CN108999408A - A kind of building block of constructional column two sides uses the concreting method of chamfering - Google Patents
A kind of building block of constructional column two sides uses the concreting method of chamfering Download PDFInfo
- Publication number
- CN108999408A CN108999408A CN201811152428.2A CN201811152428A CN108999408A CN 108999408 A CN108999408 A CN 108999408A CN 201811152428 A CN201811152428 A CN 201811152428A CN 108999408 A CN108999408 A CN 108999408A
- Authority
- CN
- China
- Prior art keywords
- constructional column
- building block
- chamfering
- sides
- steel reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A kind of building block of constructional column two sides uses the concreting method of chamfering, belongs to framed building secondary structure constructional column concreting technical field.Step: chamfering (2) are carried out to constructional column (7) two sides building block (1) on ground or platform;In constructional column framework of steel reinforcement (3) two sides, the building block being chamfered (1) and the building block (4) of non-chamfering are staggeredly built into horse tooth trough form;After formwork, to constructional column framework of steel reinforcement 3 (3) casting concrete (5), vibrating spear (6) vibrates without dead angle;After casting concrete (5) reaches intensity, to constructional column (7) demoulding, meet the requirements.The advantage is that it is easy to operate, it not only ensure that constructional column concrete pouring quality, and manpower and material resources are greatly saved, reduce construction cost, achieve good economic benefit.
Description
Technical field
The invention belongs to framed building secondary structure constructional column concreting technical fields, in particular, provide a kind of structure
Make the concreting method that the building block of column two sides uses chamfering.
Background technique
When framed building secondary structure constructional column concreting, since the horse tooth trough that two sides rectangular segment is formed exists extremely
Angle, concrete vibration stick cannot vibrate completely, can only external force tap two side templates, by vibration keep concrete vibrating closely knit, but
Scene often due to position limitation and the dynamics of vibrating be not achieved, after constructional column demoulding concrete occur honeycomb, it is loose, vibrate not
It is real and other issues, repairing and reworked processing are caused, construction cost is increased.
Summary of the invention
The purpose of the present invention is to provide the concreting methods that a kind of building block of constructional column two sides uses chamfering, to burning
It ties in main building secondary structure constructional column pouring construction, the concreting side of chamfering is used using the building block of constructional column two sides
Method, and success is achieved, this method not only ensure that concrete pouring quality, and manpower and material resources are greatly saved, and reduce
Construction cost has been gained most valuable experience for similar construction later.
The present invention carries out chamfering, when to constructional column concreting, vibrating spear energy to the building block of constructional column two sides before masonry
Enough it to be close to building block chamfering vibrated concrete, does not stay dead angle, concrete vibrating is closely knit, after constructional column demoulding, concrete appearance effect
It is good, it meets the requirements.The specific process steps are as follows:
The first step carries out chamfering 2 (Fig. 1) to 7 two sides building block 1 of constructional column on ground or platform;
Second step, in 3 two sides of constructional column framework of steel reinforcement, the building block 4 of the building block 1 and non-chamfering that are chamfered staggeredly is built into horse
Tooth raft form, (Fig. 2);
Third step, after formwork, to 3 casting concrete 5 of constructional column framework of steel reinforcement, due to building block chamfering 2, vibrating spear 6
Vibrate (Fig. 3) at no dead angle;
4th step, after casting concrete 5 reaches intensity, to 7 demoulding of constructional column, 7 presentation quality effect of constructional column is good, full
Foot requires (Fig. 4).
This method is easy to operate, not only ensure that constructional column concrete pouring quality, and manpower and material resources are greatly saved,
Construction cost is reduced, achieves good economic benefit for company.
Detailed description of the invention
Fig. 1 is constructional column two sides building block chamfering figure.
Fig. 2 is constructional column two sides concrete block masonry figure.
Fig. 3 is constructional column concreting cross-section diagram.
Fig. 4 be the demoulding of constructional column casting concrete after scheme.
In figure, the building block 1, chamfering 2, constructional column framework of steel reinforcement 3, the building block 4 of non-chamfering, casting concrete 5, the vibration that are chamfered
Tamper 6, constructional column 7.
Specific embodiment
Fig. 1-Fig. 4 is a kind of specific embodiment of the invention.Specific embodiment is as follows:
The first step carries out chamfering 2 to 7 two sides building block 1 of constructional column on ground or platform;
Second step, in 3 two sides of constructional column framework of steel reinforcement, the building block 4 of the building block 2 and non-chamfering that are chamfered staggeredly is built into horse
Tooth raft form;
Third step, after formwork, to 3 casting concrete 5 of constructional column framework of steel reinforcement, due to building block chamfering 2, vibrating spear 6
It vibrates at no dead angle;
4th step, after casting concrete 5 reaches intensity, to 7 demoulding of constructional column, 7 presentation quality effect of constructional column is good, full
Foot requires.
Claims (1)
1. the concreting method that a kind of building block of constructional column two sides uses chamfering, which is characterized in that the specific process steps are as follows:
The first step carries out chamfering (2) to constructional column (7) two sides building block (1) on ground or platform;
Second step, in constructional column framework of steel reinforcement (3) two sides, the building block (4) of the building block being chamfered (1) and non-chamfering staggeredly build at
Horse tooth trough form;
Third step, after formwork, to constructional column framework of steel reinforcement 3 (3) casting concrete (5), vibrating spear (6) vibrates without dead angle;
4th step, to constructional column (7) demoulding, is met the requirements after casting concrete (5) reaches intensity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811152428.2A CN108999408A (en) | 2018-09-29 | 2018-09-29 | A kind of building block of constructional column two sides uses the concreting method of chamfering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811152428.2A CN108999408A (en) | 2018-09-29 | 2018-09-29 | A kind of building block of constructional column two sides uses the concreting method of chamfering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108999408A true CN108999408A (en) | 2018-12-14 |
Family
ID=64590365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811152428.2A Pending CN108999408A (en) | 2018-09-29 | 2018-09-29 | A kind of building block of constructional column two sides uses the concreting method of chamfering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999408A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457556A (en) * | 2006-06-16 | 2009-06-17 | 罗进南 | Core beam constructional column mixed combination wall, building method and relevant building block |
US7780123B1 (en) * | 2006-10-05 | 2010-08-24 | Jay Bailyn | Stand for pouring concrete |
CN204456853U (en) * | 2014-12-19 | 2015-07-08 | 山西省第三建筑工程公司 | Secondary structure constructional column formwork erection positioner |
CN107165411A (en) * | 2017-05-22 | 2017-09-15 | 中国五冶集团有限公司 | A kind of Constructional Col-umn Construction technique |
CN108118904A (en) * | 2018-01-07 | 2018-06-05 | 中铁四局集团建筑工程有限公司 | A kind of Constructional Col-umn Construction method |
-
2018
- 2018-09-29 CN CN201811152428.2A patent/CN108999408A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457556A (en) * | 2006-06-16 | 2009-06-17 | 罗进南 | Core beam constructional column mixed combination wall, building method and relevant building block |
US7780123B1 (en) * | 2006-10-05 | 2010-08-24 | Jay Bailyn | Stand for pouring concrete |
CN204456853U (en) * | 2014-12-19 | 2015-07-08 | 山西省第三建筑工程公司 | Secondary structure constructional column formwork erection positioner |
CN107165411A (en) * | 2017-05-22 | 2017-09-15 | 中国五冶集团有限公司 | A kind of Constructional Col-umn Construction technique |
CN108118904A (en) * | 2018-01-07 | 2018-06-05 | 中铁四局集团建筑工程有限公司 | A kind of Constructional Col-umn Construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104989102A (en) | Improved concrete wall and column construction method | |
CN105926935A (en) | Integral column formwork based on 3d printing and used for concrete pouring and column pouring method | |
CN207812625U (en) | Special-shaped gutter template integrated apparatus | |
CN105952154B (en) | A kind of concrete-pouring template stent | |
CN109914783A (en) | A kind of expansion joint shear wall formwork | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN202483061U (en) | Post-cast strip supporting formwork | |
CN108999408A (en) | A kind of building block of constructional column two sides uses the concreting method of chamfering | |
CN102121313B (en) | Rebar planting-free formwork erecting method for masonry construction and device thereof | |
CN104074354A (en) | Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template | |
CN201835524U (en) | Pouring device for concrete beam with top embedded part | |
CN207997396U (en) | One kind exempting from formwork constructional column shaper | |
CN105908883A (en) | Construction method for preventing upward floating of composite floor system lightweight core formwork | |
CN205024573U (en) | Concrete trowelling machine that vibrates fast | |
CN209723594U (en) | A kind of positioning of assembled architecture reinforcing bar and check device | |
CN205875714U (en) | A consolidate fixture for retainer plate beam mold board | |
CN206158756U (en) | Tunnel concrete floor and low wall pour template device | |
CN203938971U (en) | Prefabricated concrete hollow slab termination integral mold plate | |
CN108999407A (en) | A kind of constructional column concreting top uses the construction method of funnel | |
CN204001714U (en) | The concrete mould of building of V-type cylinder | |
CN106968366A (en) | A kind of construction method for pouring constructional column free removal template | |
CN208934250U (en) | A kind of assembled exempts to tear round beam column concrete blinding open | |
CN106863581B (en) | A kind of production technology of the round table-like absolute altitude concrete block for floor | |
CN205799802U (en) | Produce small-sized reinforced concrete precast member tamping equipment | |
CN201915635U (en) | Form erecting device free of bar planting for brickwork construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181214 |