CN108978577A - The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag - Google Patents
The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag Download PDFInfo
- Publication number
- CN108978577A CN108978577A CN201810840291.3A CN201810840291A CN108978577A CN 108978577 A CN108978577 A CN 108978577A CN 201810840291 A CN201810840291 A CN 201810840291A CN 108978577 A CN108978577 A CN 108978577A
- Authority
- CN
- China
- Prior art keywords
- mud
- construction
- dredging
- bag
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
- E02B3/023—Removing sediments
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F11/00—Treatment of sludge; Devices therefor
- C02F11/008—Sludge treatment by fixation or solidification
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F11/00—Treatment of sludge; Devices therefor
- C02F11/12—Treatment of sludge; Devices therefor by de-watering, drying or thickening
- C02F11/14—Treatment of sludge; Devices therefor by de-watering, drying or thickening with addition of chemical agents
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
Abstract
The present invention relates to a kind of construction methods that the dredging of irrigation canals and ditches bed mud is carried out based on hydraulicking filling geotextile tube bag, belong to black and odorous water irrigation canals and ditches mud bottom Dredging Construction technical field;Include the following steps interim stockyard construction;Clear table;Cofferdam is built in segmentation;Construction drainage;Assemble dredging tube line;Hydraulicking bed mud;Add medicament;Geotechnological geo-tube filling;Sludge dewatering and solidifying;Soil after solidification is transported or is recycled.The construction method is completed to cut the earth by the effect that waterpower is cut, large geotechnical pipe bag is filled to through mud conveying pipeline by slush pump again, make to dredge mud in dredging pipeline and medicament is sufficiently stirred and generates flocculation group, is precipitated in geotextile tube band, reach the processing for carrying out dehydrating and curing to bed mud.Its main feature is that having continuity, collection is dredged, is conveyed, charging institutional operation, at low cost, and construction efficiency is high;It is without secondary pollution in transmission process with closure, good environmental protection;Construction precision is higher, and effect is preferable, easy to operate, saves working space.
Description
Technical field
The invention belongs to black and odorous water irrigation canals and ditches mud bottom Dredging Construction technical fields, are based on hydraulicking more particularly to one kind
Fill the construction method that geotextile tube bag carries out the dredging of irrigation canals and ditches bed mud.
Background technique
City black and odorous water is the water environmental problems that the common people have strong complaints, and not only compromises human settlement environment in city, also seriously
City image is influenced, it is extremely urgent to solve the problems, such as and administer city black and odorous water.Traditional irrigation canals and ditches sludge is excavated using mechanical
The method transported afterwards, not only construction efficiency is low, also will cause secondary pollution during transport or storage.Dredging of the present invention is applied
Tool has continuity, and collection is dredged, conveyed, charging institutional operation, and construction efficiency is high, and closure is good, without secondary in transmission process
Pollution, environmental-protecting performance.
Summary of the invention
The present invention provides one kind to solve technical problem present in well-known technique, and cost is relatively low, simple process, construction
Fast, strong operability, efficiently solves that irrigation canals and ditches mud bottom desilting efficiency data is low, dredging is not thorough, transports and is easy during storing
Cause the construction method that the dredging of irrigation canals and ditches bed mud is carried out based on hydraulicking filling geotextile tube bag of the problem of secondary pollution.
The technical scheme adopted by the present invention to solve the technical problems existing in the known art is that
A kind of construction method carrying out the dredging of irrigation canals and ditches bed mud based on hydraulicking filling geotextile tube bag, it is characterised in that: packet
Include following steps:
(1) interim stockyard construction mainly includes that the clear table backfill leveling in place rolls, digs gutter and sump, laying
Impervious barrier, laying rubble etc.;
(2) clear table;
(3) cofferdam is built in segmentation;Cofferdam takes native stone bag to pile up, and cofferdam side slope 1:2, upstream water level is risen out in cofferdam
Antiseepage blanket is arranged in 0.5m, cofferdam upstream face;
(4) construction drainage;After cofferdam is constructed, construction section internal water accumulation is excluded using slush pump;
(5) dredging tube line is assembled;
(6) hydraulicking bed mud;Mud is broken by mud using high-pressure pump cooperation giant, is pooled to mud pit
Slush pump inhales mud by slush pump, spoil disposal is once completed, and adopts and be piped to interim stockyard, the geotechnological geo-tube filling of progress;
(7) medicament is added;Geotextile tube bag is connected directly with equipment is dredged, in mud by adding in closed conduit transmission process
Enter conditioner, then the mud of dredging that conditioner is added is directly injected into geotextile tube bag;
(8) geotechnological geo-tube filling;Artificial to be laid with after the completion of bag body, mud inhales mud, spoil disposal by slush pump, and centre is by de-
Water medicant preparation device is added Assistant and is sufficiently mixed, and mud is filled by pipeline to geotextile tube bag;
(9) sludge dewatering and solidifying;After repeated filling and draining, the fine grained object stayed in bag body will be made due to dry
With can gradually consolidate, while the water being discharged can reuse;
(10), the soil processing after solidifying.
The advantages and positive effects of the present invention are: the present invention completes to cut the earth by the effect that waterpower is cut, then by
Slush pump is filled to large geotechnical pipe bag through mud conveying pipeline, and the conditioner for being suitble to administer the bed mud or steady is added in dredging pipeline
Determine the medicaments such as agent, by pipeline hybrid mode, makes to dredge mud and medicament is sufficiently stirred and generates flocculation group, in geotextile tube band
Middle precipitating reaches the processing that dehydrating and curing is carried out to bed mud.The present invention has continuity, and collection is dredged, conveyed, charging and be integrally turned into
Industry, at low cost, construction efficiency is high;With closure, secondary pollution in transmission process, environmental-protecting performance are solved the problems, such as
It is good;The advantages that construction precision is higher, and effect is preferable, easy to operate, saves working space.The method is abundant by engineering construction example
Demonstrate its exploitativeness and economical.
Detailed description of the invention
Fig. 1 is bed mud dredging process schematic of the present invention;
Specific embodiment
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and cooperate attached drawing
Detailed description are as follows:
Referring to Fig. 1, a kind of construction method for carrying out the dredging of irrigation canals and ditches bed mud based on hydraulicking filling geotextile tube bag:
(1) interim stockyard construction, carries out clear list processing, by center around according to thousand points in the flattening course of place first
One of ratio carry out slope;Gutter and sump are excavated in stockyard periphery;One layer of 500g/ is laid in bottom after the completion of rolling
The composite geotechnical impervious membrane of ㎡ is laid with the rubble of 30cm thickness on geomembrane, guarantees that the drainage of geotextile tube bag is smoothly discharged.
(2) clear table;The artificial water plant for removing irrigation canals and ditches bottom and house refuse reduce in order to avoid slush pump is easily caused to block
Construction efficiency.
(3) cofferdam is built in segmentation;Cofferdam takes native stone bag to pile up, and cofferdam side slope 1:2, upstream water level is risen out in cofferdam
Antiseepage blanket is arranged in 0.5m, cofferdam upstream face.
(4) construction drainage;After cofferdam is constructed, construction section internal water accumulation is excluded using slush pump.
(5) dredging tube line is assembled;The feed-line of desilting sediment is mainly made of two kinds of forms, and slush pump is complete using pipeline
Portion is hose, and land pipe is managed using PE, and current divider is arranged with PE pipe junction in hose.
(6) hydraulicking bed mud;Mud is broken by mud using high-pressure pump cooperation giant, is pooled to mud pit
Slush pump inhales mud by slush pump, spoil disposal is once completed, and adopts and be piped to interim stockyard, the geotechnological geo-tube filling of progress.
(7) medicament is added;Geotextile tube bag is connected directly with equipment is dredged, and conditioner will be improved after sufficiently curing by dosing pump
Agent is pumped into mud conveying pipeline, and then the mud of dredging that conditioner is added is directly injected into geotextile tube bag.
(8) geotechnological geo-tube filling;Artificial to be laid with after the completion of bag body, mud inhales mud, spoil disposal by slush pump, and centre is by de-
Water medicant preparation device is added Assistant and is sufficiently mixed, and mud is filled by pipeline to geotextile tube bag.
(9) sludge dewatering and solidifying;After repeated filling and draining, the fine grained object stayed in bag body will be made due to dry
With can gradually consolidate, while the water being discharged can reuse.
(10) soil after solidifying is transported or is recycled.
In conclusion the present invention completes to cut the earth by the effect that waterpower is cut, then filled by slush pump through mud conveying pipeline
To large geotechnical pipe bag, the medicaments such as the conditioner for being suitble to administer the bed mud or stabilizer are added in dredging pipeline, pass through pipeline
Hybrid mode, makes to dredge mud and medicament is sufficiently stirred and generates flocculation group, precipitates in geotextile tube band, reach to bed mud into
The processing of row dehydrating and curing.The present invention has continuity, and collection is dredged, conveyed, charging institutional operation, at low cost, construction efficiency
It is high;With closure, secondary pollution in transmission process, good environmental protection are solved the problems, such as;Construction precision is higher, effect
Preferably, easy to operate, save working space the advantages that.The method sufficiently demonstrates its exploitativeness and warp by engineering construction example
Ji type.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form,
Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to
In the range of technical solution of the present invention.
Claims (1)
1. a kind of construction method for carrying out the dredging of irrigation canals and ditches bed mud based on hydraulicking filling geotextile tube bag, it is characterised in that: including
Following steps:
(1) interim stockyard construction, carries out clear list processing, by center around according to one thousandth in the flattening course of place first
Ratio carry out slope;Gutter and sump are excavated in stockyard periphery;It is laid with one layer of 500g/ ㎡'s in bottom after the completion of rolling
Composite geotechnical impervious membrane is laid with the rubble of 30cm thickness on geomembrane, guarantees that the drainage of geotextile tube bag is smoothly discharged;
(2) clear table;The artificial water plant for removing irrigation canals and ditches bottom and house refuse;
(3) cofferdam is built in segmentation;Cofferdam takes native stone bag to pile up, and cofferdam side slope 1:2, cofferdam is risen out upstream water level 0.5m, enclosed
Antiseepage blanket is arranged in weir upstream face;
(4) construction drainage;After cofferdam is constructed, construction section internal water accumulation is excluded using slush pump;
(5) dredging tube line is assembled;The feed-line of desilting sediment is mainly made of two kinds of forms, and slush pump is all using pipeline
Hose, land pipe are managed using PE, and current divider is arranged with PE pipe junction in hose;
(6) hydraulicking bed mud;Mud is broken by mud using high-pressure pump cooperation giant, is pooled to the mud of mud pit
Pump inhales mud by slush pump, spoil disposal is once completed, and adopts and be piped to interim stockyard, the geotechnological geo-tube filling of progress;
(7) medicament is added;Geotextile tube bag is connected directly with equipment is dredged, and conditioner is pumped conditioner by dosing pump after sufficiently curing
Enter to mud conveying pipeline, then the mud of dredging that conditioner is added is directly injected into geotextile tube bag;
(8) geotechnological geo-tube filling;Artificial to be laid with after the completion of bag body, mud inhales mud, spoil disposal by slush pump, and dehydrant is passed through in centre
Agent Preparation equipment is added Assistant and is sufficiently mixed, and mud is filled by pipeline to geotextile tube bag;
(9) sludge dewatering and solidifying;After repeated filling and draining, the fine grained object stayed in bag body will be due to desiccation meeting
It gradually consolidates, while the water being discharged can reuse;
(10) soil after solidifying is transported or is recycled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810840291.3A CN108978577A (en) | 2018-07-27 | 2018-07-27 | The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810840291.3A CN108978577A (en) | 2018-07-27 | 2018-07-27 | The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108978577A true CN108978577A (en) | 2018-12-11 |
Family
ID=64551808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810840291.3A Pending CN108978577A (en) | 2018-07-27 | 2018-07-27 | The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978577A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110002717A (en) * | 2019-04-24 | 2019-07-12 | 中国建筑第八工程局有限公司 | The resource utilization method of mud in discarded pit |
CN110183074A (en) * | 2019-07-05 | 2019-08-30 | 福建川云里水利建设有限公司 | A kind of channel cleanout method |
CN111153585A (en) * | 2020-03-14 | 2020-05-15 | 中新瑞美(天津)环保科技有限公司 | Environment-friendly dredging and recycling method for polluted bottom mud |
CN111320345A (en) * | 2020-02-25 | 2020-06-23 | 中建五局第三建设有限公司 | Pipe bag treatment process and system for black and odorous sludge in urban river |
CN111501652A (en) * | 2020-03-18 | 2020-08-07 | 中铁十四局集团第四工程有限公司 | Comprehensive treatment method for sand bed riverway in plain area |
CN111892275A (en) * | 2020-07-16 | 2020-11-06 | 天津大学 | Method for ecological bank protection after dehydration of eutrophic polluted bottom mud geotextile tube bags |
CN113024057A (en) * | 2021-03-18 | 2021-06-25 | 温州舒谨建筑劳务有限公司 | Construction method for preparing engineering bag by solidifying marine sludge |
CN114427230A (en) * | 2021-12-23 | 2022-05-03 | 黄河水利委员会黄河水利科学研究院 | Ring type cavity lattice earthwork tube bag structure |
CN114506996A (en) * | 2022-02-08 | 2022-05-17 | 中国一冶集团有限公司 | Rapid dewatering system and dewatering method for engineering slurry |
CN115874497A (en) * | 2023-01-05 | 2023-03-31 | 江苏科技大学 | Geotechnical pipe bag roadbed and construction method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206070494U (en) * | 2016-08-25 | 2017-04-05 | 中交天津港航勘察设计研究院有限公司 | A kind of cofferdam suitable for lake dredging bed mud stockyard |
CN107386195A (en) * | 2017-09-13 | 2017-11-24 | 中交第三航务工程局有限公司 | A kind of Dredging Construction method for the canal that drains off floodwaters |
-
2018
- 2018-07-27 CN CN201810840291.3A patent/CN108978577A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206070494U (en) * | 2016-08-25 | 2017-04-05 | 中交天津港航勘察设计研究院有限公司 | A kind of cofferdam suitable for lake dredging bed mud stockyard |
CN107386195A (en) * | 2017-09-13 | 2017-11-24 | 中交第三航务工程局有限公司 | A kind of Dredging Construction method for the canal that drains off floodwaters |
Non-Patent Citations (2)
Title |
---|
舒俭民等: "《突发环境事件污染损害评估 11•21空难与南海湿地》", 31 January 2015 * |
董晶等: "土工管袋应用于污泥脱水的工程实践经验", 《四川环境》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110002717A (en) * | 2019-04-24 | 2019-07-12 | 中国建筑第八工程局有限公司 | The resource utilization method of mud in discarded pit |
CN110183074A (en) * | 2019-07-05 | 2019-08-30 | 福建川云里水利建设有限公司 | A kind of channel cleanout method |
CN110183074B (en) * | 2019-07-05 | 2020-12-01 | 福建川云里水利建设有限公司 | River channel dredging method |
CN111320345A (en) * | 2020-02-25 | 2020-06-23 | 中建五局第三建设有限公司 | Pipe bag treatment process and system for black and odorous sludge in urban river |
CN111153585A (en) * | 2020-03-14 | 2020-05-15 | 中新瑞美(天津)环保科技有限公司 | Environment-friendly dredging and recycling method for polluted bottom mud |
CN111501652A (en) * | 2020-03-18 | 2020-08-07 | 中铁十四局集团第四工程有限公司 | Comprehensive treatment method for sand bed riverway in plain area |
CN111501652B (en) * | 2020-03-18 | 2021-11-02 | 中铁十四局集团第四工程有限公司 | Comprehensive treatment method for sand bed riverway in plain area |
CN111892275A (en) * | 2020-07-16 | 2020-11-06 | 天津大学 | Method for ecological bank protection after dehydration of eutrophic polluted bottom mud geotextile tube bags |
CN113024057A (en) * | 2021-03-18 | 2021-06-25 | 温州舒谨建筑劳务有限公司 | Construction method for preparing engineering bag by solidifying marine sludge |
CN114427230A (en) * | 2021-12-23 | 2022-05-03 | 黄河水利委员会黄河水利科学研究院 | Ring type cavity lattice earthwork tube bag structure |
CN114506996A (en) * | 2022-02-08 | 2022-05-17 | 中国一冶集团有限公司 | Rapid dewatering system and dewatering method for engineering slurry |
CN114506996B (en) * | 2022-02-08 | 2023-07-18 | 中国一冶集团有限公司 | Engineering slurry rapid dehydration system and dehydration method |
CN115874497A (en) * | 2023-01-05 | 2023-03-31 | 江苏科技大学 | Geotechnical pipe bag roadbed and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978577A (en) | The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag | |
CN101270571B (en) | Reinforcing method for layered dead weight, prepressing water discharge concretion combination dynamic consolidation soft ground base | |
CN102587352B (en) | Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation | |
CN105178245A (en) | Large filling bag ecological embankment and revetment building method for river lake channel | |
CN2911010Y (en) | Fast reinforcing apparatus for blowing-filling sludge ground | |
CN105019425B (en) | A kind of construction method of displacement hull and cured layer combined foundation structure | |
CN102767157A (en) | Diking method through filling sludge into mold bags and vacuum preloading | |
CN105672391A (en) | Method for firstly curing and then excavating sludge at bottoms of city inland rivers and lakes | |
CN111733792A (en) | Foundation treatment method and system for soft soil foundation vacuum preloading and power consolidation drainage | |
CN103967015B (en) | A kind of water seal for deep foundation pit excavation method and structure thereof | |
CN104711968A (en) | Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method | |
CN109083100B (en) | River channel excavation construction process after mud blowing and landing | |
CN103276717B (en) | The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation | |
CN204875755U (en) | Drainage body and solidification stratum society foundation structure | |
CN101591907B (en) | One-piece vacuum preloading method for quickly treating hydraulic fill hedoro foundation | |
CN102704437A (en) | Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area | |
CN214014948U (en) | Structure for treating soil salinization of coastal region by utilizing engineering muck | |
CN215441736U (en) | Mucky soil embankment structure | |
CN202925540U (en) | Arrangement structure of device for processing soft soil foundation in coastal reclamation region | |
CN111719575A (en) | Foundation pit anti-settling drainage method | |
CN113652998B (en) | Construction method for waste puddle treatment and water system landscape reconstruction | |
CN111535293A (en) | Method and system for reinforcing deep soft foundation by combining low-level water-lowering vacuum with surcharge preloading | |
CN205529733U (en) | Processing structure of soft base in coast | |
CN217231777U (en) | Consolidation-accelerating sludge discharge field | |
CN105544332B (en) | A kind of processing structure and its construction method of coastal soft base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181211 |