CN108999408A - A kind of building block of constructional column two sides uses the concreting method of chamfering - Google Patents
A kind of building block of constructional column two sides uses the concreting method of chamfering Download PDFInfo
- Publication number
- CN108999408A CN108999408A CN201811152428.2A CN201811152428A CN108999408A CN 108999408 A CN108999408 A CN 108999408A CN 201811152428 A CN201811152428 A CN 201811152428A CN 108999408 A CN108999408 A CN 108999408A
- Authority
- CN
- China
- Prior art keywords
- constructional column
- building block
- chamfering
- sides
- concreting
- Prior art date
Links
- 238000005266 casting Methods 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 230000002787 reinforcement Effects 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 238000009415 formwork Methods 0.000 claims abstract description 4
- 238000000034 methods Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 239000000463 materials Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 3
- 210000003660 Reticulum Anatomy 0.000 description 1
- 238000010586 diagrams Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Abstract
Description
Technical field
The invention belongs to framed building secondary structure constructional column concreting technical fields, in particular, provide a kind of structure Make the concreting method that the building block of column two sides uses chamfering.
Background technique
When framed building secondary structure constructional column concreting, since the horse tooth trough that two sides rectangular segment is formed exists extremely Angle, concrete vibration stick cannot vibrate completely, can only external force tap two side templates, by vibration keep concrete vibrating closely knit, but Scene often due to position limitation and the dynamics of vibrating be not achieved, after constructional column demoulding concrete occur honeycomb, it is loose, vibrate not It is real and other issues, repairing and reworked processing are caused, construction cost is increased.
Summary of the invention
The purpose of the present invention is to provide the concreting methods that a kind of building block of constructional column two sides uses chamfering, to burning It ties in main building secondary structure constructional column pouring construction, the concreting side of chamfering is used using the building block of constructional column two sides Method, and success is achieved, this method not only ensure that concrete pouring quality, and manpower and material resources are greatly saved, and reduce Construction cost has been gained most valuable experience for similar construction later.
The present invention carries out chamfering, when to constructional column concreting, vibrating spear energy to the building block of constructional column two sides before masonry Enough it to be close to building block chamfering vibrated concrete, does not stay dead angle, concrete vibrating is closely knit, after constructional column demoulding, concrete appearance effect It is good, it meets the requirements.The specific process steps are as follows:
The first step carries out chamfering 2 (Fig. 1) to 7 two sides building block 1 of constructional column on ground or platform;
Second step, in 3 two sides of constructional column framework of steel reinforcement, the building block 4 of the building block 1 and non-chamfering that are chamfered staggeredly is built into horse Tooth raft form, (Fig. 2);
Third step, after formwork, to 3 casting concrete 5 of constructional column framework of steel reinforcement, due to building block chamfering 2, vibrating spear 6 Vibrate (Fig. 3) at no dead angle;
4th step, after casting concrete 5 reaches intensity, to 7 demoulding of constructional column, 7 presentation quality effect of constructional column is good, full Foot requires (Fig. 4).
This method is easy to operate, not only ensure that constructional column concrete pouring quality, and manpower and material resources are greatly saved, Construction cost is reduced, achieves good economic benefit for company.
Detailed description of the invention
Fig. 1 is constructional column two sides building block chamfering figure.
Fig. 2 is constructional column two sides concrete block masonry figure.
Fig. 3 is constructional column concreting cross-section diagram.
Fig. 4 be the demoulding of constructional column casting concrete after scheme.
In figure, the building block 1, chamfering 2, constructional column framework of steel reinforcement 3, the building block 4 of non-chamfering, casting concrete 5, the vibration that are chamfered Tamper 6, constructional column 7.
Specific embodiment
Fig. 1-Fig. 4 is a kind of specific embodiment of the invention.Specific embodiment is as follows:
The first step carries out chamfering 2 to 7 two sides building block 1 of constructional column on ground or platform;
Second step, in 3 two sides of constructional column framework of steel reinforcement, the building block 4 of the building block 2 and non-chamfering that are chamfered staggeredly is built into horse Tooth raft form;
Third step, after formwork, to 3 casting concrete 5 of constructional column framework of steel reinforcement, due to building block chamfering 2, vibrating spear 6 It vibrates at no dead angle;
4th step, after casting concrete 5 reaches intensity, to 7 demoulding of constructional column, 7 presentation quality effect of constructional column is good, full Foot requires.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811152428.2A CN108999408A (en) | 2018-09-29 | 2018-09-29 | A kind of building block of constructional column two sides uses the concreting method of chamfering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811152428.2A CN108999408A (en) | 2018-09-29 | 2018-09-29 | A kind of building block of constructional column two sides uses the concreting method of chamfering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108999408A true CN108999408A (en) | 2018-12-14 |
Family
ID=64590365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811152428.2A CN108999408A (en) | 2018-09-29 | 2018-09-29 | A kind of building block of constructional column two sides uses the concreting method of chamfering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999408A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457556A (en) * | 2006-06-16 | 2009-06-17 | 罗进南 | Core beam constructional column mixed combination wall, building method and relevant building block |
US7780123B1 (en) * | 2006-10-05 | 2010-08-24 | Jay Bailyn | Stand for pouring concrete |
CN204456853U (en) * | 2014-12-19 | 2015-07-08 | 山西省第三建筑工程公司 | Secondary structure constructional column formwork erection positioner |
CN107165411A (en) * | 2017-05-22 | 2017-09-15 | 中国五冶集团有限公司 | A kind of Constructional Col-umn Construction technique |
CN108118904A (en) * | 2018-01-07 | 2018-06-05 | 中铁四局集团建筑工程有限公司 | A kind of Constructional Col-umn Construction method |
-
2018
- 2018-09-29 CN CN201811152428.2A patent/CN108999408A/en not_active Application Discontinuation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101457556A (en) * | 2006-06-16 | 2009-06-17 | 罗进南 | Core beam constructional column mixed combination wall, building method and relevant building block |
US7780123B1 (en) * | 2006-10-05 | 2010-08-24 | Jay Bailyn | Stand for pouring concrete |
CN204456853U (en) * | 2014-12-19 | 2015-07-08 | 山西省第三建筑工程公司 | Secondary structure constructional column formwork erection positioner |
CN107165411A (en) * | 2017-05-22 | 2017-09-15 | 中国五冶集团有限公司 | A kind of Constructional Col-umn Construction technique |
CN108118904A (en) * | 2018-01-07 | 2018-06-05 | 中铁四局集团建筑工程有限公司 | A kind of Constructional Col-umn Construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NZ522942A (en) | A method of constructing a rail track in which a concrete slab is produced between concrete walls and rail track anchor memebers are inserted into the track slab | |
KR100948358B1 (en) | Construction technique of steel box girder bridge and this | |
CN205857530U (en) | Joint bar positioner | |
CN101768916A (en) | Lower flange improved corrugated steel web plate composite box girder and construction method thereof | |
CN103774749A (en) | Large-span prestressed concrete F plate frame structure system | |
CN105064579B (en) | A kind of construction method ensureing toilet water stopping thresholds platform pouring molding | |
CN104499498B (en) | A kind of construction method of mass concrete building | |
CN103643795B (en) | Fastening type cylindrical timber formwork concrete casting construction method | |
CN106808578A (en) | A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating | |
US10273691B2 (en) | Method of constructing a reinforced compound concrete beam containing demolished concrete lumps | |
CN207063522U (en) | A kind of frame column high-supported formwork | |
CN104975716A (en) | Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete | |
CN105952154B (en) | A kind of concrete-pouring template stent | |
CN103334356A (en) | Bridge type precast reinforced concrete hidden beam slab pavement system and construction method thereof | |
CN206737210U (en) | A kind of non-dismantling formwork | |
CN102828468B (en) | Construction method for controlling prefabricated crack of high-strength thin-walled box girder under high-temperature dry condition | |
CN101487293A (en) | Concreting method with different intensity grades for beam column nodes | |
CN103215893A (en) | Method for prefabricated assembly of middle-divided sections of large-sized capping beam and assembly structure of middle-divided sections of large-sized capping beam | |
CN105926935A (en) | Integral column formwork based on 3d printing and used for concrete pouring and column pouring method | |
CN104989102A (en) | Improved concrete wall and column construction method | |
CN104328919A (en) | Construction method for fixing preburied iron elements | |
CN108130837A (en) | A kind of prefabricated road plate and its construction method | |
CN206616862U (en) | Formwork root bracing means | |
CN204098486U (en) | The concrete of building basement roof ater-casting hangs mould | |
CN103614998B (en) | Inwall pouring concrete based on diaphragm wall is inverse makes method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181214 |
|
WD01 | Invention patent application deemed withdrawn after publication |