Plateau Permafrost Regions reinforced earth retaining wall and its construction method
Technical field
The present invention relates to traffic engineering construction technique fields, and in particular to a kind of Plateau Permafrost Regions reinforced earth retaining wall
And its construction method.
Background technique
Plateau Permafrost Regions land used width is occupied to reduce railway bed, setting reinforced earth bulkhead is one important
Environmental protection measure.Reinforced earth retaining wall major advantage be easy construction, it is cheap, account for soil less, have attractive appearance, be adapted to compared with
Big foundation deformation, and compared with other types of soil-baffling structure, there is good anti-seismic performance.
But in Permafrost Area, due to multifactor impacts such as climate, ecology, microrelief, hydrologic condition, human activities,
Biggish thaw collapse, frost-heaving deformation can occur for permanent frozen soil foundation, directly built on this ground reinforced earth retaining wall be can not
Capable.
Summary of the invention
The object of the present invention is to provide a kind of Plateau Permafrost Regions reinforced earth retaining wall and its construction methods, suitable for melting
The heavy biggish permanent frozen soil foundation of frost heave.
The technical scheme adopted by the invention is as follows:
Plateau Permafrost Regions reinforced earth retaining wall, it is characterised in that:
The wall body structure of the reinforced earth retaining wall is successively to fill the multilayer earthfill structure to be formed from bottom to top, the every layer of knot that bankets
Structure bottom surface is provided with the TGXG being made of lacing wire;
The both lateral sides of multilayer earthfill structure are inclined-plane, and the surface on the inclined-plane of code building concrete module covering from bottom to top, banket knot
Lacing wire in structure is extended in the gap of upper layer and lower layer concrete modular and is fixed by bolt.
By the TGXG that lacing wire forms include two parts in wall multilayer earthfill structure:
A part is construction lacing wire, is located at earthfill structure both lateral sides, and extend in the gap of upper layer and lower layer concrete modular
And it is fixed by bolt;
Another part is stress main reinforcement, and tunneling boring is arranged in earthfill structure.
Stress main reinforcement includes left and right two parts, and middle part overlaps up and down.
Stress main reinforcement end is folded upward at, and is formed back and is wrapped up in lacing wire.
Be provided with the biggish cap stone of area of section at the top of concrete modular, concrete modular bottom be provided with area of section compared with
Big concrete foundation.
The bottom of the wall of reinforced earth retaining wall is argillic horizon and ragstone layer from bottom to top, and top surface is from middle line to both lateral sides
It is arranged to slope surface, outside the wall of both lateral sides making to reinforced earth retaining wall;
Slabstone layer surface is provided with one layer of rubber synthetic fibers geotextiles.
Multilayer earthfill structure top surface is arranged to slope surface from middle line to both lateral sides, and fills surface layer of subgrade bed filler and form bedding
Surface layer, surface layer of subgrade bed bottom surface are provided with one layer of rubber synthetic fibers geotextiles.
Loaded filter is provided between concrete modular and multilayer earthfill structure.
The vertical pin hole for being prefabricated with perforation on concrete modular and not penetrating through is drawn by the way that the bolt in pin hole is fixed
Muscle.
The construction method of Plateau Permafrost Regions reinforced earth retaining wall, it is characterised in that:
The following steps are included:
Step 1: one layer of waterproof soil layer is filled in substrate, filler is cohesive soil, dirt or Cement Soil, thickness 0.3m, top surface
It is made into outside 4% draining horizontal slope;Cooperate the washer stone that inclines to construct using bull-dozer or excavator, is once poured onto design thickness, side slope
Slabstone is suitably regular;With the fritter stone of 0.1~0.2m partial size on the levelling surface layer of washer stone overall with range of inclining, using heavy type vibration pressure
Road machine, which rolls, to incline washer stone 6~8 times;Intermediate longitudinal progress behind elder generation two sides, is rolled, the capable be overlapped 0.4m between row repeatedly when rolling
More than, front and back abutting lot is overlapped 2.0m or more, and number of rolling is determined by test, and measurement, which is subject to, to roll rear absolute altitude and stablize;Piece
Rock layers top surface is laid with rubber synthetic fibers geotextiles;
Step 2: batch production dry wall surface concrete module reserves drain hole and pin hole, and precast reinforced bolt cuts structure
It makes lacing wire, stress lacing wire and returns and wrap up in both lacing wires and be integrated;
Step 3: the construction line-putting, every 10m are one section, and pay attention to reserved expansion joint, width 0.2m;
Step 4: cast-in-place strip concrete foundation, every segment length control is within 2m;
Step 5: it is laid with construction lacing wire, forms TGXG, dry masonry first layer concrete modular;
Step 6: paving stress lacing wire forms TGXG, and when overlapping is separated with filler;
Filler: being poured in the TGXG completed by step 7 with loading machine, suitable with spilling after excavation or the smooth filler of bull-dozer
The water of amount, with road roller by filling compaction;It is tamped in away from 1 meter of concrete modular barricade with light-duty machinery;
Step 8: returning and wrap up in filler, and sand folder cobble loaded filter of constructing;
Step 9: dry masonry second layer concrete modular, upper and lower module are fixed with bolt;
Step 10: upper and lower module is staggered, and avoids the occurrence of vertical straight joint;
Step 11: after the completion of concrete modular construction, cast-in-place cap stone and wall top railing of constructing;Cap stone length control 2m with
It is interior;
Step 12: surface layer of subgrade bed bottom surface is laid with rubber synthetic fibers geotextiles;
Step 13: surface layer of subgrade bed filler is filled.
The invention has the following advantages that
1, a synusia rock layers are arranged in retaining wall substrate of the present invention, be conducive to increase the cold reserves of retaining wall ground, actively reduce ground temperature,
Ever-frozen ground is protected, makes foundation thaw collapse control in reinforced earth retaining wall overall deformation coordination ability limit.
2, substrate ragstone layer category flexible structure of the present invention, can decay ground frost-heave force, make foundation frost heaving control in reinforced earth
In retaining wall overall deformation coordination ability limit.
3, present invention setting construction lacing wire connection wall face mould block and reinforcing body, it may be assumed that construction lacing wire one end is placed in up and down two
Between layer module, module and reinforcing body are linked together using the frictional force between upper and lower module and lacing wire, can effectively avoid because adding
The phenomenon that lacing wire fracture causes retaining wall unstability generation.
Detailed description of the invention
Fig. 1 is structure of the invention figure;
Fig. 2 is that lacing wire is laid with schematic diagram;
Fig. 3 is lacing wire and module connection diagram;
Fig. 4 is A pattern block elevation;
Fig. 5 is A pattern block plan view;
Fig. 6 is A pattern block side view;
Fig. 7 is Type B module elevation;
Fig. 8 is Type B module flat figure;
Fig. 9 is Type B module side view.
In figure, 1- rubber synthetic fibers geotextiles, 2- surface layer of subgrade bed, 3- cap stone, 4- concrete modular, 5- loaded filter, 6-
Bolt, 7- lacing wire, 8- concrete foundation, 9- ragstone layer, 10- banket, 11- argillic horizon, 12- seasonally thaw layer, and 13- frozen soil is natural
The upper limit, 14- ever-frozen ground, 15-, which is returned, wraps up in lacing wire, and 16- constructs lacing wire, 17- stress main reinforcement, 18- pin hole.
Specific embodiment
The present invention will be described in detail With reference to embodiment.
The present invention relates to a kind of Plateau Permafrost Regions reinforced earth retaining wall, the wall body structure of the reinforced earth retaining wall is
The multilayer earthfill structure to be formed successively is filled from bottom to top, and every layer of earthfill structure bottom surface is provided with the geotechnique being made of lacing wire 7
Grid;The both lateral sides of multilayer earthfill structure are inclined-plane, and code building concrete module 4 covers the surface on inclined-plane from bottom to top, are banketed
Lacing wire 7 in structure extends in the gap of upper layer and lower layer concrete modular 4 and fixed by bolt 6.Concrete modular 4 and more
Loaded filter 5 is provided between layer earthfill structure.
By the TGXG that lacing wire 7 forms include two parts in wall multilayer earthfill structure: a part is construction lacing wire 16,
Positioned at earthfill structure both lateral sides, and extend in the gap of upper layer and lower layer concrete modular 4 and fixed by bolt 6;It is another
Part is stress main reinforcement 17, and tunneling boring is arranged in earthfill structure.Stress main reinforcement 17 includes left and right two parts, and middle part is taken up and down
It connects.17 end of stress main reinforcement is folded upward at, and is formed back and is wrapped up in lacing wire 15, is returned and is wrapped up in lacing wire 15 and be entirely located in this layer of earthfill structure.
The biggish cap stone 3 of area of section is provided at the top of concrete modular 4,4 bottom of concrete modular is provided with section face
The biggish concrete foundation 8 of product.The vertical pin hole 18 for being prefabricated with perforation on concrete modular 4 and not penetrating through, passes through bolt
The fixed lacing wire 7 of bolt 6 in hole 18.Drain hole is also prefabricated on concrete modular 4, drain hole is micro- downwards from inside to outside to incline.It is mixed
Solidifying clay model block 4 can be prefabricated into A, B two types, of different size, be adjusted flexibly when building convenient for fissure of displacement code, thereon prefabricated pin hole
18 quantity, position and depth is flexibly determined all in accordance with practice of construction situation.
The bottom of the wall of reinforced earth retaining wall is argillic horizon 11 and ragstone layer 9 from bottom to top, and top surface is from middle line to transverse direction
Two sides are arranged to slope surface, outside the wall of both lateral sides making to reinforced earth retaining wall;9 surface of ragstone layer is provided with one layer of rubber and closes
At fiber earthwork cloth 1.Multilayer earthfill structure top surface is arranged to slope surface from middle line to both lateral sides, and fills surface layer of subgrade bed filler shape
At surface layer of subgrade bed 2,2 bottom surface of surface layer of subgrade bed is provided with one layer of rubber synthetic fibers geotextiles 1.
The construction method of above-mentioned Plateau Permafrost Regions reinforced earth retaining wall, comprising the following steps:
Step 1: one layer of waterproof soil layer is filled in substrate, filler is cohesive soil, dirt or Cement Soil, thickness 0.3m, top surface
It is made into outside 4% draining horizontal slope;Cooperate the washer stone that inclines to construct using bull-dozer or excavator, is once poured onto design thickness, side slope
Slabstone is suitably regular;With the fritter stone of 0.1~0.2m partial size on the levelling surface layer of washer stone overall with range of inclining, using heavy type vibration pressure
Road machine, which rolls, to incline washer stone 6~8 times;Intermediate longitudinal progress behind elder generation two sides, is rolled, the capable be overlapped 0.4m between row repeatedly when rolling
More than, front and back abutting lot is overlapped 2.0m or more, and number of rolling is determined by test, and measurement, which is subject to, to roll rear absolute altitude and stablize;Piece
Rock layers top surface is laid with rubber synthetic fibers geotextiles 1;
Step 2: batch production dry wall surface concrete module 4 reserves drain hole and pin hole 18, and precast reinforced bolt 6 is cut out
It cuts construction lacing wire 16, stress lacing wire 17 and returns and wrap up in both lacing wires 15 and be integrated;
Step 3: the construction line-putting, every 10m are one section, and pay attention to reserved expansion joint, width 0.2m;
Step 4: cast-in-place strip concrete foundation 8, every segment length control is within 2m;
Step 5: it is laid with construction lacing wire 16, forms TGXG, dry masonry first layer concrete modular 4;
Step 6: paving stress lacing wire 17 forms TGXG, and when overlapping is separated with filler;
Filler: being poured in the TGXG completed by step 7 with loading machine, suitable with spilling after excavation or the smooth filler of bull-dozer
The water of amount, with road roller by filling compaction;Using light-duty machines such as frog rammer or plate compactors in 1 meter away from 4 barricade of concrete modular
Tool compacting.Light-duty machinery gross mass is not more than 1 ton;
Step 8: returning and wrap up in filler, and sand folder cobble loaded filter of constructing;
Step 9: dry masonry second layer concrete modular 4, upper and lower module are fixed with bolt 6;
Step 10: upper and lower module is staggered, and avoids the occurrence of vertical straight joint;It should be noted that A, the collocation of Type B module are used when laid dry module;
Step 11: after the completion of concrete modular 4 is constructed, cast-in-place cap stone 3 and wall top railing of constructing;Cap stone length control 2m with
It is interior;
Step 12: surface layer of subgrade bed bottom surface is laid with rubber synthetic fibers geotextiles 1;
Step 13: 2 filler of surface layer of subgrade bed is filled.