CN109067592A - A kind of intelligent control device and management-control method for matching electricity consumption towards intelligence - Google Patents
A kind of intelligent control device and management-control method for matching electricity consumption towards intelligence Download PDFInfo
- Publication number
- CN109067592A CN109067592A CN201811014325.XA CN201811014325A CN109067592A CN 109067592 A CN109067592 A CN 109067592A CN 201811014325 A CN201811014325 A CN 201811014325A CN 109067592 A CN109067592 A CN 109067592A
- Authority
- CN
- China
- Prior art keywords
- network
- probe
- management
- control system
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
- H04L41/0668—Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0677—Localisation of faults
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
Abstract
The present invention provides a kind of intelligent control devices and management-control method for matching electricity consumption towards intelligence, increase the intelligent managing and control system based on communication traffic streams in distribution control layer, realize intelligence adapted telecommunication uniform service access, unified storage and unified displaying.Route assemblage, storage, the forward node of Backbone Communication layer, increase active probe, and the testing technology of VPN is divided using network layer, realizes the actively monitoring of business information.In terminal access layer, for communication traffic streams PLC, EPON, transmission in wireless network situation, increase distributed passive probe at the head end of PLC network, the ONU unit of EPON network, wireless network base station, realizes the functions such as acquisition, the link flow analysis and assessment of business information.The communication service intelligence management-control method provided by the invention for matching electricity consumption towards intelligence may be implemented service feature visualization, reduce terminal communication network O&M cost, optimize allocation of resources, promote operating index.
Description
Technical field
The invention belongs to intelligent adapted telecommunication fields, and in particular to a kind of intelligent control device for matching electricity consumption towards intelligence
And management-control method.
Background technique
With the continuous expansion of electric power adapted electricity business scale, diversification is presented in the various communication technologys and applied business type
Situation.Maintenance department needs to grasp information as comprehensive as possible and details to network service quality, to energy communication service network
Performance and quality of service carry out active monitoring, the timely early warning when network performance, bandwidth or quality decline to a certain extent,
And quickly level diagnosis bottleneck and failure.Therefore it is highly desirable to adapted telecommunication net network quality monitoring and traffic management and control skill
Art is furtherd investigate, and realizes the whole network, full-service visualization, provides support for intelligent O&M, monitoring and fault diagnosis.
Summary of the invention
Goal of the invention
The present invention provides a kind of communication service intelligent control device and management-control method for matching electricity consumption towards intelligence, to electricity consumption
Communication service quality actively monitoring, timely early warning, fault location are visualized from network link, service feature, for intelligent fortune
Dimension, monitoring and fault diagnosis provide support.Intellectualized reconstruction is carried out to distribution control layer, Backbone Communication layer and terminal access layer,
Ultimately form a kind of communication service intelligence management-control method for matching electricity consumption towards intelligence.
Technical solution
A kind of intelligent control device for matching electricity consumption towards intelligence, it is characterised in that: including increasing the intelligence based on communication traffic streams
Managing and control system realizes operation monitoring, operation and control, the functions such as integrated information analysis, network self-healing switching;Backbone Communication layer
Route assemblage, storage, forward node increase active probe, and the testing technology of VPN is divided using network layer, realize business information
Actively monitoring;In terminal access layer, for communication traffic streams PLC, EPON, transmission in wireless network situation, in PLC network
Head end, the ONU unit of EPON network increase distributed passive probe at wireless network base station, realize acquisition, the chain of business information
The functions such as road flow evaluation analysis;Network management system, monitoring system, SCADA master server, another SCADA master server are made
To be uniformly accessed into, being uniformly processed for the various data of server, MIS server, be unifiedly stored to intelligent managing and control system, build
Found unified adapted telecommunication service process platform;Two SCADA master servers and MIS server to detection information at
Reason, report to intelligent managing and control system, network management system and monitoring system, finally intelligent managing and control system to fault message carry out and
Alarm, positioning, self-healing switching;Monitoring-controlling system signal line connects active probe unit, for acquiring the number in certain time
According to assessment connectivity situation and collect the result of return;Monitoring-controlling system signal line connects passive type probe unit, distributed intelligence
Probe control is measured, as the control logic of main passive measurement equipment, determines the resource benefit of network data plane deployed with devices
With rate.
A kind of management-control method using such as the intelligent control device towards intelligence with electricity consumption, it is characterised in that: setting
Passive type probe unit distribution probe, in conjunction with the business demand and terminal network of terminal communication access net Network Traffic Monitoring
Probe node, the flow of the available all chain roads being connected with this node of the probe, so that guaranteeing industry is arranged in type
While business stream coverage rate, required flow probe number is minimum;Active probe unit passes through two RJ45 ethernet ports and road
It is direct-connected by device, the unique global routing address of management mouth configuration, Access type;It tests mouth and multiple VLAN is arranged by sub-interface,
The corresponding business VPN of each VLAN;Multiple addresses VLAN, Trunk type need to be distributed;Router need to provide two RJ45 simultaneously
Ethernet port, management mouth walk VPN with outer global routing, Access type;It is multiple by setting sub-interface setting to test mouth
The corresponding business VPN of VLAN, each VLAN, vlan number suggestion and VPN, VLAN setting are consistent, Trunk type;So in portion
During administration, 2 IP address are distributed for each probe, an IP address gives management mouth, another IP address gives test
Mouthful, realize system-wide by testing;Using greedy algorithm, probe collection and corresponding test path are determined, first in actual monitoring
Test purpose node is determined according to test assignment list, then according to certain each purpose forward node of frequency ping, acquisition
Data assessment connectivity situation in certain time and the result for collecting return;If it find that having test path that can not be connected to, then
Carry out fault diagnosis;The possible position of failure is judged according to the test result returned, can also be sent if necessary
Traceroute assist probes, to the last fault location;Two SCADA master servers and MIS server believe detection
Breath is handled, and intelligent managing and control system, network management system and monitoring system are reported to, and is finally believed in intelligent managing and control system failure
Breath carries out and alarm, positioning, self-healing switching;
Testing terminal is connected in each different VPN and accesses corresponding server system, tests flow, can dispose more
A testing terminal respectively corresponds each VPN and network interface is respectively configured, and management port is then connected in global routing, to realize data
It is transferred to management platform;
Intelligent managing and control system is directed to communication traffic streams PLC, EPON, transmission in wireless network situation in terminal access layer, in PLC net
The head end of network, the ONU unit of EPON network increase distributed passive probe at wireless network base station, realize adopting for business information
The functions such as collection, link flow analysis and assessment.
The Business Stream situation that intelligent managing and control system is acquired according to active probe unit and passive type probe unit, is examined in real time
Survey grid network operating condition;If obstructed situation occurs in any link of terminal network, managing and control system receives what probe was sent
After feedback, fault network network layers are determined according to active probe, failed terminals network is determined according to distributed passive probe, is monitored
Then the position that failure occurs is sent to other terminal core nets and is instructed, business is allowed to be transmitted in a manner of other terminal networks,
Realize fault network self-healing switching;Therefore it is greatly improved in the self-healing ability of intelligent managing and control system lower network.
Detailed description of the invention
Fig. 1 is the intelligent managing and control system structural schematic diagram of integration.
Fig. 2 is greedy algorithm process.
Fig. 3 is passive probe deployment and testing schematic diagram based on greedy algorithm.
Fig. 4 is that passive probe testing figure is netted in terminal access.
Fig. 5 is that the network self-healing based on intelligent managing and control system switches schematic diagram.
Specific embodiment
Following further describes the present invention with reference to the drawings:
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, a kind of intelligent control device for matching electricity consumption towards intelligence, including increase and be based on
The intelligent managing and control system of communication traffic streams realizes operation monitoring, operation and control, integrated information analysis, network self-healing switching etc.
Function.Route assemblage, storage, the forward node of Backbone Communication layer, increase active probe, and the testing of VPN is divided using network layer
Technology realizes the actively monitoring of business information.In terminal access layer, for being passed in communication traffic streams PLC, EPON, wireless network
Defeated situation increases distributed passive probe at the head end of PLC network, the ONU unit of EPON network, wireless network base station, real
The functions such as acquisition, the link flow analysis and assessment of existing business information.By network management system, monitoring system, SCADA master server, another
One SCADA master server is uniformly accessed into as the various data of standby server, MIS server, is uniformly processed, is uniformly deposited
Intelligent managing and control system is stored up, unified adapted telecommunication service process platform is established;Two SCADA master servers and MIS are serviced
Device handles detection information, reports to intelligent managing and control system, network management system and monitoring system, finally in intelligently control system
System is carried out to fault message and alarm, positioning, self-healing switching;Monitoring-controlling system signal line connects active probe unit, is used for
It acquires the data assessment connectivity situation in certain time and collects the result of return;Monitoring-controlling system signal line connects passive type and visits
Needle device, distributed intelligence measure probe control, as the control logic of main passive measurement equipment, determine network data plane
The resource utilization of deployed with devices.
Use the management-control method of the intelligent control device towards intelligence with electricity consumption: setting passive type probe unit distribution is visited
Probe node, the spy is arranged in conjunction with the business demand and terminal network type of terminal communication access net Network Traffic Monitoring in needle
The flow of the available all chain roads being connected with this node of needle, so that while guaranteeing Business Stream coverage rate, it is required
Flow probe number is minimum;Active probe unit is direct-connected by two RJ45 ethernet ports and router, and the configuration of management mouth is only
One global routing address, Access type;Multiple VLAN, the corresponding business of each VLAN is arranged by sub-interface in test mouth
VPN;Multiple addresses VLAN, Trunk type need to be distributed;Router need to provide two RJ45 ethernet ports simultaneously, and management mouth is walked
VPN is with outer global routing, Access type;It tests mouth and multiple VLAN is arranged by setting sub-interface, each VLAN is one corresponding
Business VPN, vlan number suggestion and VPN, VLAN setting are consistent, Trunk type;So being each probe during deployment
2 IP address are distributed, an IP address gives management mouth, another IP address gives test mouth, realizes system-wide by testing;Using
Greedy algorithm determines probe collection and corresponding test path, is determined and is surveyed according to test assignment list first in actual monitoring
Destination node is tried, then according to certain each purpose forward node of frequency ping, the data assessment acquired in certain time connects
General character situation and the result for collecting return;If it find that there is test path that can not be connected to, then fault diagnosis is carried out;According to having returned
The test result returned judges the possible position of failure, can also send traceroute assist probes if necessary, to the last
Fault location;Two SCADA master servers are handled detection information with MIS server, report to intelligence control system
System, network management system and monitoring system finally carry out fault message in intelligent managing and control system and alarm, positioning, self-healing are cut
It changes;
Testing terminal is connected in each different VPN and accesses corresponding server system, tests flow, can dispose more
A testing terminal respectively corresponds each VPN and network interface is respectively configured, and management port is then connected in global routing, to realize data
It is transferred to management platform;
Intelligent managing and control system is directed to communication traffic streams PLC, EPON, transmission in wireless network situation in terminal access layer, in PLC net
The head end of network, the ONU unit of EPON network increase distributed passive probe at wireless network base station, realize adopting for business information
The functions such as collection, link flow analysis and assessment.
The Business Stream situation that intelligent managing and control system is acquired according to active probe unit and passive type probe unit, is examined in real time
Survey grid network operating condition;If obstructed situation occurs in any link of terminal network, managing and control system receives what probe was sent
After feedback, fault network network layers are determined according to active probe, failed terminals network is determined according to distributed passive probe, is monitored
Then the position that failure occurs is sent to other terminal core nets and is instructed, business is allowed to be transmitted in a manner of other terminal networks,
Realize fault network self-healing switching.Therefore it is greatly improved in the self-healing ability of intelligent managing and control system lower network.
As shown in Figure 1, the intelligence managing and control system, first by the way that traditional network management system in conjunction with monitoring system, to be added
SCADA server, MIS server complete the intellectualized reconstruction for matching electricity consumption main website, while will be equipped with spare SCADA server and increase
The reliability of main website probe business stream information;And then turned for the device that cannot export IEC61850 specification in station by specification
Integral intelligent managing and control system is accessed with unified specification after changing device;Finally by intelligent managing and control system to traffic flows
It is monitored, analyzes, so that fault location is completed, network self-healing switching.
As shown in Fig. 2, the greedy algorithm process.
Step1: route lines of the shortest path in network between any two points as point-to-point are calculated, classics can be used
Floyd algorithm or dijkstra's algorithm;
Step2: the uncovered number of links of the route lines in initialization network between any two points is the length of the route;
Step3: finding out that most route of uncovered number of links in the route lines of current network, if it exists it is a plurality of in this way
Route, then select endpoint to be chosen as that route more than the number of probe;
Step4: addition minimal path set, while by two endpoints be added probe collection;
Step5: all link indicias for including by are to have covered, while updating the uncovered chain in network between any two points
Number;
Step6: terminate if all links in network are all capped, otherwise return to Step3.
As shown in figure 3, passive probe deployment and testing schematic diagram based on greedy algorithm.
(1) EPON accesses net intranet network layers test scene
The probe for being deployed in OLT periodically can initiate network layer testing to the probe for being deployed in its lower ONU, otherwise still.When any
When the ICMP request that one probe issues is not responded within the set time, second started in network layer testing task is appointed
Business initiates traceroute order to the probe for the other ONU being deployed under same OLT respectively, which section of network channel is determined
Routing goes wrong.
(2) public network internal network test scene
The probe for being deployed in front end processor periodically can initiate network layer testing to the probe for being deployed in its lower terminal, otherwise still.When
When the ICMP request that any one probe issues is not responded within the set time, second in network layer testing task will be started
A task initiates traceroute order to the probe for the other terminals being deployed under front end processor respectively, determines network channel
Which section routing goes wrong.
As shown in figure 4, passive probe testing figure is netted in terminal access.
When testing terminal initiates ICMP request to the network equipment, application server and user terminal, in fixed request time
In number, when testing object does not respond to, testing agency tentatively judges that network is unreachable, will enter next testing process.Testing
It acts on behalf of to the network equipment, application server and user terminal and initiates traceroute order, testing agency can be to each jump road
By carrying out ICMP request, when a certain section of routing is without response, and the IP that this section routes is tipped out.Edge router uses
The mode of MP-BGP is connected with backbone router, is responsible for forwarding by backbone router, saves testing inromation bandwidth.Each backbone
Routing iinformation is reported to the testing terminal being connected with management platform by VPN mode by router testing terminal, realizes the whole network road
Summarized by information.
The function of dialling network layer testing is the routed path and hop count that can recorde network layer test target, for test mesh
Mark routing changes inquiry.Data communication network networking structure is to carry different service traffics by MPLS VPN mode at present, by
In specific routed path, but data communication network overall situation road can not be obtained by testing path testing in MPLS label switched environment
By being complete IP route switching, not through any MPLS VPN, therefore test can be routed by the testing overall situation and be had
Body routed path.If being directed to same target, while VPN and global ip address are tested, can be closed by the routed path of global I P
Join the path in the address VPN out.
The network self-healing based on intelligent managing and control system switches schematic diagram as shown in Figure 5.
Distribution business guiding is that (the client) accesses wireless, EPON, Industrial Ethernet separately down from distribution main website
The transmission of further progress business.Wirelessly CPE(wireless terminal accessing device is accessed from the base station TD-LTE (LTE core network)), then
Access HUB(hub), finally enter DTU(server end);After EPON receives the information of distribution main website, from OLT to ONU,
HUB is subsequently entered, DTU is finally entered.Intelligent managing and control system is accessed in top layer, this managing and control system can not only monitor entirely
All nodes in network topology structure, supervise the situation of node, realize and visualize to whole network.It can also be to whole network
It carries out automatically controlling.
If there is obstructed situation in any link of EPON network, managing and control system receive probe send feedback it
Afterwards, it monitors the position that failure occurs, then to send and instruct to LTE core network, business is allowed wirelessly to be transmitted;Together
Reason can also send an instruction to EPON when any one wireless link of managing and control system monitoring breaks down, so that
Business can be from EPON network transmission, the case where Industrial Ethernet similarly.Therefore the self-healing energy of intelligent managing and control system network is added
Power greatly improves.
It is to be understood that the content of present invention and specific embodiment are intended to prove the reality of technical solution provided by the present invention
Border application, should not be construed as limiting the scope of the present invention.Those skilled in the art open in spirit and principles of the present invention
Give, can various modifications may be made, equivalent replacement or improve.But these changes or modification are being applied in pending protection scope.
Claims (3)
1. a kind of intelligent control device for matching electricity consumption towards intelligence, it is characterised in that: including increasing the intelligence based on communication traffic streams
Energy managing and control system, realization operation monitoring, operation and control, the functions such as integrated information is analyzed, network self-healing switches;Backbone Communication layer
Route assemblage, storage, forward node, increase active probe, divide the testing technology of VPN using network layer, realize business letter
The actively monitoring of breath;In terminal access layer, for communication traffic streams PLC, EPON, transmission in wireless network situation, in PLC network
Head end, the ONU unit of EPON network, increase distributed passive probe at wireless network base station, realize business information acquisition,
The functions such as link flow analysis and assessment;By network management system, monitoring system, SCADA master server, another SCADA master server
Various data as standby server, MIS server are uniformly accessed into, are uniformly processed, are unifiedly stored to intelligent managing and control system,
Establish unified adapted telecommunication service process platform;Two SCADA master servers and MIS server to detection information at
Reason, report to intelligent managing and control system, network management system and monitoring system, finally intelligent managing and control system to fault message carry out and
Alarm, positioning, self-healing switching;Monitoring-controlling system signal line connects active probe unit, for acquiring the number in certain time
According to assessment connectivity situation and collect the result of return;Monitoring-controlling system signal line connects passive type probe unit, distributed intelligence
Probe control is measured, as the control logic of main passive measurement equipment, determines the resource benefit of network data plane deployed with devices
With rate.
2. a kind of management-control method using the intelligent control device as described in claim 1 towards intelligence with electricity consumption, feature exist
In: setting passive type probe unit distribution probe, in conjunction with terminal communication access net Network Traffic Monitoring business demand and
Terminal network type, setting probe node, the flow of the available all chain roads being connected with this node of the probe, so that
While guaranteeing Business Stream coverage rate, required flow probe number is minimum;Active probe unit passes through two RJ45 Ethernets
Port is direct-connected with router, the unique global routing address of management mouth configuration, Access type;It is more by sub-interface setting to test mouth
The corresponding business VPN of a VLAN, each VLAN;Multiple addresses VLAN, Trunk type need to be distributed;Router needs to provide simultaneously
Two RJ45 ethernet ports, management mouth walk VPN with outer global routing, Access type;Test mouth is set by the way that sub-interface is arranged
Multiple VLAN are set, the corresponding business VPN of each VLAN, vlan number suggestion and VPN, VLAN setting are consistent, Trunk type;Institute
During deployment, to distribute 2 IP address for each probe, an IP address gives management mouth, another IP address point
Test mouth is given, realizes system-wide by testing;Using greedy algorithm, probe collection and corresponding test path are determined, in actual monitoring
Shi Shouxian determines test purpose node according to test assignment list, then according to certain each purpose forwarding section of frequency ping
Point acquires the data assessment connectivity situation in certain time and collects the result of return;If it find that there is test path can not
Connection, then carry out fault diagnosis;The possible position of failure is judged according to the test result returned, can also be sent out if necessary
Traceroute assist probes are sent, to the last fault location;Two SCADA master servers and MIS server are to detection
Information is handled, and intelligent managing and control system, network management system and monitoring system are reported to, finally in intelligent managing and control system to failure
Information carries out and alarm, positioning, self-healing switching;
Testing terminal is connected in each different VPN and accesses corresponding server system, tests flow, can dispose more
A testing terminal respectively corresponds each VPN and network interface is respectively configured, and management port is then connected in global routing, to realize data
It is transferred to management platform;
Intelligent managing and control system is directed to communication traffic streams PLC, EPON, transmission in wireless network situation in terminal access layer, in PLC net
The head end of network, the ONU unit of EPON network increase distributed passive probe at wireless network base station, realize adopting for business information
The functions such as collection, link flow analysis and assessment.
