CN109208604A - The method for clearing up sea sand in PHC pipe pile core - Google Patents
The method for clearing up sea sand in PHC pipe pile core Download PDFInfo
- Publication number
- CN109208604A CN109208604A CN201710537717.3A CN201710537717A CN109208604A CN 109208604 A CN109208604 A CN 109208604A CN 201710537717 A CN201710537717 A CN 201710537717A CN 109208604 A CN109208604 A CN 109208604A
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- core
- phc
- sea sand
- overcover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004576 sand Substances 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 53
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 20
- 238000004140 cleaning Methods 0.000 claims abstract description 19
- 238000010276 construction Methods 0.000 claims abstract description 15
- 238000002360 preparation method Methods 0.000 claims abstract description 4
- 238000002627 tracheal intubation Methods 0.000 claims abstract description 4
- 238000001514 detection method Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 238000013019 agitation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 235000014653 Carica parviflora Nutrition 0.000 description 1
- 241000243321 Cnidaria Species 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 210000004262 dental pulp cavity Anatomy 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 235000013312 flour Nutrition 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/08—Removing obstacles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The present invention relates to the live pouring concrete for building stake with mould-pipe or other moulds or similar concrete-pile field, the method for sea sand in specially a kind of cleaning PHC pipe pile core.A method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows: a. preparation of construction;B. it blocks;C. intubation and reinforcing bar;D. it fills the water;E. it rinses;F. it detects;G. it drains.The present invention saves operating personnel, reduces labor intensity, and construction efficiency is high.
Description
Technical field
The present invention relates to the live pouring concrete that stake is built with mould-pipe or other moulds or similar concrete-pile fields, specifically
For a kind of method of sea sand in cleaning PHC pipe pile core.
Background technique
Island or coastal area earth's surface soil property are with sand, flour sand, sandy silt, sand gravel, silty clay and recent shape
At coral limestone etc. based on.PHC tubular pole is used as in the engineering of ground, either using hammering or the construction party of static pressure
Case requires to send PHC tubular pole to the stake top absolute altitude of design, and stake top absolute altitude is substantially below ground surface absolute altitude.Work progress
In be difficult that sea sand is avoided to enter inside PHC tubular pole, and PHC tubular pole and basic junction are substantially all and require stake in-core certain depth
Distributing bar and casting concrete will be arranged in range, to guarantee that PHC tubular pole and basis preferably link together or play resistance to plucking
Effect.And the sea sand cleaning of stake in-core is just at a problem for having to solve.
The sea sand of PHC pipe pile in-core, which is generallyd use, in previous engineering practice holds semicircle frequently with construction personnel
The easy cleaning of cleaning tool bit by bit such as shovel, Luoyang Spade.If PHC tubular pole quantity is few, some manpowers are suitably put into slightly
Micro- consumption some times can complete.But in the large number of heavy construction of PHC tubular pole, if still simple, routine using these
Method needs to put into a large amount of labour, consumption a large amount of time, unit in charge of construction either in terms of the duration or in terms of cost
It is all unbearable, so being badly in need of a kind of to use a small number of construction personnel and can be in a short time by large number of PHC pipe pile
The method that in-core sea sand is cleaned out.
Summary of the invention
In order to overcome the drawbacks of the prior art, provide that a kind of saving operating personnel, to reduce labor intensity, construction efficiency high
Method for cleaning, the invention discloses a kind of methods of sea sand in cleaning PHC pipe pile core.
The present invention reaches goal of the invention by following technical solution:
A method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows:
A. preparation of construction: prepare water inlet pipe, water pump and reinforcing bar;
B. it blocks: the port on PHC pipe pile core top being blocked with overcover, inlet opening and apopore are provided on overcover;
C. intubation and reinforcing bar: water inlet pipe is inserted into PHC pipe pile in-core chamber by inlet opening on overcover and is inserted into PHC pipe
In the sea sand of stake stake in-core chamber, reinforcing bar is inserted into PHC pipe pile in-core chamber by the apopore on overcover;
D. it fills the water: opening water pump, water pump injects high pressure water to PHC pipe pile in-core chamber by water inlet pipe, and high pressure water rinses
It is flowed out after the intracavitary sea sand of PHC pipe pile in-core by the apopore on overcover;
E. it rinses: continual rinsing, while passing through the sea sand of the apopore insertion PHC pipe pile in-core chamber on overcover with reinforcing bar
Interior discontinuity back and forth plugs, and loosens sea sand;
F. detect: detection borehole cleaning depth reaches the inner sidewall for rinsing PHC pipe pile core after projected depth with clear water;
G. it drains: being extracted out the ponding of PHC pipe pile in-core with water pump.
The method of sea sand in the cleaning PHC pipe pile core, it is characterized in that:
When step a, it is also prepared for outlet pipe;
When step c, outlet pipe is also inserted into PHC pipe pile in-core chamber by the apopore on overcover, reinforcing bar is passed through into water outlet
Apopore of the pipe on overcover is inserted into PHC pipe pile in-core chamber;
When step e, the apopore on overcover is passed through by outlet pipe with reinforcing bar and is inserted into the sea sand of PHC pipe pile in-core chamber
It is interior.
