CN109208578A CN201810990988.9A CN201810990988A CN109208578A CN 109208578 A CN109208578 A CN 109208578A CN 201810990988 A CN201810990988 A CN 201810990988A CN 109208578 A CN109208578 A CN 109208578A
Authority
CN
China
Prior art keywords
slip casting
core pipe
segment
casting core
orients
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810990988.9A
Other languages
Chinese (zh)
Inventor
彭峰
张继昶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rui Wei Century Railway Engineering Co Ltd
Original Assignee
Beijing Rui Wei Century Railway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rui Wei Century Railway Engineering Co Ltd filed Critical Beijing Rui Wei Century Railway Engineering Co Ltd
Priority to CN201810990988.9A priority Critical patent/CN109208578A/en
Publication of CN109208578A publication Critical patent/CN109208578A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of abutments to orient grout injection control sedimentation method, comprising: orients to slip casting region and drills to form several vertical injected holes towards the internal vertical to slip casting region from constructing;By in the vertical injected hole of mini-valve tube tripping in, sleeve shell material is injected to the gap between mini-valve tube outer wall and vertical injected hole inner wall;Slip casting core pipe is transferred by hoist engine, and slip casting is oriented into mini-valve tube, wherein, slip casting core pipe includes first segment slip casting core pipe interconnected and second segment slip casting core pipe, first segment slip casting core pipe is cut by hot rolled seamless steel tube, second segment slip casting core pipe is made of galvanized pipe, the setting of first segment slip casting core pipe, to slip casting section, sets the non-slip casting section that the setting of second segment slip casting core pipe is located at vertical injected hole positioned at vertical injected hole;And step 3 is repeated, successively implement the slip casting of all vertical injected holes.

