CN109113103A CN201810898256.7A CN201810898256A CN109113103A CN 109113103 A CN109113103 A CN 109113103A CN 201810898256 A CN201810898256 A CN 201810898256A CN 109113103 A CN109113103 A CN 109113103A
Authority
CN
China
Prior art keywords
root
laid
roll form
pipe
plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810898256.7A
Other languages
Chinese (zh)
Inventor
叶吉
侯永神
田俊
王燕
王昌成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN KESHUN BUILDING MATERIAL Co Ltd
Original Assignee
FOSHAN KESHUN BUILDING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN KESHUN BUILDING MATERIAL Co Ltd filed Critical FOSHAN KESHUN BUILDING MATERIAL Co Ltd
Priority to CN201810898256.7A priority Critical patent/CN109113103A/en
Publication of CN109113103A publication Critical patent/CN109113103A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/10Roof covering by making use of flexible material, e.g. supplied in roll form by making use of compounded or laminated materials, e.g. metal foils or plastic films coated with bitumen

Abstract

The invention discloses a kind of coiled materials to be laid with pipe method for root, comprising the following steps: sticks facade overlap joint adhesive tape in pipe root surface;Plane overlap joint adhesive tape is sticked in the plane;Facade coiled material is laid in pipe root surface;It is laid with the first roll form plane material in the plane, pipe root bottom part is surrounded;The second roll form plane material is laid on the first roll form plane material again, pipe root bottom part is surrounded;Pipe collar is set at the top of facade coiled material;First roll form plane material and the second roll form plane material are equipped with the first opening to match with pipe root.The present invention can be laid with for pipe root of different shapes, applicability is higher, and the double layer planar waterproof construction used, effectively rain penetration can be avoided to ground, along with the good paving mode for repairing coiled material in this programme, increase flowing water and flow to the distance cracked, greatly improves waterproof performance of the invention.

Description

A kind of coiled material laying pipe method for root
Technical field
The present invention relates to waterproof coiled material construction methods more particularly to a kind of coiled material to be laid with pipe method for root.
Background technique
Waterproof roll is mainly used for construction wall, roofing and tunnel, highway, refuse landfill etc., plays and resists The rollable flexible building material product at web-like of one kind of extraneous rainwater, underground water leakage, as between engineering foundation and building Ne-leakage connection, is the first barrier of entire engineering waterproofing, plays a crucial role to entire engineering, therefore, waterproof Coiled material is constantly applied in various buildings.And the waterproof performance of waterproof roll also needs other than the material of waterproof roll to be seen In view of waterproof roll laying method, each difference to the greatest extent of the waterproof performance that different laying methods obtains.
Summary of the invention
The object of the present invention is to provide a kind of coiled materials to be laid with pipe method for root, coiled material can be made to be fitted tightly on pipe root, energy Effective waterproof.
A kind of coiled material laying pipe method for root, comprising the following steps:
S1, facade overlap joint adhesive tape is sticked in pipe root surface;
S2, plane overlap joint adhesive tape is sticked in the plane;
S3, facade coiled material is laid in pipe root surface;
S4, it is laid with the first roll form plane material in the plane, pipe root bottom part is surrounded;
S5, the second roll form plane material is laid on the first roll form plane material again, pipe root bottom part is surrounded;
S6, pipe collar is set at the top of facade coiled material;
First roll form plane material and the second roll form plane material are equipped with the first opening to match with pipe root.
Two layers of roll form plane material is set at pipe root, a possibility that rainwater penetrates into ground can be effectively reduced, greatly improved Waterproof performance of the invention.
Preferably, first roll form plane material is equipped with the second roll form plane material and cracks, so that the first roll form plane material and second Roll form plane material can control opening and entangle pipe root.It is described crack since the side of roll form plane material into plane waterproof roll Between.Above scheme is the design for particular tube root, avoids the shape of pipe root too special, and the first roll form plane material and the second plane are rolled up Material can not cover on pipe root, cut off one with the second roll form plane material in the first roll form plane material thus and crack, so that the first plane is rolled up Material can control opening with the second roll form plane material and entangle pipe root.
It preferably, in step s 5, further include being laid with repairing coiled material at the place of cracking of the second roll form plane material.The repairing volume Material is equipped with the second opening, is matched by the second opening with the front end of pipe root, so that repairing coiled material closely engages with pipe root.And It is described crack be arranged in front of pipe root with repairing coiled material at left and right sides of at a distance from be no less than 10cm.The radian of second opening is big In equal to 180 °.By the second opening of setting on repairing coiled material, so that repairing coiled material surrounds pipe root, rainwater is from repairing coiled material Periphery enters the distance cracked and increases, and improves the waterproof performance that obtained structure is laid with according to this method.
Preferably, first roll form plane material is no sand APF coiled material.First roll form plane material is by high density polyethylene (HDPE) (HDPE) sheet material and Macromolecular self-adhesive membrane composition.
In order to preferably be laid with roll form plane material, so that plane waterproof roll is preferably pasted onto ground or has been laid with On good roll form plane material, the present invention is laid with several plane overlap joint adhesive tape in step s 2, and several plane overlap joint adhesive tape are with pipe It is stretched around centered on root.
Preferably, it is 30-40 ° that institute is angled between the plane overlap joint adhesive tape and adjacent plane overlap joint adhesive tape.
Preferably, further include step S0, smear into circular arc or obtuse angle with mortar in Guan Genyu plane symphyses.
Preferably, the facade coiled material and the second roll form plane material are by high density polyethylene (HDPE) (HDPE) sheet material, adhesive polymer Glue film and surface particles (or specific coatings) protective layer composition.The sheet thickness is 0.9-1.5mm.
Preferably, the facade overlap joint adhesive tape and plane overlap joint adhesive tape are equipped with for rolling up with facade coiled material and the first plane The scab face of the surface particles protective layer bonding of material.By setting scab face in adhesive tape, facilitates the one side of overlap joint adhesive tape and stand The surface particles protective layer of roll material and the first roll form plane material combines, and needs to exclude facade coiled material and the when avoiding combining The surface particles protective layer of one roll form plane material.
Preferably, including step S7 overlaps adhesive tape in breakage Bonded Repair first to handling at web breakage, Then overlap joint adhesive tape surface and around coat sealing compound.
Compared to a prior art, present invention has an advantage that
The present invention can be laid with for pipe root of different shapes, and applicability is higher, and the double layer planar waterproof knot used Structure can effectively avoid rain penetration from increasing flowing water flowing along with the good paving mode for repairing coiled material in this programme to ground To the distance cracked, waterproof performance of the invention is greatly improved.
Detailed description of the invention
Fig. 1 is the positive structure schematic in embodiment 1.
Fig. 2 is the overlooking structure diagram in embodiment 1.
It is identified in figure: 1, the first roll form plane material;2, the second roll form plane material;3, coiled material is repaired;4, facade coiled material;5, it first opens Mouthful;6, it cracks;7, Guan Gen;8, plane.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
The object of the present invention is to provide a kind of coiled materials to be laid with pipe method for root, coiled material can be made to be fitted tightly on pipe root, energy Effective waterproof.
A kind of coiled material laying pipe method for root, comprising the following steps:
S1, facade overlap joint adhesive tape is sticked in pipe root surface;
S2, plane overlap joint adhesive tape is sticked in the plane;
S3, it is laid with facade coiled material in pipe root surface, the height of the facade coiled material is 20-30cm;
S4, it is laid with the first roll form plane material in the plane, pipe root bottom part is surrounded;
S5, the second roll form plane material is laid on the first roll form plane material again, equally surrounds pipe root bottom part;
S6, pipe collar is set at the top of facade coiled material;
First roll form plane material and the second roll form plane material are equipped with the first opening to match with pipe root.
Two layers of roll form plane material is set at pipe root, a possibility that rainwater penetrates into ground can be effectively reduced, greatly improved Waterproof performance of the invention.
Preferably, first roll form plane material is equipped with the second roll form plane material and cracks, so that the first roll form plane material and second Roll form plane material can control opening and entangle pipe root.It is described to crack since the side of roll form plane material to the opening of plane waterproof roll Terminate.Above scheme is the design for particular tube root, avoids the shape of pipe root too special, the first roll form plane material and the second plane Coiled material can not cover on pipe root, cut off one with the second roll form plane material in the first roll form plane material thus and crack, so that the first plane Coiled material can control opening with the second roll form plane material and entangle pipe root.Preferably, first roll form plane material and the second roll form plane material Shape of cracking it is consistent and position is identical.
It preferably, in step s 5, further include being laid with repairing coiled material at the place of cracking of the second roll form plane material.More accurately It says, first pastes overlap joint adhesive tape at place of cracking, repairing coiled material is then allowed to be pressed in overlap joint adhesive tape, then tear on one side in overlap joint adhesive tape Protective film while on one side will repairing coiled material and overlap joint adhesive tape and the second roll form plane material compress.The repairing coiled material is equipped with the Two openings are matched by the second opening with the front end of pipe root, so that repairing coiled material closely engages with pipe root.And it described cracks 10cm is no less than at a distance from being arranged in front of pipe root at left and right sides of repairing coiled material.The radian of second opening is more than or equal to 180°.By the second opening of setting on repairing coiled material so that repairing coiled material surrounds pipe root, rainwater from the periphery of repairing coiled material into Enter to the distance cracked and increase, improves the waterproof performance for being laid with obtained structure according to this method.
Preferably, first roll form plane material is no sand APF coiled material.First roll form plane material is by high density polyethylene (HDPE) (HDPE) sheet material (body layer) and Macromolecular self-adhesive membrane (adhesive-layer) composition.
In order to preferably be laid with roll form plane material, so that plane waterproof roll is preferably pasted onto ground or has been laid with On good roll form plane material, the present invention is laid with several plane overlap joint adhesive tape in step s 2, and several plane overlap joint adhesive tape are with pipe It is stretched around centered on root.
Preferably, it is 30-40 ° that institute is angled between the plane overlap joint adhesive tape and adjacent plane overlap joint adhesive tape.
Preferably, further include step S0, smear into circular arc or obtuse angle with mortar in Guan Genyu plane symphyses.
Preferably, the facade overlap joint adhesive tape and plane overlap joint adhesive tape are equipped with for rolling up with facade coiled material and the first plane The scab face of the surface particles protective layer bonding of material.
Preferably, the facade coiled material, repairing coiled material and the second roll form plane material are by high density polyethylene (HDPE) (HDPE) sheet material, height Molecule self-adhesion glue film and surface particles (or specific coatings) protective layer composition, and it is divided into three layers, based on high density polyethylene (HDPE) sheet material Body layer, Macromolecular self-adhesive membrane are adhesive-layer, and surface particles are stratum granulosum, body layer, adhesive-layer and stratum granulosum from the bottom up according to It is secondary to combine.The sheet thickness is 0.9-1.5mm.
Preferably, including step S7 overlaps adhesive tape in breakage Bonded Repair first to handling at web breakage, Then overlap joint adhesive tape surface and around coat sealing compound.
Before implementing the present invention, the first roll form plane material and the second roll form plane material are cut first, so that the first plane Be equipped among coiled material and the second roll form plane material with the matched opening of pipe root, be then additionally provided with one since the side of roll form plane material To plane waterproof roll opening terminate crack;Circular arc is smeared into mortar in Guan Genyu plane symphyses again, then in pipe root Facade overlap joint adhesive tape is sticked on surface, is sticked plane overlap joint adhesive tape in the plane, and be compacted into using rubber roller, then, is torn The protective film for falling facade overlap joint adhesive tape, is attached to pipe root bottom part for facade coiled material and is surrounded, the main body of the facade coiled material Layer is fitted in inwardly on pipe root, and stratum granulosum outwardly, then tears the protective film of plane overlap joint adhesive tape, the first roll form plane material is attached to flat On face, so that its body layer is bonded with plane, adhesive-layer is upward;The second roll form plane material is attached on the first roll form plane material again, So that the body layer of the second roll form plane material is bonded with the adhesive-layer of the first roll form plane material, the stratum granulosum of the second roll form plane material is upward; Then, it then overlaps adhesive tape by plane and will repair coiled material and be laid on to cover on the second roll form plane material and crack.Finally, being rolled up in facade Pipe collar is set at the top of material, facade coiled material is fixed.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (9)

