CN109024568A - A kind of processing method of armored concrete broken pile - Google Patents

A kind of processing method of armored concrete broken pile Download PDF

Info

Publication number
CN109024568A
CN109024568A CN201810847337.4A CN201810847337A CN109024568A CN 109024568 A CN109024568 A CN 109024568A CN 201810847337 A CN201810847337 A CN 201810847337A CN 109024568 A CN109024568 A CN 109024568A
Authority
CN
China
Prior art keywords
pile body
section
concrete
pile
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810847337.4A
Other languages
Chinese (zh)
Inventor
赵国辉
王灏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810847337.4A priority Critical patent/CN109024568A/en
Publication of CN109024568A publication Critical patent/CN109024568A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Abstract

The invention discloses a kind of processing method of armored concrete broken pile, by using lower part pile body, top pile body, section, punchinges, is implanted into reinforcing bar, realize the connection between upper and lower pile body.This method technical security is feasible, can greatly save construction cost, by section dabbing and cleans out first;Then it radially punchinges, cleans out along section, and it is wet to sprinkle water;Finally to middle implantation reinforcing bar of punchinging, casting concrete is conserved to design strength, which is suitable for bridge and industrial and civil architecture, and technical feasibility can greatly save construction cost.

Description

A kind of processing method of armored concrete broken pile
Technical field
The present invention relates to foundation engineering field more particularly to a kind of processing methods of armored concrete broken pile.
Background technique
In nowadays foundation engineering field, usually because the factors such as casting concrete interrupts, bored concrete pile sleeve is extracted, cause There is broken pile in pile body.To overcome the above problem, design a kind of armored concrete broken pile treatment method, by using lower part pile body, Top pile body section, punchinges, is implanted into reinforcing bar, realizes the connection between upper and lower pile body.This method technical security is feasible, can be greatly Save construction cost in ground.
Summary of the invention
The technical problems to be solved by the present invention are: how safely and efficiently to realize the technical treatment to broken pile.
In order to solve the above-mentioned technical problem, the invention discloses a kind of processing method of armored concrete broken pile, reinforcing bar is mixed Solidifying soil broken pile includes lower part pile body, top pile body, section, punchinges, is implanted into reinforcing bar, and lower part pile body is reinforced concrete cast-in-situ stake Body, complete cast-in-place pile body include top pile body;Top pile body is monolithic reinforced concrete structure, top pile body bottom and lower part stake It is mingled with section between body;The section causes lower part pile body concrete whole because interrupting concreting when pouring lower part pile body It coagulates and is formed;The armored concrete broken pile treatment method includes following steps in sequence:
Firstly, by section dabbing and cleaning out;
Then, it opens up and punchinges along section, clean out, and it is wet to sprinkle water;
Finally, to middle implantation reinforcing bar of punchinging, casting concrete is conserved to design strength.
Further, the section 3 needs the dabbing on original concrete, and is opened up punching using pneumatic pick on it, so Reinforcing bar, casting concrete are implanted into punchinging afterwards.
Further, the lower part pile body and top pile body result in section 3, top because of casting concrete interruption It before pile body casting concrete, needs 3 dabbing of section, and it is wet to remove waste residue watering.
Further, it after 3 dabbing of section, needs circumferentially to punching on it, right post-installing rebar, then pour mixed Solidifying soil forms.
Compared with prior art, the present invention can obtain following technical effect: lower part pile body is used only, top pile body, breaks Face punchinges, is implanted into reinforcing bar, can realize and connect to upper and lower pile body.The technical security is feasible, is avoided that the wasting of resources.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, those of ordinary skill in the art are come It says, without creative efforts, is also possible to obtain other drawings based on these drawings.
Fig. 1: the structural schematic diagram of the embodiment of the present invention.
Fig. 2: the plan view of the embodiment of the present invention.
In figure: 1. lower part pile body, 2. top pile body, 3. section 4. is punchinged 5. implantation reinforcing bars
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
With reference to the accompanying drawing and specific embodiment is further described application principle of the invention.
Embodiment one
Referring to Fig. 1, the product of the embodiment of the present invention includes lower part pile body 1, top pile body 2, section 3,4, implantation steel of punchinging Muscle 5.Lower part pile body 1 is reinforced concrete cast-in-situ pile body, and complete cast-in-place pile body includes top pile body 2;Top pile body 2 is cast-in-place steel Tendon concrete structure, bottom and lower part pile body 1 are mingled with section 3;Section 3 because interrupting concreting when pouring lower part pile body 1, Lead to the 1 concrete final set of lower part pile body, thus forms section 3;Section 3 needs the dabbing on original concrete, and makes on it 4 certain depths of punchinging are opened up with pneumatic pick, reinforcing bar 5 are then implanted into 4 punchinging, casting concrete can realize the place to broken pile Reason.
The application method of the embodiment of the present invention is as follows: referring to Fig. 1 and Fig. 2, by 3 dabbing of section and cleaning out first;So 4 are punchinged along section 3 is radial afterwards, are cleaned out, and it is wet to sprinkle water;Reinforcing bar 5 is finally implanted into 4 to punchinging, casting concrete maintenance To design strength.
Preferably, lower part pile body 1 used by the embodiment of the present invention and top pile body 2 are led because of casting concrete interruption Cause forms section 3, before 2 casting concrete of top pile body, needs 3 dabbing of section, and it is wet to remove waste residue watering.
Preferably, after 3 dabbing of section used by the embodiment of the present invention, need circumferentially to punching 4 on it, then plants Enter reinforcing bar 5, then casting concrete forms.

Claims (5)

1. a kind of processing method of armored concrete broken pile, armored concrete broken pile include lower part pile body (1), top pile body (2), Section (3) punchinges (4), is implanted into reinforcing bar (5), and lower part pile body (1) is reinforced concrete cast-in-situ pile body, and complete cast-in-place pile body includes Top pile body (2);Top pile body (2) is monolithic reinforced concrete structure, between top pile body (2) bottom and lower part pile body (1) It is mingled with section (3);The section (3) causes lower part pile body (1) mixed because interrupting concreting when pouring lower part pile body (1) It coagulates soil final set and is formed;It is characterized by: the armored concrete broken pile treatment method includes following steps in sequence:
Firstly, by section (3) dabbing and cleaning out;
Then, punching (4) are opened up along section (3), cleaned out, and it is wet to sprinkle water;
Finally, to punchinging, (4) are middle to be implanted into reinforcing bar (5), and casting concrete is conserved to design strength.
2. a kind of processing method of armored concrete broken pile according to claim 1, it is characterised in that: the section (3) The dabbing on original concrete is needed, and opens up punching (4) using pneumatic pick on it, then in (4) middle implantation reinforcing bar of punchinging (5), casting concrete.
3. a kind of processing method of armored concrete broken pile according to claim 1, it is characterised in that: the lower part stake Body (1) and top pile body (2) result in section (3) because of casting concrete interruption, before top pile body (2) casting concrete, It needs section (3) dabbing, and it is wet to remove waste residue watering.
4. a kind of processing method of armored concrete broken pile according to claim 1, it is characterised in that: the section (3) it after dabbing, needs circumferentially to punching on it (4), right post-installing rebar (5), then casting concrete form.
5. a kind of processing method of armored concrete broken pile according to claim 1, it is characterised in that: the section (3) it after dabbing, needs radially to punching on it (4), right post-installing rebar (5), then casting concrete form.
CN201810847337.4A 2018-07-27 2018-07-27 A kind of processing method of armored concrete broken pile Pending CN109024568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810847337.4A CN109024568A (en) 2018-07-27 2018-07-27 A kind of processing method of armored concrete broken pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810847337.4A CN109024568A (en) 2018-07-27 2018-07-27 A kind of processing method of armored concrete broken pile

Publications (1)

Publication Number Publication Date
CN109024568A true CN109024568A (en) 2018-12-18

Family

ID=64646364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810847337.4A Pending CN109024568A (en) 2018-07-27 2018-07-27 A kind of processing method of armored concrete broken pile

Country Status (1)

Country Link
CN (1) CN109024568A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000319876A (en) * 1999-05-10 2000-11-21 Penta Ocean Constr Co Ltd Structure for connecting head of steel pipe pile and method for connecting the same
CN205688435U (en) * 2016-06-27 2016-11-16 黑龙江科技大学 A kind of broken pile treatment device of cast-in-situ bored pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000319876A (en) * 1999-05-10 2000-11-21 Penta Ocean Constr Co Ltd Structure for connecting head of steel pipe pile and method for connecting the same
CN205688435U (en) * 2016-06-27 2016-11-16 黑龙江科技大学 A kind of broken pile treatment device of cast-in-situ bored pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张成玉等: ""浅析钻孔灌注桩的断桩处理"", 《科技信息》 *

Similar Documents

Publication Publication Date Title
CN105804410A (en) Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN103993598B (en) One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN207919746U (en) A kind of prefabricated node of high-strength high concrete assembled frame of ductility
CN108035437A (en) A kind of prefabricated node of the high-strength high concrete assembled frame of ductility and connection method
CN204753615U (en) Bridge pile foundation reinforced structure
CN106337391A (en) Long piled wharf panel bottom large-area damage repairing construction method
CN108755453A (en) A kind of water punching is damaged the composite reinforcement structure and its reinforcement means of bridge pier
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN204266136U (en) Stone arch bridge cover arch rib shotcrete ruggedized construction
CN102660956A (en) Concrete moulding bed structure and pouring method
CN106049563B (en) Earthquake is damaged pier footing reinforcing system
CN106593466A (en) Method for reinforcing fractured lining of existing railway tunnel
CN104594654B (en) A kind of concrete structure reinforcement scheme generation method
CN109024568A (en) A kind of processing method of armored concrete broken pile
CN102561329A (en) Construction method of underwater concrete cast-in-place pipe pile
CN107675838A (en) Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN110017035B (en) Method and structure for reinforcing precast prestressed beam and column joints by mixed fiber concrete
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert
CN107217865B (en) A kind of increasing reinforced construction method of the flat beam section of main body frame
CN108708565A (en) A kind of shear wall segmented ruggedized construction
CN108104135A (en) The construction method of pattern foundation pit supporting structure lattice column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication