CN109000632B - A building construction verticality deviation observer - Google Patents
A building construction verticality deviation observer Download PDFInfo
- Publication number
- CN109000632B CN109000632B CN201810977943.8A CN201810977943A CN109000632B CN 109000632 B CN109000632 B CN 109000632B CN 201810977943 A CN201810977943 A CN 201810977943A CN 109000632 B CN109000632 B CN 109000632B
- Authority
- CN
- China
- Prior art keywords
- rod
- plate
- base
- sliding sleeve
- front side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/12—Instruments for setting out fixed angles, e.g. right angles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
- Toys (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种观测仪,尤其涉及一种建筑施工垂直度偏差观测仪。The invention relates to an observation instrument, in particular to an observation instrument for verticality deviation of building construction.
背景技术Background technique
建筑施工时,墙体修建好后,为了保证墙体在后续使用中的安全性,施工人员会对墙壁的垂直度进行检测,一般人们都是使用吊锤对墙壁的垂直度进行检测,由于吊锤使用的线是软的,容易被风吹动影响对墙壁的检测,并且吊锤取下后没有任何标记,导致施工人员不清楚偏差位置,所以人们会在使用吊锤时同时进行标记,并且还需要扶着吊锤避免被风吹动,如此比较麻烦。During construction, after the wall is built, in order to ensure the safety of the wall in subsequent use, the construction personnel will test the verticality of the wall. Generally, people use a hanging hammer to test the verticality of the wall. The wire used by the hammer is soft, which is easily affected by the wind and affects the detection of the wall, and there is no mark after the hanging hammer is removed, which makes the construction personnel unclear about the deviation position, so people will mark at the same time when using the hanging hammer, and It is also necessary to hold the hanging hammer to avoid being blown by the wind, which is more troublesome.
发明内容SUMMARY OF THE INVENTION
为了克服由于吊锤使用的线是软的,容易被风吹动影响对墙壁的检测,并且吊锤取下后没有任何标记,导致施工人员不清楚偏差位置的缺点,要解决的技术问题:提供一种能够稳固的对墙壁垂直度进行检测,并且还能再检测的同时标记偏差位置的建筑施工垂直度偏差观测仪。In order to overcome the disadvantage that the wire used by the hanging hammer is soft and easily affected by the wind, and there is no mark after the hanging hammer is removed, so that the construction personnel are not clear about the deviation position, the technical problem to be solved: provide The utility model relates to a building construction verticality deviation observer which can stably detect the verticality of a wall, and can also mark the deviation position at the same time.
技术方案是:一种建筑施工垂直度偏差观测仪,包括有底座、轮子、内螺纹套筒、螺杆、旋钮、支撑座、水泡、第一固定板、支杆、连接杆、第一滑套、导套、L型杆、滚轮、横杆、安装板、第一紧固螺栓、第二固定板、第二紧固螺栓、竖杆、电动绕线轮和拉线,底座左右两侧面下部都安装有轮子,底座底部左右两侧与中间都安装有内螺纹套筒,内螺纹套筒内设有螺杆,螺杆底端安装有旋钮,旋钮底部圆心位置安装有支撑座,底座顶部和中间嵌入式的安装有水泡,底座顶部左侧前后两侧对称式的安装有第一固定板,底座顶部中间安装有支杆,支杆上方设有多个连接杆,连接杆上方设有竖杆,竖杆下部与连接杆下部都设有螺纹,连接杆顶端中部与支杆顶端中部都开有螺纹孔,连接杆下部位于螺纹孔内与支杆连接,竖杆下部位于螺纹孔内与连接杆连接,竖杆前后两侧上部都安装有第二固定板,第二固定板左右两侧与第一固定板左右两侧都设有第二紧固螺栓,竖杆上设有第一滑套,第一滑套前侧面安装有导套,导套内设有L型杆,L型杆右端安装有滚轮,L型杆前侧右部安装有横杆,横杆位于连接杆前侧,横杆左端安装有安装板,安装板上均匀间隔的开有放置孔,安装板顶部均匀间隔的设有第一紧固螺栓,竖杆前侧面上部安装有电动绕线轮,电动绕线轮上绕有拉线,拉线尾端与导套顶部左侧连接。The technical scheme is: a building construction verticality deviation observation instrument, comprising a base, a wheel, an internal thread sleeve, a screw rod, a knob, a support seat, a blister, a first fixing plate, a support rod, a connecting rod, a first sliding sleeve, Guide bush, L-shaped rod, roller, cross rod, mounting plate, first fastening bolt, second fixing plate, second fastening bolt, vertical rod, electric winding wheel and cable Wheels, the bottom left and right sides and the middle of the base are installed with internal thread sleeves, the internal thread sleeve is provided with a screw, the bottom end of the screw is equipped with a knob, the bottom of the knob is equipped with a support seat, and the top and middle of the base are embedded in the installation There are blisters, a first fixing plate is installed symmetrically on the left and right sides of the top of the base, a support rod is installed in the middle of the top of the base, a plurality of connecting rods are arranged above the support rods, and vertical rods are arranged above the connecting rods. The lower part of the connecting rod is provided with threads, the middle of the top of the connecting rod and the middle of the top of the support rod are provided with threaded holes, the lower part of the connecting rod is located in the threaded hole to connect with the support rod, the lower part of the vertical rod is located in the threaded hole to connect with the connecting rod, the front and rear of the vertical rod are connected with the connecting rod. A second fixing plate is installed on the upper part of both sides, the left and right sides of the second fixing plate and the left and right sides of the first fixing plate are provided with second fastening bolts, and a first sliding sleeve is arranged on the vertical rod. A guide sleeve is installed on the side, an L-shaped rod is installed in the guide sleeve, a roller is installed at the right end of the L-shaped rod, a crossbar is installed on the right part of the front side of the L-shaped rod, the crossbar is located on the front side of the connecting rod, and a mounting plate is installed on the left end of the crossbar , There are placement holes evenly spaced on the mounting plate, the first fastening bolts are evenly spaced at the top of the mounting plate, an electric winding wheel is installed on the upper part of the front side of the vertical rod, and a pulling wire is wound on the electric winding wheel, and the tail end of the pulling wire is Connect to the top left side of the guide bush.