Description

Abutment orients grout injection control sedimentation method
Technical field
The present invention relates to abutment technical field more particularly to a kind of methods for controlling settlement.
Background technique
Slurry injection technique is important householder method flabbiness ground strengthened in bridge foundation and underground engineering construction, is solving bridge It plays an important role in base settlement issues and raising foundation bearing capacity.Since abutment is deeper, multidigit in the lake Jiang Hai, and the depth of water compared with Greatly, therefore extreme difficulties are brought to bored grouting construction, causes grouting consolidation effect undesirable.
A kind of bridge struction pile post grouting construction method as disclosed in Chinese patent application 201710667140.8, packet Include following steps: (1) slip casting jet pipe makes;(2) Grouting Pipe is installed;(3) Grouting Pipe tries water;(4) packer permeability test and pressure water open plug. The invention improves the structural reliability of pile bearing capacity, and can be as an effective benefit for having mass defect bored concrete pile Measure is rescued, madjack pipe can be squeezed into pile side and carry out mud jacking to improve bearing capacity of single pile, the single pile of cast-in-situ bored pile can be improved Bearing capacity, and can be effectively controlled the settling amount of pile foundation.But the invention still remains following disadvantage or deficiency: (1), the invention Slip casting jet pipe cannot achieve the orientation grouting and reinforcing in deepwater environment;(2), the tolerance scarce capacity of slip casting core pipe, it is difficult to Meet the high-pressure slip-casting pressure under deepwater environment.
For another example one kind disclosed in Chinese patent application 201210536085.6 is in deep water torrent intectate steep bare rock On high-order trestle construction method.Its scheme is as follows: the first hole trestle of constructing on the coast, thereafter using the second hole of cantilever method construction Leading truck is arranged in the tail end of the second hole trestle in trestle;Steel-pipe pile after cutting is fallen into installation position, thereafter in steel-pipe pile Underwater concrete layer is inside poured, after underwater concrete layer has conserved, along the central axial drilling anchor hole of steel-pipe pile, anchor hole is through underwater Concrete layer simultaneously stretches in the basement rock in riverbed, anchor pole and slip casting anchoring is finally installed in anchor hole, assembled truss is constituted later Third hole trestle;And so on complete bed rearrangement trestle construction.But the invention still remains following disadvantage or deficiency: (1), the party The construction technology of method is complex, and construction working hour is long, and process costs are high;(2), undisclosed how high pressure to be carried out under deep water state The mode of slip casting.
Therefore it provides a kind of abutment orientation grout injection control sedimentation method for realizing bridge foundation in depth water orientation grouting and reinforcing becomes industry Interior urgent problem.
Summary of the invention
The object of the present invention is to provide a kind of abutments to orient grout injection control sedimentation method (abbreviation QDZ engineering method), by adopting With heavy caliber deep hole rigidity mini-valve tube carry out surface grouting and hole inner tube canopy horizontal grouting reinforce in combination with mode, fill up ground Layer gap, improves rock mass compactness, consolidates to rock mass, and the globality for passing through the tunnel of fault belt is reinforced in enhancing, from And surrounding rock stability is improved, guarantee the safety of tunnel excavation construction.
To achieve the goals above, the present invention provides a kind of abutments to orient grout injection control sedimentation method, comprising: (1), determines Position goes out to slip casting region and drills to form several vertical injected holes towards the internal vertical to slip casting region from constructing;(2), will In the vertical injected hole of mini-valve tube tripping in, sleeve shell material is injected to the gap between mini-valve tube outer wall and vertical injected hole inner wall;(3), Slip casting core pipe is transferred by hoist engine and is oriented slip casting into mini-valve tube, wherein slip casting core pipe includes interconnected first Section slip casting core pipe and second segment slip casting core pipe, first segment slip casting core pipe are cut by hot rolled seamless steel tube, second segment slip casting core Pipe is made of galvanized pipe, and the setting of first segment slip casting core pipe, to slip casting section, sets second segment slip casting core positioned at vertical injected hole Pipe setting is located at the non-slip casting section of vertical injected hole;And (4), repetition step (3), successively implement all vertical injected holes Slip casting.
Selectively, first segment slip casting core pipe includes the hot rolled seamless steel tube that several sections are connected by screw thread, second segment Slip casting core pipe includes the galvanized pipe that several sections are connected by screw thread, between first segment slip casting core pipe and second segment slip casting core pipe Length ratio is 1:5~6.
Selectively, the end of the first segment hot rolled seamless steel tube of first segment slip casting core pipe be equipped with stop grouting plug and with only Slurry plug connection, stop grouting plug set the end to slip casting section of the vertical injected hole in position.
Selectively, the diameter of the hot rolled seamless steel tube of each section in first segment slip casting core pipe is 20~30 millimeters, wall Thickness is 2.5~5 millimeters, and length is 1.5~2.5 meters.
Selectively, the diameter of the galvanized pipe of each section in second segment slip casting core pipe with it is every in first segment slip casting core pipe The diameter and wall thickness of the hot rolled seamless steel tube of one section are all the same.
Selectively, the slip casting process in step (3) takes segmentation retrusive grouting process, and slip casting segmentation step pitch is set as 80~100 centimetres.
Selectively, the grouting pressure of the slip casting process in step (3) is set as 2~6 megapascal.
Selectively, stop grouting plug is 40~60 millimeters of diameter, long 0.8~2 meter of water-bag type high pressure stop grouting plug.
Selectively, sleeve shell material is obtained by water, sulphate aluminium cement and bentonite mixed preparing in step (2), wherein Water, sulphate aluminium cement, bentonitic ratio are (1~2): 1:(1~2).
Selectively, before step (2), further include select casing as drilling outer guard with drilling rod follow-up squeeze into It prevents from destroying vertical injected hole.
Selectively, selection casing follow-up drilling rod squeezes into drilling, further after the completion of mini-valve tube is installed, injection sleeve shell material It is risen before sealing of hole and pulls out casing.
Selectively, the material of casing is steel.
Preferably, the hole depth of vertical injected hole should be measured correctly, hole depth school of every 20~30 meters and end Kong Shiying progress Just, and record is given, guarantees that hole depth error is not more than 0.2%.When underwater slip casting, cast in place pile should be practical according to water level real time correction Drilling hole depth.
The beneficial effects of the present invention are: (1), can effectively control the sedimentation situation of abutment, greatly improve holding for abutment Power is carried, bridge subsequent construction and operation security has been effectively ensured;(2), abutment reinforcement depth can reach 120 meters, can be in water Grouting and reinforcing is precisely oriented in deep 50 meters of environment, consolidation effect is ideal;(3), it selects two kinds of materials that slip casting core pipe is made, utilizes Hot rolled seamless steel tube is cut into first segment slip casting core pipe, improves the stress-bearing capability of slip casting core pipe, avoids screw thread frequent breakage, drops Low-loss rate, and the weight that second segment slip casting core pipe integrally alleviates slip casting core pipe is made using galvanized pipe, it avoids because of slip casting core Pipe self weight is excessive to be difficult to the problem of pulling out, injected hole is caused to scrap;(4), using water-bag type stop grouting plug and ensure its expansion start Pressure is at least 2 megapascal and causes stop grouting plug expansion that stop grouting plug is caused to pull out difficult ask to avoid 100 meters or more of hole depth pressure Topic ensure that the exploitativeness of slip casting goes on smoothly construction;(5), human assistance is taken, transfers and rises by hoist engine and pull out Slip casting core pipe avoids core pipe screw thread running caused by pulling out by slip casting core pipe power transmission, and core pipe is disconnected to fall the generation of the defects of hole Probability substantially increases construction efficiency, guarantees the smooth tripping in of core pipe and rise to pull out.
Detailed description of the invention
Fig. 1 shows the flow chart of abutment orientation grout injection control sedimentation method of the invention.
Fig. 2 shows the structural schematic diagram of slip casting core pipe of the invention in mini-valve tube.
Specific embodiment
A kind of non-limiting embodiment according to the present invention provides a kind of abutment orientation grout injection control sedimentation method, This approach includes the following steps S1-S4.
In step sl, if orient to slip casting region and to be formed from constructing to drill towards the internal vertical to slip casting region Dry vertical injected hole.
In step s 2, by the vertical injected hole of mini-valve tube tripping in, between mini-valve tube outer wall and vertical injected hole inner wall Gap inject sleeve shell material, wherein sleeve shell material is obtained by water, sulphate aluminium cement and bentonite mixed preparing, water, sulphur aluminic acid Salt cement, bentonitic ratio are (1~2): 1:(1~2).
Then, in step s3, slip casting is oriented into mini-valve tube 100 by hoist engine decentralization slip casting core pipe 200 (to ask With reference to Fig. 2), wherein as shown in Fig. 2, slip casting core pipe 200 includes that first segment slip casting core pipe 210 interconnected and second segment are infused Core pipe 220 is starched, first segment slip casting core pipe 210 is cut by hot rolled seamless steel tube, and second segment slip casting core pipe 220 is by zinc-plated control At the setting of first segment slip casting core pipe, to slip casting section, sets second segment slip casting core pipe and set to be located at and hang down positioned at vertical injected hole The non-slip casting section of straight injected hole.
In step s 4, it is to repeat step (3), successively implements the slip casting of all vertical injected holes.
First segment slip casting core pipe of the invention includes the hot rolled seamless steel tube that several sections are connected by screw thread, each section The diameter of hot rolled seamless steel tube is 25 millimeters, wall thickness is 3 millimeters, and length is 2 meters.The first segment hot rolling of first segment slip casting core pipe without The end of seam steel pipe is equipped with stop grouting plug 300 and connect with stop grouting plug, the vertical injected hole in stop grouting plug setting position to slip casting area The end of section.
Second segment slip casting core pipe includes the galvanized pipe that several sections are connected by screw thread, first segment slip casting core pipe and second segment Length ratio between slip casting core pipe is 1:5~6, the diameter and first segment of the galvanized pipe of each section in second segment slip casting core pipe The diameter and wall thickness of the hot rolled seamless steel tube of each section in slip casting core pipe are all the same, and length is controlled at 2~3 meters.
As a result, be located at deepwater environment under to pass through the first segment slip casting core made of hot rolled seamless steel tube at slip casting section Pipe carries out slip casting, so as to the stress-bearing capability of slip casting core pipe, avoids screw thread frequent breakage, reduces the proportion of goods damageds.And it is located at non-note The second segment slip casting core pipe for starching section, it is higher because being located at water level, it does not need to be resistant to biggish pressure, it can be by zinc-plated control At can not only mitigate the overall weight of slip casting core pipe, but also the cost of slip casting core pipe can be reduced.
In the non-limiting embodiment, the slip casting process in step (3) takes segmentation retrusive grouting process, slip casting Segmentation step pitch is set as 90 centimetres, and the inner wall extruding of stop grouting plug dilation by water injection and mini-valve tube is close to, and is formed and stops slurry system in hole, only The frictional force that the tube wall of slurry plug and mini-valve tube generates reaches 2 megapascal and is enough to resist grouting pressure, connects slip casting by slip casting core pipe Machine pipeline grouting behind shaft or drift lining, grouting pressure reach 6 megapascal of ending standard, stop slip casting and by stop grouting plug pressure release, then rise and pull out after the completion Slip casting core pipe and stop grouting plug are to another vertical injected hole.
It further include selecting casing as drilling outer guard before step S2 as another non-limiting embodiments It squeezes into drilling rod follow-up to prevent from destroying vertical injected hole.Selection casing follow-up is squeezed into, and further comprises having installed in mini-valve tube It is risen before Cheng Hou, injection sleeve shell material sealing of hole and pulls out casing.
After abutment orientation grout injection control sedimentation method of the invention is to bridge pier well foundation grouting and reinforcing, open caisson is integrally steady Qualitative to greatly improve, structure safety, open caisson base bearing capacity greatly improves, and meets design requirement, ensure that subsequent construction safety, Base bearing capacity significantly improves, and consolidation effect is obvious.
Although detailed description of the present invention preferred embodiment herein, it is to be understood that the invention is not limited to this In the specific structure being described in detail and show and step, without departing from the spirit and scope of the present invention can be by this field Technical staff realize other modifications and variant.