The present invention makes an in-core form one by filling water toward PHC pipe pile in-core and effectively covering at pile crown
Substantially closed space, injects high pressure water and under the agitation of tool in confined space, and sea sand is unique as high pressure water passes through
Water outlet be discharged stake core.A water injection pipe (water injection pipe will be approached or is inserted into sea sand) and one are reserved on pile crown overcover
Water outlet, injects high pressure water toward stake in-core by water inlet pipe, places a root long reinforcing bar in water outlet, starts to infuse at water filling port
When entering high pressure water, while construction personnel uses the sea sand that stake in-core is stirred above and below reinforcing bar in water outlet.Water outlet there are flowing out
When, PHC pipe pile core is discharged in the sea sand in PHC tubular pole together under the agitation of reinforcing bar also with high pressure water.Sea sand
Clear up to design requirement fill out core depth or less after can stop aforesaid operations, be transferred to next root canal pile and continue to clear up.
The present invention solves PHC pipe pile in-core sea sand cleaning hardly possible, wadding weft variation depth is not able to satisfy design requirement
Problem, so that stake in-core sea sand is smoothly clear, wadding weft variation depth is up to standard.Using the present invention, a small amount of construction can be used
Personnel can efficiently solve the problems, such as that sea sand is cleared up in PHC tubular pole in a short time, shorten applying for an in-core sea sand cleaning
The work duration, reduce construction cost.
The invention has the following beneficial effects:
1. changing pure manual operation state;
2. labor intensity of workers is substantially reduced;
3. working efficiency and speed of application significantly improve, conventional method averagely clears up 2 piles for each person every day, and 3 people of the invention are flat
One pile of cleaning can be completed within equal 15 minutes, 30 piles can be cleared up within one day.
4. the present invention efficiently solves during clearing up stake core sea sand, labor intensity of workers is big, and working efficiency is low, construction
Speed is slow, and stake holes inner wall cleaning effect is undesirable, it is difficult to the problem of meeting the requirement of detail design.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
A method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows:
A. preparation of construction: prepare water inlet pipe, outlet pipe, water pump and reinforcing bar;
B. it blocks: the port on PHC pipe pile core top is blocked with overcover, sandbag can be selected in overcover or other are soft close
Closure material is provided with inlet opening and apopore on overcover;
C. water inlet pipe and outlet pipe intubation and reinforcing bar: are inserted into PHC tubular pole by inlet opening on overcover and apopore respectively
Stake in-core chamber, water inlet pipe are simultaneously inserted into the sea sand of PHC pipe pile in-core chamber, and reinforcing bar is passed through going out on overcover by outlet pipe
PHC pipe pile in-core chamber is inserted into water hole;
D. it fills the water: opening water pump, water pump injects high pressure water to PHC pipe pile in-core chamber by water inlet pipe, and high pressure water rinses
It is flowed out after the intracavitary sea sand of PHC pipe pile in-core by the apopore on overcover;
E. it rinses: continual rinsing, while the apopore on overcover is passed through by outlet pipe with reinforcing bar and is inserted into PHC pipe pile core
Discontinuity back and forth plugs in the sea sand of inner cavity, loosens sea sand;
F. detect: detection borehole cleaning depth reaches the inner sidewall for rinsing PHC pipe pile core after projected depth with clear water;
G. it drains: being extracted out the ponding of PHC pipe pile in-core with water pump.
Claims (2)
1. a kind of method of sea sand in cleaning PHC pipe pile core, it is characterized in that: successively implementing as follows:
A. preparation of construction: prepare water inlet pipe, water pump and reinforcing bar;
B. it blocks: the port on PHC pipe pile core top being blocked with overcover, inlet opening and apopore are provided on overcover;
C. intubation and reinforcing bar: water inlet pipe is inserted into PHC pipe pile in-core chamber by inlet opening on overcover and is inserted into PHC pipe
In the sea sand of stake stake in-core chamber, reinforcing bar is inserted into PHC pipe pile in-core chamber by the apopore on overcover;
D. it fills the water: opening water pump, water pump injects high pressure water to PHC pipe pile in-core chamber by water inlet pipe, and high pressure water rinses
It is flowed out after the intracavitary sea sand of PHC pipe pile in-core by the apopore on overcover;
E. it rinses: continual rinsing, while passing through the sea sand of the apopore insertion PHC pipe pile in-core chamber on overcover with reinforcing bar
Interior discontinuity back and forth plugs, and loosens sea sand;
F. detect: detection borehole cleaning depth reaches the inner sidewall for rinsing PHC pipe pile core after projected depth with clear water;
G. it drains: being extracted out the ponding of PHC pipe pile in-core with water pump.
2. the method for clearing up sea sand in PHC pipe pile core as described in claim 1, it is characterized in that:
When step a, it is also prepared for outlet pipe;
When step c, outlet pipe is also inserted into PHC pipe pile in-core chamber by the apopore on overcover, reinforcing bar is passed through into water outlet
Apopore of the pipe on overcover is inserted into PHC pipe pile in-core chamber;
When step e, the apopore on overcover is passed through by outlet pipe with reinforcing bar and is inserted into the sea sand of PHC pipe pile in-core chamber
It is interior.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710537717.3A CN109208604A (en) | 2017-06-30 | 2017-06-30 | The method for clearing up sea sand in PHC pipe pile core |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710537717.3A CN109208604A (en) | 2017-06-30 | 2017-06-30 | The method for clearing up sea sand in PHC pipe pile core |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109208604A true CN109208604A (en) | 2019-01-15 |
Family
ID=64991986
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710537717.3A Pending CN109208604A (en) | 2017-06-30 | 2017-06-30 | The method for clearing up sea sand in PHC pipe pile core |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109208604A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116497813A (en) * | 2023-05-15 | 2023-07-28 | 中国建筑第八工程局有限公司 | Construction method of ultra-long prestressed pipe piles for dense sand layer |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203977422U (en) * | 2014-08-11 | 2014-12-03 | 重庆工商职业学院 | Building pile foundation holing with slurry wall protection sediment treating apparatus |
| CN104328786A (en) * | 2014-12-01 | 2015-02-04 | 二十二冶集团天津建设有限公司 | Construction method for cleaning soil in ultra-deep prestressed pipe pile core |
| CN204608785U (en) * | 2015-02-06 | 2015-09-02 | 耿明全 | Pile-sinking device is washed in a pan in static pressure punching |
| CN204645048U (en) * | 2015-05-11 | 2015-09-16 | 中天建设集团有限公司 | A kind of pile tube soil sampler |
-
2017
- 2017-06-30 CN CN201710537717.3A patent/CN109208604A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203977422U (en) * | 2014-08-11 | 2014-12-03 | 重庆工商职业学院 | Building pile foundation holing with slurry wall protection sediment treating apparatus |
| CN104328786A (en) * | 2014-12-01 | 2015-02-04 | 二十二冶集团天津建设有限公司 | Construction method for cleaning soil in ultra-deep prestressed pipe pile core |
| CN204608785U (en) * | 2015-02-06 | 2015-09-02 | 耿明全 | Pile-sinking device is washed in a pan in static pressure punching |
| CN204645048U (en) * | 2015-05-11 | 2015-09-16 | 中天建设集团有限公司 | A kind of pile tube soil sampler |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116497813A (en) * | 2023-05-15 | 2023-07-28 | 中国建筑第八工程局有限公司 | Construction method of ultra-long prestressed pipe piles for dense sand layer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109113068A (en) | A kind of inverse construction joint structure for building construction of deep basal pit | |
| CN104878767A (en) | Construction method for carrying out plant-growing concrete and plastic stone combined ecological landscape protection on rocky side slope | |
| CN110512892B (en) | Construction method for repairing existing ancient city wall | |
| CN108425341B (en) | Stepped landscape retaining wall for ecological river channel and construction method thereof | |
| CN110241849A (en) | An assembled concrete box retaining wall and its construction method | |
| CN205669185U (en) | A kind of hydraulic engineering ecological protection slope | |
| CN109594568A (en) | A kind of rock slope ecological safeguard structure and its method | |
| CN107165170B (en) | A kind of foundation ditch construction method | |
| CN104278679A (en) | Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method | |
| CN109208604A (en) | The method for clearing up sea sand in PHC pipe pile core | |
| CN209509559U (en) | A kind of reinforcing of plain brick wall and Saussurea DC integral structure | |
| CN108277811A (en) | A kind of slope reinforcement structure and reinforcement means | |
| CN105638383A (en) | Farmland segmental watering device | |
| CN105386444B (en) | A kind of basis pile pore-forming device and forming hole method | |
| CN207944417U (en) | A kind of ecological bank protection structure | |
| CN207812482U (en) | A kind of stone masonry vertical retaining wall structure ecological reconstruction structure | |
| CN209742048U (en) | Cascaded view lake | |
| CN204080750U (en) | Box-type suction foundation sluice structure | |
| CN207794060U (en) | A kind of Ecotype Concrete support pile | |
| CN106759162B (en) | The construction method of sluice force reduction pool bottom ruggedized construction | |
| CN206928320U (en) | A kind of retaining wall for hydraulic engineering | |
| CN104074489B (en) | Oil/gas Well drainage shutoff method with pressure | |
| CN205934938U (en) | Concrete bank protection structure is built to empty window formula anchor wire mould | |
| CN103114601A (en) | Cut-off method of rapid-hardening high-spray grouting of strong leakage stratum and device thereof | |
| CN207109850U (en) | A kind of ecological afforestation retaining wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |