CN109183782A CN201811047906.3A CN201811047906A CN109183782A CN 109183782 A CN109183782 A CN 109183782A CN 201811047906 A CN201811047906 A CN 201811047906A CN 109183782 A CN109183782 A CN 109183782A
Authority
CN
China
Prior art keywords
concrete
pile
tubular pile
positioning column
splitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811047906.3A
Other languages
Chinese (zh)
Inventor
游剑峰
陈天富
周德超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN POLY TUBULARPILE Co Ltd
Original Assignee
FUJIAN POLY TUBULARPILE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN POLY TUBULARPILE Co Ltd filed Critical FUJIAN POLY TUBULARPILE Co Ltd
Priority to CN201811047906.3A priority Critical patent/CN109183782A/en
Publication of CN109183782A publication Critical patent/CN109183782A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/10Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed the shaping being effected by centrifugal or rotational moulding
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of anti-splitting prefabricated concrete pipe pile and production methods, including the first concrete tubular pile, second concrete tubular pile, fixed plate, connecting plate, circular hole, fastening bolt, support plate, first positioning column, second positioning column, adjusting nut, first positioning hole and second location hole, first concrete tubular pile top is provided with the second concrete tubular pile, first concrete tubular pile and the second concrete tubular pile junction are provided with fixed plate, structure of the invention is scientific and reasonable, it is safe and convenient to use, first positioning hole and the first positioning column are cooperatively connected, second location hole and the second positioning column are cooperatively connected, it is attached the first concrete tubular pile with the second concrete tubular pile, the first concrete tubular pile is connect closely with the second concrete tubular pile with adjusting nut mating connection by fastening bolt, preferably it is convenient for two concrete Spliced between tubular pole, while improving the anti-fissibility of concrete tubular pile by production method.

Description

The anti-splitting prefabricated concrete pipe pile of one kind and production method
Technical field
The present invention relates to concrete tubular pile technical field, specially a kind of anti-splitting prefabricated concrete pipe pile and production side Method.
Background technique
Concrete tubular pile can be divided into post-tensioned prestressing stake and pretensioned-prestressed tube pile, pretensioned-prestressed tube pile Be using a kind of hollow cylinder elongate concrete prefabricated components made of pretensioned prestressing technique and centrifugal casting, mainly by The composition such as cylinder-shaped pile body, end plate and steel hoop.
But not only structure is complicated for concrete tubular pile currently on the market, but also has a single function, existing concrete tubular pile It in technology, is not easy to connect between concrete tubular pile, while concrete tubular pile does not have good anti-fissibility.
Summary of the invention
The purpose of the present invention is to provide a kind of anti-splitting prefabricated concrete pipe pile and production methods, to solve above-mentioned background The problem of being proposed in technology.
In order to solve the above technical problem, the present invention provides following technical solutions: a kind of anti-splitting prefabricated concrete pipe pile, Including the first concrete tubular pile, the second concrete tubular pile, fixed plate, connecting plate, circular hole, fastening bolt, support plate, the first positioning Column, the second positioning column, adjusting nut, first positioning hole and second location hole, first concrete tubular pile, first coagulation Native tubular pole top is provided with the second concrete tubular pile, and first concrete tubular pile is provided with the second concrete tubular pile junction Fixed plate, is equipped with support plate on the inside of the fixed plate, and support plate top two sides are mounted on the first positioning column, and described the Two concrete tubular pile bottoms offer first positioning hole, and the first positioning column and first positioning hole are cooperatively connected, and described first is mixed Solidifying soil tubular pole top offers second location hole, and the connecting plate bottom is equipped with the second positioning column, second positioning column with Second location hole is cooperatively connected, and the fixed plate two sides are mounted on connecting plate, offer circular hole on the outside of the connecting plate, described Circular hole is internally provided with fastening bolt, is socketed with adjusting nut on the outside of the fastening bolt.
