CN108951424A - The formwork support structure and construction method that bridge suspension type pours - Google Patents

The formwork support structure and construction method that bridge suspension type pours Download PDF

Info

Publication number
CN108951424A
CN108951424A CN201810746091.1A CN201810746091A CN108951424A CN 108951424 A CN108951424 A CN 108951424A CN 201810746091 A CN201810746091 A CN 201810746091A CN 108951424 A CN108951424 A CN 108951424A
Authority
CN
China
Prior art keywords
formwork
support
existing
beam body
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810746091.1A
Other languages
Chinese (zh)
Inventor
罗利
王侨
刘建亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201810746091.1A priority Critical patent/CN108951424A/en
Publication of CN108951424A publication Critical patent/CN108951424A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of formwork support structure that bridge suspension type pours and construction methods, supplement pouring for the gap between two parallel existing beam bodies and newly pours beam body, including end template and support group frame, the evenly spaced support group frame of several groups is provided between two existing beam bodies;Every group of support group frame includes the upper supporting beam being parallel to each other and lower supporting beam, and the both ends of upper supporting beam are respectively supported in two existing beam bodies, and lower supporting beam is located at bridge lower part, and is fixed in upper supporting beam by pull rod suspension;What end template integrally closed was intended pouring newly pours the lower part of beam body, and is supported jointly by the lower supporting beam of all support group framves.So that supplement pour that beam body is no longer limited by existing full hall support frame set up condition, have that occupied area is small, at low cost, short time limit, periphery natural conditions required with low, the advantages that security risk is easier to control.

Description

桥梁悬吊式浇筑的模板支撑结构及施工方法Formwork Support Structure and Construction Method for Suspension Casting of Bridges

技术领域technical field

本发明属于建筑施工技术领域,特别涉及一种桥梁悬吊式浇筑的模板支撑结构及施工方法。The invention belongs to the technical field of building construction, and in particular relates to a formwork support structure and a construction method for suspended pouring of bridges.

背景技术Background technique

随着城市的扩张和发展,很多现有的一些桥梁需要进行改造或加固处理,以适应不断增加的超设计负荷的车流量。比如,在实践中大量存在这样的使用中的城市桥梁:桥的两侧为车行道,中间为相对较宽的绿化带,但是,随着城市车辆的大幅增加,现有的左右车行道已不能满足通行要求,于是,很多城市管理者会将中间的绿化带加以改造,以增加两侧的车行道。但改造会面对很多棘手的问题,因为原来的施工中,桥梁的中间绿化带下没有设置有和车行道下部一样的梁体,而是只设计了支撑在两侧车行道梁体上的预制板,当然预制板已经足以支撑原来的绿化重量,也满足相关的标准,但是,如果需要改造成车行道,却并不足以满足需求和相关保准,所以必须在相应的位置进行补充浇筑梁体,以达到相应的使用要求。With the expansion and development of the city, many existing bridges need to be modified or reinforced to adapt to the ever-increasing traffic flow exceeding the design load. For example, in practice, there are a large number of such urban bridges in use: the two sides of the bridge are roadways, and the middle is a relatively wide green belt. However, with the substantial increase of urban vehicles, the existing left and right roadways It can no longer meet the traffic requirements, so many city managers will transform the green belt in the middle to increase the roadways on both sides. However, the reconstruction will face many difficult problems, because in the original construction, the same beam body as the lower part of the roadway was not installed under the green belt in the middle of the bridge, but only supported on the beam body of the roadway on both sides. Of course, the prefabricated slab is enough to support the original greening weight and meet the relevant standards. However, if it needs to be transformed into a roadway, it is not enough to meet the demand and related standards, so supplementary pouring must be carried out at the corresponding position Beam body, in order to meet the corresponding use requirements.

如果采用传统现浇梁体施工,必须搭设满堂支撑架的方式进行,但满堂支撑架必须具备相应的桥底支撑条件,架体对下部的地基要求很高,并且存在施工成本高,工期长,各类安全风险突出,安全管控难度大等缺点。If the traditional cast-in-place girder is used for construction, it must be carried out by erecting a full hall support frame, but the full hall support frame must have the corresponding bridge bottom support conditions. The frame body has high requirements for the foundation below, and there are high construction costs and long construction periods. All kinds of security risks are prominent, security management and control are difficult and other shortcomings.

发明内容Contents of the invention

本发明的目的在于:针对上述现有技术存在的问题和困难,提供了一种一种桥梁悬吊式浇筑的模板支撑结构及施工方法,使得补充浇筑梁体不再受限于现有满堂支撑架的搭设条件,具有广泛的适应性。The object of the present invention is to provide a formwork support structure and construction method for suspended casting of bridges in view of the problems and difficulties in the above-mentioned prior art, so that the supplementary pouring beam body is no longer limited by the existing full support The erection conditions of the frame have wide adaptability.

本发明的技术方案是这样实现的:一种桥梁悬吊式浇筑的模板支撑结构,用于在两根平行的现有梁体之间的间隙进行补充浇筑新浇梁体,包括底模板和支撑组架,在所述两根现有梁体之间设置有若干组均匀间隔的支撑组架;每组支撑组架均包括相互平行的上支撑梁和下支撑梁,上支撑梁的两端分别支撑在两根现有梁体上,下支撑梁位于桥梁下部,并通过拉杆悬挂固定在上支撑梁上;底模板整体封闭拟浇筑的新浇梁体的下部,并由所有支撑组架的下支撑梁共同支撑。The technical solution of the present invention is achieved in the following way: a formwork support structure for suspended casting of bridges, used for supplementary pouring of new beams in the gap between two parallel existing beams, including a bottom formwork and a supporting frame , between the two existing beams, several groups of evenly spaced supporting frames are arranged; each group of supporting frames includes an upper supporting beam and a lower supporting beam parallel to each other, and the two ends of the upper supporting beam are respectively supported on two On the existing beam body, the lower support beam is located at the lower part of the bridge, and is suspended and fixed on the upper support beam by tie rods; the bottom formwork is integrally closed to the lower part of the newly poured beam body to be poured, and is supported by all the lower support beams of the supporting frame .

本发明所述的桥梁悬吊式浇筑的模板支撑结构,所述每组支撑组架的上支撑梁和下支撑梁之间设置有2根以上的拉杆。In the formwork support structure for suspended casting of bridges according to the present invention, more than two tie rods are arranged between the upper support beams and the lower support beams of each group of support frames.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,所述底模板和下支撑梁之间还设置有若干辅助纵向梁,用于直接承载底模板上的负重。In the formwork support structure for suspended casting of bridges according to the present invention, several auxiliary longitudinal beams are arranged between the bottom formwork and the lower support beams for directly bearing the load on the bottom formwork.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,所述拉杆通过在底模板上预设的孔洞穿出底模板,并且每根拉杆均套设有留置管,留置管的长度不小于新浇梁体的厚度,用于完成浇筑后,拉杆从留置管中取出。In the formwork support structure for suspended casting of bridges according to the present invention, the tie rods pass through the bottom formwork through preset holes on the bottom formwork, and each tie rod is equipped with an indwelling tube, the length of which is not less than the new The thickness of the poured beam body, used to remove the tie rods from the indwelling tube after pouring is completed.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,所述两侧的现有梁体上沿纵向分别设置有承载纵梁,所述支撑组架的上支撑梁的两端直接支撑于承载纵梁上。In the formwork support structure for suspended casting of bridges according to the present invention, the existing beam bodies on both sides are respectively provided with load-bearing longitudinal beams along the longitudinal direction, and the two ends of the upper support beam of the support group are directly supported on the load-bearing beams. on the stringer.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,所述每组支撑组架的上支撑梁两端分别通过一个顶托支撑在两侧的现有梁体上。In the formwork support structure for suspended casting of bridges according to the present invention, the two ends of the upper support beams of each group of support frames are respectively supported on the existing beam bodies on both sides by a jacking bracket.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,单侧的所有顶托通过沿纵向布置的纵向连接钢管和管夹进行固定。两侧的纵向连接钢管通过均匀间隔的若干横向连接钢管和管夹进行连接。In the formwork supporting structure of the suspended casting of the bridge according to the present invention, all jacking brackets on one side are fixed by longitudinally connecting steel pipes and pipe clamps arranged in the longitudinal direction. The longitudinally connected steel pipes on both sides are connected by a number of evenly spaced horizontally connected steel pipes and pipe clamps.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,在所述新浇梁体的中心沿纵向设置有一根大口径pvc管,在纵向的钢筋笼中预留了大口径pvc管的容纳通孔。In the formwork supporting structure of bridge suspended casting according to the present invention, a large-diameter pvc pipe is arranged longitudinally in the center of the newly poured beam body, and a large-diameter pvc pipe is reserved in the longitudinal reinforcement cage. hole.

本发明所述的桥梁悬吊式浇筑的模板支撑结构,所述支撑组架的上支撑梁和下支撑梁上设置有对应的上孔和下孔,所述拉杆的两端均设置有螺纹,拉杆通过配套的螺母将上支撑梁和下支撑梁进行连接。In the formwork support structure for suspended casting of the bridge according to the present invention, the upper support beam and the lower support beam of the supporting frame are provided with corresponding upper holes and lower holes, and both ends of the tie rods are provided with threads, The pull rod connects the upper support beam and the lower support beam through matching nuts.

一种桥梁悬吊式浇筑的施工方法,所述施工方法的具体步骤为:A construction method for suspended pouring of bridges, the specific steps of the construction method are:

S1:拆除现状桥面绿化分隔带,对新浇梁体部位进行现状预制盖板破除,并对新浇梁体两侧的现有梁体的表面进行清理;S1: Remove the current green separation belt on the bridge deck, remove the existing prefabricated cover plate on the newly poured beam body, and clean the surface of the existing beam body on both sides of the newly poured beam body;

S2:在两侧的现有梁体上沿桥梁纵向安装承载纵梁;S2: install load-bearing longitudinal beams along the longitudinal direction of the bridge on the existing beam bodies on both sides;

S3:支撑组架的装配,采用H型钢截取上支撑梁和下支撑梁,并分别在上支撑梁上开设两个上孔,在下支撑梁上开设两个对应于上孔的下孔,然后将两根带螺纹的拉杆穿入留置管,将拉杆两端分别穿入上支撑梁的上孔和下支撑梁的下孔中,在拉杆两端旋入螺母,完成支撑组价的组装;S3: Assembling the support frame, the upper support beam and the lower support beam are intercepted by H-shaped steel, and two upper holes are respectively opened on the upper support beam, and two lower holes corresponding to the upper holes are opened on the lower support beam, and then the Two threaded tie rods are inserted into the indwelling tube, and the two ends of the tie rods are respectively inserted into the upper hole of the upper support beam and the lower hole of the lower support beam, and nuts are screwed into the two ends of the tie rods to complete the assembly of the support assembly;

S4:支撑组架的安装,在S3中完成若干组支撑组架的装配后,将支撑组架在新浇梁体上方顺着新浇梁体的纵向放入两侧的现有梁体之间,待支撑梁低于现有梁体时,旋转支撑组架,使得上支撑梁的两端垂直支撑在承载纵梁上;并按此方法完成所有支撑组架均匀间隔的安装;S4: The installation of the supporting frame. After completing the assembly of several groups of supporting frames in S3, place the supporting frame above the newly poured beam body along the longitudinal direction of the newly poured beam body between the existing beams on both sides. When the support beam is lower than the existing beam body, rotate the support frame so that the two ends of the upper support beam are vertically supported on the load-bearing longitudinal beam; and complete the installation of all support frames evenly spaced according to this method;

S5:在所有支撑组架的下支撑梁上安装辅助纵向梁;S5: Install auxiliary longitudinal beams on the lower support beams of all supporting frames;

S6:底模板的安装,每一段新浇梁体处,在横向上至少通过3块底模板拼接,并且总体宽度大于新浇梁体的底边宽度,两侧底模板的外侧设置有与拉杆对应的开口,开口的宽度与拉杆的直径相等,相邻开口的间距与相邻支撑组架的间距相等;将两侧底模板的开口卡入到对应的拉杆中,完成两侧底模板安装后,再将中间底模板安装在两侧底模板之间,以完成所有底模板的安装;S6: The installation of the bottom formwork, each section of the newly poured beam body is spliced by at least 3 bottom formworks in the horizontal direction, and the overall width is greater than the bottom edge width of the newly poured beam body. The width of the opening is equal to the diameter of the tie rod, and the distance between adjacent openings is equal to the distance between adjacent supporting frames; snap the openings of the bottom formwork on both sides into the corresponding tie rods, and after the installation of the bottom formwork on both sides is completed, Then install the middle bottom formwork between the bottom formworks on both sides to complete the installation of all bottom formworks;

S7:完成底模板的安装后,调整拉杆位于上支撑杆上的螺栓,以调整底模板的水平高度,使得底模板与两侧现有梁体底部紧密接触;S7: After the installation of the bottom formwork is completed, adjust the bolts on the upper support rod of the pull rod to adjust the horizontal height of the bottom formwork so that the bottom formwork is in close contact with the bottom of the existing beams on both sides;

S8:在底模板上完成钢筋笼的绑扎后,进行新浇梁体的浇筑;S8: After the binding of the reinforcement cage is completed on the bottom formwork, the pouring of the new beam body is carried out;

S9:新浇梁体的养护,拆模,施工完成。S9: The maintenance of the newly poured beam body, demolition of the formwork, and the construction is completed.

本发明的有益效果是:通过引入桥梁悬吊式浇筑的模板支撑结构及施工方法,使得补充浇筑梁体不再受限于现有满堂支撑架的搭设条件,特别是不再受桥下地基条件的限制,具有占地面积小、成本低、工期短,对周边自然条件要求低,安全风险较易管控等优点,因此,对于小规模现浇梁体施工,采用模板支撑结构施工,是很有必要的,并具备十分广阔的推广前景。The beneficial effects of the present invention are: by introducing the formwork support structure and construction method of bridge suspended pouring, the supplementary pouring beam body is no longer limited by the erection conditions of the existing full hall support frame, especially not by the foundation conditions under the bridge. It has the advantages of small footprint, low cost, short construction period, low requirements on surrounding natural conditions, and easy control of safety risks. Therefore, for small-scale cast-in-place beam construction, it is very useful to use formwork support structure construction Necessary, and has very broad prospects for promotion.

附图说明Description of drawings

图1为实施例1的横向剖视图;Fig. 1 is the transverse sectional view of embodiment 1;

图2为实施例2的横向剖视图;Fig. 2 is the lateral sectional view of embodiment 2;

图3为实施例2中顶托的工作状态图;Fig. 3 is the working status diagram of jacking in embodiment 2;

图4为实施例2中顶托与纵向连接钢管和横向连接钢管的连接示意图。Fig. 4 is a schematic diagram of the connection between the jacking and the longitudinally connected steel pipes and transversely connected steel pipes in Embodiment 2.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明技术进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the technology of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

实施例1Example 1

如图1所示,桥梁悬吊式浇筑的模板支撑结构,用于在两根平行的现有梁体1之间的间隙进行补充浇筑新浇梁体2,所述模板支撑结构包括底模板3和支撑组架4,在所述两根现有梁体1之间设置有若干组均匀间隔的支撑组架4;每组支撑组架4均包括相互平行的上支撑梁41和下支撑梁42,上支撑梁41的两端分别支撑在两根现有梁体1上,下支撑梁42位于桥梁下部,并通过拉杆43悬挂固定在上支撑梁41上;底模板3整体封闭拟浇筑的新浇梁体2的下部,并由所有支撑组架4的下支撑梁42共同支撑。As shown in Fig. 1, the formwork supporting structure of bridge suspended casting is used for supplementary pouring of new pouring beams 2 in the gap between two parallel existing beams 1, and the formwork supporting structure includes a bottom formwork 3 and supporting frame 4, several groups of evenly spaced supporting frame 4 are arranged between the two existing beam bodies 1; each group of supporting frame 4 includes an upper supporting beam 41 and a lower supporting beam 42 parallel to each other , the two ends of the upper support beam 41 are respectively supported on two existing beam bodies 1, the lower support beam 42 is located at the lower part of the bridge, and is suspended and fixed on the upper support beam 41 by a tie rod 43; Cast the bottom of the beam body 2, and be jointly supported by the lower support beams 42 of all support groups 4.

所述每组支撑组架4的上支撑梁41和下支撑梁42之间设置有2根以上的拉杆43,本实施例设置了两根拉杆43,并靠新浇梁体2的两侧布置,如果两侧现有梁体1之间的间距较大时,则需要加密布置拉杆43。所述支撑组架4的上支撑梁41和下支撑梁42上设置有对应的上孔411和下孔421,所述拉杆43的两端均设置有螺纹,拉杆43通过配套的上端螺母431和下端螺母432将上支撑梁41和下支撑梁42进行连接,上端螺母431位于上支撑梁41的上部,下端螺母432位于下支撑梁42的下部,以实现悬吊连接。Two or more tie rods 43 are arranged between the upper support beam 41 and the lower support beam 42 of each group of supporting frames 4, and two tie rods 43 are provided in this embodiment, and are arranged on both sides of the newly poured beam body 2 , if the distance between the existing beam bodies 1 on both sides is relatively large, the tie rods 43 need to be densely arranged. The upper support beam 41 and the lower support beam 42 of the support group frame 4 are provided with corresponding upper holes 411 and lower holes 421, and the two ends of the pull rod 43 are all provided with threads, and the pull rod 43 passes through the supporting upper end nut 431 and The lower nut 432 connects the upper supporting beam 41 and the lower supporting beam 42, the upper nut 431 is located on the upper part of the upper supporting beam 41, and the lower nut 432 is located on the lower part of the lower supporting beam 42, so as to realize the suspension connection.

所述底模板3和下支撑梁42之间还设置有若干辅助纵向梁5,用于直接承载底模板3上的负重。所述拉杆43通过在底模板3上预设的孔洞穿出底模板3,并且每根拉杆43均套设有留置管433,留置管433的长度不小于新浇梁体2的厚度,用于完成浇筑后,方便拉杆43从留置管433中取出。Several auxiliary longitudinal beams 5 are also arranged between the bottom formwork 3 and the lower support beam 42 for directly bearing the load on the bottom formwork 3 . The tie rods 43 pass through the bottom template 3 through the preset holes on the bottom template 3, and each tie rod 43 is provided with an indwelling tube 433, the length of the indwelling tube 433 is not less than the thickness of the newly poured beam body 2, for After pouring is completed, it is convenient to take out the pull rod 43 from the indwelling tube 433 .

所述两侧的现有梁体1上沿纵向分别设置有承载纵梁6,所述支撑组架4的上支撑梁41的两端直接支撑于承载纵梁6上。每侧的承载纵梁6可不限于一根,可以根据新浇梁体2的预测重量情况增加承载纵梁6的数量,本实施例中,单侧设两根并联布置的承载纵梁6,即可达到相应的承载要求。本实施例中更加具体的是,所述承载纵梁6采用的是工字钢。The existing beam bodies 1 on both sides are respectively provided with load-bearing longitudinal beams 6 along the longitudinal direction, and the two ends of the upper support beam 41 of the supporting frame 4 are directly supported on the load-bearing longitudinal beams 6 . The load-bearing stringer 6 of each side can not be limited to one, can increase the quantity of load-bearing stringer 6 according to the predicted weight situation of newly poured beam body 2, in the present embodiment, set up two load-bearing stringer 6 of parallel arrangement on one side, namely The corresponding bearing requirements can be met. More specifically in this embodiment, the load-bearing longitudinal beam 6 is made of I-beam.

在所述新浇梁体2的中心沿纵向设置有一根大口径pvc管7,在纵向的钢筋笼中预留了大口径pvc管7的容纳通孔,这样可以减轻新浇梁体2的重量,减少用料,支撑强度也没有明显降低。A large-diameter pvc pipe 7 is longitudinally arranged at the center of the newly poured beam body 2, and an accommodation through hole for the large-diameter pvc pipe 7 is reserved in the longitudinal steel cage, so that the weight of the newly poured beam body 2 can be reduced , reduce the use of materials, and the support strength has not been significantly reduced.

实施例2Example 2

如图2-4所示,本实施例与实施例1的区别在于,所述每组支撑组架4的上支撑梁41两端分别通过一个顶托8支撑在两侧的现有梁体1上;单侧的所有顶托8通过沿纵向布置的纵向连接钢管9和管夹进行固定;两侧的连接钢管9通过均匀间隔的若干横向连接钢管91和管夹进行连接。顶托8可以在垂直方向进行高度调节,避免了采用工字钢形的承载纵梁6在现有梁体1不平整,或有起伏时,设置承载纵梁6将会对支撑效果产生影响。顶托8包括下部支撑在现有梁体1上的顶托主体81,以及伸缩丝杆82、顶板83和调节螺栓84,伸缩丝杆82可在顶托主体81内自由升降,伸缩丝杆82顶部固定有顶板83,顶板83直接与H型钢制作的上支撑杆41的腹板接触以形成支撑,调节螺栓84套在伸缩丝杆82上,以方便调整伸缩丝杆82的升降高度。As shown in Figures 2-4, the difference between this embodiment and Embodiment 1 is that the two ends of the upper support beam 41 of each group of supporting frames 4 are respectively supported by a jacking 8 on the existing beam body 1 on both sides. Above: all jacking brackets 8 on one side are fixed by longitudinally connecting steel pipes 9 and pipe clamps arranged along the longitudinal direction; connecting steel pipes 9 on both sides are connected by a number of horizontally connecting steel pipes 91 and pipe clamps at even intervals. The height of the jacking 8 can be adjusted in the vertical direction, avoiding the use of I-shaped steel-shaped load-bearing longitudinal beams 6. When the existing beam body 1 is uneven or undulating, setting the load-bearing longitudinal beams 6 will have an impact on the supporting effect. Jacking 8 comprises the jacking main body 81 that the lower part is supported on existing beam body 1, and telescopic screw mandrel 82, top plate 83 and adjusting bolt 84, and telescopic screw mandrel 82 can lift freely in jacking main body 81, and telescopic screw mandrel 82 The top is fixed with a top plate 83, and the top plate 83 directly contacts with the web of the upper support rod 41 made of H-shaped steel to form a support.

实施例3Example 3

本实施例主要针对桥梁悬吊式浇筑的具体施工方法,并以申请人一处现状实施工程为例,本工程桥梁的高度大概12m。此次施工的范围为桥梁道路右幅绿化分隔带,现状右幅绿化带下为一混凝土板,无空心板梁,本次工程主要目的是将混凝土板拆除,进行现浇空心板梁,并将现状绿化分隔带改为车行道,增设道路中央绿化带。本次施工共计7片空心板梁,单片长度为20m左右,梁高为0.9m,上口为1.12m,下口为1.06m。This embodiment is mainly aimed at the specific construction method of bridge suspension pouring, and taking the applicant's current implementation project as an example, the height of the bridge in this project is about 12m. The scope of this construction is the green separation belt on the right side of the bridge road. Under the current green belt on the right side is a concrete slab without hollow slab beams. The main purpose of this project is to remove the concrete slabs and cast in-situ hollow slab beams The current green separation belt is changed to the roadway, and the central green belt of the road is added. In this construction, there are 7 hollow slab beams in total, the length of each piece is about 20m, the beam height is 0.9m, the upper opening is 1.12m, and the lower opening is 1.06m.

所述施工方法的具体步骤为:The concrete steps of described construction method are:

S1:拆除现状桥面绿化分隔带,对新浇梁体部位进行现状预制盖板破除,并对新浇梁体两侧的现有梁体的表面进行清理;S1: Remove the current green separation belt on the bridge deck, remove the existing prefabricated cover plate on the newly poured beam body, and clean the surface of the existing beam body on both sides of the newly poured beam body;

S2:在两侧的现有梁体上沿桥梁纵向安装承载纵梁;S2: install load-bearing longitudinal beams along the longitudinal direction of the bridge on the existing beam bodies on both sides;

S3:支撑组架的装配,采用H型钢截取上支撑梁和下支撑梁,并分别在上支撑梁上开设两个上孔,在下支撑梁上开设两个对应于上孔的下孔,然后将两根带螺纹的拉杆穿入留置管,将拉杆两端分别穿入上支撑梁的上孔和下支撑梁的下孔中,在拉杆两端旋入螺母,完成支撑组价的组装;S3: Assembling the support frame, the upper support beam and the lower support beam are intercepted by H-shaped steel, and two upper holes are respectively opened on the upper support beam, and two lower holes corresponding to the upper holes are opened on the lower support beam, and then the Two threaded tie rods are inserted into the indwelling tube, and the two ends of the tie rods are respectively inserted into the upper hole of the upper support beam and the lower hole of the lower support beam, and nuts are screwed into the two ends of the tie rods to complete the assembly of the support assembly;

S4:支撑组架的安装,在S3中完成若干组支撑组架的装配后,将支撑组架在新浇梁体上方顺着新浇梁体的纵向放入两侧的现有梁体之间,待支撑梁低于现有梁体时,旋转支撑组架,使得上支撑梁的两端垂直支撑在承载纵梁上;并按此方法完成所有支撑组架均匀间隔的安装;S4: The installation of the supporting frame. After completing the assembly of several groups of supporting frames in S3, place the supporting frame above the newly poured beam body along the longitudinal direction of the newly poured beam body between the existing beams on both sides. When the support beam is lower than the existing beam body, rotate the support frame so that the two ends of the upper support beam are vertically supported on the load-bearing longitudinal beam; and complete the installation of all support frames evenly spaced according to this method;

S5:在所有支撑组架的下支撑梁上安装辅助纵向梁;S5: Install auxiliary longitudinal beams on the lower support beams of all supporting frames;

S6:底模板的安装,每一段新浇梁体处,在横向上至少通过3块底模板拼接,并且总体宽度大于新浇梁体的底边宽度,两侧底模板的外侧设置有与拉杆对应的开口,开口的宽度与拉杆的直径相等,相邻开口的间距与相邻支撑组架的间距相等;将两侧底模板的开口卡入到对应的拉杆中,完成两侧底模板安装后,再将中间底模板安装在两侧底模板之间,以完成所有底模板的安装;S6: The installation of the bottom formwork, each section of the newly poured beam body is spliced by at least 3 bottom formworks in the horizontal direction, and the overall width is greater than the bottom edge width of the newly poured beam body. The width of the opening is equal to the diameter of the tie rod, and the distance between adjacent openings is equal to the distance between adjacent supporting frames; snap the openings of the bottom formwork on both sides into the corresponding tie rods, and after the installation of the bottom formwork on both sides is completed, Then install the middle bottom formwork between the bottom formworks on both sides to complete the installation of all bottom formworks;

S7:完成底模板的安装后,调整拉杆位于上支撑杆上的螺栓,以调整底模板的水平高度,使得底模板与两侧现有梁体底部紧密接触;S7: After the installation of the bottom formwork is completed, adjust the bolts on the upper support rod of the pull rod to adjust the horizontal height of the bottom formwork so that the bottom formwork is in close contact with the bottom of the existing beams on both sides;

S8:在底模板上完成钢筋笼的绑扎后,进行新浇梁体的浇筑;S8: After the binding of the reinforcement cage is completed on the bottom formwork, the pouring of the new beam body is carried out;

S9:新浇梁体的养护,拆模,施工完成。S9: The maintenance of the newly poured beam body, demolition of the formwork, and the construction is completed.

底模板表面应平整光洁,无污物,并在模板表面涂刷脱模剂,为防止漏浆,模板接缝处应贴透明胶带,并沿顺桥向现在梁体周边模板上口贴海绵条。The surface of the bottom formwork should be smooth and clean, free of dirt, and the surface of the formwork should be painted with a release agent. In order to prevent slurry leakage, scotch tape should be pasted on the joints of the formwork, and sponge strips should be pasted along the bridge to the upper edge of the formwork around the beam body. .

底模板安装完成之后,转动螺母调节模板标高,使其满足底板标高要求,模板标高应比设计标高高出5mm左右,并在模板中部起拱,起拱高度约10mm。After the bottom formwork is installed, turn the nut to adjust the height of the formwork to meet the height requirements of the bottom plate. The height of the formwork should be about 5mm higher than the design level, and arch in the middle of the formwork with a height of about 10mm.

拉杆长1.5m,顺桥向间距0.5m,横桥向间距为0.96m,对应上支撑杆和下支撑杆的螺母各用300双螺母+220mm*220mm*20mm双钢板垫片连接。下支撑杆底部的螺母必须预先安装到位,以避免后续施工困难,上支撑杆上的螺母可以后续进行统一调整。The length of the tie rod is 1.5m, the distance along the bridge is 0.5m, and the distance across the bridge is 0.96m. The nuts corresponding to the upper support rod and the lower support rod are connected with 300 double nuts + 220mm*220mm*20mm double steel plate gaskets. The nuts at the bottom of the lower support rod must be pre-installed in place to avoid difficulties in subsequent construction, and the nuts on the upper support rod can be adjusted uniformly later.

底模板施工完成后,进行现有梁体施工缝剔凿,要求施工缝剔成“V”字形,减小施工缝处钢筋所受剪力。砼浇筑前用清水清洗施工缝。After the construction of the bottom formwork is completed, the construction joints of the existing beam body are chiseled, and the construction joints are required to be cut into a "V" shape to reduce the shear force on the steel bars at the construction joints. Clean the construction joints with clean water before pouring concrete.

钢筋绑扎前对现有梁体砼连接面凿毛,凿除浮浆,以确保新旧砼接茬效果良好。Before the steel bars are bound, the roughness of the concrete connection surface of the existing beam body shall be chiseled, and the laitance shall be removed by chiseling, so as to ensure a good effect of stubble connection between the old and new concrete.

钢筋直径d≤20mm时,可采用绑扎搭接或焊接接头,亦可采用机械连接;当钢筋直径d≥22mm时优先采用机械连接。因施工误差,个别接头直螺纹无法连接时采用绑扎或焊接,绑扎焊接需满足设计及规范要求。When the steel bar diameter d≤20mm, lap joints or welded joints can be used, and mechanical connection can also be used; when the steel bar diameter d≥22mm, mechanical connection is preferred. Due to construction errors, when the straight thread of individual joints cannot be connected, binding or welding shall be used, and the binding and welding shall meet the design and specification requirements.

钢筋绑扎搭接长度为1.4倍LaE(LaE为受拉钢筋的锚固长度),钢筋焊接接头长度为:单面焊10d,双面焊5d,焊缝厚度不应小于0.4d,宽度不应小于0.8d(d为被连接钢筋直径,被连接钢筋直径不同时,取较大钢筋直径);机械连接采用Ⅱ级接头(同一连接区段内接头的面积百分率不大于50%)。当钢筋必须在同一截面连接时,应采用Ⅰ级机械接头;各种接头必须满足相关规范、规程及技术规定等要求,确保质量。The lap length of the steel bar binding is 1.4 times LaE (LaE is the anchorage length of the tensile steel bar), the length of the welded joint of the steel bar is: 10d for single-sided welding, 5d for double-sided welding, the thickness of the weld seam should not be less than 0.4d, and the width should not be less than 0.8 d (d is the diameter of the steel bars to be connected, if the diameters of the steel bars to be connected are different, the larger diameter of the steel bars shall be taken); the mechanical connection shall adopt Class II joints (the area percentage of the joints in the same connection section shall not exceed 50%). When the steel bars must be connected at the same cross-section, Class I mechanical joints should be used; various joints must meet the requirements of relevant specifications, regulations and technical regulations to ensure quality.

如果需要将新浇梁体浇筑成空心状,其钢筋绑扎方法为:在两侧现有梁体上画空心梁体箍筋间距→将上部主筋用铁丝按间距固定在上支撑梁下部,同时将箍筋穿入上部主筋→按间距将箍筋与上部主筋绑扎→穿下层纵筋并与箍筋绑扎→挂混凝土保护层垫块→放入50波纹管做内模→将梁骨架放入模板内。If it is necessary to pour the new beam body into a hollow shape, the method of binding the steel bars is as follows: draw the distance between the stirrup bars of the hollow beam body on the existing beam body on both sides → fix the upper main reinforcement to the lower part of the upper support beam with iron wires according to the spacing, and at the same time Insert the stirrups into the upper main reinforcement → bind the stirrups to the upper main reinforcement according to the spacing → pass through the lower longitudinal reinforcement and bind them with the stirrups → hang the concrete cover block → put 50 bellows as the inner mold → put the beam skeleton into the formwork .

砼浇筑时一般采用插入式振捣器人工振捣,振捣由技术熟练人员进行捣固,保证各个部位捣固均衡。用插入式振动器快插慢拔,插点均匀排列,逐点移动,按顺序进行,不得遗漏,做到均匀振实,每点振动20~30秒,移动间距不大于振动棒作用半径的1.5倍(一般为300~400mm),振捣上一层时插入下层砼面50mm,以消除两层间的接缝,以砼表面不再显著下降,不再出现气泡,表面泛出砂浆为准。插入振捣器避免碰撞钢筋,更不得放在钢筋上,振捣机头开始转动以后才能插入砼中,振完后,徐徐提出,不能过快或停转后再拔出来,振捣靠近模板时,插入式振捣器机头须与模板保持5~10cm距离。When pouring concrete, the plug-in vibrator is generally used to vibrate manually, and the vibrator is tamped by skilled personnel to ensure that all parts are tamped evenly. Use the plug-in vibrator to quickly plug in and slowly pull out, the plug-in points are evenly arranged, move point by point, and proceed in order, without omission, to achieve uniform vibration, each point vibrates for 20 to 30 seconds, and the moving distance is not greater than 1.5 of the radius of the vibrating rod. When vibrating the upper layer, insert 50mm into the concrete surface of the lower layer to eliminate the joint between the two layers. The surface of the concrete will no longer drop significantly, bubbles will no longer appear, and the surface will be covered with mortar. Insert the vibrator to avoid colliding with the steel bars, let alone put it on the steel bars. The vibrator can only be inserted into the concrete after the head of the vibrator starts to rotate. , The head of the plug-in vibrator must keep a distance of 5-10cm from the template.

分两层浇筑,每层45cm,施工过程中,控制浇筑速度,第一层浇筑完成后,停4小时,待模板受力稳定后再浇筑上层,浇筑过程中保证材料供应连续,不能存在断料的现象,减少施工冷缝的出现,保证砼整体性及密实性。It is poured in two layers, each layer is 45cm. During the construction process, the pouring speed is controlled. After the first layer is poured, stop for 4 hours. After the formwork is under stable force, the upper layer is poured. During the pouring process, the material supply is guaranteed to be continuous, and no material breaks Phenomenon, reduce the occurrence of construction cold joints, and ensure the integrity and compactness of concrete.

在浇筑完毕后的12h以内对砼加以覆盖并保湿养护;砼浇水养护的时间:对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的砼,不得少于7d;对掺用缓凝型外加剂或有抗渗要求的砼,不得少于14d;浇水次数应能保持砼处于湿润状态;砼强度达到1.2N/mm2前,不得在其上踩踏或安装模板及支架。Cover the concrete within 12 hours after pouring and maintain moisture; the time for concrete watering and curing: for concrete mixed with Portland cement, ordinary Portland cement or slag Portland cement, it shall not be less than 7 days; For concrete mixed with retarding admixtures or with impermeability requirements, it shall not be less than 14 days; the number of watering shall be able to keep the concrete in a wet state; before the strength of concrete reaches 1.2N/ mm2 , it is not allowed to step on it or install formwork and stand.

砼浇筑完成后及时进行保温处理,在浇筑完成面铺设一层保温薄膜+两层土工布进行保温。After the concrete pouring is completed, thermal insulation treatment shall be carried out in time, and a layer of thermal insulation film + two layers of geotextile shall be laid on the poured surface for thermal insulation.

冬季施工及混凝土养护措施:Winter construction and concrete maintenance measures:

如果气温不会低于零度(浇筑后一周以上期间),做好混凝土保温即可。如果在负温下(最低温度低于零下5℃)环境浇筑混凝土,需要注意的主要是早期混凝土防冻。防冻需要从两个方面操作:1)使用防冻剂:防冻剂可以大幅度降低拌合水的冰点,防止在塑性状态和早期混凝土内部水分结冰膨胀,冻伤混凝土。防冻剂对混凝土强度性能没有明显危害,但有些防冻剂含尿素,混凝土会长期释放氨味,需要特别注意。2)保温:尽可能使用胶合板、木板等具有一定保温作用的模板,用保温材料如棉被、草帘或泡沫保温板等覆盖暴露混凝土表面和包裹钢模板,使混凝土强度较快发展。冬季施工,最好使用早强型硅酸盐或普通硅酸盐水泥,因为强度发展快,水化热相对较高。不过,只要做好保温,什么水泥都可以使用,强度发展慢些,对防止热应力裂缝更好。在最低温度2℃环境,浇筑混凝土可以不使用防冻剂,但必须做好保温,并且密切注意气温变化趋势。如果温度还会降低,需要加强混凝土保温隔并且密切注意气温变化趋势。如果温度还会降低,需要加强混凝土保温隔冷。If the temperature will not be lower than zero (more than one week after pouring), it is enough to do a good job of concrete insulation. If the concrete is poured in a negative temperature environment (the lowest temperature is lower than minus 5°C), the main thing to pay attention to is the early concrete antifreeze. Antifreeze needs to be operated from two aspects: 1) Use antifreeze: antifreeze can greatly reduce the freezing point of mixing water, prevent the moisture in the plastic state and early concrete from freezing and expanding, and frostbite the concrete. Antifreeze has no obvious harm to the strength and performance of concrete, but some antifreeze contains urea, and the concrete will release ammonia odor for a long time, so special attention should be paid. 2) Thermal insulation: Use plywood, wood boards and other formwork with certain thermal insulation effects as much as possible, and use thermal insulation materials such as quilts, straw curtains or foam insulation boards to cover the exposed concrete surface and wrap the steel formwork to make the concrete strength develop faster. For winter construction, it is best to use early-strength Portland cement or ordinary Portland cement, because the strength develops quickly and the heat of hydration is relatively high. However, as long as the insulation is done well, any cement can be used, and the strength development is slower, which is better for preventing thermal stress cracks. In an environment with a minimum temperature of 2°C, antifreeze may not be used for pouring concrete, but insulation must be done well, and the trend of temperature changes must be paid close attention to. If the temperature is still lower, the concrete insulation needs to be strengthened and the temperature trend should be closely monitored. If the temperature will drop, concrete insulation needs to be strengthened.

冬季施工的混凝土宜选用硅酸盐水泥或普通硅酸盐水泥,水泥标号不宜低于32.5,每立方米混凝土中的水泥用量不宜少于300kg,水灰比不应大于0.6,并加入早强剂.由必要时应加入防冻剂(根据气温情况确定)。Portland cement or ordinary Portland cement should be used for concrete in winter construction, the cement grade should not be lower than 32.5, the amount of cement in each cubic meter of concrete should not be less than 300kg, the water-cement ratio should not be greater than 0.6, and an early strength agent should be added . Antifreeze should be added when necessary (determined according to temperature conditions).

为减少冻害,应将配合比中的用水量降至最低限度.办法是:控制坍落度,加入减水剂,优先选用高效减水剂。In order to reduce freezing damage, the water consumption in the mix ratio should be reduced to a minimum. The method is: control the slump, add a water reducer, and give priority to the high-efficiency water reducer.

模板和保温层,应在混凝土冷却到5℃后方可拆除.当混凝土与外界温差大于20℃时,拆模后的混凝土表面,应临时覆盖,使其缓慢冷却。The formwork and insulation layer should be removed after the concrete has cooled to 5°C. When the temperature difference between the concrete and the outside world is greater than 20°C, the concrete surface after formwork removal should be temporarily covered to allow it to cool slowly.

未冷却的混凝土有较高的脆性,所以结构在冷却前不得遭受冲击荷载或动力荷载的作用。Uncooled concrete has a high brittleness, so the structure must not be subjected to impact loads or dynamic loads before cooling.

拌制混凝土用的骨料必须清洁,不得含有冰雪和冻块,以及易冻裂的物质.在掺有含钾,钠离子的外加剂时,不得使用活性骨料.在有条件的时候,砂石筛洗应抢在零上温度时做,并用塑料纸,油布盖好。The aggregates used for mixing concrete must be clean and must not contain ice, snow, frozen blocks, or substances that are prone to freezing and cracking. Active aggregates must not be used when admixtures containing potassium and sodium ions are mixed. When conditions permit, sand Stone sieve washing should be done when the temperature is above zero, and covered with plastic paper and tarpaulin.

拌制掺外加剂的混凝土时,如外加剂为粉剂,可按要求掺量直接撒在水泥上面和水泥同时投入.如外加剂为液体,使用时应先配制成规定浓度溶液,然后根据使用要求,用规定浓度溶液配制成施工溶液.各溶液要分别置于有明显标志的容器中,不得混淆.每班使用的外加剂溶液应一次配成。When mixing concrete with admixtures, if the admixture is a powder, it can be directly sprinkled on the cement according to the required amount and put in at the same time as the cement. If the admixture is a liquid, it should be prepared into a solution with a specified concentration before use, and then according to the use requirements. , Prepare the construction solution with a solution of a specified concentration. Each solution should be placed in a container with a clear mark, and should not be confused. The admixture solution used in each shift should be prepared once.

当施工期处于0℃左右时,可在混凝土中添加早强剂,掺量应符合使用要求及规范规定,且应注意在添加前应做好模拟试验,以核实有关技术措施;对于有限期拆模要求的混凝土,还应适当提高混凝土设计等级.When the construction period is around 0°C, early strength agents can be added to the concrete, and the dosage should meet the requirements of use and specifications, and it should be noted that a simulation test should be done before adding to verify the relevant technical measures; The concrete required by the formwork should also be appropriately increased to the concrete design level.

混凝土中添加防冻剂时,严禁使用高铝水泥。When antifreeze is added to concrete, high alumina cement is strictly prohibited.

严格控制混凝土水灰比,由骨料带入的水分及外加剂溶液中的水分均应从拌合水中扣除。Strictly control the water-cement ratio of concrete, and the moisture brought in by the aggregate and the moisture in the admixture solution should be deducted from the mixing water.

搅拌掺有外加剂的混凝土时,搅拌时间应取常温搅拌时间的1.5倍.(7)混凝土拌合物的出机温度不宜低于10℃,入模温度不得低于5℃。When mixing concrete mixed with admixtures, the mixing time should be 1.5 times the normal temperature mixing time. (7) The exit temperature of the concrete mixture should not be lower than 10°C, and the mold entry temperature should not be lower than 5°C.

冬季浇筑的混凝土,由正温转入负温养护前,混凝土的抗压强度不应低于设计强度的40%。For concrete poured in winter, the compressive strength of the concrete should not be lower than 40% of the design strength before it is cured from positive temperature to negative temperature.

浇注完毕后,先覆盖塑料薄膜,上部再覆棉毛毡、草袋,麻袋等保温材料,保温材料的铺设厚度为:一般情况下0℃以上铺一层;0℃以下铺二层或三层;不得洒水养护,确保毛毡的干燥。After the pouring is completed, first cover the plastic film, and then cover the upper part with cotton felt, straw bag, gunny bag and other insulation materials. The thickness of the insulation material is: generally one layer above 0°C; two or three layers below 0°C; Do not sprinkle water for maintenance to ensure that the felt is dry.

拆模后的混凝土也应及时覆盖保温材料,以防混凝土表面温度的骤降而产生裂缝.The concrete after form removal should also be covered with thermal insulation materials in time to prevent cracks due to the sudden drop in the surface temperature of the concrete.

在梁体砼强度达到规范要求后,首先松动上部螺母,用手锤敲打拉杆,使拉杆以及底模板与砼松动,然后使其依靠自身重力下落。After the concrete strength of the beam body meets the specification requirements, firstly loosen the upper nut and hit the tie rod with a hand hammer to loosen the tie rod and the bottom formwork from the concrete, and then make it fall by its own gravity.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.

Claims (10)

1.一种桥梁悬吊式浇筑的模板支撑结构,用于在两根平行的现有梁体之间的间隙进行补充浇筑新浇梁体,其特征在于:包括底模板和支撑组架,在所述两根现有梁体之间设置有若干组均匀间隔的支撑组架;每组支撑组架均包括相互平行的上支撑梁和下支撑梁,上支撑梁的两端分别支撑在两根现有梁体上,下支撑梁位于桥梁下部,并通过拉杆悬挂固定在上支撑梁上;底模板整体封闭拟浇筑的新浇梁体的下部,并由所有支撑组架的下支撑梁共同支撑。1. A formwork support structure for suspended casting of a bridge, used for supplementary pouring of a new beam body in the gap between two parallel existing beam bodies, characterized in that: it includes a bottom formwork and a supporting frame, in the Several groups of evenly spaced supporting frames are set between the two existing beams; each group of supporting frames includes an upper supporting beam and a lower supporting beam parallel to each other, and the two ends of the upper supporting beam are respectively supported on the two existing beams. The upper and lower support beams are located at the lower part of the bridge, and are suspended and fixed on the upper support beam by tie rods; the bottom formwork as a whole closes the lower part of the newly poured beam body to be poured, and is supported by all the lower support beams supporting the frame. 2.根据权利要求1所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:所述每组支撑组架的上支撑梁和下支撑梁之间设置有2根以上的拉杆。2. The formwork support structure for suspended casting of bridges according to claim 1, characterized in that: more than 2 tie rods are arranged between the upper support beam and the lower support beam of each supporting group frame. 3.根据权利要求2所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:所述底模板和下支撑梁之间还设置有若干辅助纵向梁,用于直接承载底模板上的负重。3. The formwork support structure for suspended casting of bridges according to claim 2, characterized in that: a number of auxiliary longitudinal beams are also arranged between the bottom formwork and the lower support beam for directly bearing the load on the bottom formwork . 4.根据权利要求2所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:所述拉杆通过在底模板上预设的孔洞穿出底模板,并且每根拉杆均套设有留置管,留置管的长度不小于新浇梁体的厚度,用于完成浇筑后,拉杆从留置管中取出。4. The formwork support structure for suspended casting of bridges according to claim 2, characterized in that: the tie rods pass through the bottom formwork through preset holes on the bottom formwork, and each tie rod is sleeved with an indwelling tube , the length of the indwelling tube is not less than the thickness of the newly poured beam body, and is used for taking out the tie rod from the indwelling tube after the pouring is completed. 5.根据权利要求2所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:所述两侧的现有梁体上沿纵向分别设置有承载纵梁,所述支撑组架的上支撑梁的两端直接支撑于承载纵梁上。5. The formwork support structure for suspended casting of bridges according to claim 2, characterized in that: the existing beam bodies on both sides are respectively provided with load-bearing longitudinal beams along the longitudinal direction, and the upper supports of the support groups Both ends of the beam are directly supported on the load-bearing longitudinal beams. 6.根据权利要求2所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:所述每组支撑组架的上支撑梁两端分别通过一个顶托支撑在两侧的现有梁体上。6. The formwork support structure for suspended casting of bridges according to claim 2, characterized in that: the two ends of the upper support beams of each group of supporting frames are respectively supported by a jacking on the existing beams on both sides superior. 7.根据权利要求6所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:单侧的所有顶托通过沿纵向布置的纵向连接钢管和管夹进行固定;两侧的纵向连接钢管通过均匀间隔的若干横向连接钢管和管夹进行连接。7. The formwork support structure for suspended casting of bridges according to claim 6, characterized in that: all jacking supports on one side are fixed by longitudinally connected steel pipes and pipe clamps arranged in the longitudinal direction; longitudinally connected steel pipes on both sides are fixed by A number of evenly spaced horizontal connecting steel pipes and pipe clamps are connected. 8.根据权利要求1所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:在所述新浇梁体的中心沿纵向设置有一根大口径pvc管,在纵向的钢筋笼中预留了大口径pvc管的容纳通孔。8. The formwork support structure for suspended casting of bridges according to claim 1, characterized in that: a large diameter pvc pipe is longitudinally arranged at the center of the newly poured beam body, and a large diameter pvc pipe is reserved in the longitudinal reinforcement cage. The accommodating through hole of the large-diameter pvc pipe is provided. 9.根据权利要求1所述的桥梁悬吊式浇筑的模板支撑结构,其特征在于:所述支撑组架的上支撑梁和下支撑梁上设置有对应的上孔和下孔,所述拉杆的两端均设置有螺纹,拉杆通过配套的螺母将上支撑梁和下支撑梁进行连接。9. The formwork support structure for bridge suspension casting according to claim 1, characterized in that: the upper support beam and the lower support beam of the supporting frame are provided with corresponding upper holes and lower holes, and the tie rods Threads are provided at both ends, and the pull rod connects the upper support beam and the lower support beam through matching nuts. 10.一种桥梁悬吊式浇筑的施工方法,其特征在于,所述施工方法的具体步骤为:10. A construction method for bridge suspension pouring, characterized in that, the specific steps of the construction method are: S1:拆除现状桥面绿化分隔带,对新浇梁体部位进行现状预制盖板破除,并对新浇梁体两侧的现有梁体的表面进行清理;S1: Remove the current green separation belt on the bridge deck, remove the existing prefabricated cover plate on the newly poured beam body, and clean the surface of the existing beam body on both sides of the newly poured beam body; S2:在两侧的现有梁体上沿桥梁纵向安装承载纵梁;S2: install load-bearing longitudinal beams along the longitudinal direction of the bridge on the existing beam bodies on both sides; S3:支撑组架的装配,采用H型钢截取上支撑梁和下支撑梁,并分别在上支撑梁上开设两个上孔,在下支撑梁上开设两个对应于上孔的下孔,然后将两根带螺纹的拉杆穿入留置管,将拉杆两端分别穿入上支撑梁的上孔和下支撑梁的下孔中,在拉杆两端旋入螺母,完成支撑组价的组装;S3: Assembling the support frame, the upper support beam and the lower support beam are intercepted by H-shaped steel, and two upper holes are respectively opened on the upper support beam, and two lower holes corresponding to the upper holes are opened on the lower support beam, and then the Two threaded tie rods are inserted into the indwelling tube, and the two ends of the tie rods are respectively inserted into the upper hole of the upper support beam and the lower hole of the lower support beam, and nuts are screwed into the two ends of the tie rods to complete the assembly of the support assembly; S4:支撑组架的安装,在S3中完成若干组支撑组架的装配后,将支撑组架在新浇梁体上方顺着新浇梁体的纵向放入两侧的现有梁体之间,待支撑梁低于现有梁体时,旋转支撑组架,使得上支撑梁的两端垂直支撑在承载纵梁上;并按此方法完成所有支撑组架均匀间隔的安装;S4: The installation of the supporting frame. After completing the assembly of several groups of supporting frames in S3, place the supporting frame above the newly poured beam body along the longitudinal direction of the newly poured beam body between the existing beams on both sides. When the support beam is lower than the existing beam body, rotate the support frame so that the two ends of the upper support beam are vertically supported on the load-bearing longitudinal beam; and complete the installation of all support frames evenly spaced according to this method; S5:在所有支撑组架的下支撑梁上安装辅助纵向梁;S5: Install auxiliary longitudinal beams on the lower support beams of all supporting frames; S6:底模板的安装,每一段新浇梁体处,在横向上至少通过3块底模板拼接,并且总体宽度大于新浇梁体的底边宽度,两侧底模板的外侧设置有与拉杆对应的开口,开口的宽度与拉杆的直径相等,相邻开口的间距与相邻支撑组架的间距相等;将两侧底模板的开口卡入到对应的拉杆中,完成两侧底模板安装后,再将中间底模板安装在两侧底模板之间,以完成所有底模板的安装;S6: The installation of the bottom formwork, each section of the newly poured beam body is spliced by at least 3 bottom formworks in the horizontal direction, and the overall width is greater than the bottom edge width of the newly poured beam body. The width of the opening is equal to the diameter of the tie rod, and the distance between adjacent openings is equal to the distance between adjacent supporting frames; snap the openings of the bottom formwork on both sides into the corresponding tie rods, and after the installation of the bottom formwork on both sides is completed, Then install the middle bottom formwork between the bottom formworks on both sides to complete the installation of all bottom formworks; S7:完成底模板的安装后,调整拉杆位于上支撑杆上的螺栓,以调整底模板的水平高度,使得底模板与两侧现有梁体底部紧密接触;S7: After the installation of the bottom formwork is completed, adjust the bolts on the upper support rod of the pull rod to adjust the horizontal height of the bottom formwork so that the bottom formwork is in close contact with the bottom of the existing beams on both sides; S8:在底模板上完成钢筋笼的绑扎后,进行新浇梁体的浇筑;S8: After the binding of the reinforcement cage is completed on the bottom formwork, the pouring of the new beam body is carried out; S9:新浇梁体的养护,拆模,施工完成。S9: The maintenance of the newly poured beam body, demolition of the formwork, and the construction is completed.
CN201810746091.1A 2018-07-09 2018-07-09 The formwork support structure and construction method that bridge suspension type pours Pending CN108951424A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810746091.1A CN108951424A (en) 2018-07-09 2018-07-09 The formwork support structure and construction method that bridge suspension type pours

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810746091.1A CN108951424A (en) 2018-07-09 2018-07-09 The formwork support structure and construction method that bridge suspension type pours

Publications (1)

Publication Number Publication Date
CN108951424A true CN108951424A (en) 2018-12-07

Family

ID=64483487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810746091.1A Pending CN108951424A (en) 2018-07-09 2018-07-09 The formwork support structure and construction method that bridge suspension type pours

Country Status (1)

Country Link
CN (1) CN108951424A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680706A (en) * 2018-12-11 2019-04-26 中交一公局土木工程建筑研究院有限公司 A full-scale model of a prefabricated cap pier pile and a construction technology for filling joints using the same
CN110331667A (en) * 2019-07-02 2019-10-15 中交二公局东萌工程有限公司 When being open to traffic under execution conditions bridge joining method
CN110629655A (en) * 2019-10-09 2019-12-31 广西大学 A partially replaceable slab-steel-concrete composite beam using a suspended formwork system
CN112095874A (en) * 2020-09-16 2020-12-18 江苏万年达杭萧钢构有限公司 Detachable steel construction building carrier plate structure
CN112411568A (en) * 2020-11-11 2021-02-26 中天建设集团有限公司 Foundation pit concrete support beam bottom form removal device and form removal method
CN114481857A (en) * 2022-03-17 2022-05-13 中铁大桥局集团第二工程有限公司 A formwork system for hanging formwork in the post-cast section of the middle flange of a highway beam of a dual-use highway and railway bridge
CN116591133A (en) * 2023-04-28 2023-08-15 中建一局集团第三建筑有限公司 A segmented construction method of concrete cast-in-situ structure of water landscape platform

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696431A (en) * 2004-05-10 2005-11-16 邱则有 Hollow slab made from concrete reinforced by steel bar cast in-site
CN202017346U (en) * 2011-04-13 2011-10-26 中建七局第二建筑有限公司 Late poured band hanging formwork structure
CN202416184U (en) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 Construction device for formwork for longitudinal wet joint of box girder
CN103452052A (en) * 2013-08-26 2013-12-18 中铁六局集团有限公司 Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN204098486U (en) * 2014-10-13 2015-01-14 中建七局(上海)有限公司 The concrete of building basement roof ater-casting hangs mould
CN104631512A (en) * 2014-12-22 2015-05-20 山东万鑫建设有限公司 Post-cast strip beam and slab construction method adopting formwork hanging method
CN105525569A (en) * 2014-10-22 2016-04-27 五冶集团上海有限公司 Bridge flange plate wet joint suspended formwork construction method
KR101645469B1 (en) * 2015-12-31 2016-08-08 브릿지테크놀러지(주) Molding system for through bridge and through bridge construction method therewith
CN106013781A (en) * 2016-07-18 2016-10-12 广州建筑股份有限公司 Slab supporting construction method and construction device by reversely suspending template
CN206562761U (en) * 2017-01-13 2017-10-17 中国建筑第五工程局有限公司 Floor post-cast strip boatswain chair mould
CN207406036U (en) * 2017-10-17 2018-05-25 云南建投第二建设有限公司 A kind of adjustable beam bottom support jacking device
CN208430443U (en) * 2018-07-09 2019-01-25 中国五冶集团有限公司 A kind of formwork support structure that bridge suspension type pours

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696431A (en) * 2004-05-10 2005-11-16 邱则有 Hollow slab made from concrete reinforced by steel bar cast in-site
CN202017346U (en) * 2011-04-13 2011-10-26 中建七局第二建筑有限公司 Late poured band hanging formwork structure
CN202416184U (en) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 Construction device for formwork for longitudinal wet joint of box girder
CN103452052A (en) * 2013-08-26 2013-12-18 中铁六局集团有限公司 Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN204098486U (en) * 2014-10-13 2015-01-14 中建七局(上海)有限公司 The concrete of building basement roof ater-casting hangs mould
CN105525569A (en) * 2014-10-22 2016-04-27 五冶集团上海有限公司 Bridge flange plate wet joint suspended formwork construction method
CN104631512A (en) * 2014-12-22 2015-05-20 山东万鑫建设有限公司 Post-cast strip beam and slab construction method adopting formwork hanging method
KR101645469B1 (en) * 2015-12-31 2016-08-08 브릿지테크놀러지(주) Molding system for through bridge and through bridge construction method therewith
CN106013781A (en) * 2016-07-18 2016-10-12 广州建筑股份有限公司 Slab supporting construction method and construction device by reversely suspending template
CN206562761U (en) * 2017-01-13 2017-10-17 中国建筑第五工程局有限公司 Floor post-cast strip boatswain chair mould
CN207406036U (en) * 2017-10-17 2018-05-25 云南建投第二建设有限公司 A kind of adjustable beam bottom support jacking device
CN208430443U (en) * 2018-07-09 2019-01-25 中国五冶集团有限公司 A kind of formwork support structure that bridge suspension type pours

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐建军;: "地下室顶板后浇带吊支模施工技术", 浙江建筑, no. 01 *
陈典华;: "地铁车站预留洞口现浇顶板吊模施工技术", 隧道建设, no. 12, pages 872 - 876 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680706A (en) * 2018-12-11 2019-04-26 中交一公局土木工程建筑研究院有限公司 A full-scale model of a prefabricated cap pier pile and a construction technology for filling joints using the same
CN110331667A (en) * 2019-07-02 2019-10-15 中交二公局东萌工程有限公司 When being open to traffic under execution conditions bridge joining method
CN110629655A (en) * 2019-10-09 2019-12-31 广西大学 A partially replaceable slab-steel-concrete composite beam using a suspended formwork system
CN112095874A (en) * 2020-09-16 2020-12-18 江苏万年达杭萧钢构有限公司 Detachable steel construction building carrier plate structure
CN112095874B (en) * 2020-09-16 2021-12-17 江苏万年达杭萧钢构有限公司 Detachable steel construction building carrier plate structure
CN112411568A (en) * 2020-11-11 2021-02-26 中天建设集团有限公司 Foundation pit concrete support beam bottom form removal device and form removal method
CN114481857A (en) * 2022-03-17 2022-05-13 中铁大桥局集团第二工程有限公司 A formwork system for hanging formwork in the post-cast section of the middle flange of a highway beam of a dual-use highway and railway bridge
CN116591133A (en) * 2023-04-28 2023-08-15 中建一局集团第三建筑有限公司 A segmented construction method of concrete cast-in-situ structure of water landscape platform
CN116591133B (en) * 2023-04-28 2025-06-24 中建一局集团第三建筑有限公司 A segmented construction method for a water landscape platform type concrete cast-in-place structure

Similar Documents

Publication Publication Date Title
CN106284044B (en) A kind of novel steel-concrete combined bridge and its construction method
CN103590602B (en) The construction method of cast-in-place concrete hollow building roof
CN102168407B (en) Method for preventing and controlling cracks of long and big-segment bracket cantilever box girder structure
CN113718777A (en) Mass concrete crack prevention construction method
CN105666687B (en) Prestressing force Reactive Powder Concrete box girder construction technique
CN106677049A (en) Assembled steel-concrete combination structure bridge and construction method
CN104452591B (en) A kind of construction of cast-in-situ box-beam technique that is applied to science of bridge building
CN104790302B (en) Integral construction method for hanging basket and combining bent cap support on side span straight line segment of high-pier continuous rigid frame bridge
CN114180911B (en) Anti-freezing high-ductility cement-based material, and preparation method, application and application method thereof
CN101864744A (en) Construction Method of New Type Wall Guardrail for Highway
CN104563391A (en) Recycled hybrid beam with built-in discontinuous I-shaped steel and construction technology thereof
CN101736701A (en) Bridge steel and concrete mixing section constructing method
CN101096885A (en) Strengthening method of steel-self-compacting concrete composite structure
CN114645721B (en) A highway tunnel combined assembly process and its inverted arch structure and assembly device
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN111764216A (en) A kind of prefabricated concrete road slab construction method and application
CN109235891A (en) A kind of Large Span Prestressed Beam concrete pitched roof jump storehouse method construction method
CN107090777A (en) A kind of T beam manufacture methods for reducing blibbing
CN109972524A (en) Inverted Y-shaped upper king-post strut closes up section constructing method
CN209874476U (en) Non-dismantling side baffle structure of beam post-cast strip
CN103806659B (en) Super thick prestressing force change-over panel individual layer comprehensively supports and splits temperature control construction technology with control
CN107386246A (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN108867392A (en) Precast beam adjustable type tire construction method
CN104846745B (en) Urban high-pier support-free formwork turnover construction method
CN115855624A (en) A full-scale test method for large-volume RPC reactive powder concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207

RJ01 Rejection of invention patent application after publication