CN108971783A - Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment - Google Patents

Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment Download PDF

Info

Publication number
CN108971783A
CN108971783A CN201710398756.XA CN201710398756A CN108971783A CN 108971783 A CN108971783 A CN 108971783A CN 201710398756 A CN201710398756 A CN 201710398756A CN 108971783 A CN108971783 A CN 108971783A
Authority
CN
China
Prior art keywords
plate
pressure ring
tank
welding
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710398756.XA
Other languages
Chinese (zh)
Inventor
廖兴银
唐敏
任鸿
赵洪浩
卢伟
张昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710398756.XA priority Critical patent/CN108971783A/en
Publication of CN108971783A publication Critical patent/CN108971783A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Abstract

Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under a kind of hot environment, characterized by the following steps: a, prefabricated pressure ring plate, b, prefabricated standard angle square, c, prefabricated, installation pressure ring plate stiffener plate, d, pressure ring plate fitting up inspection, e, the welding installation of pressure ring plate.Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation has the characteristics that more longer than usual welding stress release time for the bottom plate welding under high temperature, high humidity, wind sand environment under hot environment of the invention, cause welding deformation after avoiding release, the welding quality of pressure ring plate is good, pass through the check criteria that U.S.'s ASME standard and Saudi Arabia SABIC standard be combined with each other and be complementary to one another, the advantages of having won owner's praise, having had accumulated the manufacturing experience of relevant petrochemical industry groove tank.

Description

Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment
Technical field
The present invention relates to a kind of groove tank tank deck edge pressure ring plates, specifically, being large-size stainless steel under a kind of hot environment Groove tank tank deck edge pressure ring method of plate installation.
Background technique
Chinese patent CN104002079A disclosed a kind of stainless steel spherical tank spherical shell component assembling side on August 27th, 2014 Method, including following steps:
The first step places the pushing template on the moulding bed;
Second step places the stainless steel ball ladle bowl plate to be assembled in the pushing template;
Third step places the upper die plate on the stainless steel ball ladle bowl plate;
4th step is fixed the upper die plate, stainless steel ball ladle bowl plate and lower die board clamping using the fixture;
5th step welds the stainless steel ball ladle bowl plate and spherical tank support column in the open area of the upper die plate, complete At assembling.The stainless steel spherical tank spherical shell parts assembling method includes moulding bed, upper die plate, pushes template and fixture, lower die Plate, stainless steel ball ladle bowl plate and upper die plate are successively layed in from the bottom to top on the moulding bed and via the clamp It is fixed together.But this dependence molding method of pressuring template will cause the assembled difficulty of groove tank siding under high temperature environment, especially Its in the assembly of large-size stainless steel groove tank siding, also have pressure ring plate make it is integral after install because its do not control it is each The dimensional accuracy of block groove tank siding is not provided with tolerance range, and serious person will appear stainless steel spherical tank spherical shell component can not group The predicament of dress.
Therefore known large-size stainless steel groove tank tank deck edge pressure ring plate installation there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose large-size stainless steel groove tank tank deck edge pressure under a kind of safe and reliable hot environment Ring flat-plate installation method.
To achieve the above object, the technical solution of the invention is as follows:
Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under a kind of hot environment, in the production of first layer siding, assembling After carry out pressure ring plate installation, pressure ring plate is to be formed a circle to install groove tank tank deck edge by several pieces of ring flat-plates, with groove tank wall The angled setting of plate, pressure ring plate one end exceed groove tank siding 100mm, it is characterised in that the following steps are included:
A, prefabricated pressure ring plate
By the prefabricated pressure ring plate of design drawing, pressure ring plate includes several pieces of ring flat-plates, and every piece of ring flat-plate arc template inspection meets the requirements It is spare afterwards;
B, prefabricated standard angle square
By the prefabricated standard angle square of design drawing, with the angle of standard angle square detection pressure ring plate and tank shell, it is ensured that pressed after the completion of construction Ring flat-plate angle meets design requirement;
C, prefabricated, installation pressure ring plate stiffener plate
By the prefabricated several pressure ring plate stiffener plates of design drawing, stiffener plate is similar to triangular steel plate, one side and groove tank tank skin It is close to welding, another side is close to welding with pressure ring plate, and soldered length is 200mm;Stiffener plate every 3 are one group, uniformly It is installed between one group of net rack support;Adjacent two-stage stiffener plate spacing 829mm;
D, pressure ring plate fitting up inspection
Pressure ring board group inspects for acceptance to the circularity of groove tank, tank body verticality, pressure ring plate and tank shell angle to rear, meets rule Model requires to carry out welding;
E, pressure ring plate welding installation, comprising the following steps:
(1) several pieces of ring flat-plates and the welding of tank skin weld seam should along the circumferential direction symmetrical, welding simultaneously, tank is detected during welding at any time The deformation of body;
(2) it is fixed when ring flat-plate is mutually butted weld with fixture, weld seam is polished after welding, it is ensured that tank deck skin panel and pressure ring plate It is tightly combined when overlap joint.
Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation can also use following under hot environment of the invention Technical measures further realize.
Method above-mentioned, wherein in the installation pressure ring plate stiffener plate, if what stiffener plate and tank skin weld seam were collided, it adjusts Whole position, with weld spacing 100mm.
Method above-mentioned, wherein the ring flat-plate with arc template in being checked, gap is not greater than 2mm.
Method above-mentioned, wherein the ring flat-plate is being placed on platform in inspection with arc template, buckling deformation must not surpass The 0.1% of component length is crossed, and is not greater than 6mm.
After adopting the above technical scheme, large-size stainless steel groove tank tank deck edge pressure ring plate is installed under hot environment of the invention Method has the advantage that
1, pressure ring plate installs and designs superior, calculating accurately;
2, tank deck edge pressure ring plate installation engineering quality is safe and reliable, groove tank forming circularity is good;
3, the welding anti-deformation measure of groove tank tank deck edge pressure ring plate is thorough, passes through U.S.'s ASME standard and Saudi Arabia SABIC The check criteria that standard be combined with each other and is complementary to one another.
Detailed description of the invention
Fig. 1 is the pressure ring-plane structure schematic diagram of the embodiment of the present invention;
Fig. 2 is the pressure ring plate muscle plate arrangement schematic diagram of the embodiment of the present invention;
Fig. 3 is the groove tank pressure ring plate scheme of installation of the embodiment of the present invention.
In figure: 1 pressure ring plate, 2 pressure ring plate muscle plates, 3 net rack supports, 4 groove tank sidings.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment of the invention, first layer siding make, The installation of pressure ring plate 1 is carried out after assembling, pressure ring plate is to be formed a circle to install groove tank tank deck edge by several pieces of ring flat-plates, with slot The angled setting of tank shell 4, pressure ring plate one end exceed groove tank siding 100mm, comprising the following steps:
A, prefabricated pressure ring plate
By the prefabricated pressure ring plate of design drawing, pressure ring plate 1 includes 20 pieces of ring flat-plates, and every piece of ring flat-plate arc template inspection meets the requirements It is spare afterwards;For the ring flat-plate in being checked with arc template, gap is not greater than 2mm.The ring flat-plate is placed on arc template In checking on platform, buckling deformation must not exceed the 0.1% of component length, and be not greater than 6mm.
It is the pressure ring-plane structure schematic diagram of the embodiment of the present invention referring now to Fig. 1, Fig. 1.As shown, each ring flat-plate mutually group Synthesis circle is mounted on groove tank tank deck edge.
B, prefabricated standard angle square
By the prefabricated standard angle square of design drawing, with the angle of standard angle square detection pressure ring plate and tank shell, it is ensured that pressed after the completion of construction Ring flat-plate angle meets design requirement.
C, prefabricated, installation pressure ring plate stiffener plate
Fig. 2 is the pressure ring plate muscle plate arrangement schematic diagram of the embodiment of the present invention.By the prefabricated several pressure ring plate muscle plates 2 of design drawing, reinforce Gusset is similar to triangular steel plate, and welding is close on one side with groove tank tank skin, and another side is close to welding, soldered with pressure ring plate Length is 200mm;Stiffener plate every 3 are one group, are uniformly installed between one group of net rack support 3;Adjacent two-stage stiffener plate Spacing 829mm.
D, pressure ring plate fitting up inspection
Pressure ring board group inspects for acceptance to the circularity of groove tank, tank body verticality, pressure ring plate and tank shell angle to rear, meets rule Model requires to carry out welding.
E, pressure ring plate welding installation, comprising the following steps:
Fig. 3 is the groove tank pressure ring plate scheme of installation of the embodiment of the present invention.
(1) 20 piece of ring flat-plate and the welding of tank skin weld seam should along the circumferential direction symmetrical, welding simultaneously, detected at any time during welding The deformation of tank body;In the installation pressure ring plate stiffener plate, if what stiffener plate and tank skin weld seam were collided, position is adjusted, with weldering Stitch spacing 100mm.In the installation pressure ring plate stiffener plate, if what stiffener plate and 4 weld seam of groove tank siding were collided, adjust position It sets, with weld spacing 100mm.
(2) it is fixed when ring flat-plate is mutually butted weld with fixture, weld seam is polished after welding, it is ensured that tank deck skin panel and pressure Ring flat-plate is tightly combined when overlapping.
The present invention has substantive distinguishing features and significant technological progress, large-size stainless steel groove tank under hot environment of the invention Tank deck edge pressure ring method of plate installation has abandoned pressure ring plate and has made the integral rear way installed, established the welding of complete set Management system formulates practicable welding management measure, works out safe and reliable welding procedure technique, becomes pressure ring plate welding seams Shape inspection is up to standard, passes through the check criteria of Unite States Standard Yu Saudi Arabia SABIC.
Large-size stainless steel groove tank tank deck edge pressure ring plate under hot environment under high temperature of the invention, high humidity, wind sand environment Installation method uses in the vertical stainless steel groove tank engineering of Saudi Arabia 20,000, and significant effect has been widely recognized.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (4)

1. large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under a kind of hot environment, in the production of first layer siding, group The installation that pressure ring plate is carried out after finishing is installed, pressure ring plate is to be formed a circle to install groove tank tank deck edge by several pieces of ring flat-plates, with groove tank The angled setting of siding, pressure ring plate one end exceed groove tank siding 100mm, it is characterised in that the following steps are included:
A, prefabricated pressure ring plate
By the prefabricated pressure ring plate of design drawing, pressure ring plate includes several pieces of ring flat-plates, and every piece of ring flat-plate arc template inspection meets the requirements It is spare afterwards;
B, prefabricated standard angle square
By the prefabricated standard angle square of design drawing, with the angle of standard angle square detection pressure ring plate and tank shell, it is ensured that pressed after the completion of construction Ring flat-plate angle meets design requirement;
C, prefabricated, installation pressure ring plate stiffener plate
By the prefabricated several pressure ring plate stiffener plates of design drawing, stiffener plate is similar to triangular steel plate, one side and groove tank tank skin It is close to welding, another side is close to welding with pressure ring plate, and soldered length is 200mm;Stiffener plate every 3 are one group, uniformly It is installed between one group of net rack support;Adjacent two-stage stiffener plate spacing 829mm;
D, pressure ring plate fitting up inspection
Pressure ring board group inspects for acceptance to the circularity of groove tank, tank body verticality, pressure ring plate and tank shell angle to rear, meets rule Model requires to carry out welding;
E, pressure ring plate welding installation, comprising the following steps:
(1) several pieces of ring flat-plates and the welding of tank skin weld seam should along the circumferential direction symmetrical, welding simultaneously, tank is detected during welding at any time The deformation of body;
(2) it is fixed when ring flat-plate is mutually butted weld with fixture, weld seam is polished after welding, it is ensured that tank deck skin panel and pressure ring plate It is tightly combined when overlap joint.
2. large-size stainless steel groove tank tank deck edge pressure ring method of plate installation, feature under hot environment as described in claim 1 It is, in the installation pressure ring plate stiffener plate, if what stiffener plate and tank skin weld seam were collided, position is adjusted, with weld spacing 100mm。
3. large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment as described in claim 1, feature It is, for the ring flat-plate in being checked with arc template, gap is not greater than 2mm.
4. large-size stainless steel groove tank tank deck edge pressure ring method of plate installation, feature under hot environment as described in claim 1 It is, the ring flat-plate is being placed on platform in inspection with arc template, and buckling deformation must not exceed the 0.1% of component length, and It is not greater than 6mm.
CN201710398756.XA 2017-05-31 2017-05-31 Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment Pending CN108971783A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710398756.XA CN108971783A (en) 2017-05-31 2017-05-31 Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710398756.XA CN108971783A (en) 2017-05-31 2017-05-31 Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment

Publications (1)

Publication Number Publication Date
CN108971783A true CN108971783A (en) 2018-12-11

Family

ID=64501352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710398756.XA Pending CN108971783A (en) 2017-05-31 2017-05-31 Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment

Country Status (1)

Country Link
CN (1) CN108971783A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111055088A (en) * 2019-12-31 2020-04-24 上海齐耀动力技术有限公司 Method for adjusting roundness of tank body of asymmetric outer annular rib pressure vessel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890583A (en) * 2009-11-17 2010-11-24 陕西化建工程有限责任公司 Hydraulic jacking automatic welding inverted construction method of large-sized storage tank
CN102626850A (en) * 2012-04-27 2012-08-08 中国化学工程第四建设有限公司 Installation process for metal oil tank in cave storage
CN203865305U (en) * 2014-05-06 2014-10-08 辽河石油勘探局油田建设工程二公司 Novel oil storage tank of 15 ten thousand cubic meters connected through assembled clamps
CN104843357A (en) * 2014-02-17 2015-08-19 五冶集团上海有限公司 Tank of benzene hydrogenation engineering and manufacturing and mounting method thereof
CN105290573A (en) * 2014-06-17 2016-02-03 中石化南京工程有限公司 Welding method of medium-sized storage tank of 1000m<3>00Cr14Ni14Si4 steel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890583A (en) * 2009-11-17 2010-11-24 陕西化建工程有限责任公司 Hydraulic jacking automatic welding inverted construction method of large-sized storage tank
CN102626850A (en) * 2012-04-27 2012-08-08 中国化学工程第四建设有限公司 Installation process for metal oil tank in cave storage
CN104843357A (en) * 2014-02-17 2015-08-19 五冶集团上海有限公司 Tank of benzene hydrogenation engineering and manufacturing and mounting method thereof
CN203865305U (en) * 2014-05-06 2014-10-08 辽河石油勘探局油田建设工程二公司 Novel oil storage tank of 15 ten thousand cubic meters connected through assembled clamps
CN105290573A (en) * 2014-06-17 2016-02-03 中石化南京工程有限公司 Welding method of medium-sized storage tank of 1000m<3>00Cr14Ni14Si4 steel

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
化学工业部人事教育司,化学工业部教育培训中心组织编写: "《化工检修铆工工艺学》", 30 September 1997 *
徐至钧等: "《大型立式圆柱形储液罐制造与安装》", 31 December 2003 *
瞿洪绪: "《实用铆工手册》", 30 April 1998, 化学工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111055088A (en) * 2019-12-31 2020-04-24 上海齐耀动力技术有限公司 Method for adjusting roundness of tank body of asymmetric outer annular rib pressure vessel
CN111055088B (en) * 2019-12-31 2022-06-07 上海齐耀动力技术有限公司 Method for adjusting roundness of tank body of asymmetric outer annular rib pressure vessel

Similar Documents

Publication Publication Date Title
CN103273281B (en) A kind of construction technology of thin-wall barrel
CN101886401B (en) Segmented assembly component of steel end housings of underwater tunnel immersed segment and construction method
CN106284787B (en) Assembled superimposed sheet is installed and localization method
CN108971783A (en) Large-size stainless steel groove tank tank deck edge pressure ring method of plate installation under hot environment
CN112570998A (en) Manufacturing process method of air cooling pipeline of thermal generator set
CN106270983A (en) A kind of top cover flexibility arc stud welding frock
CN109853850A (en) A kind of assembled architecture steel-structure box steel column and preparation method thereof
US20120169108A1 (en) Cantilevered seat support
CN104295086B (en) Metal frame type fabricated formwork structure
CN104889530B (en) Liner structure for abutting steel pipe and welding method
CN112339930B (en) Three-dimensional modeling and precision control method for ship stem steel casting
CN101870041A (en) Mounting technique for double-deck floating roof structure of large storage tank
CN102059520B (en) Method for manufacturing twisted case
CN103949783B (en) The welding method of extra large work crane cylinder neckline
CN112878861A (en) Method for building window frame of marine cab
CN106112219A (en) A kind of building nonstandard box steel beam column processing method of assembled thin-walled
CN108161364B (en) Processing technology of hyperbolic crankle component
CN105817841B (en) Shape tube forming method
CN108930441A (en) Large-size stainless steel groove tank siding installation method under hot environment
JP5689726B2 (en) Manufacturing apparatus and manufacturing method of overhang molded product
CN108857254B (en) Jig frame for manufacturing ship flow guide pipe
CN108994469A (en) Large-size stainless steel groove tank siding construction anti-deformation method under hot environment
CN108994467A (en) Large-size stainless steel groove tank top layer siding installation method under hot environment
CN108994417A (en) The welding method of large-size stainless steel groove tank siding under hot environment
CN108788618B (en) Assembling tool and assembling method for barrel segmentation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211