Claims (10)

1. a kind of abutment orients grout injection control sedimentation method, comprising:
(1), it orients to slip casting region and to form several from constructing to drill towards the internal vertical to slip casting region and hang down Straight injected hole;
(2), by vertical injected hole described in mini-valve tube tripping in, between the mini-valve tube outer wall and the vertical injected hole inner wall Gap inject sleeve shell material;
(3), slip casting core pipe is transferred by hoist engine and is oriented slip casting into the mini-valve tube, wherein the slip casting core pipe packet First segment slip casting core pipe interconnected and second segment slip casting core pipe are included, the first segment slip casting core pipe is cut by hot rolled seamless steel tube It cuts and is made, the second segment slip casting core pipe is made of galvanized pipe, and the first segment slip casting core pipe setting is located at the vertical slip casting Hole to slip casting section, set the non-slip casting section that the second segment slip casting core pipe setting is located at the vertical injected hole;And
(4), step (3) are repeated, successively implements the slip casting of all vertical injected holes.
2. a kind of abutment as described in claim 1 orients grout injection control sedimentation method, which is characterized in that the first segment slip casting Core pipe includes the hot rolled seamless steel tube that several sections are connected by screw thread, and the second segment slip casting core pipe includes that several sections pass through silk Detain the galvanized pipe that is connected, the length ratio between the first segment slip casting core pipe and the second segment slip casting core pipe be 1:5~ 6。
3. a kind of abutment as claimed in claim 2 orients grout injection control sedimentation method, which is characterized in that the first segment slip casting The end of the first segment hot rolled seamless steel tube of core pipe is equipped with stop grouting plug and connect with the stop grouting plug, the stop grouting plug setting The end to slip casting section of the position vertical injected hole.
4. a kind of abutment as claimed in claim 3 orients grout injection control sedimentation method, which is characterized in that the first segment slip casting The diameter of the hot rolled seamless steel tube of each section in core pipe is 20~30 millimeters, wall thickness is 2.5~5 millimeters, length be 1.5~ 2.5 rice.
5. a kind of abutment as claimed in claim 3 orients grout injection control sedimentation method, which is characterized in that the second segment slip casting The diameter of the galvanized pipe of each section in core pipe is straight with the hot rolled seamless steel tube of each section in the first segment slip casting core pipe Diameter and wall thickness are all the same.
6. a kind of abutment as claimed in claim 3 orients grout injection control sedimentation method, which is characterized in that the note in step (3) Slurry process takes segmentation retrusive grouting process, and slip casting segmentation step pitch is set as 80~100 centimetres.
7. a kind of abutment as claimed in claim 3 orients grout injection control sedimentation method, which is characterized in that the note in step (3) The grouting pressure of slurry process is set as 2~6 megapascal.
8. a kind of abutment as claimed in claim 3 orients grout injection control sedimentation method, which is characterized in that the stop grouting plug is straight 40~60 millimeters of diameter, long 0.8~2 meter of water-bag type high pressure stop grouting plug.
9. a kind of abutment as described in claim 1 orients grout injection control sedimentation method, which is characterized in that described in step (2) Sleeve shell material is obtained by water, sulphate aluminium cement and bentonite mixed preparing, wherein water, sulphate aluminium cement, bentonitic ratio Example is (1~2): 1:(1~2).
10. a kind of abutment as described in claim 1 orients grout injection control sedimentation method, which is characterized in that step (2) it Before, it further include that casing is selected to squeeze into as drilling outer guard with drilling rod follow-up to prevent from destroying the vertical injected hole.
CN201810990988.9A 2018-08-28 2018-08-28 Abutment orients grout injection control sedimentation method Pending CN109208578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810990988.9A CN109208578A (en) 2018-08-28 2018-08-28 Abutment orients grout injection control sedimentation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810990988.9A CN109208578A (en) 2018-08-28 2018-08-28 Abutment orients grout injection control sedimentation method

Publications (1)

Publication Number Publication Date
CN109208578A true CN109208578A (en) 2019-01-15

Family

ID=64986055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810990988.9A Pending CN109208578A (en) 2018-08-28 2018-08-28 Abutment orients grout injection control sedimentation method

Country Status (1)

Country Link
CN (1) CN109208578A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204456128U (en) * 2015-01-21 2015-07-08 河北省建筑科学研究院 A kind of delamination pour slurry rifle
CN106640120A (en) * 2016-10-31 2017-05-10 彭峰 Ground-surface fixed-point deep hole layered grouting construction method
CN207211153U (en) * 2017-08-23 2018-04-10 中国水利水电第十三工程局有限公司 A kind of high artesian area concrete structure behind perforate grouting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204456128U (en) * 2015-01-21 2015-07-08 河北省建筑科学研究院 A kind of delamination pour slurry rifle
CN106640120A (en) * 2016-10-31 2017-05-10 彭峰 Ground-surface fixed-point deep hole layered grouting construction method
CN207211153U (en) * 2017-08-23 2018-04-10 中国水利水电第十三工程局有限公司 A kind of high artesian area concrete structure behind perforate grouting device

Similar Documents

Publication Publication Date Title
CN104594348B (en) Enlarged footing bellows anchor pole and construction method thereof
CN101638891B (en) Construction method of all casing precessing isolation pile
CN103669346B (en) A kind of tuck inside the sleeve raft pipe and the application in landslide control
CN106193032B (en) A kind of anti-float anchor rod construction method
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN108547291A (en) A kind of herring-bone form basalt fibre anchor system and its anchoring process
CN105220714B (en) Built-in anchor cable fills core compound prestress pile tube float Structure construction method
CN104314076B (en) A kind of soft foundation recoverable prestressed anchor Cable Structure and construction method
CN101532292B (en) Construction process for jet grouting anchor rod
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN101967983A (en) Method for over-dredging, anchoring, backfilling and controlling deep well rock roadway floor heave
CN204174618U (en) Soft foundation recoverable prestressed anchor Cable Structure
CN102168419A (en) Method for compounding anchor rod by geotextile reinforcing
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN110144978A (en) A kind of anti-float anchor rod construction method
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN206971247U (en) Concrete toe board foundation reinforcing structure arranged on unloading rock mass
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN106088123A (en) A kind of sand geology steel tube well fall water level device and construction method thereof
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed
CN206581314U (en) Screw head muscle body posttension pile foundation
CN204125941U (en) Uplift pile structure
CN109208578A (en) Abutment orients grout injection control sedimentation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115

RJ01 Rejection of invention patent application after publication