CN108952770A - A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting - Google Patents

A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting Download PDF

Info

Publication number
CN108952770A
CN108952770A CN201811160625.9A CN201811160625A CN108952770A CN 108952770 A CN108952770 A CN 108952770A CN 201811160625 A CN201811160625 A CN 201811160625A CN 108952770 A CN108952770 A CN 108952770A
Authority
CN
China
Prior art keywords
portal frame
frame system
side mode
lining cutting
rectangular configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811160625.9A
Other languages
Chinese (zh)
Inventor
谢阿梅
周丹
耿进军
杨仪
彭建辉
徐岩
苏伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Guangzhou Engineering Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
Guangzhou Railway Group Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Railway Group Engineering Co Ltd filed Critical Guangzhou Railway Group Engineering Co Ltd
Priority to CN201811160625.9A priority Critical patent/CN108952770A/en
Publication of CN108952770A publication Critical patent/CN108952770A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention provides mould trolleys outside a kind of slope open trench tunnel rectangular configuration lining cutting, are related to construction equipment technical field.The outer mould trolley of the lining cutting includes template system, portal frame system and cover half dismoulding system;The cross section of portal frame system is in Π shape, the column framework of crossbeam framework and two sides including top;Template system includes the side mode of two sides opposition;Two side modes are located at the inner cavity of portal frame system, and hinged with the top inner wall of portal frame system;Cover half dismoulding system is arranged between template system and portal frame system, is capable of fixing portal frame system and two side modes, and side mode is driven to swing relative to portal frame system.The outer mould trolley of slope open trench tunnel rectangular configuration lining cutting of the invention, it is in the portal frame system of Π shape using cross section, and the side mode of two sides opposition is set, scattered decking and bowl buckle strutting system are broken instead of traditional, rigidity is high, stability is good, it ensure that concrete structure globality and design size requirement, improve construction the degree of automation and construction efficiency.

Description

A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting
Technical field
The present invention relates to construction equipment technical fields, in particular to a kind of slope open trench tunnel rectangular configuration The outer mould trolley of lining cutting.
Background technique
With the progress of the fast lifting and engineering design and construction technology of China's level of urbanization, limited by specific condition The open trench tunnel of system comes into being in high speed railway construction as a kind of Important building constructing structure form.
In existing and traditional technology, slope Rectangular Tunnel side wall and top board construction generally use falsework system System mostly dissipates and breaks decking and bowl buckle strutting system, and this method need to use screw rod through walls, and panel and back cord etc. need to spell piece by piece Installation and dismantling remove, and since side wall and top plate are separately constructed, and flow chart is more, reinforcing support is more, overall appearance is not good enough and construction is existing Difficulty of construction is big when the cross-operation of field.Meanwhile construction efficiency is low, is unfavorable for the waterproofness for improving construction quality, guaranteeing structure Can, and it is difficult to ensure the safety of construction and the control of duration.
So how to improve the structure design of slope open trench tunnel lining trolley, simplifies flow chart and device structure, mentions High construction efficiency, reduction are those skilled in the art's urgent problems to be solved to the interference effect of cross-operation.
Summary of the invention
The purpose of the present invention is to provide mould trolleys outside a kind of slope open trench tunnel rectangular configuration lining cutting, to solve existing skill Flow chart existing for tunnel lining trolley in art is more, it is more to reinforce support, construction efficiency is low, difficulty of construction is big for cross-operation The problems such as.
To achieve the goals above, the invention adopts the following technical scheme:
A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided by the invention, including template system, door frame system System and cover half dismoulding system;The cross section of the portal frame system is in Π shape, the column support of crossbeam framework and two sides including top Structure;The template system includes the side mode of two sides opposition;Two side modes are located at the inner cavity of the portal frame system, and with it is described The top inner wall of portal frame system is hinged;The cover half dismoulding system is arranged between the template system and the portal frame system, It is capable of fixing the portal frame system and two side modes, and the side mode is driven to swing relative to the portal frame system.
Wherein, the entire length of outer mould trolley is preferably designed for 12 meters;And in order to guarantee tunnel clearance, formwork jumbo it is complete Section unilateral side increases 50 millimeters.
Based on the above technical solution, further, the cover half dismoulding system includes door frame lift structure and side mode Top-pushing mechanism;The door frame lift structure is set to the portal frame system lower part, for controlling the lifting of the portal frame system;Institute Side mode top-pushing mechanism is stated between the side mode and the portal frame system, for controlling the swing of the side mode.
Based on the above technical solution, further, the door frame lift structure and the side mode top-pushing mechanism are liquid Compressing cylinder.Hydraulic cylinder driving method allowable stress is larger, and durability is high, and control is slowly steady, and has overload protection Ability.
On the basis of any of the above-described technical solution, further, the cover half dismoulding system further includes door frame supporting device With side mode supporting device;The door frame supporting device is located at the portal frame system periphery, for preventing the portal frame system outside Side slip, the side mode supporting device is arranged between the side mode and the portal frame system, for preventing the side mode to institute State portal frame system translation.
On the basis of any of the above-described technical solution, further, the door frame supporting device and the side mode supporting device For screw rod.Screw rod adjusting is sensitive quick, and jacking resistance is big.
On the basis of any of the above-described technical solution, further, the cover half dismoulding system further includes anchor;It is described The bottom end of two side modes is arranged in anchor.
It further include translation system further on the basis of any of the above-described technical solution;The translation system includes two The top of the portal frame system is arranged in by a horizontal pipe bending cylinder for horizontal pipe bending cylinder, the top of any side mode Portion's inner wall can push the side mode to translate along the width direction of the portal frame system.
It further include reinforcing support further on the basis of any of the above-described technical solution;The reinforcing support is arranged in institute The outside for stating portal frame system, for being fixedly connected with excavation slope.
On the basis of any of the above-described technical solution, further, the portal frame system further includes bottom beam and supporting leg, the bottom Beam is located at the lower end of the column framework, and the supporting leg is uniformly arranged on the lower edge of the bottom beam.
It further include walking mechanism further on the basis of any of the above-described technical solution;The walking mechanism includes guide rail And motor;Supporting leg described in the guide supporting, portal frame system described in the motor driven are mobile relative to the guide rail.
The invention has the following beneficial effects:
The outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided by the invention is in the door frame system of Π shape using cross section System, and the side mode of two sides opposition is set, instead of it is traditional it is scattered break decking and bowl buckle strutting system, rigidity is high, stability is good, It ensure that concrete structure globality and design size requirement, improve construction the degree of automation and construction efficiency.
Additional technical feature and its advantage of the invention will illustrate more obvious in following description content, or pass through Concrete practice of the invention is recognized that.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the specific embodiment of the invention, specific embodiment will be described below Needed in attached drawing be briefly described.It should be evident that the accompanying drawings in the following description is some implementations of the invention Mode for those of ordinary skill in the art without creative efforts, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the section structure signal of the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided in an embodiment of the present invention Figure;
Fig. 2 is after the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided in an embodiment of the present invention removes reinforcing support Side view;
Fig. 3 is that the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided in an embodiment of the present invention is combined with interior mould trolley Section structure diagram;
Fig. 4 is that the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided in an embodiment of the present invention demoulds schematic diagram.
Icon: 1- crossbeam framework;2- column framework;3- side mode;4- door frame lift structure;5- side mode top-pushing mechanism;6- Frame supporting device;7- side mode supporting device;8- anchor;The horizontal pipe bending cylinder of 9-;10- reinforces support;11- bottom beam;12- branch Leg;13- guide rail;14- motor;15- tunnel sidewalls;16- tunnel roof.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
One, DESCRIPTION OF THE PRIOR ART:
In the prior art, slope Rectangular Tunnel side wall 15 and tunnel roof 16 are constructed generally using falsework system System mostly dissipates and breaks decking and bowl buckle strutting system, and this method need to use screw rod through walls, and panel and back cord etc. need to spell piece by piece Installation and dismantling remove, and since side wall and top plate are separately constructed, and flow chart is more, reinforce support more than 10, overall appearance is not good enough and constructs Difficulty of construction is big when live cross-operation.Meanwhile construction efficiency is low, is unfavorable for the waterproof for improving construction quality, guaranteeing structure Performance, and it is difficult to ensure the safety of construction and the control of duration.
Two, technical solution of the present invention is summarized:
The outer mould trolley of slope open trench tunnel rectangular configuration lining cutting provided in this embodiment, including template system, portal frame system With cover half dismoulding system;The cross section of portal frame system is in Π shape, the column framework 2 of crossbeam framework 1 and two sides including top;Mould Plate system includes the side mode 3 of two sides opposition;Two side modes 3 are located at the inner cavity of portal frame system, and the top inner wall with portal frame system Hingedly;Cover half dismoulding system is arranged between template system and portal frame system, is capable of fixing portal frame system and two side modes 3, and Side mode 3 is driven to swing relative to portal frame system.
The technical solution of the outer mould trolley of above-mentioned slope open trench tunnel rectangular configuration lining cutting, can preferably solve the prior art In tunnel lining trolley existing for flow chart it is more, reinforce support more than 10, construction efficiency lowly, difficulty of construction is big for cross-operation The problems such as: be in the portal frame system of Π shape using cross section, and the side mode 3 of two sides opposition be set, instead of it is traditional it is scattered break it is die-filling Plate and bowl buckle strutting system, rigidity is high, stability is good, ensure that concrete structure globality and design size requirement, improves The degree of automation of constructing and construction efficiency.
Three, technical solution of the present invention specific embodiment:
For above-mentioned prior art, below with reference to specific embodiment to skill of the invention Art scheme is further explained explanation:
Present embodiments provide a kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting, in which: Fig. 1 is that the present invention is real The section structure diagram of the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting of example offer is provided;Fig. 2 is the embodiment of the present invention The outer mould trolley of the slope open trench tunnel rectangular configuration lining cutting of offer removes the side view after reinforcing support 10;Fig. 3 is that the present invention is real Apply the section structure diagram that the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting of example offer is combined with interior mould trolley;Fig. 4 Schematic diagram is demoulded for mould trolley outside slope open trench tunnel rectangular configuration lining cutting provided in an embodiment of the present invention.As shown in figures 1-4, The outer mould trolley of slope open trench tunnel rectangular configuration lining cutting includes template system, portal frame system and cover half dismoulding system;Portal frame system Cross section be in Π shape, the column framework 2 of crossbeam framework 1 and two sides including top;Template system includes the side of two sides opposition Mould 3;Two side modes 3 are located at the inner cavity of portal frame system, and hinged with the top inner wall of portal frame system;The setting of cover half dismoulding system exists Between template system and portal frame system, it is capable of fixing portal frame system and two side modes 3, and drive side mode 3 relative to portal frame system It swings.
Wherein, the entire length of outer mould trolley is preferably designed for 12 meters;And in order to guarantee tunnel clearance, formwork jumbo it is complete Section unilateral side increases 50 millimeters.
On the basis of the above embodiments, as shown in Fig. 1,3,4, further, cover half dismoulding system includes door frame lifting Mechanism 4 and side mode top-pushing mechanism 5;Door frame lift structure 4 is set to portal frame system lower part, for controlling the lifting of portal frame system; Side mode top-pushing mechanism 5 is between side mode 3 and portal frame system, for controlling the swing of side mode 3.Wherein, 4 He of door frame lift structure Side mode top-pushing mechanism 5 is hydraulic cylinder.Hydraulic cylinder driving method allowable stress is larger, and durability is high, and control is slowly steady, And there is overload protection ability.
On the basis of the above embodiments, as shown in Fig. 1,3,4, further, cover half dismoulding system further includes door frame branch Hold mechanism 6 and side mode supporting device 7;Door frame supporting device 6 is located at portal frame system periphery, for preventing portal frame system from breakking away outward It moves, side mode supporting device 7 is arranged between side mode 3 and portal frame system, for preventing side mode 3 from translating to portal frame system.Wherein, door Frame supporting device 6 and side mode supporting device 7 are screw rod.Screw rod adjusting is sensitive quick, and jacking resistance is big.
On the basis of the above embodiments, as shown in Fig. 1,3,4, further, cover half dismoulding system further includes anchoring dress Set 8;The bottom end of two side modes 3 is arranged in anchor 8.Keep the concrete formation poured completely beautiful.
It on the basis of the above embodiments, as shown in Figure 1,2,3, 4, further, further include translation system;Translation system Including two horizontal pipe bending cylinders 99, portal frame system is arranged in by a horizontal pipe bending cylinder 99 in the top of any side mode 3 Top inner wall can push side mode 3 to translate along the width direction of portal frame system.Translation system can adjust the lining cutting of template system Center and the centering of tunnel center, and control the lining thickness of side wall.
On the basis of the above embodiments, as shown in Figure 1, further including reinforcing support 10 further;Support 10 is reinforced to set It sets in the outside of portal frame system, for being fixedly connected with excavation slope.After fixed portal frame system and template system, support 10 is reinforced Firmly outer mould trolley can be fixed in tunnel foundation pit, guarantee the positioning and sizing in tunnel.
On the basis of the above embodiments, as shown in Figure 1,2,3, 4, further, portal frame system further includes 11 He of bottom beam Supporting leg 12, bottom beam 11 are located at the lower end of column framework 2, and supporting leg 12 is uniformly arranged on the lower edge of bottom beam 11.
It on the basis of the above embodiments, as shown in Figure 1,2,3, 4, further, further include walking mechanism;Walking mechanism Including guide rail 13 and motor 14;13 support leg 12 of guide rail, motor 14 drive portal frame system mobile relative to guide rail 13.Due to tunnel Road normal length is big, and the length dimension of outer mould trolley is smaller, it is impossible to which primary concreting is complete, utilizes guide rail 13 and motor 14, it can be poured one by one along length of tunnel direction, while reducing the construction infection of cross-operation.According to the design needs with actually apply Work experience, the travel speed of walking mechanism are designed as 6.7 meters per minute.Wherein, the spacing of two guide rails 13 is 8000 millimeters.
Using the construction of mould trolley outside above-mentioned slope open trench tunnel rectangular configuration lining cutting, wherein outer mould trolley is in place It is as follows with fixed construction process:
1, walking mechanism is in place
Each two sets of external mold hydraulic jumbo principal and subordinate's walking mechanism, they are hinged on column framework 2.Main walking mechanism is by Y type After motor 14 drives primary gear speed reducing, then slow down by two-stage chain, walking wheel diameter is Φ 350mm, trolley walking surface need Hardening is smooth using the compacting of mud knot rubble, guarantees height error in 5cm, rail is that 43kg/m simple guide rail frame 13 is (convenient It is mobile), sleeper is channel steel 20#, and for interorbital away from according to depending on tunnel cross-section size, motor 14 selects 7.5KW two.Trolley design The speed of travel about 6.7m/min.
2, outer mould trolley is in place
Outer mould trolley is aligned, and outer mould trolley is first reached lower ring construction location, further according to the data that measurement is told somebody what one's real intentions are, is led to It crosses and is supported on the horizontal direction oil cylinder of door frame side below the crossbeam pedestal to adjust the lining cutting center of template and the centering of tunnel center, it is left Right range-adjustable 17cm;The vertical positioning of template is adjusted by the contraction for the door frame lift structure 4 being connected with avris column, Upper and lower range-adjustable 300mm;Template is adjusted by the side mode top-pushing mechanism 5 that is mounted on door frame and side mode supporting device 7 Position.
3, outer mould trolley is reinforced
Side mode 3 is reinforced after contraposition is accurate, passes through door frame supporting device 6, side mode top-pushing mechanism 5, side mode supporting device 7 And reinforce 10 pairs of trolley formworks of support and reinforce, 3 bottom of side mode is fastened by anchor 8, the walking stringer of side mode 3 Locate the necessary firm support of support screw over the ground on ground.
Illustrate: outer mould trolley reaches in next operation section and outer mould trolley should be polished, and coating release agent.
The outer mould trolley of above-mentioned slope open trench tunnel rectangular configuration lining cutting and its construction scattered break decking with traditional Compare with bowl buckle strutting system and its construction method, has the advantage that
1, rectangle external mold hydraulic lining trolley is high using overall steel modular system rigidity, stability is good, ensure that concrete knot Structure globality and structure size meet design requirement, also ensure that concrete appearance is closely knit, beautiful.
2, outer mould trolley operating automation degree is high, and it is whole that the walking of rectangle external mold hydraulic lining trolley is all made of motor 14 Driving, cover half, demoulding are automatically controlled using hydraulic cylinder, and easy to operate, process is simple, and labor intensity is low, reduce it is artificial and Lifting machine cost;Trolley the whole series are fixed automatically at mould, are reduced the materials such as temporary support in conventional method, have been saved and be constructed into This, and be conducive to keep live civilization clean and tidy.
3, work efficiency is high, and rectangle external mold hydraulic lining trolley is to support large-scale steel structure mould with combined steel structure door frame Plate system, using electric walking, speed of travel 6.7m/min, in place and reinforcing is fast and convenient, and formwork reinforcement is not required to construction and wears Wall screw rod avoids the hidden danger using the easy leak in wall-through pull rod position.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting, which is characterized in that including template system, portal frame system and Cover half dismoulding system;
The cross section of the portal frame system is in Π shape, the column framework of crossbeam framework and two sides including top;The template system System includes the side mode of two sides opposition;Two side modes are located at the inner cavity of the portal frame system, and the top with the portal frame system Portion's inner wall is hinged;
The cover half dismoulding system is arranged between the template system and the portal frame system, is capable of fixing the portal frame system With two side modes, and the side mode is driven to swing relative to the portal frame system.
2. the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting according to claim 1, which is characterized in that the cover half Dismoulding system includes door frame lift structure and side mode top-pushing mechanism;
The door frame lift structure is set to the portal frame system lower part, for controlling the lifting of the portal frame system;The side Mould top-pushing mechanism is between the side mode and the portal frame system, for controlling the swing of the side mode.
3. the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting according to claim 2, which is characterized in that the door frame Elevating mechanism and the side mode top-pushing mechanism are hydraulic cylinder.
4. the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting according to claim 2, which is characterized in that the cover half Dismoulding system further includes door frame supporting device and side mode supporting device;
The door frame supporting device is located at the portal frame system periphery, described for preventing the outside side slip of the portal frame system Side mode supporting device is arranged between the side mode and the portal frame system, for preventing the side mode flat to the portal frame system It moves.
5. the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting according to claim 2, which is characterized in that the door frame Supporting device and the side mode supporting device are screw rod.
6. the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting according to claim 2, which is characterized in that the cover half Dismoulding system further includes anchor;The bottom end of two side modes is arranged in the anchor.
7. the outer mould trolley of described in any item slope open trench tunnel rectangular configuration lining cutting, feature exist according to claim 1~6 In further including translation system;The translation system includes two horizontal pipe bending cylinders, and the top of any side mode passes through one The top inner wall of the portal frame system is arranged in the horizontal pipe bending cylinder, and the side mode can be pushed along the portal frame system Width direction translation.
8. the outer mould trolley of described in any item slope open trench tunnel rectangular configuration lining cutting, feature exist according to claim 1~6 In, further include reinforce support;The outside for reinforcing support and the portal frame system being set, for being fixedly connected with excavation slope.
9. the outer mould trolley of described in any item slope open trench tunnel rectangular configuration lining cutting, feature exist according to claim 1~6 In the portal frame system further includes bottom beam and supporting leg, and the bottom beam is located at the lower end of the column framework, and the supporting leg is uniformly set Set the lower edge in the bottom beam.
10. the outer mould trolley of slope open trench tunnel rectangular configuration lining cutting according to claim 9, which is characterized in that further include Walking mechanism;The walking mechanism includes guide rail and motor;Supporting leg described in the guide supporting, door frame described in the motor driven System is mobile relative to the guide rail.
CN201811160625.9A 2018-09-30 2018-09-30 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting Pending CN108952770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811160625.9A CN108952770A (en) 2018-09-30 2018-09-30 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811160625.9A CN108952770A (en) 2018-09-30 2018-09-30 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting

Publications (1)

Publication Number Publication Date
CN108952770A true CN108952770A (en) 2018-12-07

Family

ID=64472530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811160625.9A Pending CN108952770A (en) 2018-09-30 2018-09-30 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting

Country Status (1)

Country Link
CN (1) CN108952770A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513125A (en) * 2019-09-24 2019-11-29 中铁八局集团第四工程有限公司 Inside and outside mould trolley shoring system for open cut closed conduit
CN113250716A (en) * 2021-06-22 2021-08-13 四川公路桥梁建设集团有限公司 Open-cut tunnel overhaul cavern lining rapid construction method
CN113982258A (en) * 2021-11-08 2022-01-28 广东省水利水电第三工程局有限公司 Portal template structure and template system
CN115162406A (en) * 2022-08-04 2022-10-11 广东省水利水电第三工程局有限公司 Whole template portal suitable for box culvert structure

Citations (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996026337A1 (en) * 1995-02-23 1996-08-29 Paschal-Werk G. Maier Gmbh Formwork with a haunch formwork element
KR20040019818A (en) * 2002-08-30 2004-03-06 주식회사 토암건설 Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
JP2004124641A (en) * 2002-10-07 2004-04-22 Techno Pro Kk Outer form for tunnel entrance, and construction method of tunnel entrance using the same
CN201460910U (en) * 2009-07-27 2010-05-12 中铁二局股份有限公司 Dedicated lining jumbo for open-excavated tunnels
KR20110013079A (en) * 2009-08-01 2011-02-09 삼부토건주식회사 Formwork for continuous structure construction with self-propelled bogie and method of construction of continuous structure using the formwork
CN202810870U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Combined type template trolley for box culvert lining
CN103016028A (en) * 2012-12-06 2013-04-03 长沙进军机械有限公司 Hydraulic self-propelled steel form carrier for tunnel secondary lining operation
CN103615264A (en) * 2013-11-26 2014-03-05 华北水利水电大学 Desert conduit two-casting type steel form trolley and casting method
CN203702180U (en) * 2014-03-04 2014-07-09 张进军 Single-track railway outer mold tunnel trolley
CN104564104A (en) * 2014-12-17 2015-04-29 张进军 Trolley system used for tunnel lining
CN204371360U (en) * 2014-12-09 2015-06-03 中铁十二局集团有限公司 A kind of chassis for the construction of cut-and-cover tunnel concrete pouring
CN204402501U (en) * 2014-12-17 2015-06-17 张进军 A kind ofly hang die device for tunnel lining
CN204457802U (en) * 2014-12-31 2015-07-08 上海市机械施工集团有限公司 Formed by integrally casting formula formwork jumbo
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN105221166A (en) * 2015-10-23 2016-01-06 中铁五局集团第一工程有限责任公司 Upstriker large span contains tunnel outer mould liner platform building cart
CN205100999U (en) * 2015-11-16 2016-03-23 湖南五新隧道智能装备股份有限公司 A lining cutting platform truck that is used for external mold platform truck of open cut tunnel lining cutting and contains this external mold platform truck
CN105673048A (en) * 2016-03-17 2016-06-15 福建省海湾桥隧机械有限公司 Novel self-propelled hydraulic box culvert and tunnel trolley
CN106089253A (en) * 2016-08-17 2016-11-09 中国路桥工程有限责任公司 A kind of all-hydraulic template system poured for culvert
CN205805577U (en) * 2016-03-30 2016-12-14 中国水利水电第四工程局有限公司 A kind of arch wall type open cut tunnel chassis
CN205936645U (en) * 2016-08-17 2017-02-08 中国路桥工程有限责任公司 A full liquid die plate system for culvert is pour
CN206386132U (en) * 2017-01-12 2017-08-08 李晓真 Tunnel casting concrete quick template supporting stripper apparatus
CN107060831A (en) * 2017-06-09 2017-08-18 中建八局第建设有限公司 One kind is used for tunnel groove constructing device
CN206681036U (en) * 2017-04-05 2017-11-28 中铁四局集团路桥工程有限公司 The adaptive gradient gate-type end-blocking plate device of frame structure piping lane
CN206830194U (en) * 2017-04-27 2018-01-02 湖南五新隧道智能装备股份有限公司 A kind of lining trolley
CN206971264U (en) * 2016-12-19 2018-02-06 中铁第五勘察设计院集团有限公司 A kind of Urban Underground pipe gallery rapid construction equipment
KR101844977B1 (en) * 2016-12-14 2018-04-03 최명철 Scaffolding frame for tunnel
CN207700067U (en) * 2017-12-22 2018-08-07 四川路桥华东建设有限责任公司 A kind of packaged type box culvert construct trolley
CN108442405A (en) * 2018-04-11 2018-08-24 中建三局第二建设工程有限责任公司 A kind of piping lane support construction based on Urban Underground pipe gallery
CN207812486U (en) * 2017-09-29 2018-09-04 上海二十冶建设有限公司 Variable moveable electric power pipe trench encapsulates erecting device
CN209067224U (en) * 2018-09-30 2019-07-05 中铁六局集团有限公司 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting

Patent Citations (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996026337A1 (en) * 1995-02-23 1996-08-29 Paschal-Werk G. Maier Gmbh Formwork with a haunch formwork element
KR20040019818A (en) * 2002-08-30 2004-03-06 주식회사 토암건설 Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
JP2004124641A (en) * 2002-10-07 2004-04-22 Techno Pro Kk Outer form for tunnel entrance, and construction method of tunnel entrance using the same
CN201460910U (en) * 2009-07-27 2010-05-12 中铁二局股份有限公司 Dedicated lining jumbo for open-excavated tunnels
KR20110013079A (en) * 2009-08-01 2011-02-09 삼부토건주식회사 Formwork for continuous structure construction with self-propelled bogie and method of construction of continuous structure using the formwork
CN202810870U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Combined type template trolley for box culvert lining
CN103016028A (en) * 2012-12-06 2013-04-03 长沙进军机械有限公司 Hydraulic self-propelled steel form carrier for tunnel secondary lining operation
CN103615264A (en) * 2013-11-26 2014-03-05 华北水利水电大学 Desert conduit two-casting type steel form trolley and casting method
CN203702180U (en) * 2014-03-04 2014-07-09 张进军 Single-track railway outer mold tunnel trolley
CN204371360U (en) * 2014-12-09 2015-06-03 中铁十二局集团有限公司 A kind of chassis for the construction of cut-and-cover tunnel concrete pouring
CN104564104A (en) * 2014-12-17 2015-04-29 张进军 Trolley system used for tunnel lining
CN204402501U (en) * 2014-12-17 2015-06-17 张进军 A kind ofly hang die device for tunnel lining
CN204457802U (en) * 2014-12-31 2015-07-08 上海市机械施工集团有限公司 Formed by integrally casting formula formwork jumbo
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN105221166A (en) * 2015-10-23 2016-01-06 中铁五局集团第一工程有限责任公司 Upstriker large span contains tunnel outer mould liner platform building cart
CN205100999U (en) * 2015-11-16 2016-03-23 湖南五新隧道智能装备股份有限公司 A lining cutting platform truck that is used for external mold platform truck of open cut tunnel lining cutting and contains this external mold platform truck
CN105673048A (en) * 2016-03-17 2016-06-15 福建省海湾桥隧机械有限公司 Novel self-propelled hydraulic box culvert and tunnel trolley
CN205805577U (en) * 2016-03-30 2016-12-14 中国水利水电第四工程局有限公司 A kind of arch wall type open cut tunnel chassis
CN106089253A (en) * 2016-08-17 2016-11-09 中国路桥工程有限责任公司 A kind of all-hydraulic template system poured for culvert
CN205936645U (en) * 2016-08-17 2017-02-08 中国路桥工程有限责任公司 A full liquid die plate system for culvert is pour
KR101844977B1 (en) * 2016-12-14 2018-04-03 최명철 Scaffolding frame for tunnel
CN206971264U (en) * 2016-12-19 2018-02-06 中铁第五勘察设计院集团有限公司 A kind of Urban Underground pipe gallery rapid construction equipment
CN206386132U (en) * 2017-01-12 2017-08-08 李晓真 Tunnel casting concrete quick template supporting stripper apparatus
CN206681036U (en) * 2017-04-05 2017-11-28 中铁四局集团路桥工程有限公司 The adaptive gradient gate-type end-blocking plate device of frame structure piping lane
CN206830194U (en) * 2017-04-27 2018-01-02 湖南五新隧道智能装备股份有限公司 A kind of lining trolley
CN107060831A (en) * 2017-06-09 2017-08-18 中建八局第建设有限公司 One kind is used for tunnel groove constructing device
CN207812486U (en) * 2017-09-29 2018-09-04 上海二十冶建设有限公司 Variable moveable electric power pipe trench encapsulates erecting device
CN207700067U (en) * 2017-12-22 2018-08-07 四川路桥华东建设有限责任公司 A kind of packaged type box culvert construct trolley
CN108442405A (en) * 2018-04-11 2018-08-24 中建三局第二建设工程有限责任公司 A kind of piping lane support construction based on Urban Underground pipe gallery
CN209067224U (en) * 2018-09-30 2019-07-05 中铁六局集团有限公司 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘翔;: "超长大跨涵隧内、外模台车设计与施工技术", 企业技术开发, no. 02 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513125A (en) * 2019-09-24 2019-11-29 中铁八局集团第四工程有限公司 Inside and outside mould trolley shoring system for open cut closed conduit
CN110513125B (en) * 2019-09-24 2023-11-03 中铁八局集团建筑工程有限公司 Inner and outer mould trolley lining system for open cut underdrain
CN113250716A (en) * 2021-06-22 2021-08-13 四川公路桥梁建设集团有限公司 Open-cut tunnel overhaul cavern lining rapid construction method
CN113982258A (en) * 2021-11-08 2022-01-28 广东省水利水电第三工程局有限公司 Portal template structure and template system
CN115162406A (en) * 2022-08-04 2022-10-11 广东省水利水电第三工程局有限公司 Whole template portal suitable for box culvert structure
CN115162406B (en) * 2022-08-04 2023-11-28 广东省水利水电第三工程局有限公司 Integral template portal suitable for box culvert structure

Similar Documents

Publication Publication Date Title
CN108952770A (en) A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting
CN105908777B (en) A kind of pipe gallery sliding mould and its application method
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN110076889B (en) Full-section integral prefabricated immersed tube template system adopting dry dock sequential method
CN109403374A (en) Factorial construction method for open trench tunnel integral tunnel lining
CN110185476B (en) Pouring system for full-section concrete of circular tunnel
CN103967050A (en) Construction system of subway station
CN109113765A (en) A kind of Rectangular Tunnel lining template trolley for baffle and its construction
CN101363224A (en) Mobile Foundation Pit Support System and Construction Method
CN110513125A (en) Inside and outside mould trolley shoring system for open cut closed conduit
CN108687950A (en) A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating
CN113417219B (en) Hydraulic internal mold asynchronous traveling system and method for bridge suspension casting basket box chamber
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN205112063U (en) Integral hydraulic pressure exterior sheathing of precast box girder
CN110904969A (en) High steep slope slab corridor structure concrete placement slipform system
CN108915730A (en) A kind of open trench tunnel rectangular configuration lining template trolley for baffle system
CN209067225U (en) A kind of Rectangular Tunnel lining template trolley for baffle
CN209067224U (en) A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting
CN216305944U (en) Template trolley system suitable for construction of small-section double-bin underground excavation tunnel lining
CN202017493U (en) Construction equipment for inverted arch of high-speed railway double-track tunnel
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN208831022U (en) A kind of open trench tunnel rectangular configuration lining template trolley for baffle system
CN108625883B (en) Anchor section trolley for secondary lining construction of tunnel and construction method
CN109914476A (en) Construction process of cast-in-place urban comprehensive pipe gallery
CN109594581A (en) Cross a river segment pipe structure and its installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181227

Address after: 100036 Wanshou Road, Haidian District, Beijing, No. 2

Applicant after: CHINA RAILWAY SIXTH GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY SIXTH GROUP GUANGZHOU ENGINEERING Co.,Ltd.

Address before: 511400 Unit 101, Building 18, Tian'an Headquarters Center, 555 North Panyu Avenue, Donghuan Street, Panyu District, Guangzhou City, Guangdong Province

Applicant before: CHINA RAILWAY SIXTH GROUP GUANGZHOU ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207