进一步地,还包括有擦除装置,擦除装置包括有箱体、第一轴承座、转轴、转盘、卡齿、导杆、第二滑套、挡杆、驱动电机、连接板、擦板和弹簧,竖杆左侧面上部安装有箱体,箱体底部后侧开有通孔,箱体内前侧面下部左右两侧对称式的安装有导杆,导杆后部套有第二滑套,第二滑套前侧面与箱体内前侧面之间连接有弹簧,弹簧套在导杆上,左右两侧第二滑套后端之间安装有连接板,连接板后侧面中部安装有擦板,左侧第二滑套顶部右侧安装有挡杆,箱体内右侧面上部安装有第一轴承座,第一轴承座内安装有转轴,转轴左端贯穿箱体左侧上部,转轴左部安装有转盘,转盘外侧面均匀间隔的安装有卡齿,卡齿与挡杆接触,箱体外左侧面上部水平安装有驱动电机,驱动电机的输出轴通过联轴器与转轴左端连接。Further, an erasing device is also included, and the erasing device includes a box body, a first bearing seat, a rotating shaft, a turntable, a clamping tooth, a guide rod, a second sliding sleeve, a blocking rod, a driving motor, a connecting plate, a wiping plate and Spring, a box body is installed on the upper part of the left side of the vertical rod, a through hole is opened on the rear side of the bottom of the box body, a guide rod is installed symmetrically on the left and right sides of the lower part of the front side of the box body, and a second sliding sleeve is sleeved at the rear of the guide rod. A spring is connected between the front side of the second sliding sleeve and the front side of the box, the spring is sleeved on the guide rod, a connecting plate is installed between the rear ends of the second sliding sleeve on the left and right sides, and a wiper plate is installed in the middle of the rear side of the connecting plate. A blocking rod is installed on the top right side of the second sliding sleeve on the left side, a first bearing seat is installed on the upper part of the right side of the box body, a rotating shaft is installed in the first bearing seat, the left end of the rotating shaft runs through the upper left side of the box body, and the left part of the rotating shaft is installed with a On the turntable, the outer side of the turntable is equipped with clamping teeth evenly spaced, and the clamping teeth are in contact with the blocking rod. A drive motor is installed horizontally on the upper left side of the box, and the output shaft of the drive motor is connected to the left end of the rotating shaft through a coupling.
进一步地,还包括有第三滑套、第三紧固螺栓、竖板、按钮和接触杆,L型杆上设有第三滑套,第三滑套前侧中部设有第三紧固螺栓,第三紧固螺栓与L型杆接触,第三滑套顶部中间安装有竖板,竖板左侧面安装有按钮,按钮与电动绕线轮有电路连接,导套右侧面上部安装有接触杆,接触杆位于按钮左侧。Further, it also includes a third sliding sleeve, a third fastening bolt, a vertical plate, a button and a contact rod, a third sliding sleeve is arranged on the L-shaped rod, and a third fastening bolt is arranged in the middle of the front side of the third sliding sleeve. , the third tightening bolt is in contact with the L-shaped rod, a vertical plate is installed in the middle of the top of the third sliding sleeve, a button is installed on the left side of the vertical plate, the button is connected with the electric winding wheel, and the upper right side of the guide sleeve is installed with a Contact lever, the contact lever is located to the left of the button.
进一步地,还包括有盖板、7型杆和第二轴承座,底座前侧面中部开有凹槽,底座前侧面下部通过合页安装有盖板,盖板与凹槽配合,底座前侧面上部左右两侧对称式的安装有第二轴承座,第二轴承座内安装有7型杆,7型杆位于盖板前侧与其接触。Further, it also includes a cover plate, a 7-type rod and a second bearing seat, a groove is opened in the middle of the front side of the base, a cover plate is installed on the lower part of the front side of the base through a hinge, the cover plate is matched with the groove, and the upper part of the front side of the base is installed. A second bearing seat is installed symmetrically on the left and right sides, a 7-type rod is installed in the second bearing seat, and the 7-type rod is located on the front side of the cover plate and contacts with it.
首先操作人员将适量的连接杆与支杆和竖杆连接,再将油纸其中一端放置在前后两侧第一固定板之间,另一端放置在前后两侧第二固定板之间,即可扭动第二紧固螺栓向内移动,第二紧固螺栓向内移动与油纸接触将其固定,停止扭动第二紧固螺栓,再将大头笔放入放置孔内,且使大头笔与油纸接触,再扭动第一紧固螺栓向内移动与大头笔接触将其固定,即可通过轮子将本装置移动至墙壁旁边,且使滚轮与墙壁接触,再转动旋钮正反交替转动,旋钮正反交替转动带动螺杆和支撑座正反交替转动,螺杆正反交替转动通过内螺纹套筒带动底座上下移动,底座上下移动带动水泡上下移动,当水泡居中时,停止转动旋钮,进而说明本装置为水平状态,即可启动电动绕线轮正转,拉线被放松,因重力的影响,第一滑套向下移动带动导套向下移动,导套向相爱移动带动L型杆向下移动,L型杆向下移动带动滚轮向下移动,滚轮向下移动在墙壁上滚动,同时,L型杆还带动横杆向下移动,横杆向下移动通过安装板带动大头笔向下移动,大头笔向下移动在油纸上画线。当滚轮向下移动至最大行程时,即可关闭电动绕线轮,操作人员即可查看油纸上线,要是线是弯曲的则说明墙壁不是垂直的,反之则是垂直的。同理,当操作人员查看完线后,即可启动电动绕线轮反转,电动绕线轮反转通过拉线带动第一滑套向上移动,进而带动滚轮向上移动恢复至原位,关闭电动绕线轮,操作人员即可将油纸上的线擦除,再推动本装置对下一面墙壁进行观测。First, the operator connects an appropriate amount of connecting rods to the support rods and vertical rods, and then places one end of the oil paper between the first fixing plates on the front and rear sides, and the other end between the second fixing plates on the front and rear sides. Move the second tightening bolt inward, the second tightening bolt moves inward and contacts the oil paper to fix it, stop twisting the second tightening bolt, and then put the tack pen into the placement hole, and make the tack pen and the oil paper contact, and then twist the first fastening bolt to move inward and contact the pen to fix it, then the device can be moved to the side of the wall through the wheels, and the rollers are in contact with the wall, and then turn the knob to rotate forward and reverse alternately, the knob is positive and negative. The reverse alternate rotation drives the screw and the support base to rotate alternately, and the forward and reverse rotation of the screw drives the base to move up and down through the inner threaded sleeve, and the base moves up and down to drive the blisters to move up and down. In the horizontal state, the electric winding wheel can be started to rotate forward, and the cable is loosened. Due to the influence of gravity, the first sliding sleeve moves downward to drive the guide sleeve to move downward, and the guide sleeve moves towards love to drive the L-shaped rod to move downward. The downward movement of the shaped rod drives the rollers to move downwards, and the rollers move downwards to roll on the wall. At the same time, the L-shaped rods also drive the horizontal bars to move downwards. Move down to draw lines on the oiled paper. When the roller moves down to the maximum stroke, the electric winding wheel can be turned off, and the operator can check the oil paper on the line. If the line is curved, it means that the wall is not vertical, otherwise it is vertical. In the same way, when the operator finishes checking the wire, he can start the reversal of the electric reel, and the reversal of the electric reel drives the first sliding sleeve to move up through the pulling wire, which in turn drives the roller to move up to return to its original position, and close the electric reel. Line wheel, the operator can wipe the line on the oil paper, and then push the device to observe the next wall.
初始时,转轴上卷有油纸,油纸头端穿过通孔移动至箱体外,油纸与擦板接触,首先操作人员启动驱动电机反转,驱动电机反转带动转轴反转,转轴反转带动油纸反转,同时,转轴反转带动转盘反转,转盘反转带动卡齿反转,因弹簧的作用,卡齿反转带动挡杆前后移动,挡杆前后移动带动第二滑套前后移动,第二滑套前后移动带动连接板前后移动,连接板前后移动带动擦板前后移动,当擦板向前移动时,擦板不与油纸接触,进而油纸向下移动,当擦板向后移动时,擦板与油纸接触将其固定,如此反复,即可使油纸不断的向下移动,当油纸头端向下移动至前后两侧第一固定板之间时,关闭驱动电机,因弹簧的作用,擦板与油纸接触,操作人员即可扭动第二紧固螺栓向内移动将油纸固定,当墙壁垂直度观测完成后,且操作人员查看完线后,即可扭动第二紧固螺栓向外移动不与油纸接触,再启动驱动电机正转,驱动电机正转带动转轴正转,转轴正转带动转盘正转,转盘正转带动卡齿正转,卡齿正转在挡杆上滑动,同时,转轴正转将油纸卷起,油纸卷起时,擦板对油纸上的线进行擦除,当油纸恢复至原位后,即可关闭驱动电机。如此,无需操作人员手动对油纸上的线擦除,省时省力。Initially, oil paper is rolled on the rotating shaft, the head end of the oil paper moves through the through hole to the outside of the box, and the oil paper is in contact with the wiper. First, the operator starts the drive motor to reverse, and the drive motor reverses the rotation to drive the shaft to reverse. The oil paper is reversed, and at the same time, the rotation of the rotating shaft drives the reverse rotation of the turntable, and the reverse rotation of the turntable drives the reverse rotation of the card teeth. The back and forth movement of the second sliding sleeve drives the connecting plate to move back and forth, and the back and forth movement of the connecting plate drives the wiper to move back and forth. When the wiper moves forward, the wiper does not contact the oil paper, and then the oil paper moves downward. When the wiper moves backwards , the wiper is in contact with the oil paper to fix it. Repeatedly, the oil paper can be continuously moved downward. When the head end of the oil paper moves down between the first fixed plates on the front and rear sides, the drive motor is turned off. Due to the action of the spring , the wiper is in contact with the oil paper, and the operator can twist the second fastening bolt to move inward to fix the oil paper. When the verticality of the wall is observed, and the operator has checked the line, the second fastening bolt can be twisted. Move outward without contacting the oil paper, and then start the driving motor to rotate forward, the forward rotation of the driving motor drives the forward rotation of the rotating shaft, the forward rotation of the rotating shaft drives the forward rotation of the turntable, the forward rotation of the turntable drives the positive rotation of the card teeth, and the positive rotation of the card teeth slides on the blocking rod , At the same time, the shaft rotates forward to roll up the oil paper. When the oil paper is rolled up, the wiper wipes the lines on the oil paper. When the oil paper returns to its original position, the drive motor can be turned off. In this way, the operator does not need to manually wipe the lines on the oil paper, saving time and effort.
当油纸被固定后,操作人员即可扭动第三紧固螺栓向外移动,第三紧固螺栓向外移动不与L型杆接触,即可拉动第三滑套左右移动至合适的位置,当第三滑套移动至合适的位置时,停止移动第三滑套,扭动第三紧固螺栓向内移动与L型杆接触将第三滑套固定,即可开始对墙壁进行检测,当L型杆向左移动带动第三滑套向左移动时,第三滑套向左移动通过竖板带动按钮向左移动,按钮向左移动与接触杆接触时,电动绕线轮被关闭,进而说明墙壁不垂直,并且已经超出倾斜范围。如此,可对需求的倾斜度进行调节。When the oil paper is fixed, the operator can twist the third tightening bolt to move outward, and the third tightening bolt moves outward without contacting the L-shaped rod, and then the third sliding sleeve can be pulled left and right to move to a suitable position. When the third sliding sleeve moves to an appropriate position, stop moving the third sliding sleeve, twist the third fastening bolt to move inward and contact the L-shaped rod to fix the third sliding sleeve, and then start to detect the wall. When the L-shaped rod moves to the left to drive the third sliding sleeve to the left, the third sliding sleeve moves to the left through the vertical plate to drive the button to move to the left. When the button moves to the left and contacts the contact rod, the electric winding wheel is closed, and then Indicates that the wall is not vertical and has exceeded the inclination range. In this way, the required inclination can be adjusted.
当本装置无需使用时,操作人员即可将连接杆从竖杆与支杆上拆下,再转动7型杆反转不与盖板接触,打开盖板将连接杆放入凹槽内。当连接杆全部放入凹槽内后,即可关闭盖板,再转动7型杆正转与盖板接触将其挡住固定。如此,可防止连接杆长时间的支撑导致损坏。When the device is not in use, the operator can remove the connecting rod from the vertical rod and the support rod, and then turn the 7-type rod to reverse and not contact the cover plate, open the cover plate and put the connecting rod into the groove. When the connecting rods are all put into the grooves, the cover can be closed, and then the 7-type rod can be turned to contact with the cover to block and fix it. In this way, damage caused by prolonged support of the connecting rod can be prevented.
本发明的有益效果:本发明通过支撑座与轮子的作用,能使滚轮更稳固的对墙壁垂直度进行检测,并且通过将大头笔放入放置孔内固定,即可在检测的同时在油纸上画线,出现偏差时油纸上画的线则会出现弯曲,进而使操作人员更清楚的知道偏差位置,通过擦除装置,则能对油纸上的线进行擦除,无需操作人员对油纸上的线进行擦除,方便快捷。Beneficial effects of the present invention: the present invention enables the roller to more stably detect the verticality of the wall through the function of the support seat and the wheel, and by placing the pen in the placement hole for fixation, it can be detected on the oil paper at the same time. When drawing a line, the line drawn on the oil paper will be bent when there is a deviation, so that the operator can know the deviation position more clearly. It is convenient and quick to erase the line.
附图说明Description of drawings
图1为本发明的主视结构示意图。FIG. 1 is a schematic view of the front structure of the present invention.
图2为本发明连接杆的主视结构示意图。FIG. 2 is a schematic view of the front structure of the connecting rod of the present invention.
图3为本发明的部分主视结构示意图。FIG. 3 is a partial front view structural schematic diagram of the present invention.
图4为本发明的部分左视结构示意图。FIG. 4 is a partial left-view structural schematic diagram of the present invention.
图5为本发明A部分的放大示意图。Figure 5 is an enlarged schematic view of Part A of the present invention.
附图标号:1 底座,2 轮子,3 内螺纹套筒,4 螺杆,5 旋钮,6 支撑座,7 水泡,8第一固定板,9 支杆,10 连接杆,11 螺纹孔,12 油纸,13 第一滑套,14 导套,15 L型杆,16滚轮,17 横杆,18 安装板,19 放置孔,20 第一紧固螺栓,21 第二固定板,22 第二紧固螺栓,23 竖杆,24 电动绕线轮,25 拉线,26 擦除装置,261 箱体,262 第一轴承座,263 转轴,264 转盘,265 卡齿,266 导杆,267 第二滑套,268 挡杆,269 驱动电机,2610 连接板,2611 通孔,2612 擦板,2613 弹簧,27 第三滑套,28 第三紧固螺栓,29 竖板,30 按钮,31接触杆,32 凹槽,33 盖板,34 7型杆,35 第二轴承座。Reference number: 1 base, 2 wheels, 3 internal thread sleeves, 4 screws, 5 knobs, 6 support bases, 7 blisters, 8 first fixing plates, 9 support rods, 10 connecting rods, 11 threaded holes, 12 oil paper, 13 The first sliding sleeve, 14 The guide sleeve, 15 The L-shaped rod, 16 The roller, 17 The cross bar, 18 The mounting plate, 19 The placement hole, 20 The first fastening bolt, 21 The second fixing plate, 22 The second fastening bolt, 23 vertical rod, 24 electric winding wheel, 25 pull wire, 26 erasing device, 261 box, 262 first bearing seat, 263 rotating shaft, 264 turntable, 265 locking teeth, 266 guide rod, 267 second sliding sleeve, 268 block Lever, 269 Drive Motor, 2610 Connecting Plate, 2611 Through Hole, 2612 Wipe Plate, 2613 Spring, 27 Third Sleeve, 28 Third Fastening Bolt, 29 Riser, 30 Button, 31 Contact Lever, 32 Groove, 33 Cover plate, 34
具体实施方式Detailed ways
下面结合附图对本发明进行具体描述。The present invention will be described in detail below with reference to the accompanying drawings.
实施例1Example 1
一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a
实施例2Example 2
一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a
还包括有擦除装置26,擦除装置26包括有箱体261、第一轴承座262、转轴263、转盘264、卡齿265、导杆266、第二滑套267、挡杆268、驱动电机269、连接板2610、擦板2612和弹簧2613,竖杆23左侧面上部安装有箱体261,箱体261底部后侧开有通孔2611,箱体261内前侧面下部左右两侧对称式的安装有导杆266,导杆266后部套有第二滑套267,第二滑套267前侧面与箱体261内前侧面之间连接有弹簧2613,弹簧2613套在导杆266上,左右两侧第二滑套267后端之间安装有连接板2610,连接板2610后侧面中部安装有擦板2612,左侧第二滑套267顶部右侧安装有挡杆268,箱体261内右侧面上部安装有第一轴承座262,第一轴承座262内安装有转轴263,转轴263左端贯穿箱体261左侧上部,转轴263左部安装有转盘264,转盘264外侧面均匀间隔的安装有卡齿265,卡齿265与挡杆268接触,箱体261外左侧面上部水平安装有驱动电机269,驱动电机269的输出轴通过联轴器与转轴263左端连接。It also includes an erasing
实施例3Example 3
一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a
还包括有擦除装置26,擦除装置26包括有箱体261、第一轴承座262、转轴263、转盘264、卡齿265、导杆266、第二滑套267、挡杆268、驱动电机269、连接板2610、擦板2612和弹簧2613,竖杆23左侧面上部安装有箱体261,箱体261底部后侧开有通孔2611,箱体261内前侧面下部左右两侧对称式的安装有导杆266,导杆266后部套有第二滑套267,第二滑套267前侧面与箱体261内前侧面之间连接有弹簧2613,弹簧2613套在导杆266上,左右两侧第二滑套267后端之间安装有连接板2610,连接板2610后侧面中部安装有擦板2612,左侧第二滑套267顶部右侧安装有挡杆268,箱体261内右侧面上部安装有第一轴承座262,第一轴承座262内安装有转轴263,转轴263左端贯穿箱体261左侧上部,转轴263左部安装有转盘264,转盘264外侧面均匀间隔的安装有卡齿265,卡齿265与挡杆268接触,箱体261外左侧面上部水平安装有驱动电机269,驱动电机269的输出轴通过联轴器与转轴263左端连接。It also includes an erasing
还包括有第三滑套27、第三紧固螺栓28、竖板29、按钮30和接触杆31,L型杆15上设有第三滑套27,第三滑套27前侧中部设有第三紧固螺栓28,第三紧固螺栓28与L型杆15接触,第三滑套27顶部中间安装有竖板29,竖板29左侧面安装有按钮30,按钮30与电动绕线轮24有电路连接,导套14右侧面上部安装有接触杆31,接触杆31位于按钮30左侧。It also includes a third sliding
实施例4Example 4
一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a
还包括有擦除装置26,擦除装置26包括有箱体261、第一轴承座262、转轴263、转盘264、卡齿265、导杆266、第二滑套267、挡杆268、驱动电机269、连接板2610、擦板2612和弹簧2613,竖杆23左侧面上部安装有箱体261,箱体261底部后侧开有通孔2611,箱体261内前侧面下部左右两侧对称式的安装有导杆266,导杆266后部套有第二滑套267,第二滑套267前侧面与箱体261内前侧面之间连接有弹簧2613,弹簧2613套在导杆266上,左右两侧第二滑套267后端之间安装有连接板2610,连接板2610后侧面中部安装有擦板2612,左侧第二滑套267顶部右侧安装有挡杆268,箱体261内右侧面上部安装有第一轴承座262,第一轴承座262内安装有转轴263,转轴263左端贯穿箱体261左侧上部,转轴263左部安装有转盘264,转盘264外侧面均匀间隔的安装有卡齿265,卡齿265与挡杆268接触,箱体261外左侧面上部水平安装有驱动电机269,驱动电机269的输出轴通过联轴器与转轴263左端连接。It also includes an erasing
还包括有第三滑套27、第三紧固螺栓28、竖板29、按钮30和接触杆31,L型杆15上设有第三滑套27,第三滑套27前侧中部设有第三紧固螺栓28,第三紧固螺栓28与L型杆15接触,第三滑套27顶部中间安装有竖板29,竖板29左侧面安装有按钮30,按钮30与电动绕线轮24有电路连接,导套14右侧面上部安装有接触杆31,接触杆31位于按钮30左侧。It also includes a third sliding
还包括有盖板33、7型杆34和第二轴承座35,底座1前侧面中部开有凹槽32,底座1前侧面下部通过合页安装有盖板33,盖板33与凹槽32配合,底座1前侧面上部左右两侧对称式的安装有第二轴承座35,第二轴承座35内安装有7型杆34,7型杆34位于盖板33前侧与其接触。It also includes a
首先操作人员将适量的连接杆10与支杆9和竖杆23连接,再将油纸12其中一端放置在前后两侧第一固定板8之间,另一端放置在前后两侧第二固定板21之间,即可扭动第二紧固螺栓22向内移动,第二紧固螺栓22向内移动与油纸12接触将其固定,停止扭动第二紧固螺栓22,再将大头笔放入放置孔19内,且使大头笔与油纸12接触,再扭动第一紧固螺栓20向内移动与大头笔接触将其固定,即可通过轮子2将本装置移动至墙壁旁边,且使滚轮16与墙壁接触,再转动旋钮5正反交替转动,旋钮5正反交替转动带动螺杆4和支撑座6正反交替转动,螺杆4正反交替转动通过内螺纹套筒3带动底座1上下移动,底座1上下移动带动水泡7上下移动,当水泡7居中时,停止转动旋钮5,进而说明本装置为水平状态,即可启动电动绕线轮24正转,拉线25被放松,因重力的影响,第一滑套13向下移动带动导套14向下移动,导套14向相爱移动带动L型杆15向下移动,L型杆15向下移动带动滚轮16向下移动,滚轮16向下移动在墙壁上滚动,同时,L型杆15还带动横杆17向下移动,横杆17向下移动通过安装板18带动大头笔向下移动,大头笔向下移动在油纸12上画线。当滚轮16向下移动至最大行程时,即可关闭电动绕线轮24,操作人员即可查看油纸12上线,要是线是弯曲的则说明墙壁不是垂直的,反之则是垂直的。同理,当操作人员查看完线后,即可启动电动绕线轮24反转,电动绕线轮24反转通过拉线25带动第一滑套13向上移动,进而带动滚轮16向上移动恢复至原位,关闭电动绕线轮24,操作人员即可将油纸12上的线擦除,再推动本装置对下一面墙壁进行观测。First, the operator connects an appropriate amount of connecting
初始时,转轴263上卷有油纸12,油纸12头端穿过通孔2611移动至箱体261外,油纸12与擦板2612接触,首先操作人员启动驱动电机269反转,驱动电机269反转带动转轴263反转,转轴263反转带动油纸12反转,同时,转轴263反转带动转盘264反转,转盘264反转带动卡齿265反转,因弹簧2613的作用,卡齿265反转带动挡杆268前后移动,挡杆268前后移动带动第二滑套267前后移动,第二滑套267前后移动带动连接板2610前后移动,连接板2610前后移动带动擦板2612前后移动,当擦板2612向前移动时,擦板2612不与油纸12接触,进而油纸12向下移动,当擦板2612向后移动时,擦板2612与油纸12接触将其固定,如此反复,即可使油纸12不断的向下移动,当油纸12头端向下移动至前后两侧第一固定板8之间时,关闭驱动电机269,因弹簧2613的作用,擦板2612与油纸12接触,操作人员即可扭动第二紧固螺栓22向内移动将油纸12固定,当墙壁垂直度观测完成后,且操作人员查看完线后,即可扭动第二紧固螺栓22向外移动不与油纸12接触,再启动驱动电机269正转,驱动电机269正转带动转轴263正转,转轴263正转带动转盘264正转,转盘264正转带动卡齿265正转,卡齿265正转在挡杆268上滑动,同时,转轴263正转将油纸12卷起,油纸12卷起时,擦板2612对油纸12上的线进行擦除,当油纸12恢复至原位后,即可关闭驱动电机269。如此,无需操作人员手动对油纸12上的线擦除,省时省力。Initially, the oiled
当油纸12被固定后,操作人员即可扭动第三紧固螺栓28向外移动,第三紧固螺栓28向外移动不与L型杆15接触,即可拉动第三滑套27左右移动至合适的位置,当第三滑套27移动至合适的位置时,停止移动第三滑套27,扭动第三紧固螺栓28向内移动与L型杆15接触将第三滑套27固定,即可开始对墙壁进行检测,当L型杆15向左移动带动第三滑套27向左移动时,第三滑套27向左移动通过竖板29带动按钮30向左移动,按钮30向左移动与接触杆31接触时,电动绕线轮24被关闭,进而说明墙壁不垂直,并且已经超出倾斜范围。如此,可对需求的倾斜度进行调节。After the
当本装置无需使用时,操作人员即可将连接杆10从竖杆23与支杆9上拆下,再转动7型杆34反转不与盖板33接触,打开盖板33将连接杆10放入凹槽32内。当连接杆10全部放入凹槽32内后,即可关闭盖板33,再转动7型杆34正转与盖板33接触将其挡住固定。如此,可防止连接杆10长时间的支撑导致损坏。When the device does not need to be used, the operator can remove the connecting
上述实施例,只是本发明的较佳实施例,并非用来限制本发明实施范围,故凡以本发明权利要求所述内容所做的等效变化,均应包括在本发明权利要求范围之内。The above-mentioned embodiments are only preferred embodiments of the present invention, and are not intended to limit the scope of implementation of the present invention. Therefore, all equivalent changes made based on the contents described in the claims of the present invention shall be included within the scope of the claims of the present invention. .
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810977943.8A CN109000632B (en) | 2018-08-27 | 2018-08-27 | A building construction verticality deviation observer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810977943.8A CN109000632B (en) | 2018-08-27 | 2018-08-27 | A building construction verticality deviation observer |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109000632A CN109000632A (en) | 2018-12-14 |
| CN109000632B true CN109000632B (en) | 2020-09-04 |
Family
ID=64593929
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810977943.8A Active CN109000632B (en) | 2018-08-27 | 2018-08-27 | A building construction verticality deviation observer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109000632B (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109855611B (en) * | 2019-03-27 | 2022-03-15 | 中南大学 | A rapid measurement and calibration method of PC wall based on total station |
| CN110375725A (en) * | 2019-07-05 | 2019-10-25 | 深圳市华建工程项目管理有限公司 | A kind of construction supervision wall testing apparatus for verticality |
| CN111238460A (en) * | 2020-03-24 | 2020-06-05 | 中国十七冶集团有限公司 | Wall post template straightness measuring tool that hangs down |
| CN111947633B (en) * | 2020-08-18 | 2022-01-28 | 上海博骜建筑工程设计有限公司 | Building verticality measuring device |
| CN112304199A (en) * | 2020-09-22 | 2021-02-02 | 温州简顿商贸有限公司 | Wall curvature measurement information collection device |
| CN116295593B (en) * | 2023-05-24 | 2023-08-11 | 临沂宏基工程检测有限公司 | Measuring equipment based on building monitoring |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN206291907U (en) * | 2017-01-03 | 2017-06-30 | 王常 | Surveying and mapping device for curve or curved surface |
| CN107389021A (en) * | 2017-08-31 | 2017-11-24 | 无锡厚发自动化设备有限公司 | Construction wall measuring for verticality equipment |
| CN206930286U (en) * | 2017-06-26 | 2018-01-26 | 中车唐山机车车辆有限公司 | Curved surface positioner |
| CN207074063U (en) * | 2017-07-02 | 2018-03-06 | 上海二十冶建设有限公司 | A kind of column template verticality inspection device |
| CN207123289U (en) * | 2017-08-17 | 2018-03-20 | 广东稳固检测鉴定有限公司 | A kind of wall body vertical degree detection means for building |
| CN207231386U (en) * | 2017-10-10 | 2018-04-13 | 张广建 | A kind of Building Engineering Design special measurement device |
| CN207421690U (en) * | 2017-11-12 | 2018-05-29 | 兰真真 | A kind of building levelness detecting device |
| CN108332730A (en) * | 2018-01-24 | 2018-07-27 | 吴义锖 | A kind of building verticality measurement device |
| CN210108372U (en) * | 2019-07-16 | 2020-02-21 | 安徽东昌建设工程有限公司 | Telescopic support for measuring wall surface verticality |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0814488B2 (en) * | 1987-11-02 | 1996-02-14 | 新王子製紙株式会社 | Sheet thickness unevenness measurement method |
| JP3166000B2 (en) * | 1996-09-05 | 2001-05-14 | 鹿島建設株式会社 | Processing method of steel plate for reinforcement of concrete structure |
| US6118626A (en) * | 1997-03-11 | 2000-09-12 | Massachusetts Institute Of Technology | Contact sheet recording with a self-acting negative air bearing |
| DE59906562D1 (en) * | 1998-05-18 | 2003-09-18 | Voith Paper Patent Gmbh | Method and winding machine for winding a web of material |
| US6778337B2 (en) * | 2000-12-12 | 2004-08-17 | The Furukawa Electric Co., Ltd. | Optical attenuator and optical attenuator module |
-
2018
- 2018-08-27 CN CN201810977943.8A patent/CN109000632B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN206291907U (en) * | 2017-01-03 | 2017-06-30 | 王常 | Surveying and mapping device for curve or curved surface |
| CN206930286U (en) * | 2017-06-26 | 2018-01-26 | 中车唐山机车车辆有限公司 | Curved surface positioner |
| CN207074063U (en) * | 2017-07-02 | 2018-03-06 | 上海二十冶建设有限公司 | A kind of column template verticality inspection device |
| CN207123289U (en) * | 2017-08-17 | 2018-03-20 | 广东稳固检测鉴定有限公司 | A kind of wall body vertical degree detection means for building |
| CN107389021A (en) * | 2017-08-31 | 2017-11-24 | 无锡厚发自动化设备有限公司 | Construction wall measuring for verticality equipment |
| CN207231386U (en) * | 2017-10-10 | 2018-04-13 | 张广建 | A kind of Building Engineering Design special measurement device |
| CN207421690U (en) * | 2017-11-12 | 2018-05-29 | 兰真真 | A kind of building levelness detecting device |
| CN108332730A (en) * | 2018-01-24 | 2018-07-27 | 吴义锖 | A kind of building verticality measurement device |
| CN210108372U (en) * | 2019-07-16 | 2020-02-21 | 安徽东昌建设工程有限公司 | Telescopic support for measuring wall surface verticality |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109000632A (en) | 2018-12-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109000632B (en) | A building construction verticality deviation observer | |
| CN211121031U (en) | A kind of road and bridge engineering flatness detection device | |
| CN210084657U (en) | Cable winding mechanism for winding and unwinding flexible cable | |
| CN205240971U (en) | Electric power construction cable reel installation | |
| CN115615829A (en) | A strength testing device based on optical fiber steel wire | |
| CN206610209U (en) | A kind of computer display | |
| CN117775903A (en) | Geotechnical engineering reconnaissance groundwater level measuring device | |
| CN208298464U (en) | Alarming device used in a kind of electric power power transformation distribution | |
| CN113023490B (en) | A tangle-free cable storage device | |
| CN210434920U (en) | Wire surface wiping arrangement | |
| CN112133161A (en) | An art appreciation teaching demonstration device | |
| CN217947170U (en) | An equipment testing and testing line pay-off mechanism | |
| CN207016286U (en) | A kind of construction project detects auto take-up with lightning protection | |
| CN211149686U (en) | An Internet teaching equipment based on big data analysis | |
| CN213876295U (en) | Projection curtain of chinese medicine english translation | |
| CN213516334U (en) | A quality detection device for gear processing | |
| CN219957534U (en) | Wire harness broken skin detection device | |
| CN223107447U (en) | Breaking and stretching device for adhesive tape testing | |
| CN221593808U (en) | Ultrasonic thickness gauge | |
| CN216679608U (en) | Decoiling device of drawing machine | |
| CN217772314U (en) | A Portable Eyesight Test Form for Ophthalmology | |
| CN218893231U (en) | Nylon cloth coiling mechanism is used in weaving | |
| CN216248122U (en) | Polishing head type electroscope | |
| CN218272498U (en) | Building lightning protection ground resistance detection device | |
| LU503474B1 (en) | An electronic test bench for aircraft anti-thrust lift-off |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20200728 Address after: C-5 shop, Dongguan community, Wuhang Town, Changle City, Fuzhou City, Fujian Province Applicant after: CHANGLE YUMENG ELECTROMECHANICAL TECHNOLOGY Co.,Ltd. Address before: Room 507, 6th floor, Shenzhen-Hong Kong Building, 12 Meilin Yuehua Road, Futian District, Shenzhen City, Guangdong Province Applicant before: Liao Xin |
|
| TA01 | Transfer of patent application right | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20220728 Address after: 423000 Room 303, building 5, Gucheng Xinyu, No. 49, Wushiji, Suxian District, Chenzhou City, Hunan Province Patentee after: Hunan Warsaw Garden Construction Engineering Co.,Ltd. Address before: 350200 C-5 shop, Dongguan community, Wuhang Town, Changle City, Fuzhou City, Fujian Province Patentee before: CHANGLE YUMENG ELECTROMECHANICAL TECHNOLOGY CO.,LTD. |
|
| TR01 | Transfer of patent right |