CN109000632B - A building construction verticality deviation observer - Google Patents

A building construction verticality deviation observer Download PDF

Info

Publication number
CN109000632B
CN109000632B CN201810977943.8A CN201810977943A CN109000632B CN 109000632 B CN109000632 B CN 109000632B CN 201810977943 A CN201810977943 A CN 201810977943A CN 109000632 B CN109000632 B CN 109000632B
Authority
CN
China
Prior art keywords
rod
plate
base
sliding sleeve
front side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810977943.8A
Other languages
Chinese (zh)
Other versions
CN109000632A (en
Inventor
廖鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Warsaw Garden Construction Engineering Co ltd
Original Assignee
Changle Yumeng Electromechanical Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changle Yumeng Electromechanical Technology Co ltd filed Critical Changle Yumeng Electromechanical Technology Co ltd
Priority to CN201810977943.8A priority Critical patent/CN109000632B/en
Publication of CN109000632A publication Critical patent/CN109000632A/en
Application granted granted Critical
Publication of CN109000632B publication Critical patent/CN109000632B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/12Instruments for setting out fixed angles, e.g. right angles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
  • Toys (AREA)

Abstract

The invention relates to a viewer, in particular to a viewer for building construction verticality deviation. The technical problem to be solved is as follows: the utility model provides a can stabilize to the wall straightness that hangs down detect to the construction straightness deviation of hanging down visualizer of mark deviation position when can also retest. The technical scheme is as follows: a building construction verticality deviation observer comprises a base, wheels, an internal thread sleeve, a screw, a knob, a supporting seat, a bubble, a first fixing plate, a supporting rod, a connecting rod, a first sliding sleeve, a guide sleeve, an L-shaped rod and the like; wheels are arranged on the lower portions of the left side surface and the right side surface of the base, and internal thread sleeves are arranged on the left side and the right side of the bottom of the base and in the middle of the bottom of the base. The roller can detect the perpendicularity of the wall more stably through the action of the supporting seat and the wheels, and the large-head pen is placed in the placing hole to be fixed, so that the line can be drawn on the oil paper while the detection is carried out, and the line drawn on the oil paper is bent when deviation occurs, so that an operator can know the deviation position more clearly.

Description

一种建筑施工垂直度偏差观测仪A building construction verticality deviation observer

技术领域technical field

本发明涉及一种观测仪,尤其涉及一种建筑施工垂直度偏差观测仪。The invention relates to an observation instrument, in particular to an observation instrument for verticality deviation of building construction.

背景技术Background technique

建筑施工时,墙体修建好后,为了保证墙体在后续使用中的安全性,施工人员会对墙壁的垂直度进行检测,一般人们都是使用吊锤对墙壁的垂直度进行检测,由于吊锤使用的线是软的,容易被风吹动影响对墙壁的检测,并且吊锤取下后没有任何标记,导致施工人员不清楚偏差位置,所以人们会在使用吊锤时同时进行标记,并且还需要扶着吊锤避免被风吹动,如此比较麻烦。During construction, after the wall is built, in order to ensure the safety of the wall in subsequent use, the construction personnel will test the verticality of the wall. Generally, people use a hanging hammer to test the verticality of the wall. The wire used by the hammer is soft, which is easily affected by the wind and affects the detection of the wall, and there is no mark after the hanging hammer is removed, which makes the construction personnel unclear about the deviation position, so people will mark at the same time when using the hanging hammer, and It is also necessary to hold the hanging hammer to avoid being blown by the wind, which is more troublesome.

发明内容SUMMARY OF THE INVENTION

为了克服由于吊锤使用的线是软的,容易被风吹动影响对墙壁的检测,并且吊锤取下后没有任何标记,导致施工人员不清楚偏差位置的缺点,要解决的技术问题:提供一种能够稳固的对墙壁垂直度进行检测,并且还能再检测的同时标记偏差位置的建筑施工垂直度偏差观测仪。In order to overcome the disadvantage that the wire used by the hanging hammer is soft and easily affected by the wind, and there is no mark after the hanging hammer is removed, so that the construction personnel are not clear about the deviation position, the technical problem to be solved: provide The utility model relates to a building construction verticality deviation observer which can stably detect the verticality of a wall, and can also mark the deviation position at the same time.

技术方案是:一种建筑施工垂直度偏差观测仪,包括有底座、轮子、内螺纹套筒、螺杆、旋钮、支撑座、水泡、第一固定板、支杆、连接杆、第一滑套、导套、L型杆、滚轮、横杆、安装板、第一紧固螺栓、第二固定板、第二紧固螺栓、竖杆、电动绕线轮和拉线,底座左右两侧面下部都安装有轮子,底座底部左右两侧与中间都安装有内螺纹套筒,内螺纹套筒内设有螺杆,螺杆底端安装有旋钮,旋钮底部圆心位置安装有支撑座,底座顶部和中间嵌入式的安装有水泡,底座顶部左侧前后两侧对称式的安装有第一固定板,底座顶部中间安装有支杆,支杆上方设有多个连接杆,连接杆上方设有竖杆,竖杆下部与连接杆下部都设有螺纹,连接杆顶端中部与支杆顶端中部都开有螺纹孔,连接杆下部位于螺纹孔内与支杆连接,竖杆下部位于螺纹孔内与连接杆连接,竖杆前后两侧上部都安装有第二固定板,第二固定板左右两侧与第一固定板左右两侧都设有第二紧固螺栓,竖杆上设有第一滑套,第一滑套前侧面安装有导套,导套内设有L型杆,L型杆右端安装有滚轮,L型杆前侧右部安装有横杆,横杆位于连接杆前侧,横杆左端安装有安装板,安装板上均匀间隔的开有放置孔,安装板顶部均匀间隔的设有第一紧固螺栓,竖杆前侧面上部安装有电动绕线轮,电动绕线轮上绕有拉线,拉线尾端与导套顶部左侧连接。The technical scheme is: a building construction verticality deviation observation instrument, comprising a base, a wheel, an internal thread sleeve, a screw rod, a knob, a support seat, a blister, a first fixing plate, a support rod, a connecting rod, a first sliding sleeve, Guide bush, L-shaped rod, roller, cross rod, mounting plate, first fastening bolt, second fixing plate, second fastening bolt, vertical rod, electric winding wheel and cable Wheels, the bottom left and right sides and the middle of the base are installed with internal thread sleeves, the internal thread sleeve is provided with a screw, the bottom end of the screw is equipped with a knob, the bottom of the knob is equipped with a support seat, and the top and middle of the base are embedded in the installation There are blisters, a first fixing plate is installed symmetrically on the left and right sides of the top of the base, a support rod is installed in the middle of the top of the base, a plurality of connecting rods are arranged above the support rods, and vertical rods are arranged above the connecting rods. The lower part of the connecting rod is provided with threads, the middle of the top of the connecting rod and the middle of the top of the support rod are provided with threaded holes, the lower part of the connecting rod is located in the threaded hole to connect with the support rod, the lower part of the vertical rod is located in the threaded hole to connect with the connecting rod, the front and rear of the vertical rod are connected with the connecting rod. A second fixing plate is installed on the upper part of both sides, the left and right sides of the second fixing plate and the left and right sides of the first fixing plate are provided with second fastening bolts, and a first sliding sleeve is arranged on the vertical rod. A guide sleeve is installed on the side, an L-shaped rod is installed in the guide sleeve, a roller is installed at the right end of the L-shaped rod, a crossbar is installed on the right part of the front side of the L-shaped rod, the crossbar is located on the front side of the connecting rod, and a mounting plate is installed on the left end of the crossbar , There are placement holes evenly spaced on the mounting plate, the first fastening bolts are evenly spaced at the top of the mounting plate, an electric winding wheel is installed on the upper part of the front side of the vertical rod, and a pulling wire is wound on the electric winding wheel, and the tail end of the pulling wire is Connect to the top left side of the guide bush.

进一步地,还包括有擦除装置,擦除装置包括有箱体、第一轴承座、转轴、转盘、卡齿、导杆、第二滑套、挡杆、驱动电机、连接板、擦板和弹簧,竖杆左侧面上部安装有箱体,箱体底部后侧开有通孔,箱体内前侧面下部左右两侧对称式的安装有导杆,导杆后部套有第二滑套,第二滑套前侧面与箱体内前侧面之间连接有弹簧,弹簧套在导杆上,左右两侧第二滑套后端之间安装有连接板,连接板后侧面中部安装有擦板,左侧第二滑套顶部右侧安装有挡杆,箱体内右侧面上部安装有第一轴承座,第一轴承座内安装有转轴,转轴左端贯穿箱体左侧上部,转轴左部安装有转盘,转盘外侧面均匀间隔的安装有卡齿,卡齿与挡杆接触,箱体外左侧面上部水平安装有驱动电机,驱动电机的输出轴通过联轴器与转轴左端连接。Further, an erasing device is also included, and the erasing device includes a box body, a first bearing seat, a rotating shaft, a turntable, a clamping tooth, a guide rod, a second sliding sleeve, a blocking rod, a driving motor, a connecting plate, a wiping plate and Spring, a box body is installed on the upper part of the left side of the vertical rod, a through hole is opened on the rear side of the bottom of the box body, a guide rod is installed symmetrically on the left and right sides of the lower part of the front side of the box body, and a second sliding sleeve is sleeved at the rear of the guide rod. A spring is connected between the front side of the second sliding sleeve and the front side of the box, the spring is sleeved on the guide rod, a connecting plate is installed between the rear ends of the second sliding sleeve on the left and right sides, and a wiper plate is installed in the middle of the rear side of the connecting plate. A blocking rod is installed on the top right side of the second sliding sleeve on the left side, a first bearing seat is installed on the upper part of the right side of the box body, a rotating shaft is installed in the first bearing seat, the left end of the rotating shaft runs through the upper left side of the box body, and the left part of the rotating shaft is installed with a On the turntable, the outer side of the turntable is equipped with clamping teeth evenly spaced, and the clamping teeth are in contact with the blocking rod. A drive motor is installed horizontally on the upper left side of the box, and the output shaft of the drive motor is connected to the left end of the rotating shaft through a coupling.

进一步地,还包括有第三滑套、第三紧固螺栓、竖板、按钮和接触杆,L型杆上设有第三滑套,第三滑套前侧中部设有第三紧固螺栓,第三紧固螺栓与L型杆接触,第三滑套顶部中间安装有竖板,竖板左侧面安装有按钮,按钮与电动绕线轮有电路连接,导套右侧面上部安装有接触杆,接触杆位于按钮左侧。Further, it also includes a third sliding sleeve, a third fastening bolt, a vertical plate, a button and a contact rod, a third sliding sleeve is arranged on the L-shaped rod, and a third fastening bolt is arranged in the middle of the front side of the third sliding sleeve. , the third tightening bolt is in contact with the L-shaped rod, a vertical plate is installed in the middle of the top of the third sliding sleeve, a button is installed on the left side of the vertical plate, the button is connected with the electric winding wheel, and the upper right side of the guide sleeve is installed with a Contact lever, the contact lever is located to the left of the button.

进一步地,还包括有盖板、7型杆和第二轴承座,底座前侧面中部开有凹槽,底座前侧面下部通过合页安装有盖板,盖板与凹槽配合,底座前侧面上部左右两侧对称式的安装有第二轴承座,第二轴承座内安装有7型杆,7型杆位于盖板前侧与其接触。Further, it also includes a cover plate, a 7-type rod and a second bearing seat, a groove is opened in the middle of the front side of the base, a cover plate is installed on the lower part of the front side of the base through a hinge, the cover plate is matched with the groove, and the upper part of the front side of the base is installed. A second bearing seat is installed symmetrically on the left and right sides, a 7-type rod is installed in the second bearing seat, and the 7-type rod is located on the front side of the cover plate and contacts with it.

首先操作人员将适量的连接杆与支杆和竖杆连接,再将油纸其中一端放置在前后两侧第一固定板之间,另一端放置在前后两侧第二固定板之间,即可扭动第二紧固螺栓向内移动,第二紧固螺栓向内移动与油纸接触将其固定,停止扭动第二紧固螺栓,再将大头笔放入放置孔内,且使大头笔与油纸接触,再扭动第一紧固螺栓向内移动与大头笔接触将其固定,即可通过轮子将本装置移动至墙壁旁边,且使滚轮与墙壁接触,再转动旋钮正反交替转动,旋钮正反交替转动带动螺杆和支撑座正反交替转动,螺杆正反交替转动通过内螺纹套筒带动底座上下移动,底座上下移动带动水泡上下移动,当水泡居中时,停止转动旋钮,进而说明本装置为水平状态,即可启动电动绕线轮正转,拉线被放松,因重力的影响,第一滑套向下移动带动导套向下移动,导套向相爱移动带动L型杆向下移动,L型杆向下移动带动滚轮向下移动,滚轮向下移动在墙壁上滚动,同时,L型杆还带动横杆向下移动,横杆向下移动通过安装板带动大头笔向下移动,大头笔向下移动在油纸上画线。当滚轮向下移动至最大行程时,即可关闭电动绕线轮,操作人员即可查看油纸上线,要是线是弯曲的则说明墙壁不是垂直的,反之则是垂直的。同理,当操作人员查看完线后,即可启动电动绕线轮反转,电动绕线轮反转通过拉线带动第一滑套向上移动,进而带动滚轮向上移动恢复至原位,关闭电动绕线轮,操作人员即可将油纸上的线擦除,再推动本装置对下一面墙壁进行观测。First, the operator connects an appropriate amount of connecting rods to the support rods and vertical rods, and then places one end of the oil paper between the first fixing plates on the front and rear sides, and the other end between the second fixing plates on the front and rear sides. Move the second tightening bolt inward, the second tightening bolt moves inward and contacts the oil paper to fix it, stop twisting the second tightening bolt, and then put the tack pen into the placement hole, and make the tack pen and the oil paper contact, and then twist the first fastening bolt to move inward and contact the pen to fix it, then the device can be moved to the side of the wall through the wheels, and the rollers are in contact with the wall, and then turn the knob to rotate forward and reverse alternately, the knob is positive and negative. The reverse alternate rotation drives the screw and the support base to rotate alternately, and the forward and reverse rotation of the screw drives the base to move up and down through the inner threaded sleeve, and the base moves up and down to drive the blisters to move up and down. In the horizontal state, the electric winding wheel can be started to rotate forward, and the cable is loosened. Due to the influence of gravity, the first sliding sleeve moves downward to drive the guide sleeve to move downward, and the guide sleeve moves towards love to drive the L-shaped rod to move downward. The downward movement of the shaped rod drives the rollers to move downwards, and the rollers move downwards to roll on the wall. At the same time, the L-shaped rods also drive the horizontal bars to move downwards. Move down to draw lines on the oiled paper. When the roller moves down to the maximum stroke, the electric winding wheel can be turned off, and the operator can check the oil paper on the line. If the line is curved, it means that the wall is not vertical, otherwise it is vertical. In the same way, when the operator finishes checking the wire, he can start the reversal of the electric reel, and the reversal of the electric reel drives the first sliding sleeve to move up through the pulling wire, which in turn drives the roller to move up to return to its original position, and close the electric reel. Line wheel, the operator can wipe the line on the oil paper, and then push the device to observe the next wall.

初始时,转轴上卷有油纸,油纸头端穿过通孔移动至箱体外,油纸与擦板接触,首先操作人员启动驱动电机反转,驱动电机反转带动转轴反转,转轴反转带动油纸反转,同时,转轴反转带动转盘反转,转盘反转带动卡齿反转,因弹簧的作用,卡齿反转带动挡杆前后移动,挡杆前后移动带动第二滑套前后移动,第二滑套前后移动带动连接板前后移动,连接板前后移动带动擦板前后移动,当擦板向前移动时,擦板不与油纸接触,进而油纸向下移动,当擦板向后移动时,擦板与油纸接触将其固定,如此反复,即可使油纸不断的向下移动,当油纸头端向下移动至前后两侧第一固定板之间时,关闭驱动电机,因弹簧的作用,擦板与油纸接触,操作人员即可扭动第二紧固螺栓向内移动将油纸固定,当墙壁垂直度观测完成后,且操作人员查看完线后,即可扭动第二紧固螺栓向外移动不与油纸接触,再启动驱动电机正转,驱动电机正转带动转轴正转,转轴正转带动转盘正转,转盘正转带动卡齿正转,卡齿正转在挡杆上滑动,同时,转轴正转将油纸卷起,油纸卷起时,擦板对油纸上的线进行擦除,当油纸恢复至原位后,即可关闭驱动电机。如此,无需操作人员手动对油纸上的线擦除,省时省力。Initially, oil paper is rolled on the rotating shaft, the head end of the oil paper moves through the through hole to the outside of the box, and the oil paper is in contact with the wiper. First, the operator starts the drive motor to reverse, and the drive motor reverses the rotation to drive the shaft to reverse. The oil paper is reversed, and at the same time, the rotation of the rotating shaft drives the reverse rotation of the turntable, and the reverse rotation of the turntable drives the reverse rotation of the card teeth. The back and forth movement of the second sliding sleeve drives the connecting plate to move back and forth, and the back and forth movement of the connecting plate drives the wiper to move back and forth. When the wiper moves forward, the wiper does not contact the oil paper, and then the oil paper moves downward. When the wiper moves backwards , the wiper is in contact with the oil paper to fix it. Repeatedly, the oil paper can be continuously moved downward. When the head end of the oil paper moves down between the first fixed plates on the front and rear sides, the drive motor is turned off. Due to the action of the spring , the wiper is in contact with the oil paper, and the operator can twist the second fastening bolt to move inward to fix the oil paper. When the verticality of the wall is observed, and the operator has checked the line, the second fastening bolt can be twisted. Move outward without contacting the oil paper, and then start the driving motor to rotate forward, the forward rotation of the driving motor drives the forward rotation of the rotating shaft, the forward rotation of the rotating shaft drives the forward rotation of the turntable, the forward rotation of the turntable drives the positive rotation of the card teeth, and the positive rotation of the card teeth slides on the blocking rod , At the same time, the shaft rotates forward to roll up the oil paper. When the oil paper is rolled up, the wiper wipes the lines on the oil paper. When the oil paper returns to its original position, the drive motor can be turned off. In this way, the operator does not need to manually wipe the lines on the oil paper, saving time and effort.