1. a kind of coiled material is laid with pipe method for root, which comprises the following steps:
S1, facade overlap joint adhesive tape is sticked in pipe root surface;
S2, plane overlap joint adhesive tape is sticked in the plane;
S3, facade coiled material is laid in pipe root surface;
S4, it is laid with the first roll form plane material in the plane, pipe root bottom part is surrounded;
S5, the second roll form plane material is re-layed, pipe root bottom part is surrounded;
S6, pipe collar is set at the top of facade coiled material;
First roll form plane material and the second roll form plane material are equipped with the first opening to match with pipe root.
2. a kind of coiled material according to claim 1 is laid with pipe method for root, which is characterized in that first roll form plane material and the Two roll form plane materials, which are equipped with, to crack, and enables the first roll form plane material to control opening with the second roll form plane material and entangles pipe root.
3. a kind of coiled material according to claim 2 is laid with pipe method for root, which is characterized in that in step s 5, further include The place of cracking of second roll form plane material is laid with repairing coiled material.
4. a kind of coiled material according to claim 1 is laid with pipe method for root, which is characterized in that first roll form plane material is nothing Sand APF coiled material.
5. a kind of coiled material according to claim 1 is laid with pipe method for root, which is characterized in that be laid in step s 2 several flat Face overlaps adhesive tape, and several plane overlap joint adhesive tape are stretched around centered on pipe root.
6. a kind of coiled material according to claim 5 is laid with pipe method for root, which is characterized in that the plane overlap joint adhesive tape and phase It is 30-40 ° that institute is angled between adjacent plane overlap joint adhesive tape.
7. a kind of coiled material according to claim 1 is laid with pipe method for root, which is characterized in that further include step S0, in pipe root Circular arc or obtuse angle are smeared into mortar with plane symphyses.
8. a kind of coiled material according to claim 1 is laid with pipe method for root, which is characterized in that the facade coiled material and first flat Roll material is made of high density polyethylene (HDPE) (HDPE) sheet material, Macromolecular self-adhesive membrane and surface particles protective layer or specific coatings.
9. a kind of coiled material according to claim 8 is laid with pipe method for root, which is characterized in that the facade overlaps adhesive tape and puts down Face overlaps adhesive tape and is equipped with for the scab face Nian Jie with the surface particles protective layer of facade coiled material and the first roll form plane material.
CN201810898256.7A 2018-08-08 2018-08-08 A kind of coiled material laying pipe method for root Pending CN109113103A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810898256.7A CN109113103A (en) 2018-08-08 2018-08-08 A kind of coiled material laying pipe method for root

