kind of to use a small number of construction personnel and can be in a short time by large number of PHC pipe pile The method that in-core sea sand is cleaned out.
Summary of the invention
In order to overcome the drawbacks of the prior art, provide that a kind of saving operating personnel, to reduce labor intensity, construction efficiency high Method for cleaning, the invention discloses a kind of methods of sea sand in cleaning PHC pipe pile core.
The present invention reaches goal of the invention by following technical solution:
A method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows:
A. preparation of construction: prepare water inlet pipe, water pump and reinforcing bar;
B. it blocks: the port on PHC pipe pile core top being blocked with overcover, inlet opening and apopore are provided on overcover;
C. intubation and reinforcing bar: water inlet pipe is inserted into PHC pipe pile in-core chamber by inlet opening on overcover and is inserted into PHC pipe In the sea sand of stake stake in-core chamber, reinforcing bar is inserted into PHC pipe pile in-core chamber by the apopore on overcover;
D. it fills the water: opening water pump, water pump injects high pressure water to PHC pipe pile in-core chamber by water inlet pipe, and high pressure water rinses It is flowed out after the intracavitary sea sand of PHC pipe pile in-core by the apopore on overcover;
E. it rinses: continual rinsing, while passing through the sea sand of the apopore insertion PHC pipe pile in-core chamber on overcover with reinforcing bar Interior discontinuity back and forth plugs, and loosens sea sand;
F. detect: detection borehole cleaning depth reaches the inner sidewall for rinsing PHC pipe pile core after projected depth with clear water;
G. it drains: being extracted out the ponding of PHC pipe pile in-core with water pump.
The method of sea sand in the cleaning PHC pipe pile core, it is characterized in that:
When step a, it is also prepared for outlet pipe;
When step c, outlet pipe is also inserted into PHC pipe pile in-core chamber by the apopore on overcover, reinforcing bar is passed through into water outlet Apopore of the pipe on overcover is inserted into PHC pipe pile in-core chamber;
When step e, the apopore on overcover is passed through by outlet pipe with reinforcing bar and is inserted into the sea sand of PHC pipe pile in-core chamber It is interior.
The present invention makes an in-core form one by filling water toward PHC pipe pile in-core and effectively covering at pile crown Substantially closed space, injects high pressure water and under the agitation of tool in confined space, and sea sand is unique as high pressure water passes through Water outlet be discharged stake core.A water injection pipe (water injection pipe will be approached or is inserted into sea sand) and one are reserved on pile crown overcover Water outlet, injects high pressure water toward stake in-core by water inlet pipe, places a root long reinforcing bar in water outlet, starts to infuse at water filling port When entering high pressure water, while construction personnel uses the sea sand that stake in-core is stirred above and below reinforcing bar in water outlet.Water outlet there are flowing out When, PHC pipe pile core is discharged in the sea sand in PHC tubular pole together under the agitation of reinforcing bar also with high pressure water.Sea sand Clear up to design requirement fill out core depth or less after can stop aforesaid operations, be transferred to next root canal pile and continue to clear up.
The present invention solves PHC pipe pile in-core sea sand cleaning hardly possible, wadding weft variation depth is not able to satisfy design requirement Problem, so that stake in-core sea sand is smoothly clear, wadding weft variation depth is up to standard.Using the present invention, a small amount of construction can be used Personnel can efficiently solve the problems, such as that sea sand is cleared up in PHC tubular pole in a short time, shorten applying for an in-core sea sand cleaning The work duration, reduce construction cost.
The invention has the following beneficial effects:
1. changing pure manual operation state;
2. labor intensity of workers is substantially reduced;
3. working efficiency and speed of application significantly improve, conventional method averagely clears up 2 piles for each person every day, and 3 people of the invention are flat One pile of cleaning can be completed within equal 15 minutes, 30 piles can be cleared up within one day.
4. the present invention efficiently solves during clearing up stake core sea sand, labor intensity of workers is big, and working efficiency is low, construction Speed is slow, and stake holes inner wall cleaning effect is undesirable, it is difficult to the problem of meeting the requirement of detail design.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
A method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows:
A. preparation of construction: prepare water inlet pipe, outlet pipe, water pump and reinforcing bar;
B. it blocks: the port on PHC pipe pile core top is blocked with overcover, sandbag can be selected in overcover or other are soft close Closure material is provided with inlet opening and apopore on overcover;
C. water inlet pipe and outlet pipe intubation and reinforcing bar: are inserted into PHC tubular pole by inlet opening on overcover and apopore respectively Stake in-core chamber, water inlet pipe are simultaneously inserted into the sea sand of PHC pipe pile in-core chamber, and reinforcing bar is passed through going out on overcover by outlet pipe PHC pipe pile in-core chamber is inserted into water hole;
D. it fills the water: opening water pump, water pump injects high pressure water to PHC pipe pile in-core chamber by water inlet pipe, and high pressure water rinses It is flowed out after the intracavitary sea sand of PHC pipe pile in-core by the apopore on overcover;
E. it rinses: continual rinsing, while the apopore on overcover is passed through by outlet pipe with reinforcing bar and is inserted into PHC pipe pile core Discontinuity back and forth plugs in the sea sand of inner cavity, loosens sea sand;
F. detect: detection borehole cleaning depth reaches the inner sidewall for rinsing PHC pipe pile core after projected depth with clear water;
G. it drains: being extracted out the ponding of PHC pipe pile in-core with water pump.

Claims (2)

1. a kind of method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows:
A. preparation of construction: prepare water inlet pipe, water pump and reinforcing bar;
B. it blocks: the port on PHC pipe pile core top being blocked with overcover, inlet opening and apopore are provided on overcover;
C. intubation and reinforcing bar: water inlet pipe is inserted into PHC pipe pile in-core chamber by inlet opening on overcover and is inserted into PHC pipe In the sea sand of stake stake in-core chamber, reinforcing bar is inserted into PHC pipe pile in-core chamber by the apopore on overcover;
D. it fills the water: opening water pump, water pump injects high pressure water to PHC pipe pile in-core chamber by water inlet pipe, and high pressure water rinses It is flowed out after the intracavitary sea sand of PHC pipe pile in-core by the apopore on overcover;
E. it rinses: continual rinsing, while passing through the sea sand of the apopore insertion PHC pipe pile in-core chamber on overcover with reinforcing bar Interior discontinuity back and forth plugs, and loosens sea sand;
F. detect: detection borehole cleaning depth reaches the inner sidewall for rinsing PHC pipe pile core after projected depth with clear water;
G. it drains: being extracted out the ponding of PHC pipe pile in-core with water pump.
2. the method for clearing up sea sand in PHC pipe pile core as described in claim 1, it is characterized in that:
When step a, it is also prepared for outlet pipe;
When step c, outlet pipe is also inserted into PHC pipe pile in-core chamber by the apopore on overcover, reinforcing bar is passed through into water outlet Apopore of the pipe on overcover is inserted into PHC pipe pile in-core chamber;
When step e, the apopore on overcover is passed through by outlet pipe with reinforcing bar and is inserted into the sea sand of PHC pipe pile in-core chamber It is interior.
CN201710537717.3A 2017-06-30 2017-06-30 The method for clearing up sea sand in PHC pipe pile core Pending CN109208604A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710537717.3A CN109208604A (en) 2017-06-30 2017-06-30 The method for clearing up sea sand in PHC pipe pile core

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710537717.3A CN109208604A (en) 2017-06-30 2017-06-30 The method for clearing up sea sand in PHC pipe pile core

Publications (1)

Publication Number Publication Date
CN109208604A true CN109208604A (en) 2019-01-15

Family

ID=64991986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710537717.3A Pending CN109208604A (en) 2017-06-30 2017-06-30 The method for clearing up sea sand in PHC pipe pile core

Country Status (1)

Country Link
CN (1) CN109208604A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116497813A (en) * 2023-05-15 2023-07-28 中国建筑第八工程局有限公司 Construction method of ultra-long prestressed pipe piles for dense sand layer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203977422U (en) * 2014-08-11 2014-12-03 重庆工商职业学院 Building pile foundation holing with slurry wall protection sediment treating apparatus
CN104328786A (en) * 2014-12-01 2015-02-04 二十二冶集团天津建设有限公司 Construction method for cleaning soil in ultra-deep prestressed pipe pile core
CN204608785U (en) * 2015-02-06 2015-09-02 耿明全 Pile-sinking device is washed in a pan in static pressure punching
CN204645048U (en) * 2015-05-11 2015-09-16 中天建设集团有限公司 A kind of pile tube soil sampler

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203977422U (en) * 2014-08-11 2014-12-03 重庆工商职业学院 Building pile foundation holing with slurry wall protection sediment treating apparatus
CN104328786A (en) * 2014-12-01 2015-02-04 二十二冶集团天津建设有限公司 Construction method for cleaning soil in ultra-deep prestressed pipe pile core
CN204608785U (en) * 2015-02-06 2015-09-02 耿明全 Pile-sinking device is washed in a pan in static pressure punching
CN204645048U (en) * 2015-05-11 2015-09-16 中天建设集团有限公司 A kind of pile tube soil sampler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116497813A (en) * 2023-05-15 2023-07-28 中国建筑第八工程局有限公司 Construction method of ultra-long prestressed pipe piles for dense sand layer

Similar Documents

Publication Publication Date Title
CN109113068A (en) A kind of inverse construction joint structure for building construction of deep basal pit
CN104878767A (en) Construction method for carrying out plant-growing concrete and plastic stone combined ecological landscape protection on rocky side slope
CN110512892B (en) Construction method for repairing existing ancient city wall
CN108425341B (en) Stepped landscape retaining wall for ecological river channel and construction method thereof
CN110241849A (en) An assembled concrete box retaining wall and its construction method
CN205669185U (en) A kind of hydraulic engineering ecological protection slope
CN109594568A (en) A kind of rock slope ecological safeguard structure and its method
CN107165170B (en) A kind of foundation ditch construction method
CN104278679A (en) Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN109208604A (en) The method for clearing up sea sand in PHC pipe pile core
CN209509559U (en) A kind of reinforcing of plain brick wall and Saussurea DC integral structure
CN108277811A (en) A kind of slope reinforcement structure and reinforcement means
CN105638383A (en) Farmland segmental watering device
CN105386444B (en) A kind of basis pile pore-forming device and forming hole method
CN207944417U (en) A kind of ecological bank protection structure
CN207812482U (en) A kind of stone masonry vertical retaining wall structure ecological reconstruction structure
CN209742048U (en) Cascaded view lake
CN204080750U (en) Box-type suction foundation sluice structure
CN207794060U (en) A kind of Ecotype Concrete support pile
CN106759162B (en) The construction method of sluice force reduction pool bottom ruggedized construction
CN206928320U (en) A kind of retaining wall for hydraulic engineering
CN104074489B (en) Oil/gas Well drainage shutoff method with pressure
CN205934938U (en) Concrete bank protection structure is built to empty window formula anchor wire mould
CN103114601A (en) Cut-off method of rapid-hardening high-spray grouting of strong leakage stratum and device thereof
CN207109850U (en) A kind of ecological afforestation retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115