CN108978577A - The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag - Google Patents

The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag Download PDF

Info

Publication number
CN108978577A
CN108978577A CN201810840291.3A CN201810840291A CN108978577A CN 108978577 A CN108978577 A CN 108978577A CN 201810840291 A CN201810840291 A CN 201810840291A CN 108978577 A CN108978577 A CN 108978577A
Authority
CN
China
Prior art keywords
mud
construction
dredging
bag
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810840291.3A
Other languages
Chinese (zh)
Inventor
殷立中
刘梦会
吴永彬
刘�文
冯晨
李聪亚
冷文厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Harbour Engineering Co Ltd
Original Assignee
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Harbour Engineering Co Ltd
Priority to CN201810840291.3A priority Critical patent/CN108978577A/en
Publication of CN108978577A publication Critical patent/CN108978577A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • E02B3/023Removing sediments
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/008Sludge treatment by fixation or solidification
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • C02F11/14Treatment of sludge; Devices therefor by de-watering, drying or thickening with addition of chemical agents
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins

Abstract

The present invention relates to a kind of construction methods that the dredging of irrigation canals and ditches bed mud is carried out based on hydraulicking filling geotextile tube bag, belong to black and odorous water irrigation canals and ditches mud bottom Dredging Construction technical field;Include the following steps interim stockyard construction;Clear table;Cofferdam is built in segmentation;Construction drainage;Assemble dredging tube line;Hydraulicking bed mud;Add medicament;Geotechnological geo-tube filling;Sludge dewatering and solidifying;Soil after solidification is transported or is recycled.The construction method is completed to cut the earth by the effect that waterpower is cut, large geotechnical pipe bag is filled to through mud conveying pipeline by slush pump again, make to dredge mud in dredging pipeline and medicament is sufficiently stirred and generates flocculation group, is precipitated in geotextile tube band, reach the processing for carrying out dehydrating and curing to bed mud.Its main feature is that having continuity, collection is dredged, is conveyed, charging institutional operation, at low cost, and construction efficiency is high;It is without secondary pollution in transmission process with closure, good environmental protection;Construction precision is higher, and effect is preferable, easy to operate, saves working space.

Description

The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag
Technical field
The invention belongs to black and odorous water irrigation canals and ditches mud bottom Dredging Construction technical fields, are based on hydraulicking more particularly to one kind Fill the construction method that geotextile tube bag carries out the dredging of irrigation canals and ditches bed mud.
Background technique
City black and odorous water is the water environmental problems that the common people have strong complaints, and not only compromises human settlement environment in city, also seriously City image is influenced, it is extremely urgent to solve the problems, such as and administer city black and odorous water.Traditional irrigation canals and ditches sludge is excavated using mechanical The method transported afterwards, not only construction efficiency is low, also will cause secondary pollution during transport or storage.Dredging of the present invention is applied Tool has continuity, and collection is dredged, conveyed, charging institutional operation, and construction efficiency is high, and closure is good, without secondary in transmission process Pollution, environmental-protecting performance.
Summary of the invention
The present invention provides one kind to solve technical problem present in well-known technique, and cost is relatively low, simple process, construction Fast, strong operability, efficiently solves that irrigation canals and ditches mud bottom desilting efficiency data is low, dredging is not thorough, transports and is easy during storing Cause the construction method that the dredging of irrigation canals and ditches bed mud is carried out based on hydraulicking filling geotextile tube bag of the problem of secondary pollution.
The technical scheme adopted by the present invention to solve the technical problems existing in the known art is that
A kind of construction method carrying out the dredging of irrigation canals and ditches bed mud based on hydraulicking filling geotextile tube bag, it is characterised in that: packet Include following steps:
(1) interim stockyard construction mainly includes that the clear table backfill leveling in place rolls, digs gutter and sump, laying Impervious barrier, laying rubble etc.;
(2) clear table;
(3) cofferdam is built in segmentation;Cofferdam takes native stone bag to pile up, and cofferdam side slope 1:2, upstream water level is risen out in cofferdam Antiseepage blanket is arranged in 0.5m, cofferdam upstream face;
(4) construction drainage;After cofferdam is constructed, construction section internal water accumulation is excluded using slush pump;
(5) dredging tube line is assembled;
(6) hydraulicking bed mud;Mud is broken by mud using high-pressure pump cooperation giant, is pooled to mud pit Slush pump inhales mud by slush pump, spoil disposal is once completed, and adopts and be piped to interim stockyard, the geotechnological geo-tube filling of progress;
(7) medicament is added;Geotextile tube bag is connected directly with equipment is dredged, in mud by adding in closed conduit transmission process Enter conditioner, then the mud of dredging that conditioner is added is directly injected into geotextile tube bag;
(8) geotechnological geo-tube filling;Artificial to be laid with after the completion of bag body, mud inhales mud, spoil disposal by slush pump, and centre is by de- Water medicant preparation device is added Assistant and is sufficiently mixed, and mud is filled by pipeline to geotextile tube bag;
(9) sludge dewatering and solidifying;After repeated filling and draining, the fine grained object stayed in bag body will be made due to dry With can gradually consolidate, while the water being discharged can reuse;
(10), the soil processing after solidifying.
The advantages and positive effects of the present invention are: the present invention completes to cut the earth by the effect that waterpower is cut, then by Slush pump is filled to large geotechnical pipe bag through mud conveying pipeline, and the conditioner for being suitble to administer the bed mud or steady is added in dredging pipeline Determine the medicaments such as agent, by pipeline hybrid mode, makes to dredge mud and medicament is sufficiently stirred and generates flocculation group, in geotextile tube band Middle precipitating reaches the processing that dehydrating and curing is carried out to bed mud.The present invention has continuity, and collection is dredged, conveyed, charging and be integrally turned into Industry, at low cost, construction efficiency is high;With closure, secondary pollution in transmission process, environmental-protecting performance are solved the problems, such as It is good;The advantages that construction precision is higher, and effect is preferable, easy to operate, saves working space.The method is abundant by engineering construction example Demonstrate its exploitativeness and economical.
Detailed description of the invention
Fig. 1 is bed mud dredging process schematic of the present invention;
Specific embodiment
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and cooperate attached drawing Detailed description are as follows:
Referring to Fig. 1, a kind of construction method for carrying out the dredging of irrigation canals and ditches bed mud based on hydraulicking filling geotextile tube bag:
(1) interim stockyard construction, carries out clear list processing, by center around according to thousand points in the flattening course of place first One of ratio carry out slope;Gutter and sump are excavated in stockyard periphery;One layer of 500g/ is laid in bottom after the completion of rolling The composite geotechnical impervious membrane of ㎡ is laid with the rubble of 30cm thickness on geomembrane, guarantees that the drainage of geotextile tube bag is smoothly discharged.
(2) clear table;The artificial water plant for removing irrigation canals and ditches bottom and house refuse reduce in order to avoid slush pump is easily caused to block Construction efficiency.
(3) cofferdam is built in segmentation;Cofferdam takes native stone bag to pile up, and cofferdam side slope 1:2, upstream water level is risen out in cofferdam Antiseepage blanket is arranged in 0.5m, cofferdam upstream face.
(4) construction drainage;After cofferdam is constructed, construction section internal water accumulation is excluded using slush pump.
(5) dredging tube line is assembled;The feed-line of desilting sediment is mainly made of two kinds of forms, and slush pump is complete using pipeline Portion is hose, and land pipe is managed using PE, and current divider is arranged with PE pipe junction in hose.
(6) hydraulicking bed mud;Mud is broken by mud using high-pressure pump cooperation giant, is pooled to mud pit Slush pump inhales mud by slush pump, spoil disposal is once completed, and adopts and be piped to interim stockyard, the geotechnological geo-tube filling of progress.
(7) medicament is added;Geotextile tube bag is connected directly with equipment is dredged, and conditioner will be improved after sufficiently curing by dosing pump Agent is pumped into mud conveying pipeline, and then the mud of dredging that conditioner is added is directly injected into geotextile tube bag.
(8) geotechnological geo-tube filling;Artificial to be laid with after the completion of bag body, mud inhales mud, spoil disposal by slush pump, and centre is by de- Water medicant preparation device is added Assistant and is sufficiently mixed, and mud is filled by pipeline to geotextile tube bag.
(9) sludge dewatering and solidifying;After repeated filling and draining, the fine grained object stayed in bag body will be made due to dry With can gradually consolidate, while the water being discharged can reuse.
(10) soil after solidifying is transported or is recycled.
In conclusion the present invention completes to cut the earth by the effect that waterpower is cut, then filled by slush pump through mud conveying pipeline To large geotechnical pipe bag, the medicaments such as the conditioner for being suitble to administer the bed mud or stabilizer are added in dredging pipeline, pass through pipeline Hybrid mode, makes to dredge mud and medicament is sufficiently stirred and generates flocculation group, precipitates in geotextile tube band, reach to bed mud into The processing of row dehydrating and curing.The present invention has continuity, and collection is dredged, conveyed, charging institutional operation, at low cost, construction efficiency It is high;With closure, secondary pollution in transmission process, good environmental protection are solved the problems, such as;Construction precision is higher, effect Preferably, easy to operate, save working space the advantages that.The method sufficiently demonstrates its exploitativeness and warp by engineering construction example Ji type.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form, Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to In the range of technical solution of the present invention.

Claims (1)

1. a kind of construction method for carrying out the dredging of irrigation canals and ditches bed mud based on hydraulicking filling geotextile tube bag, it is characterised in that: including Following steps:
(1) interim stockyard construction, carries out clear list processing, by center around according to one thousandth in the flattening course of place first Ratio carry out slope;Gutter and sump are excavated in stockyard periphery;It is laid with one layer of 500g/ ㎡'s in bottom after the completion of rolling Composite geotechnical impervious membrane is laid with the rubble of 30cm thickness on geomembrane, guarantees that the drainage of geotextile tube bag is smoothly discharged;
(2) clear table;The artificial water plant for removing irrigation canals and ditches bottom and house refuse;
(3) cofferdam is built in segmentation;Cofferdam takes native stone bag to pile up, and cofferdam side slope 1:2, cofferdam is risen out upstream water level 0.5m, enclosed Antiseepage blanket is arranged in weir upstream face;
(4) construction drainage;After cofferdam is constructed, construction section internal water accumulation is excluded using slush pump;
(5) dredging tube line is assembled;The feed-line of desilting sediment is mainly made of two kinds of forms, and slush pump is all using pipeline Hose, land pipe are managed using PE, and current divider is arranged with PE pipe junction in hose;
(6) hydraulicking bed mud;Mud is broken by mud using high-pressure pump cooperation giant, is pooled to the mud of mud pit Pump inhales mud by slush pump, spoil disposal is once completed, and adopts and be piped to interim stockyard, the geotechnological geo-tube filling of progress;
(7) medicament is added;Geotextile tube bag is connected directly with equipment is dredged, and conditioner is pumped conditioner by dosing pump after sufficiently curing Enter to mud conveying pipeline, then the mud of dredging that conditioner is added is directly injected into geotextile tube bag;
(8) geotechnological geo-tube filling;Artificial to be laid with after the completion of bag body, mud inhales mud, spoil disposal by slush pump, and dehydrant is passed through in centre Agent Preparation equipment is added Assistant and is sufficiently mixed, and mud is filled by pipeline to geotextile tube bag;
(9) sludge dewatering and solidifying;After repeated filling and draining, the fine grained object stayed in bag body will be due to desiccation meeting It gradually consolidates, while the water being discharged can reuse;
(10) soil after solidifying is transported or is recycled.
CN201810840291.3A 2018-07-27 2018-07-27 The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag Pending CN108978577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810840291.3A CN108978577A (en) 2018-07-27 2018-07-27 The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810840291.3A CN108978577A (en) 2018-07-27 2018-07-27 The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag

Publications (1)

Publication Number Publication Date
CN108978577A true CN108978577A (en) 2018-12-11

Family

ID=64551808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810840291.3A Pending CN108978577A (en) 2018-07-27 2018-07-27 The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag

Country Status (1)

Country Link
CN (1) CN108978577A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110002717A (en) * 2019-04-24 2019-07-12 中国建筑第八工程局有限公司 The resource utilization method of mud in discarded pit
CN110183074A (en) * 2019-07-05 2019-08-30 福建川云里水利建设有限公司 A kind of channel cleanout method
CN111153585A (en) * 2020-03-14 2020-05-15 中新瑞美(天津)环保科技有限公司 Environment-friendly dredging and recycling method for polluted bottom mud
CN111320345A (en) * 2020-02-25 2020-06-23 中建五局第三建设有限公司 Pipe bag treatment process and system for black and odorous sludge in urban river
CN111501652A (en) * 2020-03-18 2020-08-07 中铁十四局集团第四工程有限公司 Comprehensive treatment method for sand bed riverway in plain area
CN111892275A (en) * 2020-07-16 2020-11-06 天津大学 Method for ecological bank protection after dehydration of eutrophic polluted bottom mud geotextile tube bags
CN113024057A (en) * 2021-03-18 2021-06-25 温州舒谨建筑劳务有限公司 Construction method for preparing engineering bag by solidifying marine sludge
CN114427230A (en) * 2021-12-23 2022-05-03 黄河水利委员会黄河水利科学研究院 Ring type cavity lattice earthwork tube bag structure
CN114506996A (en) * 2022-02-08 2022-05-17 中国一冶集团有限公司 Rapid dewatering system and dewatering method for engineering slurry
CN115874497A (en) * 2023-01-05 2023-03-31 江苏科技大学 Geotechnical pipe bag roadbed and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206070494U (en) * 2016-08-25 2017-04-05 中交天津港航勘察设计研究院有限公司 A kind of cofferdam suitable for lake dredging bed mud stockyard
CN107386195A (en) * 2017-09-13 2017-11-24 中交第三航务工程局有限公司 A kind of Dredging Construction method for the canal that drains off floodwaters

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206070494U (en) * 2016-08-25 2017-04-05 中交天津港航勘察设计研究院有限公司 A kind of cofferdam suitable for lake dredging bed mud stockyard
CN107386195A (en) * 2017-09-13 2017-11-24 中交第三航务工程局有限公司 A kind of Dredging Construction method for the canal that drains off floodwaters

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
舒俭民等: "《突发环境事件污染损害评估 11•21空难与南海湿地》", 31 January 2015 *
董晶等: "土工管袋应用于污泥脱水的工程实践经验", 《四川环境》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110002717A (en) * 2019-04-24 2019-07-12 中国建筑第八工程局有限公司 The resource utilization method of mud in discarded pit
CN110183074A (en) * 2019-07-05 2019-08-30 福建川云里水利建设有限公司 A kind of channel cleanout method
CN110183074B (en) * 2019-07-05 2020-12-01 福建川云里水利建设有限公司 River channel dredging method
CN111320345A (en) * 2020-02-25 2020-06-23 中建五局第三建设有限公司 Pipe bag treatment process and system for black and odorous sludge in urban river
CN111153585A (en) * 2020-03-14 2020-05-15 中新瑞美(天津)环保科技有限公司 Environment-friendly dredging and recycling method for polluted bottom mud
CN111501652A (en) * 2020-03-18 2020-08-07 中铁十四局集团第四工程有限公司 Comprehensive treatment method for sand bed riverway in plain area
CN111501652B (en) * 2020-03-18 2021-11-02 中铁十四局集团第四工程有限公司 Comprehensive treatment method for sand bed riverway in plain area
CN111892275A (en) * 2020-07-16 2020-11-06 天津大学 Method for ecological bank protection after dehydration of eutrophic polluted bottom mud geotextile tube bags
CN113024057A (en) * 2021-03-18 2021-06-25 温州舒谨建筑劳务有限公司 Construction method for preparing engineering bag by solidifying marine sludge
CN114427230A (en) * 2021-12-23 2022-05-03 黄河水利委员会黄河水利科学研究院 Ring type cavity lattice earthwork tube bag structure
CN114506996A (en) * 2022-02-08 2022-05-17 中国一冶集团有限公司 Rapid dewatering system and dewatering method for engineering slurry
CN114506996B (en) * 2022-02-08 2023-07-18 中国一冶集团有限公司 Engineering slurry rapid dehydration system and dehydration method
CN115874497A (en) * 2023-01-05 2023-03-31 江苏科技大学 Geotechnical pipe bag roadbed and construction method thereof

Similar Documents

Publication Publication Date Title
CN108978577A (en) The construction method of irrigation canals and ditches bed mud dredging is carried out based on hydraulicking filling geotextile tube bag
CN101270571B (en) Reinforcing method for layered dead weight, prepressing water discharge concretion combination dynamic consolidation soft ground base
CN102587352B (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN105178245A (en) Large filling bag ecological embankment and revetment building method for river lake channel
CN2911010Y (en) Fast reinforcing apparatus for blowing-filling sludge ground
CN105019425B (en) A kind of construction method of displacement hull and cured layer combined foundation structure
CN102767157A (en) Diking method through filling sludge into mold bags and vacuum preloading
CN105672391A (en) Method for firstly curing and then excavating sludge at bottoms of city inland rivers and lakes
CN111733792A (en) Foundation treatment method and system for soft soil foundation vacuum preloading and power consolidation drainage
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
CN104711968A (en) Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method
CN109083100B (en) River channel excavation construction process after mud blowing and landing
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN204875755U (en) Drainage body and solidification stratum society foundation structure
CN101591907B (en) One-piece vacuum preloading method for quickly treating hydraulic fill hedoro foundation
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN214014948U (en) Structure for treating soil salinization of coastal region by utilizing engineering muck
CN215441736U (en) Mucky soil embankment structure
CN202925540U (en) Arrangement structure of device for processing soft soil foundation in coastal reclamation region
CN111719575A (en) Foundation pit anti-settling drainage method
CN113652998B (en) Construction method for waste puddle treatment and water system landscape reconstruction
CN111535293A (en) Method and system for reinforcing deep soft foundation by combining low-level water-lowering vacuum with surcharge preloading
CN205529733U (en) Processing structure of soft base in coast
CN217231777U (en) Consolidation-accelerating sludge discharge field
CN105544332B (en) A kind of processing structure and its construction method of coastal soft base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211