3. the management-control method of the intelligent control device according to claim 2 towards intelligence with electricity consumption, it is characterised in that: intelligence
The Business Stream situation that energy managing and control system is acquired according to active probe unit and passive type probe unit, the real-time detection network operation
Situation;If there is obstructed situation in any link of terminal network, after managing and control system receives the feedback that probe is sent, root
Fault network network layers are determined according to active probe, and failed terminals network is determined according to distributed passive probe, monitors what failure occurred
Then position is sent to other terminal core nets and is instructed, business is allowed to be transmitted in a manner of other terminal networks, realize fault network
Network self-healing switching;Therefore it is greatly improved in the self-healing ability of intelligent managing and control system lower network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811014325.XA CN109067592B (en) | 2018-08-31 | 2018-08-31 | Intelligent management and control device and method for intelligent power distribution and utilization |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811014325.XA CN109067592B (en) | 2018-08-31 | 2018-08-31 | Intelligent management and control device and method for intelligent power distribution and utilization |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109067592A true CN109067592A (en) | 2018-12-21 |
CN109067592B CN109067592B (en) | 2022-01-18 |
Family
ID=64759193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811014325.XA Active CN109067592B (en) | 2018-08-31 | 2018-08-31 | Intelligent management and control device and method for intelligent power distribution and utilization |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109067592B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109728980A (en) * | 2019-03-15 | 2019-05-07 | 广东电网有限责任公司 | A kind of network quality active dial testing method, device and equipment |
CN110086260A (en) * | 2019-05-28 | 2019-08-02 | 深圳供电局有限公司 | A kind of power distribution network Intellisense control device |
CN110138598A (en) * | 2019-04-23 | 2019-08-16 | 国网安徽省电力有限公司经济技术研究院 | A kind of rural area distributed generation system data communication network-building method |
CN111083654A (en) * | 2019-12-18 | 2020-04-28 | 欧普照明股份有限公司 | Method for realizing control of wireless passive switch, wireless passive switch and proxy node |
CN111090131A (en) * | 2019-12-16 | 2020-05-01 | 亿水泰科(北京)信息技术有限公司 | Rainfall radar intelligent early warning system |
CN111278045A (en) * | 2020-01-21 | 2020-06-12 | 广东博智林机器人有限公司 | Probe scheduling method, probe scheduling device, probe method, probe device, probe equipment and storage medium |
CN112636942A (en) * | 2019-10-08 | 2021-04-09 | 中国移动通信集团浙江有限公司 | Method and device for monitoring service host node |
CN113039755A (en) * | 2018-12-26 | 2021-06-25 | 西门子股份公司 | Monitoring method, device, system and computer readable medium for industrial control system |
CN113727357A (en) * | 2021-08-23 | 2021-11-30 | 南京理工大学紫金学院 | 5G dial testing method and system for industrial scene |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216709A (en) * | 2007-12-28 | 2008-07-09 | 毛建良 | Client distribution automation remote real time monitoring system |
US20130227689A1 (en) * | 2012-02-17 | 2013-08-29 | Tt Government Solutions, Inc. | Method and system for packet acquisition, analysis and intrusion detection in field area networks |
CN105207850A (en) * | 2015-09-29 | 2015-12-30 | 国家电网公司 | Network connectivity testing method and system |
CN106789177A (en) * | 2016-11-30 | 2017-05-31 | 武汉船舶通信研究所 | A kind of system of dealing with network breakdown |
CN108306756A (en) * | 2017-12-21 | 2018-07-20 | 国网北京市电力公司 | One kind being based on electric power data network holography assessment system and its Fault Locating Method |
-
2018
- 2018-08-31 CN CN201811014325.XA patent/CN109067592B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216709A (en) * | 2007-12-28 | 2008-07-09 | 毛建良 | Client distribution automation remote real time monitoring system |
US20130227689A1 (en) * | 2012-02-17 | 2013-08-29 | Tt Government Solutions, Inc. | Method and system for packet acquisition, analysis and intrusion detection in field area networks |
CN105207850A (en) * | 2015-09-29 | 2015-12-30 | 国家电网公司 | Network connectivity testing method and system |
CN106789177A (en) * | 2016-11-30 | 2017-05-31 | 武汉船舶通信研究所 | A kind of system of dealing with network breakdown |
CN108306756A (en) * | 2017-12-21 | 2018-07-20 | 国网北京市电力公司 | One kind being based on electric power data network holography assessment system and its Fault Locating Method |
Non-Patent Citations (4)
Title |
---|
刘远龙等: "《配网调控知识应答》", 30 September 2016 * |
卢泉等: "二层VPN故障定位与性能监测方案探讨", 《广东通信技术》 * |
朱宏等: "《城市轨道交通概论》", 31 July 2011 * |
高敏等: "面向SDN/NFV的虚拟化网络测试探针的应用", 《2017电力行业信息化年会论文集》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113039755A (en) * | 2018-12-26 | 2021-06-25 | 西门子股份公司 | Monitoring method, device, system and computer readable medium for industrial control system |
CN109728980A (en) * | 2019-03-15 | 2019-05-07 | 广东电网有限责任公司 | A kind of network quality active dial testing method, device and equipment |
CN110138598A (en) * | 2019-04-23 | 2019-08-16 | 国网安徽省电力有限公司经济技术研究院 | A kind of rural area distributed generation system data communication network-building method |
CN110086260A (en) * | 2019-05-28 | 2019-08-02 | 深圳供电局有限公司 | A kind of power distribution network Intellisense control device |
CN110086260B (en) * | 2019-05-28 | 2024-02-23 | 深圳供电局有限公司 | Intelligent sensing management and control device for power distribution network |
CN112636942A (en) * | 2019-10-08 | 2021-04-09 | 中国移动通信集团浙江有限公司 | Method and device for monitoring service host node |
CN112636942B (en) * | 2019-10-08 | 2022-09-27 | 中国移动通信集团浙江有限公司 | Method and device for monitoring service host node |
CN111090131A (en) * | 2019-12-16 | 2020-05-01 | 亿水泰科(北京)信息技术有限公司 | Rainfall radar intelligent early warning system |
CN111083654A (en) * | 2019-12-18 | 2020-04-28 | 欧普照明股份有限公司 | Method for realizing control of wireless passive switch, wireless passive switch and proxy node |
CN111083654B (en) * | 2019-12-18 | 2022-09-16 | 欧普照明股份有限公司 | Method for realizing control of wireless passive switch, wireless passive switch and proxy node |
CN111278045A (en) * | 2020-01-21 | 2020-06-12 | 广东博智林机器人有限公司 | Probe scheduling method, probe scheduling device, probe method, probe device, probe equipment and storage medium |
CN113727357A (en) * | 2021-08-23 | 2021-11-30 | 南京理工大学紫金学院 | 5G dial testing method and system for industrial scene |
Also Published As
Publication number | Publication date |
---|---|
CN109067592B (en) | 2022-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109067592A (en) | A kind of intelligent control device and management-control method for matching electricity consumption towards intelligence | |
CN106100999B (en) | Image network flow control methods in a kind of virtualized network environment | |
US7120118B2 (en) | Multi-path analysis for managing machine communications in a network | |
CN100514918C (en) | Topology discovering method of IP backbone network | |
CN107005437B (en) | Network tomography method and device | |
KR101089832B1 (en) | Network Management System | |
US8605603B2 (en) | Route convergence based on ethernet operations, administration, and maintenance protocol | |
US7969908B2 (en) | Connectivity outage detection based on a multicast management MPLS-VPN group | |
WO2016089921A1 (en) | System and method of discovering paths in a network | |
CN104993988B (en) | A kind of energy internet scheduling and control method | |
CN103069754A (en) | Communication device, communication system, communication method, and recording medium | |
CN111130928B (en) | Network measurement method based on in-band detection in wide area network | |
CN104767680B (en) | It route the method and apparatus being switched fast | |
US10848402B1 (en) | Application aware device monitoring correlation and visualization | |
CN105406988A (en) | Software-definition survivable network construction method | |
CN107800624A (en) | A kind of optimal circuitous path selection new method of regional protection key message | |
Choi | Design and implementation of a stateful PCE-based unified control and management framework for carrier-grade MPLS-TP networks | |
CN108512702A (en) | A kind of system and method for realizing end-to-end quality guarantee between DC based on SR and ESI | |
US11032124B1 (en) | Application aware device monitoring | |
CN109951321A (en) | A kind of substation's station level network topology analytical method, device and storage medium | |
US20120239796A1 (en) | Zone-based network traffic analysis | |
Vdovin et al. | Network utilization optimizer for SD-WAN | |
CN108111423A (en) | Flow transfer management method, apparatus and network derived channel equipment | |
Tri et al. | Locating deteriorated links by network-assisted multicast proving on OpenFlow networks | |
CN110351148A (en) | A kind of three layers of forward-path diagnostic method of network and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||