It is a kind of for handling the device of sand grain in sewage
Technical field
The present invention relates to technical field of sewage more particularly to a kind of for handling the device of sand grain in sewage.
Background technique
With fast urbanization in current china, city domestic sewage discharge amount is in rapid growth.Country pays much attention to sewage
Processing and discharge.City domestic sewage discharge amount was more than discharged volume of industrial waste water from 1998, municipal sewage treatment cause
It rapidly develops, at the bottom of ending the third season in 2015, built sewage treatment plant of China 4078, sewage treatment total capacity is up to 1.66 hundred million
Ton/day, actual treatment ability is about 1.2 hundred million ton/days.
Sand grain cannot be effectively treated in existing equipment, and wastewater treatment efficiency is not ideal enough, be further improved.
Summary of the invention
To solve technical problem present in background technique, the present invention proposes a kind of for handling sand grain in sewage
Device, effect are good.
It is proposed by the present invention a kind of for handling the device of sand grain in sewage, including tube body, multiple sewage pipes, first
Valve, tube body is interior to be equipped with multiple decanting zones, and multiple decanting zones are spaced apart along the length direction of tube body, the tube body positioned at decanting zone
Internal diameter be first gradually increased along the flow direction of sewage and be gradually reduced again;Tube body be equipped with multiple mudholes, multiple mudholes with
Multiple decanting zones are arranged in a one-to-one correspondence, and mudhole is located at the lower section of decanting zone, and mudhole is connected to decanting zone;Multiple sewage pipes point
It is not connected to multiple mudholes, the first valve is mounted on each sewage pipe.
It preferably, further include multiple spray heads, feeding machanism, multiple spray heads are located at multiple decanting zones, spray head and tube body
Connection, spray head are connected to feeding machanism.
It preferably, further include multiple strainers, multiple strainers and multiple decanting zone arranged for interval, strainer is connect with tube body.
Preferably, along the flow direction of sewage, the aperture of multiple strainers is gradually reduced.
It preferably, further include drainpipe, connecting tube, water pump, the second valve, drainpipe is connected to the water outlet of tube body;Water
Pump is connected to by connecting tube with drainpipe;Second valve is mounted on drainpipe, and the second valve is located at connecting tube far from tube body
Side;Third valve is mounted in connecting tube.
Sand grain meeting in the present invention, after sewage inlet pipe body, due to the broken-line of the tube body of decanting zone, in sewage
In decanting zone rapid subsidence.By the way that multiple decanting zones are arranged, the silt in sewage can be effectively settled.After sediment settlement,
The first valve is opened, silt is discharged from sewage pipe.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutual combination;Below with reference to the accompanying drawings it and in conjunction with the embodiments elaborates to the present invention.
Referring to Fig.1, proposed by the present invention a kind of for handling the device of sand grain in sewage, including tube body 1, Duo Gepai
Dirty pipe 2, the first valve 3, tube body 1 is interior to be equipped with multiple decanting zones, and multiple decanting zones are spaced apart along the length direction of tube body 1, position
It is first gradually increased in the internal diameter of the tube body 1 of decanting zone along the flow direction of sewage and is gradually reduced again;Tube body 1 is equipped with multiple blowdowns
Hole 4, multiple mudholes 4 are arranged in a one-to-one correspondence with multiple decanting zones, and mudhole 4 is located at the lower section of decanting zone, mudhole 4 and sedimentation
Area's connection;Multiple sewage pipes 2 are connected to multiple mudholes 4 respectively, and the first valve 3 is mounted on each sewage pipe 2.
After sewage inlet pipe body 1, due to the broken-line of the tube body 1 of decanting zone, the sand grain in sewage can settled
Area's rapid subsidence.By the way that multiple decanting zones are arranged, the silt in sewage can be effectively settled.After sediment settlement, the is opened
Silt is discharged one valve 3 from sewage pipe 2.
It further include multiple spray heads 5, feeding machanism 6 in further embodiment, multiple spray heads 5 are located at multiple heavy
Area drops, and spray head 5 is connect with tube body 1, and spray head 5 is connected to feeding machanism 6.When silt is discharged by sewage pipe 2, feeding machine is utilized
Structure 6 is passed through clear water to spray head 5, cleans to tube body 1, and silt can effectively be discharged, and effect is good.
It further include multiple strainers 7 in further embodiment, multiple strainers 7 and multiple decanting zone arranged for interval, strainer
7 connect with tube body 1.Sewage is filtered using strainer 7, convenient for flocculation, can effectively allow sediment settlement.
In further embodiment, along the flow direction of sewage, the aperture of multiple strainers 7 is gradually reduced.Gradually filter,
Improve effect of settling.
Further include drainpipe 8, connecting tube 9, water pump 10, the second valve 11 in further embodiment, drainpipe 8 with
The water outlet of tube body 1 is connected to;Water pump 10 is connected to by connecting tube 9 with drainpipe 8;Second valve 11 is mounted on drainpipe 8, the
Two valves 11 are located at side of the connecting tube 9 far from tube body 1;Third valve 12 is mounted in connecting tube 9.The water outlet of tube body 1 is
The right end of tube body 1.It closes the first valve 3, open the second valve 11, sewage enters from 1 left end of tube body, is discharged from right end.Make
After a period of time, stop sewage enter, close the second valve 11, open the first valve 3, third valve 12, using water pump 10,
Connecting tube 9 is passed through clear water into drainpipe 8, using clear water right-to-left, backwashes to tube body 1, strainer 7, improves and uses
Effect.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.