当油纸被固定后,操作人员即可扭动第三紧固螺栓向外移动,第三紧固螺栓向外移动不与L型杆接触,即可拉动第三滑套左右移动至合适的位置,当第三滑套移动至合适的位置时,停止移动第三滑套,扭动第三紧固螺栓向内移动与L型杆接触将第三滑套固定,即可开始对墙壁进行检测,当L型杆向左移动带动第三滑套向左移动时,第三滑套向左移动通过竖板带动按钮向左移动,按钮向左移动与接触杆接触时,电动绕线轮被关闭,进而说明墙壁不垂直,并且已经超出倾斜范围。如此,可对需求的倾斜度进行调节。When the oil paper is fixed, the operator can twist the third tightening bolt to move outward, and the third tightening bolt moves outward without contacting the L-shaped rod, and then the third sliding sleeve can be pulled left and right to move to a suitable position. When the third sliding sleeve moves to an appropriate position, stop moving the third sliding sleeve, twist the third fastening bolt to move inward and contact the L-shaped rod to fix the third sliding sleeve, and then start to detect the wall. When the L-shaped rod moves to the left to drive the third sliding sleeve to the left, the third sliding sleeve moves to the left through the vertical plate to drive the button to move to the left. When the button moves to the left and contacts the contact rod, the electric winding wheel is closed, and then Indicates that the wall is not vertical and has exceeded the inclination range. In this way, the required inclination can be adjusted.

当本装置无需使用时,操作人员即可将连接杆从竖杆与支杆上拆下,再转动7型杆反转不与盖板接触,打开盖板将连接杆放入凹槽内。当连接杆全部放入凹槽内后,即可关闭盖板,再转动7型杆正转与盖板接触将其挡住固定。如此,可防止连接杆长时间的支撑导致损坏。When the device is not in use, the operator can remove the connecting rod from the vertical rod and the support rod, and then turn the 7-type rod to reverse and not contact the cover plate, open the cover plate and put the connecting rod into the groove. When the connecting rods are all put into the grooves, the cover can be closed, and then the 7-type rod can be turned to contact with the cover to block and fix it. In this way, damage caused by prolonged support of the connecting rod can be prevented.

本发明的有益效果:本发明通过支撑座与轮子的作用,能使滚轮更稳固的对墙壁垂直度进行检测,并且通过将大头笔放入放置孔内固定,即可在检测的同时在油纸上画线,出现偏差时油纸上画的线则会出现弯曲,进而使操作人员更清楚的知道偏差位置,通过擦除装置,则能对油纸上的线进行擦除,无需操作人员对油纸上的线进行擦除,方便快捷。Beneficial effects of the present invention: the present invention enables the roller to more stably detect the verticality of the wall through the function of the support seat and the wheel, and by placing the pen in the placement hole for fixation, it can be detected on the oil paper at the same time. When drawing a line, the line drawn on the oil paper will be bent when there is a deviation, so that the operator can know the deviation position more clearly. It is convenient and quick to erase the line.

附图说明Description of drawings

图1为本发明的主视结构示意图。FIG. 1 is a schematic view of the front structure of the present invention.

图2为本发明连接杆的主视结构示意图。FIG. 2 is a schematic view of the front structure of the connecting rod of the present invention.

图3为本发明的部分主视结构示意图。FIG. 3 is a partial front view structural schematic diagram of the present invention.

图4为本发明的部分左视结构示意图。FIG. 4 is a partial left-view structural schematic diagram of the present invention.

图5为本发明A部分的放大示意图。Figure 5 is an enlarged schematic view of Part A of the present invention.

附图标号:1 底座,2 轮子,3 内螺纹套筒,4 螺杆,5 旋钮,6 支撑座,7 水泡,8第一固定板,9 支杆,10 连接杆,11 螺纹孔,12 油纸,13 第一滑套,14 导套,15 L型杆,16滚轮,17 横杆,18 安装板,19 放置孔,20 第一紧固螺栓,21 第二固定板,22 第二紧固螺栓,23 竖杆,24 电动绕线轮,25 拉线,26 擦除装置,261 箱体,262 第一轴承座,263 转轴,264 转盘,265 卡齿,266 导杆,267 第二滑套,268 挡杆,269 驱动电机,2610 连接板,2611 通孔,2612 擦板,2613 弹簧,27 第三滑套,28 第三紧固螺栓,29 竖板,30 按钮,31接触杆,32 凹槽,33 盖板,34 7型杆,35 第二轴承座。Reference number: 1 base, 2 wheels, 3 internal thread sleeves, 4 screws, 5 knobs, 6 support bases, 7 blisters, 8 first fixing plates, 9 support rods, 10 connecting rods, 11 threaded holes, 12 oil paper, 13 The first sliding sleeve, 14 The guide sleeve, 15 The L-shaped rod, 16 The roller, 17 The cross bar, 18 The mounting plate, 19 The placement hole, 20 The first fastening bolt, 21 The second fixing plate, 22 The second fastening bolt, 23 vertical rod, 24 electric winding wheel, 25 pull wire, 26 erasing device, 261 box, 262 first bearing seat, 263 rotating shaft, 264 turntable, 265 locking teeth, 266 guide rod, 267 second sliding sleeve, 268 block Lever, 269 Drive Motor, 2610 Connecting Plate, 2611 Through Hole, 2612 Wipe Plate, 2613 Spring, 27 Third Sleeve, 28 Third Fastening Bolt, 29 Riser, 30 Button, 31 Contact Lever, 32 Groove, 33 Cover plate, 34 Type 7 rod, 35 Second bearing housing.

具体实施方式Detailed ways

下面结合附图对本发明进行具体描述。The present invention will be described in detail below with reference to the accompanying drawings.

实施例1Example 1

一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a wheel 2, an internally threaded sleeve 3, a screw 4, a knob 5, a support base 6, a blister 7, and a first fixing plate 8 , support rod 9, connecting rod 10, first sliding sleeve 13, guide sleeve 14, L-shaped rod 15, roller 16, cross rod 17, mounting plate 18, first fastening bolt 20, second fixing plate 21, second Fastening bolts 22, vertical rods 23, electric reels 24 and pull wires 25, wheels 2 are installed on the lower part of the left and right sides of the base 1, and internal thread sleeves 3 are installed on the left and right sides and the middle of the bottom of the base 1. There is a screw 4 in the barrel 3, a knob 5 is installed at the bottom end of the screw 4, a support base 6 is installed at the center of the bottom of the knob 5, a blister 7 is embedded in the top and middle of the base 1, and the top left side of the base 1 is symmetrical on both sides. A first fixing plate 8 is installed in the form of a type, a support rod 9 is installed in the middle of the top of the base 1, a plurality of connecting rods 10 are arranged above the support rod 9, a vertical rod 23 is arranged above the connecting rod 10, and the lower part of the vertical rod 23 is connected with the connecting rod 10. The lower part is provided with threads, the middle part of the top end of the connecting rod 10 and the middle part of the top end of the support rod 9 are provided with threaded holes 11, the lower part of the connecting rod 10 is located in the threaded hole 11 to connect with the support rod 9, and the lower part of the vertical rod 23 is located in the threaded hole 11 and connected The rod 10 is connected, the upper part of the front and rear sides of the vertical rod 23 is installed with a second fixing plate 21, the left and right sides of the second fixing plate 21 and the left and right sides of the first fixing plate 8 are provided with second fastening bolts 22, the vertical rod 23 There is a first sliding sleeve 13 on it, a guide sleeve 14 is installed on the front side of the first sliding sleeve 13, an L-shaped rod 15 is arranged in the guide sleeve 14, a roller 16 is installed on the right end of the L-shaped rod 15, and the front side of the L-shaped rod 15 is on the right side. A cross bar 17 is installed at the front side of the connecting rod 10, and a mounting plate 18 is installed on the left end of the cross bar 17. The mounting plate 18 is evenly spaced with placement holes 19, and the top of the mounting plate 18 is evenly spaced. A tightening bolt 20 is installed, and an electric reel 24 is installed on the upper part of the front side of the vertical rod 23 .

实施例2Example 2

一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a wheel 2, an internally threaded sleeve 3, a screw 4, a knob 5, a support base 6, a blister 7, and a first fixing plate 8 , support rod 9, connecting rod 10, first sliding sleeve 13, guide sleeve 14, L-shaped rod 15, roller 16, cross rod 17, mounting plate 18, first fastening bolt 20, second fixing plate 21, second Fastening bolts 22, vertical rods 23, electric reels 24 and pull wires 25, wheels 2 are installed on the lower part of the left and right sides of the base 1, and internal thread sleeves 3 are installed on the left and right sides and the middle of the bottom of the base 1. There is a screw 4 in the barrel 3, a knob 5 is installed at the bottom end of the screw 4, a support base 6 is installed at the center of the bottom of the knob 5, a blister 7 is embedded in the top and middle of the base 1, and the top left side of the base 1 is symmetrical on both sides. A first fixing plate 8 is installed in the form of a type, a support rod 9 is installed in the middle of the top of the base 1, a plurality of connecting rods 10 are arranged above the support rod 9, a vertical rod 23 is arranged above the connecting rod 10, and the lower part of the vertical rod 23 is connected with the connecting rod 10. The lower part is provided with threads, the middle part of the top end of the connecting rod 10 and the middle part of the top end of the support rod 9 are provided with threaded holes 11, the lower part of the connecting rod 10 is located in the threaded hole 11 to connect with the support rod 9, and the lower part of the vertical rod 23 is located in the threaded hole 11 and connected The rod 10 is connected, the upper part of the front and rear sides of the vertical rod 23 is installed with a second fixing plate 21, the left and right sides of the second fixing plate 21 and the left and right sides of the first fixing plate 8 are provided with second fastening bolts 22, the vertical rod 23 There is a first sliding sleeve 13 on it, a guide sleeve 14 is installed on the front side of the first sliding sleeve 13, an L-shaped rod 15 is arranged in the guide sleeve 14, a roller 16 is installed on the right end of the L-shaped rod 15, and the front side of the L-shaped rod 15 is on the right side. A cross bar 17 is installed at the front side of the connecting rod 10, and a mounting plate 18 is installed on the left end of the cross bar 17. The mounting plate 18 is evenly spaced with placement holes 19, and the top of the mounting plate 18 is evenly spaced. A tightening bolt 20 is installed, and an electric reel 24 is installed on the upper part of the front side of the vertical rod 23 .

还包括有擦除装置26,擦除装置26包括有箱体261、第一轴承座262、转轴263、转盘264、卡齿265、导杆266、第二滑套267、挡杆268、驱动电机269、连接板2610、擦板2612和弹簧2613,竖杆23左侧面上部安装有箱体261,箱体261底部后侧开有通孔2611,箱体261内前侧面下部左右两侧对称式的安装有导杆266,导杆266后部套有第二滑套267,第二滑套267前侧面与箱体261内前侧面之间连接有弹簧2613,弹簧2613套在导杆266上,左右两侧第二滑套267后端之间安装有连接板2610,连接板2610后侧面中部安装有擦板2612,左侧第二滑套267顶部右侧安装有挡杆268,箱体261内右侧面上部安装有第一轴承座262,第一轴承座262内安装有转轴263,转轴263左端贯穿箱体261左侧上部,转轴263左部安装有转盘264,转盘264外侧面均匀间隔的安装有卡齿265,卡齿265与挡杆268接触,箱体261外左侧面上部水平安装有驱动电机269,驱动电机269的输出轴通过联轴器与转轴263左端连接。It also includes an erasing device 26. The erasing device 26 includes a box body 261, a first bearing seat 262, a rotating shaft 263, a turntable 264, a tooth 265, a guide rod 266, a second sliding sleeve 267, a blocking rod 268, and a drive motor. 269. Connecting plate 2610, wiping plate 2612 and spring 2613, a box body 261 is installed on the upper left side of the vertical rod 23, a through hole 2611 is opened at the bottom and rear side of the box body 261, and the left and right sides of the lower part of the inner front side of the box body 261 are symmetrical A guide rod 266 is installed on the rear of the guide rod 266, a second sliding sleeve 267 is sleeved at the rear of the guide rod 266, a spring 2613 is connected between the front side of the second sliding sleeve 267 and the inner front side of the box 261, and the spring 2613 is sleeved on the guide rod 266, A connecting plate 2610 is installed between the rear ends of the second sliding sleeves 267 on the left and right sides, a wiping plate 2612 is installed in the middle of the rear side of the connecting plate 2610, and a blocking rod 268 is installed on the top right side of the second sliding sleeve 267 on the left side. A first bearing seat 262 is installed on the upper part of the right side surface, a rotating shaft 263 is installed in the first bearing seat 262, the left end of the rotating shaft 263 penetrates the upper left side of the box body 261, and a rotating plate 264 is installed on the left part of the rotating shaft 263. The outer surface of the rotating plate 264 is evenly spaced. A tooth 265 is installed, and the tooth 265 is in contact with the blocking rod 268. A drive motor 269 is installed horizontally on the upper left side of the box body 261. The output shaft of the drive motor 269 is connected to the left end of the rotating shaft 263 through a coupling.

实施例3Example 3

一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a wheel 2, an internally threaded sleeve 3, a screw 4, a knob 5, a support base 6, a blister 7, and a first fixing plate 8 , support rod 9, connecting rod 10, first sliding sleeve 13, guide sleeve 14, L-shaped rod 15, roller 16, cross rod 17, mounting plate 18, first fastening bolt 20, second fixing plate 21, second Fastening bolts 22, vertical rods 23, electric reels 24 and pull wires 25, wheels 2 are installed on the lower part of the left and right sides of the base 1, and internal thread sleeves 3 are installed on the left and right sides and the middle of the bottom of the base 1. There is a screw 4 in the barrel 3, a knob 5 is installed at the bottom end of the screw 4, a support base 6 is installed at the center of the bottom of the knob 5, a blister 7 is embedded in the top and middle of the base 1, and the top left side of the base 1 is symmetrical on both sides. A first fixing plate 8 is installed in the form of a type, a support rod 9 is installed in the middle of the top of the base 1, a plurality of connecting rods 10 are arranged above the support rod 9, a vertical rod 23 is arranged above the connecting rod 10, and the lower part of the vertical rod 23 is connected with the connecting rod 10. The lower part is provided with threads, the middle part of the top end of the connecting rod 10 and the middle part of the top end of the support rod 9 are provided with threaded holes 11, the lower part of the connecting rod 10 is located in the threaded hole 11 to connect with the support rod 9, and the lower part of the vertical rod 23 is located in the threaded hole 11 and connected The rod 10 is connected, the upper part of the front and rear sides of the vertical rod 23 is installed with a second fixing plate 21, the left and right sides of the second fixing plate 21 and the left and right sides of the first fixing plate 8 are provided with second fastening bolts 22, the vertical rod 23 There is a first sliding sleeve 13 on it, a guide sleeve 14 is installed on the front side of the first sliding sleeve 13, an L-shaped rod 15 is arranged in the guide sleeve 14, a roller 16 is installed on the right end of the L-shaped rod 15, and the front side of the L-shaped rod 15 is on the right side. A cross bar 17 is installed at the front side of the connecting rod 10, and a mounting plate 18 is installed on the left end of the cross bar 17. The mounting plate 18 is evenly spaced with placement holes 19, and the top of the mounting plate 18 is evenly spaced. A tightening bolt 20 is installed, and an electric reel 24 is installed on the upper part of the front side of the vertical rod 23 .

还包括有擦除装置26,擦除装置26包括有箱体261、第一轴承座262、转轴263、转盘264、卡齿265、导杆266、第二滑套267、挡杆268、驱动电机269、连接板2610、擦板2612和弹簧2613,竖杆23左侧面上部安装有箱体261,箱体261底部后侧开有通孔2611,箱体261内前侧面下部左右两侧对称式的安装有导杆266,导杆266后部套有第二滑套267,第二滑套267前侧面与箱体261内前侧面之间连接有弹簧2613,弹簧2613套在导杆266上,左右两侧第二滑套267后端之间安装有连接板2610,连接板2610后侧面中部安装有擦板2612,左侧第二滑套267顶部右侧安装有挡杆268,箱体261内右侧面上部安装有第一轴承座262,第一轴承座262内安装有转轴263,转轴263左端贯穿箱体261左侧上部,转轴263左部安装有转盘264,转盘264外侧面均匀间隔的安装有卡齿265,卡齿265与挡杆268接触,箱体261外左侧面上部水平安装有驱动电机269,驱动电机269的输出轴通过联轴器与转轴263左端连接。It also includes an erasing device 26. The erasing device 26 includes a box body 261, a first bearing seat 262, a rotating shaft 263, a turntable 264, a tooth 265, a guide rod 266, a second sliding sleeve 267, a blocking rod 268, and a drive motor. 269. Connecting plate 2610, wiping plate 2612 and spring 2613, a box body 261 is installed on the upper left side of the vertical rod 23, a through hole 2611 is opened at the bottom and rear side of the box body 261, and the left and right sides of the lower part of the inner front side of the box body 261 are symmetrical A guide rod 266 is installed on the rear of the guide rod 266, a second sliding sleeve 267 is sleeved at the rear of the guide rod 266, a spring 2613 is connected between the front side of the second sliding sleeve 267 and the inner front side of the box 261, and the spring 2613 is sleeved on the guide rod 266, A connecting plate 2610 is installed between the rear ends of the second sliding sleeves 267 on the left and right sides, a wiping plate 2612 is installed in the middle of the rear side of the connecting plate 2610, and a blocking rod 268 is installed on the top right side of the second sliding sleeve 267 on the left side. A first bearing seat 262 is installed on the upper part of the right side surface, a rotating shaft 263 is installed in the first bearing seat 262, the left end of the rotating shaft 263 penetrates the upper left side of the box body 261, and a rotating plate 264 is installed on the left part of the rotating shaft 263. The outer surface of the rotating plate 264 is evenly spaced. A tooth 265 is installed, and the tooth 265 is in contact with the blocking rod 268. A drive motor 269 is installed horizontally on the upper left side of the box body 261. The output shaft of the drive motor 269 is connected to the left end of the rotating shaft 263 through a coupling.

还包括有第三滑套27、第三紧固螺栓28、竖板29、按钮30和接触杆31,L型杆15上设有第三滑套27,第三滑套27前侧中部设有第三紧固螺栓28,第三紧固螺栓28与L型杆15接触,第三滑套27顶部中间安装有竖板29,竖板29左侧面安装有按钮30,按钮30与电动绕线轮24有电路连接,导套14右侧面上部安装有接触杆31,接触杆31位于按钮30左侧。It also includes a third sliding sleeve 27, a third tightening bolt 28, a vertical plate 29, a button 30 and a contact rod 31. The L-shaped rod 15 is provided with a third sliding sleeve 27, and the middle of the front side of the third sliding sleeve 27 is provided with The third tightening bolt 28, the third tightening bolt 28 is in contact with the L-shaped rod 15, a vertical plate 29 is installed in the middle of the top of the third sliding sleeve 27, and a button 30 is installed on the left side of the vertical plate 29. The button 30 is connected to the electric winding The wheel 24 is electrically connected, and a contact rod 31 is installed on the upper part of the right side of the guide sleeve 14 , and the contact rod 31 is located on the left side of the button 30 .

实施例4Example 4

一种建筑施工垂直度偏差观测仪,如图1-5所示,包括有底座1、轮子2、内螺纹套筒3、螺杆4、旋钮5、支撑座6、水泡7、第一固定板8、支杆9、连接杆10、第一滑套13、导套14、L型杆15、滚轮16、横杆17、安装板18、第一紧固螺栓20、第二固定板21、第二紧固螺栓22、竖杆23、电动绕线轮24和拉线25,底座1左右两侧面下部都安装有轮子2,底座1底部左右两侧与中间都安装有内螺纹套筒3,内螺纹套筒3内设有螺杆4,螺杆4底端安装有旋钮5,旋钮5底部圆心位置安装有支撑座6,底座1顶部和中间嵌入式的安装有水泡7,底座1顶部左侧前后两侧对称式的安装有第一固定板8,底座1顶部中间安装有支杆9,支杆9上方设有多个连接杆10,连接杆10上方设有竖杆23,竖杆23下部与连接杆10下部都设有螺纹,连接杆10顶端中部与支杆9顶端中部都开有螺纹孔11,连接杆10下部位于螺纹孔11内与支杆9连接,竖杆23下部位于螺纹孔11内与连接杆10连接,竖杆23前后两侧上部都安装有第二固定板21,第二固定板21左右两侧与第一固定板8左右两侧都设有第二紧固螺栓22,竖杆23上设有第一滑套13,第一滑套13前侧面安装有导套14,导套14内设有L型杆15,L型杆15右端安装有滚轮16,L型杆15前侧右部安装有横杆17,横杆17位于连接杆10前侧,横杆17左端安装有安装板18,安装板18上均匀间隔的开有放置孔19,安装板18顶部均匀间隔的设有第一紧固螺栓20,竖杆23前侧面上部安装有电动绕线轮24,电动绕线轮24上绕有拉线25,拉线25尾端与导套14顶部左侧连接。A building construction verticality deviation observation instrument, as shown in Figures 1-5, includes a base 1, a wheel 2, an internally threaded sleeve 3, a screw 4, a knob 5, a support base 6, a blister 7, and a first fixing plate 8 , support rod 9, connecting rod 10, first sliding sleeve 13, guide sleeve 14, L-shaped rod 15, roller 16, cross rod 17, mounting plate 18, first fastening bolt 20, second fixing plate 21, second Fastening bolts 22, vertical rods 23, electric reels 24 and pull wires 25, wheels 2 are installed on the lower part of the left and right sides of the base 1, and internal thread sleeves 3 are installed on the left and right sides and the middle of the bottom of the base 1. There is a screw 4 in the barrel 3, a knob 5 is installed at the bottom end of the screw 4, a support base 6 is installed at the center of the bottom of the knob 5, a blister 7 is embedded in the top and middle of the base 1, and the top left side of the base 1 is symmetrical on both sides. A first fixing plate 8 is installed in the form of a type, a support rod 9 is installed in the middle of the top of the base 1, a plurality of connecting rods 10 are arranged above the support rod 9, a vertical rod 23 is arranged above the connecting rod 10, and the lower part of the vertical rod 23 is connected with the connecting rod 10. The lower part is provided with threads, the middle part of the top end of the connecting rod 10 and the middle part of the top end of the support rod 9 are provided with threaded holes 11, the lower part of the connecting rod 10 is located in the threaded hole 11 to connect with the support rod 9, and the lower part of the vertical rod 23 is located in the threaded hole 11 and connected The rod 10 is connected, the upper part of the front and rear sides of the vertical rod 23 is installed with a second fixing plate 21, the left and right sides of the second fixing plate 21 and the left and right sides of the first fixing plate 8 are provided with second fastening bolts 22, the vertical rod 23 There is a first sliding sleeve 13 on it, a guide sleeve 14 is installed on the front side of the first sliding sleeve 13, an L-shaped rod 15 is arranged in the guide sleeve 14, a roller 16 is installed on the right end of the L-shaped rod 15, and the front side of the L-shaped rod 15 is on the right side. A cross bar 17 is installed at the front side of the connecting rod 10, and a mounting plate 18 is installed on the left end of the cross bar 17. The mounting plate 18 is evenly spaced with placement holes 19, and the top of the mounting plate 18 is evenly spaced. A tightening bolt 20 is installed, and an electric reel 24 is installed on the upper part of the front side of the vertical rod 23 .

还包括有擦除装置26,擦除装置26包括有箱体261、第一轴承座262、转轴263、转盘264、卡齿265、导杆266、第二滑套267、挡杆268、驱动电机269、连接板2610、擦板2612和弹簧2613,竖杆23左侧面上部安装有箱体261,箱体261底部后侧开有通孔2611,箱体261内前侧面下部左右两侧对称式的安装有导杆266,导杆266后部套有第二滑套267,第二滑套267前侧面与箱体261内前侧面之间连接有弹簧2613,弹簧2613套在导杆266上,左右两侧第二滑套267后端之间安装有连接板2610,连接板2610后侧面中部安装有擦板2612,左侧第二滑套267顶部右侧安装有挡杆268,箱体261内右侧面上部安装有第一轴承座262,第一轴承座262内安装有转轴263,转轴263左端贯穿箱体261左侧上部,转轴263左部安装有转盘264,转盘264外侧面均匀间隔的安装有卡齿265,卡齿265与挡杆268接触,箱体261外左侧面上部水平安装有驱动电机269,驱动电机269的输出轴通过联轴器与转轴263左端连接。It also includes an erasing device 26. The erasing device 26 includes a box body 261, a first bearing seat 262, a rotating shaft 263, a turntable 264, a tooth 265, a guide rod 266, a second sliding sleeve 267, a blocking rod 268, and a drive motor. 269. Connecting plate 2610, wiping plate 2612 and spring 2613, a box body 261 is installed on the upper left side of the vertical rod 23, a through hole 2611 is opened at the bottom and rear side of the box body 261, and the left and right sides of the lower part of the inner front side of the box body 261 are symmetrical A guide rod 266 is installed on the rear of the guide rod 266, a second sliding sleeve 267 is sleeved at the rear of the guide rod 266, a spring 2613 is connected between the front side of the second sliding sleeve 267 and the inner front side of the box 261, and the spring 2613 is sleeved on the guide rod 266, A connecting plate 2610 is installed between the rear ends of the second sliding sleeves 267 on the left and right sides, a wiping plate 2612 is installed in the middle of the rear side of the connecting plate 2610, and a blocking rod 268 is installed on the top right side of the second sliding sleeve 267 on the left side. A first bearing seat 262 is installed on the upper part of the right side surface, a rotating shaft 263 is installed in the first bearing seat 262, the left end of the rotating shaft 263 penetrates the upper left side of the box body 261, and a rotating plate 264 is installed on the left part of the rotating shaft 263. The outer surface of the rotating plate 264 is evenly spaced. A tooth 265 is installed, and the tooth 265 is in contact with the blocking rod 268. A drive motor 269 is installed horizontally on the upper left side of the box body 261. The output shaft of the drive motor 269 is connected to the left end of the rotating shaft 263 through a coupling.

还包括有第三滑套27、第三紧固螺栓28、竖板29、按钮30和接触杆31,L型杆15上设有第三滑套27,第三滑套27前侧中部设有第三紧固螺栓28,第三紧固螺栓28与L型杆15接触,第三滑套27顶部中间安装有竖板29,竖板29左侧面安装有按钮30,按钮30与电动绕线轮24有电路连接,导套14右侧面上部安装有接触杆31,接触杆31位于按钮30左侧。It also includes a third sliding sleeve 27, a third tightening bolt 28, a vertical plate 29, a button 30 and a contact rod 31. The L-shaped rod 15 is provided with a third sliding sleeve 27, and the middle of the front side of the third sliding sleeve 27 is provided with The third tightening bolt 28, the third tightening bolt 28 is in contact with the L-shaped rod 15, a vertical plate 29 is installed in the middle of the top of the third sliding sleeve 27, and a button 30 is installed on the left side of the vertical plate 29. The button 30 is connected to the electric winding The wheel 24 is electrically connected, and a contact rod 31 is installed on the upper part of the right side of the guide sleeve 14 , and the contact rod 31 is located on the left side of the button 30 .

还包括有盖板33、7型杆34和第二轴承座35,底座1前侧面中部开有凹槽32,底座1前侧面下部通过合页安装有盖板33,盖板33与凹槽32配合,底座1前侧面上部左右两侧对称式的安装有第二轴承座35,第二轴承座35内安装有7型杆34,7型杆34位于盖板33前侧与其接触。It also includes a cover plate 33, a 7-type rod 34 and a second bearing seat 35, a groove 32 is opened in the middle of the front side of the base 1, and a cover plate 33 is installed in the lower part of the front side of the base 1 through hinges. The cover plate 33 and the groove 32 Matching, the upper part of the front side of the base 1 is symmetrically installed with a second bearing seat 35 on the left and right sides, and a 7-type rod 34 is installed in the second bearing seat 35.

首先操作人员将适量的连接杆10与支杆9和竖杆23连接,再将油纸12其中一端放置在前后两侧第一固定板8之间,另一端放置在前后两侧第二固定板21之间,即可扭动第二紧固螺栓22向内移动,第二紧固螺栓22向内移动与油纸12接触将其固定,停止扭动第二紧固螺栓22,再将大头笔放入放置孔19内,且使大头笔与油纸12接触,再扭动第一紧固螺栓20向内移动与大头笔接触将其固定,即可通过轮子2将本装置移动至墙壁旁边,且使滚轮16与墙壁接触,再转动旋钮5正反交替转动,旋钮5正反交替转动带动螺杆4和支撑座6正反交替转动,螺杆4正反交替转动通过内螺纹套筒3带动底座1上下移动,底座1上下移动带动水泡7上下移动,当水泡7居中时,停止转动旋钮5,进而说明本装置为水平状态,即可启动电动绕线轮24正转,拉线25被放松,因重力的影响,第一滑套13向下移动带动导套14向下移动,导套14向相爱移动带动L型杆15向下移动,L型杆15向下移动带动滚轮16向下移动,滚轮16向下移动在墙壁上滚动,同时,L型杆15还带动横杆17向下移动,横杆17向下移动通过安装板18带动大头笔向下移动,大头笔向下移动在油纸12上画线。当滚轮16向下移动至最大行程时,即可关闭电动绕线轮24,操作人员即可查看油纸12上线,要是线是弯曲的则说明墙壁不是垂直的,反之则是垂直的。同理,当操作人员查看完线后,即可启动电动绕线轮24反转,电动绕线轮24反转通过拉线25带动第一滑套13向上移动,进而带动滚轮16向上移动恢复至原位,关闭电动绕线轮24,操作人员即可将油纸12上的线擦除,再推动本装置对下一面墙壁进行观测。First, the operator connects an appropriate amount of connecting rods 10 to the support rods 9 and the vertical rods 23, and then places one end of the oil paper 12 between the first fixing plates 8 on the front and rear sides, and the other end on the second fixing plates 21 on the front and rear sides. Then, you can twist the second tightening bolt 22 to move inward, the second tightening bolt 22 moves inward and contacts the oil paper 12 to fix it, stop twisting the second tightening bolt 22, and then put the pen into the Put it in the hole 19, and make the big-end pen contact with the oil paper 12, and then twist the first fastening bolt 20 to move inward and contact the big-end pen to fix it, then the device can be moved to the side of the wall through the wheel 2, and the roller 16 is in contact with the wall, and then turn the knob 5 to rotate forward and reverse alternately. The forward and reverse rotation of the knob 5 drives the screw 4 and the support base 6 to rotate alternately. The base 1 moves up and down to drive the blisters 7 to move up and down. When the blisters 7 are in the center, stop rotating the knob 5, and further explain that the device is in a horizontal state, and the electric reel 24 can be started to rotate forward, and the pull wire 25 is loosened. Due to the influence of gravity, The downward movement of the first sliding sleeve 13 drives the guide sleeve 14 to move downward, the guide sleeve 14 moves towards love and drives the L-shaped rod 15 to move downward, the L-shaped rod 15 moves downward to drive the roller 16 to move downward, and the roller 16 moves downward. Rolling on the wall, at the same time, the L-shaped rod 15 also drives the cross rod 17 to move downward, the cross rod 17 moves downward through the mounting plate 18 and drives the pencil to move downward, and the pencil moves downward to draw lines on the oil paper 12. When the roller 16 moves down to the maximum stroke, the electric winding wheel 24 can be turned off, and the operator can check the oil paper 12 on the line. If the line is curved, it means that the wall is not vertical, otherwise it is vertical. In the same way, when the operator finishes checking the wire, he can start the electric reel 24 to reverse, and the electric reel 24 reversal drives the first sliding sleeve 13 to move upward through the pull wire 25, and then drives the roller 16 to move upward and restore to the original position. position, close the electric winding wheel 24, the operator can wipe the line on the oil paper 12, and then push the device to observe the next wall.

初始时,转轴263上卷有油纸12,油纸12头端穿过通孔2611移动至箱体261外,油纸12与擦板2612接触,首先操作人员启动驱动电机269反转,驱动电机269反转带动转轴263反转,转轴263反转带动油纸12反转,同时,转轴263反转带动转盘264反转,转盘264反转带动卡齿265反转,因弹簧2613的作用,卡齿265反转带动挡杆268前后移动,挡杆268前后移动带动第二滑套267前后移动,第二滑套267前后移动带动连接板2610前后移动,连接板2610前后移动带动擦板2612前后移动,当擦板2612向前移动时,擦板2612不与油纸12接触,进而油纸12向下移动,当擦板2612向后移动时,擦板2612与油纸12接触将其固定,如此反复,即可使油纸12不断的向下移动,当油纸12头端向下移动至前后两侧第一固定板8之间时,关闭驱动电机269,因弹簧2613的作用,擦板2612与油纸12接触,操作人员即可扭动第二紧固螺栓22向内移动将油纸12固定,当墙壁垂直度观测完成后,且操作人员查看完线后,即可扭动第二紧固螺栓22向外移动不与油纸12接触,再启动驱动电机269正转,驱动电机269正转带动转轴263正转,转轴263正转带动转盘264正转,转盘264正转带动卡齿265正转,卡齿265正转在挡杆268上滑动,同时,转轴263正转将油纸12卷起,油纸12卷起时,擦板2612对油纸12上的线进行擦除,当油纸12恢复至原位后,即可关闭驱动电机269。如此,无需操作人员手动对油纸12上的线擦除,省时省力。Initially, the oiled paper 12 is rolled on the rotating shaft 263, the head end of the oiled paper 12 moves through the through hole 2611 to the outside of the box 261, and the oiled paper 12 is in contact with the wiper 2612. First, the operator starts the driving motor 269 to reverse, and the driving motor 269 reverses. Drive the rotating shaft 263 to reverse, the rotating shaft 263 reverses to drive the oil paper 12 to reverse, and at the same time, the rotating shaft 263 reverses to drive the turntable 264 to reverse. Drive the blocking rod 268 to move back and forth, the blocking rod 268 moves back and forth to drive the second sliding sleeve 267 to move back and forth, the second sliding sleeve 267 moves back and forth to drive the connecting plate 2610 to move back and forth, and the connecting plate 2610 moves back and forth to drive the wiper 2612 to move back and forth. When the wiper 2612 moves forward, the wiper 2612 does not contact the oiled paper 12, and then the oiled paper 12 moves downward. When the wiper 2612 moves backward, the wiper 2612 contacts the oiled paper 12 to fix it. Repeat this to make the oiled paper 12 Keep moving downward, when the head end of the oil paper 12 moves down between the first fixed plates 8 on the front and rear sides, turn off the driving motor 269. Due to the action of the spring 2613, the wiper plate 2612 is in contact with the oil paper 12, and the operator can Twist the second tightening bolt 22 to move inward to fix the oil paper 12. When the verticality of the wall is observed and the operator has checked the line, the second tightening bolt 22 can be twisted to move outward without contacting the oil paper 12. , and then start the driving motor 269 to rotate forward, the forward rotation of the driving motor 269 drives the rotating shaft 263 to rotate forward, the rotating shaft 263 rotates forward to drive the turntable 264 to rotate forward, the rotating disk 264 rotates forward to drive the teeth 265 to rotate forward, and the teeth 265 rotate forward at the stop lever 268 When the oil paper 12 is rolled up, the wiper 2612 wipes the lines on the oil paper 12. When the oil paper 12 returns to its original position, the drive motor 269 can be turned off. In this way, there is no need for the operator to manually wipe off the lines on the oiled paper 12, which saves time and effort.

当油纸12被固定后,操作人员即可扭动第三紧固螺栓28向外移动,第三紧固螺栓28向外移动不与L型杆15接触,即可拉动第三滑套27左右移动至合适的位置,当第三滑套27移动至合适的位置时,停止移动第三滑套27,扭动第三紧固螺栓28向内移动与L型杆15接触将第三滑套27固定,即可开始对墙壁进行检测,当L型杆15向左移动带动第三滑套27向左移动时,第三滑套27向左移动通过竖板29带动按钮30向左移动,按钮30向左移动与接触杆31接触时,电动绕线轮24被关闭,进而说明墙壁不垂直,并且已经超出倾斜范围。如此,可对需求的倾斜度进行调节。After the oil paper 12 is fixed, the operator can twist the third tightening bolt 28 to move outward, and the third tightening bolt 28 can move outward without contacting the L-shaped rod 15, and can then pull the third sliding sleeve 27 to move left and right When the third sliding sleeve 27 moves to the appropriate position, stop moving the third sliding sleeve 27, twist the third tightening bolt 28 to move inward and contact the L-shaped rod 15 to fix the third sliding sleeve 27 , the detection of the wall can be started. When the L-shaped rod 15 moves to the left and drives the third sliding sleeve 27 to move to the left, the third sliding sleeve 27 moves to the left through the vertical plate 29 to drive the button 30 to move to the left, and the button 30 moves to the left. When moving to the left and contacting the contact rod 31, the electric reel 24 is turned off, which further indicates that the wall is not vertical and has exceeded the inclination range. In this way, the required inclination can be adjusted.

当本装置无需使用时,操作人员即可将连接杆10从竖杆23与支杆9上拆下,再转动7型杆34反转不与盖板33接触,打开盖板33将连接杆10放入凹槽32内。当连接杆10全部放入凹槽32内后,即可关闭盖板33,再转动7型杆34正转与盖板33接触将其挡住固定。如此,可防止连接杆10长时间的支撑导致损坏。When the device does not need to be used, the operator can remove the connecting rod 10 from the vertical rod 23 and the support rod 9, then turn the 7-type rod 34 to reverse and not contact the cover plate 33, open the cover plate 33 to connect the connecting rod 10 into the groove 32. When all the connecting rods 10 are put into the grooves 32, the cover plate 33 can be closed, and then the 7-shaped rod 34 is rotated forwardly to contact the cover plate 33 to block and fix it. In this way, the connecting rod 10 can be prevented from being damaged due to long-term support.

上述实施例,只是本发明的较佳实施例,并非用来限制本发明实施范围,故凡以本发明权利要求所述内容所做的等效变化,均应包括在本发明权利要求范围之内。The above-mentioned embodiments are only preferred embodiments of the present invention, and are not intended to limit the scope of implementation of the present invention. Therefore, all equivalent changes made based on the contents described in the claims of the present invention shall be included within the scope of the claims of the present invention. .

Claims (3)

1.一种建筑施工垂直度偏差观测仪,其特征在于,包括有底座、轮子、内螺纹套筒、螺杆、旋钮、支撑座、水泡、第一固定板、支杆、连接杆、第一滑套、导套、L型杆、滚轮、横杆、安装板、第一紧固螺栓、第二固定板、第二紧固螺栓、竖杆、电动绕线轮和拉线,底座左右两侧面下部都安装有轮子,底座底部左右两侧与中间都安装有内螺纹套筒,内螺纹套筒内设有螺杆,螺杆底端安装有旋钮,旋钮底部圆心位置安装有支撑座,底座顶部和中间嵌入式的安装有水泡,底座顶部左侧前后两侧对称式的安装有第一固定板,底座顶部中间安装有支杆,支杆上方设有多个连接杆,连接杆上方设有竖杆,竖杆下部与连接杆下部都设有螺纹,连接杆顶端中部与支杆顶端中部都开有螺纹孔,连接杆下部位于螺纹孔内与支杆连接,竖杆下部位于螺纹孔内与连接杆连接,竖杆前后两侧上部都安装有第二固定板,第二固定板左右两侧与第一固定板左右两侧都设有第二紧固螺栓,竖杆上设有第一滑套,第一滑套前侧面安装有导套,导套内设有L型杆,L型杆右端安装有滚轮,L型杆前侧右部安装有横杆,横杆位于连接杆前侧,横杆左端安装有安装板,安装板上均匀间隔的开有放置孔,安装板顶部均匀间隔的设有第一紧固螺栓,竖杆前侧面上部安装有电动绕线轮,电动绕线轮上绕有拉线,拉线尾端与导套顶部左侧连接,油纸的两端分别固定在前后两侧第一固定板之间和前后两侧第二固定板之间,放入放置孔内的大头笔与油纸接触,横杆向下移动通过安装板带动大头笔向下移动,大头笔向下移动在油纸上画线;还包括有擦除装置,擦除装置包括有箱体、第一轴承座、转轴、转盘、卡齿、导杆、第二滑套、挡杆、驱动电机、连接板、擦板和弹簧,竖杆左侧面上部安装有箱体,箱体底部后侧开有通孔,箱体内前侧面下部左右两侧对称式的安装有导杆,导杆后部套有第二滑套,第二滑套前侧面与箱体内前侧面之间连接有弹簧,弹簧套在导杆上,左右两侧第二滑套后端之间安装有连接板,连接板后侧面中部安装有擦板,左侧第二滑套顶部右侧安装有挡杆,箱体内右侧面上部安装有第一轴承座,第一轴承座内安装有转轴,转轴左端贯穿箱体左侧上部,转轴左部安装有转盘,转盘外侧面均匀间隔的安装有卡齿,卡齿与挡杆接触,箱体外左侧面上部水平安装有驱动电机,驱动电机的输出轴通过联轴器与转轴左端连接。1. a building construction verticality deviation observation instrument is characterized in that, comprises base, wheel, internal thread sleeve, screw rod, knob, support seat, blister, the first fixed plate, support rod, connecting rod, the first sliding Sleeves, guide sleeves, L-shaped rods, rollers, cross rods, mounting plates, first fastening bolts, second fixing plates, second fastening bolts, vertical rods, electric reels and cables Wheels are installed, inner threaded sleeves are installed on the left and right sides and the middle of the bottom of the base, a screw is installed in the inner threaded sleeve, a knob is installed at the bottom of the screw, a support seat is installed at the center of the bottom of the knob, and the top and middle of the base are embedded There are blisters installed on the top of the base, a first fixing plate is installed symmetrically on the left and right sides of the top of the base, a support rod is installed in the middle of the top of the base, a plurality of connecting rods are arranged above the support rods, and vertical rods are arranged above the connecting rods. The lower part and the lower part of the connecting rod are provided with threads, and the middle part of the top of the connecting rod and the middle part of the top of the support rod are provided with threaded holes. A second fixing plate is installed on the upper part of the front and rear sides of the rod, the left and right sides of the second fixing plate and the left and right sides of the first fixing plate are provided with second fastening bolts, the vertical rod is provided with a first sliding sleeve, the first sliding A guide sleeve is installed on the front side of the sleeve, and an L-shaped rod is installed in the guide sleeve. A roller is installed at the right end of the L-shaped rod. The mounting plate, the mounting holes are evenly spaced on the mounting plate, the first fastening bolts are evenly spaced at the top of the mounting plate, the electric winding wheel is installed on the upper part of the front side of the vertical rod, and the pulling wire is wound on the electric winding wheel. The tail end is connected to the left side of the top of the guide sleeve, and the two ends of the oil paper are respectively fixed between the first fixing plates on the front and rear sides and between the second fixing plates on the front and rear sides. The rod moves down through the mounting plate to drive the stylus to move downward, and the stylus moves downward to draw lines on the oil paper; it also includes an erasing device, which includes a box, a first bearing seat, a rotating shaft, a turntable, a card Tooth, guide rod, second sliding sleeve, blocking rod, drive motor, connecting plate, wiper plate and spring, a box is installed on the upper left side of the vertical rod, a through hole is opened on the rear side of the bottom of the box, and the lower part of the front side inside the box A guide rod is installed symmetrically on the left and right sides, a second sliding sleeve is sleeved at the rear of the guide rod, a spring is connected between the front side of the second sliding sleeve and the front side of the box, and the spring is sleeved on the guide rod. A connecting plate is installed between the rear ends of the two sliding sleeves, a wiping plate is installed in the middle of the rear side of the connecting plate, a blocking rod is installed on the top right side of the second sliding sleeve on the left side, a first bearing seat is installed on the upper part of the right side of the box, A bearing seat is installed with a rotating shaft. The left end of the rotating shaft runs through the upper left side of the box body. A turntable is installed on the left side of the rotating shaft. The outer side of the turntable is evenly spaced with clamping teeth. The clamping teeth are in contact with the blocking rod. A drive motor is installed, and the output shaft of the drive motor is connected with the left end of the rotating shaft through a coupling. 2.根据权利要求1所述的一种建筑施工垂直度偏差观测仪,其特征在于,还包括有第三滑套、第三紧固螺栓、竖板、按钮和接触杆,L型杆上设有第三滑套,第三滑套前侧中部设有第三紧固螺栓,第三紧固螺栓与L型杆接触,第三滑套顶部中间安装有竖板,竖板左侧面安装有按钮,按钮与电动绕线轮有电路连接,导套右侧面上部安装有接触杆,接触杆位于按钮左侧。2. A kind of building construction verticality deviation observation instrument according to claim 1, is characterized in that, also comprises the 3rd sliding sleeve, the 3rd fastening bolt, the vertical plate, the button and the contact rod, and the L-shaped rod is provided with the There is a third sliding sleeve, a third fastening bolt is arranged in the middle of the front side of the third sliding sleeve, the third fastening bolt is in contact with the L-shaped rod, a vertical plate is installed in the middle of the top of the third sliding sleeve, and a vertical plate is installed on the left side of the vertical plate. The button has a circuit connection with the electric winding wheel, a contact rod is installed on the upper part of the right side of the guide sleeve, and the contact rod is located on the left side of the button. 3.根据权利要求2所述的一种建筑施工垂直度偏差观测仪,其特征在于,还包括有盖板、7型杆和第二轴承座,底座前侧面中部开有凹槽,底座前侧面下部通过合页安装有盖板,盖板与凹槽配合,底座前侧面上部左右两侧对称式的安装有第二轴承座,第二轴承座内安装有7型杆,7型杆位于盖板前侧与其接触。3. a kind of building construction verticality deviation observation instrument according to claim 2 is characterized in that, also comprises cover plate, 7-type rod and the second bearing seat, the middle of the front side of the base is provided with a groove, and the front side of the base is provided with a groove. The lower part is installed with a cover plate through a hinge, and the cover plate is matched with the groove. The upper part of the front side of the base is symmetrically installed with a second bearing seat on the left and right sides, and a 7-type rod is installed in the second bearing seat, and the 7-type rod is located on the cover plate. The front side is in contact with it.
CN201810977943.8A 2018-08-27 2018-08-27 A building construction verticality deviation observer Active CN109000632B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810977943.8A CN109000632B (en) 2018-08-27 2018-08-27 A building construction verticality deviation observer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810977943.8A CN109000632B (en) 2018-08-27 2018-08-27 A building construction verticality deviation observer

Publications (2)

Publication Number Publication Date
CN109000632A CN109000632A (en) 2018-12-14
CN109000632B true CN109000632B (en) 2020-09-04

Family

ID=64593929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810977943.8A Active CN109000632B (en) 2018-08-27 2018-08-27 A building construction verticality deviation observer

Country Status (1)

Country Link
CN (1) CN109000632B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109855611B (en) * 2019-03-27 2022-03-15 中南大学 A rapid measurement and calibration method of PC wall based on total station
CN110375725A (en) * 2019-07-05 2019-10-25 深圳市华建工程项目管理有限公司 A kind of construction supervision wall testing apparatus for verticality
CN111238460A (en) * 2020-03-24 2020-06-05 中国十七冶集团有限公司 Wall post template straightness measuring tool that hangs down
CN111947633B (en) * 2020-08-18 2022-01-28 上海博骜建筑工程设计有限公司 Building verticality measuring device
CN112304199A (en) * 2020-09-22 2021-02-02 温州简顿商贸有限公司 Wall curvature measurement information collection device
CN116295593B (en) * 2023-05-24 2023-08-11 临沂宏基工程检测有限公司 Measuring equipment based on building monitoring

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206291907U (en) * 2017-01-03 2017-06-30 王常 Surveying and mapping device for curve or curved surface
CN107389021A (en) * 2017-08-31 2017-11-24 无锡厚发自动化设备有限公司 Construction wall measuring for verticality equipment
CN206930286U (en) * 2017-06-26 2018-01-26 中车唐山机车车辆有限公司 Curved surface positioner
CN207074063U (en) * 2017-07-02 2018-03-06 上海二十冶建设有限公司 A kind of column template verticality inspection device
CN207123289U (en) * 2017-08-17 2018-03-20 广东稳固检测鉴定有限公司 A kind of wall body vertical degree detection means for building
CN207231386U (en) * 2017-10-10 2018-04-13 张广建 A kind of Building Engineering Design special measurement device
CN207421690U (en) * 2017-11-12 2018-05-29 兰真真 A kind of building levelness detecting device
CN108332730A (en) * 2018-01-24 2018-07-27 吴义锖 A kind of building verticality measurement device
CN210108372U (en) * 2019-07-16 2020-02-21 安徽东昌建设工程有限公司 Telescopic support for measuring wall surface verticality

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0814488B2 (en) * 1987-11-02 1996-02-14 新王子製紙株式会社 Sheet thickness unevenness measurement method
JP3166000B2 (en) * 1996-09-05 2001-05-14 鹿島建設株式会社 Processing method of steel plate for reinforcement of concrete structure
US6118626A (en) * 1997-03-11 2000-09-12 Massachusetts Institute Of Technology Contact sheet recording with a self-acting negative air bearing
DE59906562D1 (en) * 1998-05-18 2003-09-18 Voith Paper Patent Gmbh Method and winding machine for winding a web of material
US6778337B2 (en) * 2000-12-12 2004-08-17 The Furukawa Electric Co., Ltd. Optical attenuator and optical attenuator module

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206291907U (en) * 2017-01-03 2017-06-30 王常 Surveying and mapping device for curve or curved surface
CN206930286U (en) * 2017-06-26 2018-01-26 中车唐山机车车辆有限公司 Curved surface positioner
CN207074063U (en) * 2017-07-02 2018-03-06 上海二十冶建设有限公司 A kind of column template verticality inspection device
CN207123289U (en) * 2017-08-17 2018-03-20 广东稳固检测鉴定有限公司 A kind of wall body vertical degree detection means for building
CN107389021A (en) * 2017-08-31 2017-11-24 无锡厚发自动化设备有限公司 Construction wall measuring for verticality equipment
CN207231386U (en) * 2017-10-10 2018-04-13 张广建 A kind of Building Engineering Design special measurement device
CN207421690U (en) * 2017-11-12 2018-05-29 兰真真 A kind of building levelness detecting device
CN108332730A (en) * 2018-01-24 2018-07-27 吴义锖 A kind of building verticality measurement device
CN210108372U (en) * 2019-07-16 2020-02-21 安徽东昌建设工程有限公司 Telescopic support for measuring wall surface verticality

Also Published As

Publication number Publication date
CN109000632A (en) 2018-12-14

Similar Documents

Publication Publication Date Title
CN109000632B (en) A building construction verticality deviation observer
CN211121031U (en) A kind of road and bridge engineering flatness detection device
CN210084657U (en) Cable winding mechanism for winding and unwinding flexible cable
CN205240971U (en) Electric power construction cable reel installation
CN115615829A (en) A strength testing device based on optical fiber steel wire
CN206610209U (en) A kind of computer display
CN117775903A (en) Geotechnical engineering reconnaissance groundwater level measuring device
CN208298464U (en) Alarming device used in a kind of electric power power transformation distribution
CN113023490B (en) A tangle-free cable storage device
CN210434920U (en) Wire surface wiping arrangement
CN112133161A (en) An art appreciation teaching demonstration device
CN217947170U (en) An equipment testing and testing line pay-off mechanism
CN207016286U (en) A kind of construction project detects auto take-up with lightning protection
CN211149686U (en) An Internet teaching equipment based on big data analysis
CN213876295U (en) Projection curtain of chinese medicine english translation
CN213516334U (en) A quality detection device for gear processing
CN219957534U (en) Wire harness broken skin detection device
CN223107447U (en) Breaking and stretching device for adhesive tape testing
CN221593808U (en) Ultrasonic thickness gauge
CN216679608U (en) Decoiling device of drawing machine
CN217772314U (en) A Portable Eyesight Test Form for Ophthalmology
CN218893231U (en) Nylon cloth coiling mechanism is used in weaving
CN216248122U (en) Polishing head type electroscope
CN218272498U (en) Building lightning protection ground resistance detection device
LU503474B1 (en) An electronic test bench for aircraft anti-thrust lift-off

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200728

Address after: C-5 shop, Dongguan community, Wuhang Town, Changle City, Fuzhou City, Fujian Province

Applicant after: CHANGLE YUMENG ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Address before: Room 507, 6th floor, Shenzhen-Hong Kong Building, 12 Meilin Yuehua Road, Futian District, Shenzhen City, Guangdong Province

Applicant before: Liao Xin

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220728

Address after: 423000 Room 303, building 5, Gucheng Xinyu, No. 49, Wushiji, Suxian District, Chenzhou City, Hunan Province

Patentee after: Hunan Warsaw Garden Construction Engineering Co.,Ltd.

Address before: 350200 C-5 shop, Dongguan community, Wuhang Town, Changle City, Fuzhou City, Fujian Province

Patentee before: CHANGLE YUMENG ELECTROMECHANICAL TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right