A kind of anti-splitting prefabricated concrete pipe pile production method includes the following steps: step 1, steel reinforcement cage binding;Step Two, enter mould;Step 3, filling concrete;Step 4, tensioning;Step 5, centrifugal forming;Step 6, steam press maintenance;Step 7, Demoulding;
In the step one, treated main reinforcement is fitted on the disk of binding machine stretched in trolley, trolley can be It is moved on lateral guide rail, adapts to the needs of the long steel reinforcement cage of piles with different, stirrup is placed on the disk in binding machine, and trolley is with solid Fixed speed moves, and then to be constantly wound steel reinforcement cage in main reinforcement, main reinforcement and stirrup are welded the reinforcing bar on disk with electrical pads, Without binding.
In the step two, after the completion of steel reinforcement cage binding, steel reinforcement cage is hung in prefabricated molds using overhead crane, Steel reinforcement cage both ends are equipped with nut, and after steel reinforcement cage is hung in punching block, both ends are secured to using the steel plate of annular, are arranged on steel plate There is bolt corresponding with nut, the setting of stretching end and the form of the other end are different, and the gap in punching block is tensioning sky Gap, after steel reinforcement cage is installed, it is medium to be filled that overhead crane is hung in filling concrete area.
In the step three, the position of steel reinforcement cage is placed and should not be deviated, and fix stably, filling concrete area has Corresponding oil well cracking acid pumping truck is run on station side rails, and the concrete amount of a pile is controlled in a vehicle, and trolley is hollow It is run in half die sinking, the concrete that lower part is exposed gradually fills in model, after the completion of filling concrete, around punching block It prevents water in concrete from losing in centrifugal process around a circle cotton thread, and hangs the punching block for coming the other half, closed.
In the step four, specific machine is sent at tubular piles stretching end and carries out tensioning, sequence of PR tension Symmetrical tensioning is answered, when both ends simultaneous tension, two ends must not loosen simultaneously, first anchor at one end, then supply tensioning in the other end It being anchored after power, both ends stretching force should be consistent, and two end stretch values should meet design code requirement after being added, when repeatedly stretching, It answers grading tension, after intermediate anchoring temporarilies at different levels, meter reading and is further continued for tensioning after measuring stretch value again, stretch value is avoided to measure The Specific amounts of accumulated error, tensioning is determined according to different requirements.
In the step five, the good tubular pole of tensioning is put into eccentric groove and is centrifuged, centrifugal action by a slow speed, it is low Speed, middling speed, high speed four-stage carry out, and to guarantee concrete compaction, the time of centrifugation is controlled in 15min or so, general basis Centrifugation rate determines that the hollow space of doughnut-shaped steel plate will use plantation rubber closure, is convenient for centrifugal forming, and can extract after molding Extra slurries guarantee smooth inside stake everywhere.
In the step six, T-PC, T-PTC centrifugal pile through centrifugal forming should use high-pressure steaming and cultivating, T-PHC centrifugation Stake should use normal pressure steam-cured and high-pressure steaming and cultivating, steam-cured pond are the big pond that concrete is built into, and the tubular pole after centrifugal forming is put into In pond, concrete cover is covered, steam press maintenance can be carried out, after steam curing in 16-20 hours, intensity is supported up to normal The 70%-80% of 28 days intensity under the conditions of shield.
It is described to recall punching block after reaching the steam pressure time in the step seven, the fixing bolt for two sides of dismantling, Model can be dismantled by overhead crane, manufactured prestressed concrete pipe pile stacking in heaps, wait train agreement to transport to and apply Work scene
According to the above technical scheme, rubber pad is provided on the inside of the fixed plate, the rubber pad and fixed plate pass through seccotine Bonding.
According to the above technical scheme, the fixed plate outside opens up fluted, and the inside grooves are provided with reinforcing rib.
According to the above technical scheme, first positioning column is installed on inside first positioning hole, and the first positioning column and A positioning hole is interference fit.
According to the above technical scheme, in the steam press maintenance temperature is 175 DEG C, air pressure is 8 atmospheric pressure still kettle into Row.
According to the above technical scheme, because of the concrete of holding identical weight when the filling concrete is filling.
According to the above technical scheme, connect two sides punching block closely by fixing bolt after the completion of the punching block closing It connects.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being: structure of the invention is scientific and reasonable, uses secure side Just, first positioning hole and the first positioning column are cooperatively connected, second location hole and the second positioning column are cooperatively connected, and make the first coagulation Native tubular pole is attached with the second concrete tubular pile, makes the first concrete tubular pile by fastening bolt and adjusting nut mating connection It is closely connect with the second concrete tubular pile, preferably convenient for being spliced between two concrete tubular piles, while passing through production method Improve the anti-fissibility of concrete tubular pile.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is entirety perspective view of the invention;
Fig. 2 is support plate mounting structure schematic diagram of the invention;
Fig. 3 is first positioning hole mounting structure schematic diagram of the invention;
Fig. 4 is overall flow structural schematic diagram of the invention;
In figure: 1, the first concrete tubular pile;2, the second concrete tubular pile;3, fixed plate;4, connecting plate;5, circular hole;6, spiral shell is fastened Bolt;7, support plate;8, the first positioning column;9, the second positioning column;10, adjusting nut;11, first positioning hole;12, the second positioning Hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution: a kind of anti-splitting prefabricated concrete pipe pile, including first Concrete tubular pile 1, the second concrete tubular pile 2, fixed plate 3, connecting plate 4, circular hole 5, fastening bolt 6, support plate 7, first position Column 8, the second positioning column 9, adjusting nut 10, first positioning hole 11 and second location hole 12, the first concrete tubular pile 1, first is mixed 1 top of solidifying soil tubular pole is provided with the second concrete tubular pile 2, and the first concrete tubular pile 1 and 2 junction of the second concrete tubular pile are arranged There is fixed plate 3, support plate 7 is installed on the inside of fixed plate 3,7 top two sides of support plate are mounted on the first positioning column 8, and second is mixed 2 bottom of solidifying soil tubular pole offers first positioning hole 11, and the first positioning column 8 is cooperatively connected with first positioning hole 11, the first coagulation Native 1 top of tubular pole offers second location hole 12, and 4 bottom of connecting plate is equipped with the second positioning column 9, the second positioning column 9 and second Location hole 12 is cooperatively connected, and 3 two sides of fixed plate are mounted on connecting plate 4, offers circular hole 5 on the outside of connecting plate 4, inside circular hole 5 It is provided with fastening bolt 6, adjusting nut 10 is socketed on the outside of fastening bolt 6.
Referring to Fig. 4, the present invention provides a kind of technical solution: a kind of anti-splitting prefabricated concrete pipe pile production method, packet Include following steps: step 1, steel reinforcement cage binding;Step 2 enters mould;Step 3, filling concrete;Step 4, tensioning;Step Five, centrifugal forming;Step 6, steam press maintenance;Step 7, demoulding;
In step 1, treated main reinforcement is fitted on the disk of binding machine stretched in trolley, trolley can be in transverse direction It is moved on guide rail, adapts to the needs of the long steel reinforcement cage of piles with different, stirrup is placed on the disk in binding machine, and trolley is with fixed speed Degree moves, and the reinforcing bar on disk in main reinforcement then to be constantly wound steel reinforcement cage, and main reinforcement and stirrup are welded with electrical pads, without tying up It pricks.
In step 2, after the completion of steel reinforcement cage binding, steel reinforcement cage is hung in prefabricated molds using overhead crane, steel reinforcement cage Both ends are equipped with nut, and after steel reinforcement cage is hung in punching block, both ends are secured to using the steel plate of annular, are provided on steel plate and spiral shell The corresponding bolt of cap, the setting of stretching end and the form of the other end are different, and the gap in punching block is tensioning gap, work as steel After muscle cage is installed, it is medium to be filled that overhead crane is hung in filling concrete area.
In step 3, the position of steel reinforcement cage is placed and should not be deviated, and fix stably, and filling concrete area has corresponding Oil well cracking acid pumping truck is run on station side rails, and the concrete amount of a pile is controlled in a vehicle, and trolley is in half hollow die sinking Upper operation, the concrete that lower part is exposed gradually fills in model, after the completion of filling concrete, around one around punching block Circle cotton thread prevents water in concrete from losing in centrifugal process, and hangs the punching block for coming the other half, is closed.