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810898256.7A CN109113103A (en) 2018-08-08 2018-08-08 A kind of coiled material laying pipe method for root

Publications (1)

Publication Number Publication Date
CN109113103A true CN109113103A (en) 2019-01-01

Family

ID=64853102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810898256.7A Pending CN109113103A (en) 2018-08-08 2018-08-08 A kind of coiled material laying pipe method for root

Country Status (1)

Country Link
CN (1) CN109113103A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250904A (en) * 2008-03-26 2008-08-27 河南省第二建筑工程有限责任公司 Construction method for sticking SBC water-proof coiled material by JS composite water-proof paint
CN103397637A (en) * 2013-08-27 2013-11-20 二十二冶集团第一建设有限公司 Pre-embedding method of grouting sleeve under raft foundation
CN204982977U (en) * 2015-09-24 2016-01-20 中建四局第一建筑工程有限公司 Basement bottom plate and waterproofing membrane integration waterproof construction
CN205530718U (en) * 2016-01-22 2016-08-31 金维度科技发展(大连)有限公司 Gas tightness structure of passive form wall bushing
US20180002887A1 (en) * 2015-08-21 2018-01-04 Parks Waterproofing, Llc Free-flowing waterproofing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250904A (en) * 2008-03-26 2008-08-27 河南省第二建筑工程有限责任公司 Construction method for sticking SBC water-proof coiled material by JS composite water-proof paint
CN103397637A (en) * 2013-08-27 2013-11-20 二十二冶集团第一建设有限公司 Pre-embedding method of grouting sleeve under raft foundation
US20180002887A1 (en) * 2015-08-21 2018-01-04 Parks Waterproofing, Llc Free-flowing waterproofing system
CN204982977U (en) * 2015-09-24 2016-01-20 中建四局第一建筑工程有限公司 Basement bottom plate and waterproofing membrane integration waterproof construction
CN205530718U (en) * 2016-01-22 2016-08-31 金维度科技发展(大连)有限公司 Gas tightness structure of passive form wall bushing

Similar Documents

Publication Publication Date Title
CN101914927B (en) Waterproof system for basement bottom board and wall surface and construction method thereof
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN201588229U (en) Basement waterproof construction system
CN211547826U (en) Waterproof lap joint structure for different waterproof materials at guide wall
CN201695411U (en) Waterproof system of bottom board and wall surface of basement
CN203701446U (en) Roof structure for garage roof planting
CN103806609A (en) Construction method of double-faced self-adhesion waterproof roll
CN111350282A (en) Pre-laid waterproof coiled material construction process for welding and gluing combined construction
CN206352400U (en) Positively fixed type parapet of roofing position waterproof modular repair structure
CN110735499A (en) parapet waterproof structure and construction method thereof
KR102261398B1 (en) manufacturing method of Complex waterproofing layer
CN104762999A (en) Self-adhesion coiled material underground waterproof construction method
CN209760629U (en) Just put local seepage maintenance structure in formula roofing pipe root position
CN208618582U (en) A kind of lapped configuration of self-adhering-type polymer membranes
KR101431380B1 (en) Triple composite waterproofing method applied loose laying joint type
CN207310696U (en) Strength intersects film composite of water-proof coiled material
CN102912945A (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN109056801A (en) A kind of pipe gallery Slab Waterproof Construction technique
CN109113103A (en) A kind of coiled material laying pipe method for root
WO2022127094A1 (en) Method for overlapping different waterproofing materials of side wall and roof
CN206607611U (en) A kind of waterproof roll bridging arrangement
CN214739146U (en) Arc roofing structure
CN213329697U (en) Planting roof waterproof system
CN212827208U (en) PVC pre-paved anti-sticking inner-reinforced waterproof roll
Reither et al. Application of a newly developed double lining system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190101