In step 4, specific machine is sent at tubular piles stretching end and carries out tensioning, sequence of PR tension should be symmetrical Tensioning, when both ends simultaneous tension, two ends must not loosen simultaneously, first anchor at one end, then in the other end to supply stretching force laggard Row anchoring, both ends stretching force should be consistent, and two end stretch values should meet design code requirement after being added, and when repeatedly stretching, should be classified Tensioning after intermediate anchoring temporarilies at different levels, meter reading and is further continued for tensioning after measuring stretch value again, avoids stretch value from measuring accumulation and miss The Specific amounts of difference, tensioning is determined according to different requirements.
In step 5, the good tubular pole of tensioning is put into eccentric groove and is centrifuged, centrifugal action by a slow speed, low speed, in Speed, high speed four-stage carry out, and to guarantee concrete compaction, the time of centrifugation is controlled in 15min or so, generally according to centrifugation speed Rate determine, the hollow space of doughnut-shaped steel plate will use plantation rubber closure, be convenient for centrifugal forming, and when form after can extract it is more everywhere Remaining slurries guarantee smooth inside stake.
In step 6, T-PC, T-PTC centrifugal pile through centrifugal forming should use high-pressure steaming and cultivating, and T-PHC centrifugal pile should be adopted With normal pressure is steam-cured and high-pressure steaming and cultivating, steam-cured pond is the big pond that concrete is built into, and the tubular pole after centrifugal forming is put into pond, Concrete cover is covered, steam press maintenance can be carried out, after steam curing in 16-20 hours, intensity is up to normal curing condition The 70%-80% of lower 28 days intensity.
In step 7, after reaching the steam pressure time, punching block is recalled, the fixing bolt for two sides of dismantling is hung by truss Vehicle can dismantle model, manufactured prestressed concrete pipe pile stacking in heaps, and train agreement is waited to transport to construction site
Wherein, it is provided with rubber pad, rubber pad and fixed plate 3 on the inside of fixed plate 3 by strength glue sticking, preferably increases and fixes 3 internal friction of plate, makes to connect even closer;Open up fluted on the outside of fixed plate 3, inside grooves are provided with reinforcing rib, more preferably 3 intensity of enhancing fixed plate, prolong its service life;First positioning column 8 is installed on inside first positioning hole 11, and the first positioning Column 8 and first positioning hole 11 are interference fit, connect the first positioning column 8 closely with first positioning hole 11;It steams It presses in the still kettle that curing temperature is 175 DEG C, air pressure is 8 atmospheric pressure and carries out;Because keeping identical heavy when filling concrete is filling The concrete of amount;Two sides punching block is connected closely by fixing bolt after the completion of punching block closing.
Based on above-mentioned, it is an advantage of the current invention that of the invention, 1 top of the first concrete tubular pile is provided with the second concrete Tubular pole 2, the first concrete tubular pile 1 and 2 junction of the second concrete tubular pile are provided with fixed plate 3, and branch is equipped on the inside of fixed plate 3 Fagging 7,7 top two sides of support plate are mounted on the first positioning column 8, and 2 bottom of the second concrete tubular pile offers first positioning hole 11, and the first positioning column 8 is cooperatively connected with first positioning hole 11,1 top of the first concrete tubular pile offers second location hole 12, 4 bottom of connecting plate is equipped with the second positioning column 9, and the second positioning column 9 is cooperatively connected with second location hole 12, by first positioning hole 11 and first positioning column 8 be cooperatively connected, second location hole 12 and the second positioning column 9 are cooperatively connected, make the first concrete tubular pile 1 and Second concrete tubular pile 2 is attached, by fastening bolt 6 and the mating connection of adjusting nut 10 make the first concrete tubular pile 1 with The second closely connection of concrete tubular pile 2.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of anti-splitting prefabricated concrete pipe pile, including the first concrete tubular pile (1), the second concrete tubular pile (2), fixed plate (3), connecting plate (4), circular hole (5), fastening bolt (6), support plate (7), the first positioning column (8), the second positioning column (9), adjusting Nut (10), first positioning hole (11) and second location hole (12), it is characterised in that: first concrete tubular pile (1) is described First concrete tubular pile (1) top is provided with the second concrete tubular pile (2), first concrete tubular pile (1) and the second coagulation Native tubular pole (2) junction is provided with fixed plate (3), is equipped with support plate (7) on the inside of the fixed plate (3), the support plate (7) Top two sides are mounted on the first positioning column (8), and the second concrete tubular pile (2) bottom offers first positioning hole (11), And first positioning column (8) and first positioning hole (11) be cooperatively connected, it is fixed that the first concrete tubular pile (1) top offers second Position hole (12), connecting plate (4) bottom are equipped with the second positioning column (9), second positioning column (9) and second location hole (12) it is cooperatively connected, fixed plate (3) two sides are mounted on connecting plate (4), offer circular hole on the outside of the connecting plate (4) (5), the circular hole (5) is internally provided with fastening bolt (6), is socketed with adjusting nut (10) on the outside of the fastening bolt (6).
2. a kind of anti-splitting prefabricated concrete pipe pile production method includes the following steps: step 1, steel reinforcement cage binding;Step 2, Enter mould;Step 3, filling concrete;Step 4, tensioning;Step 5, centrifugal forming;Step 6, steam press maintenance;Step 7 takes off Mould;It is characterized by:
In the step one, treated main reinforcement is fitted on the disk of binding machine stretched in trolley, trolley can be It is moved on lateral guide rail, adapts to the needs of the long steel reinforcement cage of piles with different, stirrup is placed on the disk in binding machine, and trolley is with solid Fixed speed moves, and then to be constantly wound steel reinforcement cage in main reinforcement, main reinforcement and stirrup are welded the reinforcing bar on disk with electrical pads, Without binding;
In the step two, after the completion of steel reinforcement cage binding, steel reinforcement cage is hung in prefabricated molds using overhead crane, reinforcing bar Cage both ends are equipped with nut, after steel reinforcement cage is hung in punching block, both ends using annular steel plate be secured to, be provided on steel plate with The corresponding bolt of nut, the setting of stretching end and the form of the other end are different, and the gap in punching block is tensioning gap, when After steel reinforcement cage is installed, it is medium to be filled that overhead crane is hung in filling concrete area;
In the step three, the position of steel reinforcement cage is placed and should not be deviated, and fix stably, and filling concrete area has corresponding Oil well cracking acid pumping truck, run on station side rails, the concrete amount of a pile is controlled in a vehicle, and trolley is hollow half-open It is run on mould, the concrete that lower part is exposed gradually fills in model, after the completion of filling concrete, surround around punching block One circle cotton thread prevents water in concrete from losing in centrifugal process, and hangs the punching block for coming the other half, is closed;
In the step four, specific machine is sent at tubular piles stretching end and carries out tensioning, sequence of PR tension reply Claim tensioning, when both ends simultaneous tension, two ends must not loosen simultaneously, first anchor at one end, then after the other end supplies stretching force It is anchored, both ends stretching force should be consistent, and two end stretch values should meet design code requirement after being added, and when repeatedly stretching, should divide Grade tensioning after intermediate anchoring temporarilies at different levels, meter reading and is further continued for tensioning after measuring stretch value again, stretch value is avoided to measure accumulation The Specific amounts of error, tensioning is determined according to different requirements;
In the step five, the good tubular pole of tensioning is put into eccentric groove and is centrifuged, centrifugal action by a slow speed, low speed, Middling speed, high speed four-stage carry out, and to guarantee concrete compaction, the time of centrifugation is controlled in 15min or so, generally according to centrifugation Rate determines that the hollow space of doughnut-shaped steel plate will use plantation rubber closure, is convenient for centrifugal forming, and can extract everywhere after molding Extra slurries guarantee smooth inside stake;
In the step six, T-PC, T-PTC centrifugal pile through centrifugal forming should use high-pressure steaming and cultivating, and T-PHC centrifugal pile is answered Using normal pressure is steam-cured and high-pressure steaming and cultivating, steam-cured pond is the big pond that concrete is built into, and the tubular pole after centrifugal forming is put into pond In, concrete cover is covered, steam press maintenance can be carried out, after steam curing in 16-20 hours, intensity is up to normal maintenance item The 70%-80% of the lower 28 days intensity of part;
In the step seven, after reaching the steam pressure time, punching block is recalled, the fixing bolt for two sides of dismantling passes through truss Crane can dismantle model, manufactured prestressed concrete pipe pile stacking in heaps, and train agreement is waited to transport to construction site.
3. a kind of anti-splitting prefabricated concrete pipe pile according to claim 1, it is characterised in that: in the fixed plate (3) Side is provided with rubber pad, and the rubber pad and fixed plate (3) pass through strength glue sticking.
4. a kind of anti-splitting prefabricated concrete pipe pile according to claim 1, it is characterised in that: the fixed plate (3) is outside Side opens up fluted, and the inside grooves are provided with reinforcing rib.
5. a kind of anti-splitting prefabricated concrete pipe pile according to claim 1, it is characterised in that: first positioning column (8) it is internal to be installed on first positioning hole (11), and the first positioning column (8) and first positioning hole (11) are interference fit.
6. the anti-splitting prefabricated concrete pipe pile production method of one kind according to claim 2, it is characterised in that: the steam pressure It is carried out in the still kettle that curing temperature is 175 DEG C, air pressure is 8 atmospheric pressure.
7. the anti-splitting prefabricated concrete pipe pile production method of one kind according to claim 2, it is characterised in that: the coagulation Because of the concrete of holding identical weight when soil perfusion is filling.
8. the anti-splitting prefabricated concrete pipe pile production method of one kind according to claim 2, it is characterised in that: the punching block Two sides punching block is connected closely by fixing bolt after the completion of closing.
CN201811047906.3A 2018-09-10 2018-09-10 The anti-splitting prefabricated concrete pipe pile of one kind and production method Pending CN109183782A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811047906.3A CN109183782A (en) 2018-09-10 2018-09-10 The anti-splitting prefabricated concrete pipe pile of one kind and production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811047906.3A CN109183782A (en) 2018-09-10 2018-09-10 The anti-splitting prefabricated concrete pipe pile of one kind and production method

Publications (1)

Publication Number Publication Date
CN109183782A true CN109183782A (en) 2019-01-11

Family

ID=64915581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811047906.3A Pending CN109183782A (en) 2018-09-10 2018-09-10 The anti-splitting prefabricated concrete pipe pile of one kind and production method

Country Status (1)

Country Link
CN (1) CN109183782A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110818326A (en) * 2019-10-28 2020-02-21 福建宝丰管桩有限公司 Artificial sand precast concrete pipe pile and manufacturing process
CN112459052A (en) * 2020-10-21 2021-03-09 中国一冶集团有限公司 Pile extension device for prestressed concrete solid square pile
CN114150598A (en) * 2021-12-09 2022-03-08 湖北省路桥集团有限公司 Traffic sign post and construction method thereof
CN114482032A (en) * 2021-11-25 2022-05-13 福建大力新型建材科技有限公司 Combined prestressed concrete thin-wall pipe pile
CN115647126A (en) * 2022-10-17 2023-01-31 福建宝丰管桩有限公司 Automatic detection and repair device for deformation point position of inner wall of prestressed pipe pile mould cylinder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480593A (en) * 2002-09-06 2004-03-10 西胁醇 Connection structure of pile
KR20120083607A (en) * 2011-01-18 2012-07-26 (주)비제이피코리아 A joint apparatus of concrete pile for foundation work
CN203021995U (en) * 2012-12-21 2013-06-26 中建七局第四建筑有限公司 Positioning hoop for piling prestressed high strength concrete pipe pile
CN203475422U (en) * 2013-07-31 2014-03-12 天津永生鑫和管桩有限公司 Concrete tubular pile extension device
CN107989029A (en) * 2017-11-24 2018-05-04 华中科技大学 A kind of stake is connected system and its construction method with stake

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480593A (en) * 2002-09-06 2004-03-10 西胁醇 Connection structure of pile
KR20120083607A (en) * 2011-01-18 2012-07-26 (주)비제이피코리아 A joint apparatus of concrete pile for foundation work
CN203021995U (en) * 2012-12-21 2013-06-26 中建七局第四建筑有限公司 Positioning hoop for piling prestressed high strength concrete pipe pile
CN203475422U (en) * 2013-07-31 2014-03-12 天津永生鑫和管桩有限公司 Concrete tubular pile extension device
CN107989029A (en) * 2017-11-24 2018-05-04 华中科技大学 A kind of stake is connected system and its construction method with stake

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
郭琦: "《钢筋工由新手变高手》", 31 January 2015, 金盾出版社 *
陈龙: "《岩土网》", 7 April 2013 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110818326A (en) * 2019-10-28 2020-02-21 福建宝丰管桩有限公司 Artificial sand precast concrete pipe pile and manufacturing process
CN112459052A (en) * 2020-10-21 2021-03-09 中国一冶集团有限公司 Pile extension device for prestressed concrete solid square pile
CN114482032A (en) * 2021-11-25 2022-05-13 福建大力新型建材科技有限公司 Combined prestressed concrete thin-wall pipe pile
CN114482032B (en) * 2021-11-25 2024-02-20 福建大力新型建材科技有限公司 Combined prestressed concrete thin-wall pipe pile
CN114150598A (en) * 2021-12-09 2022-03-08 湖北省路桥集团有限公司 Traffic sign post and construction method thereof
CN115647126A (en) * 2022-10-17 2023-01-31 福建宝丰管桩有限公司 Automatic detection and repair device for deformation point position of inner wall of prestressed pipe pile mould cylinder

Similar Documents

Publication Publication Date Title
CN109183782A (en) The anti-splitting prefabricated concrete pipe pile of one kind and production method
CN110847044B (en) Semi-prefabricated assembled bent cap construction method
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN110528402B (en) Construction method of ultra-wide box girder multi-truss-piece combined hanging basket
CN109162199A (en) Assembling-type precast pier connection structure and its construction method
CN112412707A (en) Assembled wind turbine generator system circle cross section concrete bearing structure
CN204982681U (en) Steel bow member integral translation device
CN103950100A (en) Production technology of high-strength post-tensioned reinforced concrete electric pole and same
CN111893889A (en) Main bridge closure section construction method
CN205369295U (en) Basis precast prestressed beam slab formula wind power generation column foot plinth
CN208472757U (en) A kind of precast prestressed board-like generation power foundation of wind power
CN109881575A (en) Using the prefabricated bent cap in π type cross section and its method for prefabricating of prestressing with bond muscle
CN112195957B (en) Reinforced connecting structure of fan tower and foundation and construction method
CN104264659A (en) Prefabricated hollow uplift pile and preparation method thereof
CN208252281U (en) A kind of wind power generating set steel reinforced concrete pylon
CN208202343U (en) A kind of steel core concrete column
CN109267489A (en) A kind of Anchorage Zone of Cable-stayed Bridge Pylon construction method
CN209873551U (en) Pier stud concrete insulation device after form removal
CN103909574A (en) Production technology of large bending moment and high strength post tensioning reinforced concrete electric pole and electric pole
CN113737838A (en) Offshore wind turbine generator system high pile-steel pipe concrete composite structure bearing platform foundation
CN204080791U (en) A kind of precast hollow uplift pile
CN216787107U (en) Anti-carbonization concrete pipe column
CN216810618U (en) Steel and concrete combined beam
CN220470120U (en) Connection structure for wind power precast concrete tower drum
CN109594718A (en) The assembled steel reinforced concrete column of prefabricated standard assembly piece and application the assembly piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication