- CN108934291A CN108934291A CN201810726332.6A CN201810726332A CN108934291A CN 108934291 A CN108934291 A CN 108934291A CN 201810726332 A CN201810726332 A CN 201810726332A CN 108934291 A CN108934291 A CN 108934291A
- Authority
- CN
- China
- Prior art keywords
- fixed
- pit
- support plate
- top surface
- digging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01C—PLANTING; SOWING; FERTILISING
- A01C5/00—Making or covering furrows or holes for sowing, planting or manuring
- A01C5/04—Machines for making or covering holes for sowing or planting
Abstract
The present invention relates to planting technology fields, specifically a kind of forest plantation digging apparatus, including pulley, the first supporting mechanism, handrail, the second supporting mechanism, elevating mechanism, fixed mechanism, damping, battery, mechanism of digging pit, installing mechanism and position-limit mechanism, the inside of second supporting mechanism is installed by mechanism of digging pit, mechanism of digging pit, which is rotated down on bottom surface, digs out pit-hole, reduce the labor intensity of people, and accelerates the working efficiency that people plant forest;Elevating mechanism is installed in the top surface for mechanism of digging pit, and in use, elevating mechanism drives mechanism up and down motion of digging pit, and not only conveniently digs pit, but also the mechanism that will dig pit is facilitated to take out inside pit-hole;Damping is installed in the top surface of the bottom surface mechanism for installing for mechanism of digging pit, mechanism of digging pit, and during mechanism is digged pit in use, fixed mechanism and damping fix mechanism of digging pit simultaneously up and down, prevent mechanism double swerve of digging pit, easy to use.
Description
Technical field
The present invention relates to planting technology field, digging apparatus is used in specifically a kind of forest plantation.
Background technique
Plantation is plant culture, including various crops, forest, fruit tree, flowers and plants, medicinal and ornamental etc. cultivations of plants,
There are cereal crops, industrial crops, vegetable crop, green manure crop, forage crop, herbage etc..
The big portion of plantation forest, which uses, now manually digs pit, not only large labor intensity of manually digging pit, and working efficiency is low, now
Some digging apparatus after digging pit, drill bit protrudes into inside pit-hole, it has not been convenient to take out drill bit, and existing digging apparatus exists
In use process, shockproofness is big, device double swerve, it has not been convenient to which people use;In consideration of it, the present invention provides a kind of forests
Plantation digging apparatus, has the following characteristics that
(1) mechanism of digging pit is installed in the inside of a kind of forest of the invention plantation digging apparatus, the second supporting mechanism, digs pit
Mechanism, which is rotated down on bottom surface, digs out pit-hole, reduces the labor intensity of people, and accelerates the work that people plant forest
Efficiency.
(2) elevating mechanism is installed in the top surface of a kind of forest of the invention plantation digging apparatus, mechanism of digging pit, and is using
Cheng Zhong, elevating mechanism drive mechanism up and down motion of digging pit, not only conveniently digged pit, but also the mechanism that will dig pit is facilitated to take out inside pit-hole.
(3) a kind of forest of the invention plantation digging apparatus, the bottom surface mechanism for installing for mechanism of digging pit, mechanism of digging pit
Top surface damping is installed, during mechanism is digged pit in use, fixed mechanism and damping are fixed simultaneously dig pit up and down
Mechanism prevents mechanism double swerve of digging pit, easy to use.
Summary of the invention
For the problems of the prior art, the present invention provides a kind of forest plantation digging apparatus, the second supporting mechanisms
Inside installation dig pit mechanism, mechanism of digging pit, which is rotated down on bottom surface, digs out pit-hole, reduces the labor intensity of people, and add
Fast people plant the working efficiency of forests.The top surface for mechanism of digging pit is installed by elevating mechanism, in use, elevating mechanism band
Dynamic mechanism up and down motion of digging pit, not only conveniently digged pit, but also the mechanism that will dig pit is facilitated to take out inside pit-hole.Pacify the bottom surface for mechanism of digging pit
Fixed mechanism is filled, damping, during mechanism is digged pit in use, fixed mechanism and damping machine are installed in the top surface for mechanism of digging pit
Structure fixes mechanism of digging pit simultaneously up and down, prevents mechanism double swerve of digging pit, easy to use.
The technical solution adopted by the present invention to solve the technical problems is: a kind of forest plantation digging apparatus, including cunning
Wheel, the first supporting mechanism, handrail, the second supporting mechanism, elevating mechanism, fixed mechanism, damping, battery, mechanism of digging pit,
Installing mechanism and position-limit mechanism;The bottom surface of first supporting mechanism is installed by the pulley, the top surface of first supporting mechanism
The handrail is installed;The side wall of first supporting mechanism installs second supporting mechanism, first supporting mechanism it is interior
Portion is slidably connected the installing mechanism, mechanism of digging pit described in the inside installation of the installing mechanism;Second supporting mechanism
The elevating mechanism is installed in top surface, and the elevating mechanism is fixedly connected with the installing mechanism, the inside of second supporting mechanism
Damping is installed, one end of the damping is installed on the top surface of the installing mechanism;One end of the fixed mechanism is solid
Surely second supporting mechanism is connected, the other end of the fixed mechanism is fixedly connected with the bottom surface of the installing mechanism;Described
Two supporting mechanisms connect the installing mechanism by the position-limit mechanism;The side wall of first supporting mechanism installs the electric power storage
Pond, the battery are electrically connected the elevating mechanism and the mechanism of digging pit.
Specifically, first supporting mechanism includes first support bar, fence and the first support plate, the first support bar
Bottom surface the pulley is installed, the installation first support bar at the sidewall edge of first support plate, first support
The fence is installed, the pulley rotation pushes the first supporting mechanism movement for convenience at the bottom edge of plate.
Specifically, second supporting mechanism includes second support bar and the second support plate, the top of first support plate
Face is symmetrically installed the second support bar, and second support plate is installed on the top of the second support bar, described for convenience
Fixed second support plate of first support plate.
Specifically, the installing mechanism includes connector sleeve, stop collar and connecting rod, the internal slide of first support plate
Connecting the connector sleeve, the bottom surface installation stop collar of the connector sleeve, and the bottom surface of the connector sleeve and being symmetrically installed has
The connecting rod of elasticity, mechanism of digging pit described in the inside fixation of the installing mechanism for convenience.
Specifically, the mechanism of digging pit includes drilling rod, blade and motor, the top surface of the connector sleeve is fixedly connected with the electricity
Machine, the bottom end of the motor are rotatablely connected the drilling rod, and the drilling rod and the stop collar are rotatablely connected, and the side of the drilling
Wall installs the blade of isometric helix shape, and the motor drives the drilling rod and the blade rotation to dig in bottom surface for convenience
Hole.
Specifically, the elevating mechanism includes hydraulic stem, hydraulic cylinder and fixing sleeve, the top surface of second support plate is symmetrical
The hydraulic cylinder is installed, the hydraulic stem is installed in the bottom end of the hydraulic cylinder, and the bottom surface of the connector sleeve is symmetrically installed described solid
Fixed set, the hydraulic stem are fixedly connected through the connector sleeve with the fixing sleeve, and the hydraulic cylinder drives institute's liquid for convenience
Compression bar moves up and down, thus mechanism up and down motion of digging pit described in driving.
Specifically, the fixed mechanism includes fixed block, fixed plate, spring, the first fixed link and the second fixed link, it is described
The bottom surface of connector sleeve is symmetrically installed the fixed plate that side wall is L shape, passes through institute between the fixed plate and the fixing sleeve
State connecting rod connection;The fixed plate is installed in one end of the fixed block, and the other end installation described second of the fixed block is solid
One end of fixed pole, second fixed link connects first fixed link by the spring slide, and first fixed link is solid
Due between first support plate and second support plate, for convenience during the mechanism decline of digging pit, the liter
Descending mechanism and second fixed link are lifted up the installing mechanism, so that the mechanism surrounding of digging pit be fixed, reduce institute
State the shaking for mechanism of digging pit.
Specifically, the damping includes fixed ring and decoupling rod, the bottom surface installation of second support plate is described solid
Determine ring, one end of the flexible decoupling rod is rotatablely connected the inner sidewall of the fixed ring, and the decoupling rod is another
End is rotatablely connected the top surface of the connector sleeve;The sum of length of first fixed link and second fixed link is less than described subtract
The length of bar is shaken, the mechanism of digging pit rotates down for convenience when digging pit, and the decoupling rod slowly extends, and makes the decoupling rod
The top of the mechanism of digging pit is fixed.
Specifically, the position-limit mechanism includes limit plate, limited block and pull ring, the top surface of the connector sleeve is symmetrically installed side
Wall is the limited block of L shape, and the top surface of first support plate is symmetrically rotatablely connected the limit plate;The limit plate
The pull ring is installed in top surface, and one end of the limit plate engages the limited block and when not in use consolidates the installing mechanism
It is scheduled on first supporting mechanism top surface, prevents the installing mechanism from gliding.
Beneficial effects of the present invention:
(1) mechanism of digging pit is installed in the inside of a kind of forest of the invention plantation digging apparatus, the second supporting mechanism, digs pit
Mechanism, which is rotated down on bottom surface, digs out pit-hole, reduces the labor intensity of people, and accelerates the work that people plant forest
Efficiency.
(2) elevating mechanism is installed in the top surface of a kind of forest of the invention plantation digging apparatus, mechanism of digging pit, and is using
Cheng Zhong, elevating mechanism drive mechanism up and down motion of digging pit, not only conveniently digged pit, but also the mechanism that will dig pit is facilitated to take out inside pit-hole.
(3) a kind of forest of the invention plantation digging apparatus, the bottom surface mechanism for installing for mechanism of digging pit, mechanism of digging pit
Top surface damping is installed, during mechanism is digged pit in use, fixed mechanism and damping are fixed simultaneously dig pit up and down
Mechanism prevents mechanism double swerve of digging pit, easy to use.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of structural schematic diagram of preferred embodiment of forest provided by the invention plantation digging apparatus;
Fig. 2 is damping structural schematic diagram shown in FIG. 1;
Fig. 3 is fixed mechanism schematic diagram of internal structure shown in FIG. 1;
Fig. 4 is enlarged structure schematic diagram at A shown in FIG. 1.
In figure: 1, pulley, the 2, first supporting mechanism, 21, first support bar, 22, fence, the 23, first support plate, 3, help
Hand, the 4, second supporting mechanism, 41, second support bar, the 42, second support plate, 5, elevating mechanism, 51, hydraulic stem, 52, hydraulic cylinder,
53, fixing sleeve, 6, fixed mechanism, 61, fixed block, 62, fixed plate, 63, spring, the 64, first fixed link, the 65, second fixed link,
7, damping, 71, fixed ring, 72, decoupling rod, 8, battery, 9, mechanism of digging pit, 91, drilling rod, 92, blade, 93, motor,
10, installing mechanism, 101, connector sleeve, 102, stop collar, 103, connecting rod, 11, position-limit mechanism, 111, limit plate, 112, limit
Block, 113, pull ring.
Specific embodiment
In order to realize the present invention technical method, creation characteristic, reach purpose and effect is easy to understand, tie below
Specific embodiment is closed, the present invention is further explained.
As shown in Figure 1, a kind of forest plantation digging apparatus of the present invention, including pulley 1, the first supporting mechanism 2,
Handrail 3, the second supporting mechanism 4, elevating mechanism 5, fixed mechanism 6, damping 7, battery 8, mechanism of digging pit 9, installing mechanism
10 and position-limit mechanism 11;The bottom surface of first supporting mechanism 2 is installed by the pulley 1, the top surface peace of first supporting mechanism 2
Fill the handrail 3;The side wall of first supporting mechanism 2 installs second supporting mechanism 4, first supporting mechanism 2
Internal slide connects the installing mechanism 10, mechanism 9 of digging pit described in the inside installation of the installing mechanism 10;Second support
The elevating mechanism 5 is installed in the top surface of mechanism 4, and the elevating mechanism 5 is fixedly connected with the installing mechanism 10, second support
Damping 7 is installed in the inside of mechanism 4, and one end of the damping 7 is installed on the top surface of the installing mechanism 10;It is described solid
The one end for determining mechanism 6 is fixedly connected with second supporting mechanism 4, and the other end of the fixed mechanism 6 is fixedly connected with the installation
The bottom surface of mechanism 10;Second supporting mechanism 4 connects the installing mechanism 10 by the position-limit mechanism 11;Described first
The side wall of support mechanism 2 installs the battery 8, and the battery 8 is electrically connected the elevating mechanism 5 and the mechanism 9 of digging pit.
Specifically, as shown in Figure 1, a kind of forest plantation digging apparatus of the present invention, first supporting mechanism 2
Including first support bar 21, fence 22 and the first support plate 23, the pulley 1, institute are installed in the bottom surface of the first support bar 21
It states and the first support bar 21 is installed at the sidewall edge of first support plate 23, pacify at the bottom edge of first support plate 23
The fence 22 is filled, the pulley 1 rotation for convenience pushes first supporting mechanism 2 to move.
Specifically, as shown in Figure 1, a kind of forest plantation digging apparatus of the present invention, second supporting mechanism 4
Including second support bar 41 and the second support plate 42, the top surface of first support plate 23 is symmetrically installed the second support bar
41, second support plate 42 is installed on the top of the second support bar 41, for convenience the fixed institute of first support plate 41
State the second support plate 42.
Specifically, as shown in Fig. 2, a kind of forest plantation digging apparatus of the present invention, the installing mechanism 10 wrap
Connector sleeve 101, stop collar 102 and connecting rod 103 are included, the internal slide of first support plate 23 connects the connector sleeve 101,
The stop collar 102 is installed in the bottom surface of the connector sleeve 101, and the bottom surface of the connector sleeve 101 be symmetrically installed it is flexible
The connecting rod 103, mechanism 9 of digging pit described in the inside fixation of the installing mechanism 10 for convenience.
Specifically, as shown in Figure 1, a kind of forest plantation digging apparatus of the present invention, the mechanism 9 of digging pit include
Drilling rod 91, blade 92 and motor 93, the top surface of the connector sleeve 101 are fixedly connected with the motor 93, the bottom end of the motor 93
It is rotatablely connected the drilling rod 91, the drilling rod 91 is rotatablely connected with the stop collar 102, and the side wall installation etc. of the drilling 91
Away from the spiral blade 92, the motor 93 drives the drilling rod 91 and the blade 92 to rotate and digs in bottom surface for convenience
Hole.
Specifically, as depicted in figs. 1 and 2, a kind of forest plantation digging apparatus of the present invention, the elevating mechanism
5 include hydraulic stem 51, hydraulic cylinder 52 and fixing sleeve 53, and the top surface of second support plate 42 is symmetrically installed the hydraulic cylinder 52,
The hydraulic stem 51 is installed in the bottom end of the hydraulic cylinder 52, and the bottom surface of the connector sleeve 101 is symmetrically installed the fixing sleeve 53, institute
It states hydraulic stem 51 to be fixedly connected through the connector sleeve 101 with the fixing sleeve 53, the hydraulic cylinder 52 drives institute for convenience
Hydraulic stem 51 moves up and down, thus the up and down motion of mechanism 9 of digging pit described in driving.
Specifically, as shown in Figure 1, Figure 2 and Figure 3, a kind of forest plantation digging apparatus of the present invention, the fixation
Mechanism 6 includes fixed block 61, fixed plate 62, spring 63, the first fixed link 64 and the second fixed link 65, the connector sleeve 101
Bottom surface is symmetrically installed the fixed plate 62 that side wall is L shape, by described between the fixed plate 62 and the fixing sleeve 53
Connecting rod 103 connects;The fixed plate 62 is installed in one end of the fixed block 61, described in the other end installation of the fixed block 62
Second fixed link 65, one end of second fixed link 65 are slidably connected first fixed link 64 by the spring 63, institute
It states the first fixed link 64 to be fixed between first support plate 23 and second support plate 42, for convenience the pit-picker
During structure 9 declines, the elevating mechanism 5 and second fixed link 65 are lifted up the installing mechanism 9, thus will be described
9 surrounding of mechanism of digging pit is fixed, the shaking of mechanism of digging pit described in reduction 9.
Specifically, as depicted in figs. 1 and 2, a kind of forest plantation digging apparatus of the present invention, the damping
7 include fixed ring 71 and decoupling rod 72, and the fixed ring 71 is installed in the bottom surface of second support plate 42, flexible described
One end of decoupling rod 72 is rotatablely connected the inner sidewall of the fixed ring 71, and described in the other end rotation connection of the decoupling rod 71
The top surface of connector sleeve 101;The sum of length of first fixed link 64 and second fixed link 65 is less than the decoupling rod 72
Length, the mechanism 9 of digging pit rotates down for convenience when digging pit, and the decoupling rod 72 slowly extends, and makes the decoupling rod
72 fix the top for digging pit mechanism 9.
Specifically, as shown in Figure 1 and Figure 4, a kind of forest plantation digging apparatus of the present invention, the position-limit mechanism
11 include limit plate 111, limited block 112 and pull ring 113, and the top surface of the connector sleeve 101 is symmetrically installed side wall as the institute of L shape
Limited block 112 is stated, the top surface of first support plate 21 is symmetrically rotatablely connected the limit plate 111;The top of the limit plate 111
The pull ring 113 is installed in face, and one end of the limit plate 111 engages the limited block 112, when not in use, by the peace
Mounting mechanism 9 is fixed on 2 top surface of the first supporting mechanism, prevents the installing mechanism 10 from gliding.
Battery 8 is full of to the side wall for being electrically mounted to the first support plate 23, makes battery 8 and hydraulic cylinder 52 and 93 electricity of motor
Property connection, pull pull ring 113, make pull ring 113 that limit plate 111 be driven to separate with limited block 112, to make connector sleeve 101 and the
One support plate 23 separates.
(1) it holds the handrail 3, pushes the present apparatus to the place for needing to dig pit, open motor 93, make the drive drilling rod 91 of motor 93
With spiral 92 high-speed rotation of blade, hydraulic cylinder 52 is opened, makes hydraulic cylinder 52 that hydraulic stem 51 be driven to move downward, hydraulic stem 51
Connector sleeve 101 is pushed to move downward in the inside of the first support plate 23, to make drilling rod 91 move downward, when drilling rod 91 and blade
92 excavate ground with ground face contact, drilling rod 91 and the rotation of blade 92, form pit-hole.
(2) when connector sleeve 101 moves downward, connector sleeve 101 drives the second fixed link 65 out of first fixed link 64
Portion moves upwards, and elongates the spring 63 inside the first fixed link 64, and spring 63 pulls up the first fixed link 64, makes first to fix
Bar 64 pulls up connector sleeve 101, the first fixed link 64 and hydraulic stem 51, and connector sleeve 101 is fixed, prevent connector sleeve 101 downwards with
Double swerve.
(3) during connector sleeve 101 moves downward, the distance between connector sleeve 101 and fixed ring 71 are increasingly remoter,
Decoupling rod 72 between connector sleeve 101 and fixed ring 71 rotates, and decoupling rod 72 slowly extends, and 72 bending angle of decoupling rod is increasingly
It is small, so that decoupling rod 72 is contradicted the top surface of connector sleeve 101 downwards, prevents connector sleeve 101 from shaking upwards.
(4) after pit-hole is intact, hydraulic cylinder 52 drives hydraulic stem 51 to shrink, and drives connector sleeve 101 to move upwards, makes drilling rod
91 stretch out from pit-hole, and the second fixed link 65 is driven to enter the inside of the first fixed link 64, reset spring 63, and connector sleeve
101 move upwards, compression shock absorption bar 73, are bent decoupling rod 73 slowly and contradict connector sleeve 101, and connector sleeve 101 is fixed;When even
When female connector 101 engages the first support plate 23, closing hydraulic cylinder 52 and motor 93, rotary spacing plate 111 makes the top of limit plate 111
Face contradicts the bottom surface of limited block 112, makes the fixed limited block 112 of limit plate 111, so that connector sleeve 101 is fixed on the first support
The inside of plate 23.
Mechanism 9 of digging pit is installed in the inside of second supporting mechanism 4 of the invention, and mechanism of digging pit 9 is rotated down digs on bottom surface
Pit-hole out, reduces the labor intensity of people, and accelerates the working efficiency that people plant forest.Pacify the top surface of mechanism of digging pit 9
Elevating mechanism 5 is filled, in use, elevating mechanism 5 drives the up and down motion of mechanism 9 of digging pit, and not only conveniently digs pit, but also facilitate and will dig
Mechanism 9 is cheated to take out inside pit-hole.The top surface of the bottom surface mechanism for installing 6 of mechanism of digging pit 9, mechanism of digging pit 9 is installed by damping machine
Structure 7, during mechanism 9 are digged pit in use, fixed mechanism 6 and about 7 damping fix mechanism 9 of digging pit simultaneously, prevent from digging
9 double swerve of mechanism is cheated, it is easy to use.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the description in above embodiment and specification only illustrates the present invention
Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these variation and
Improvement is both fallen in the scope of protection of present invention.The claimed scope of the invention is by appended claims and its equivalent
Object defines.
Claims (9)
1. a kind of forest plantation digging apparatus, it is characterised in that: including pulley (1), the first supporting mechanism (2), handrail (3),
Second supporting mechanism (4), elevating mechanism (5), fixed mechanism (6), damping (7), battery (8), mechanism of digging pit (9), peace
Mounting mechanism (10) and position-limit mechanism (11);The bottom surface installation pulley (1) of first supporting mechanism (2), described first
The top surface of support mechanism (2) is installed by the handrail (3);The side wall of first supporting mechanism (2) installs second supporting mechanism
(4), the internal slide of first supporting mechanism (2) connects the installing mechanism (10), the inside of the installing mechanism (10)
Mechanism of digging pit described in installation (9);The top surface of second supporting mechanism (4) is installed by the elevating mechanism (5), the elevating mechanism
(5) it is fixedly connected the installing mechanism (10), damping (7) are installed in the inside of second supporting mechanism (4), the damping
One end of mechanism (7) is installed on the top surface of the installing mechanism (10);One end of the fixed mechanism (6) is fixedly connected with described
The other end of two supporting mechanisms (4), the fixed mechanism (6) is fixedly connected with the bottom surface of the installing mechanism (10);Described second
Supporting mechanism (4) connects the installing mechanism (10) by the position-limit mechanism (11);The side wall of first supporting mechanism (2)
It installs the battery (8), the battery (8) is electrically connected the elevating mechanism (5) and the mechanism of digging pit (9).
2. a kind of forest plantation digging apparatus according to claim 1, it is characterised in that: first supporting mechanism
It (2) include first support bar (21), fence (22) and the first support plate (23), institute is installed in the bottom surface of the first support bar (21)
It states pulley (1), the first support bar (21), first support plate is installed at the sidewall edge of first support plate (23)
(23) fence (22) is installed at bottom edge.
3. a kind of forest plantation digging apparatus according to claim 2, it is characterised in that: second supporting mechanism
It (4) include second support bar (41) and the second support plate (42), the top surface of first support plate (23) is symmetrically installed described
The top of two support rods (41), the second support bar (41) is installed by second support plate (42).
4. a kind of forest plantation digging apparatus according to claim 3, it is characterised in that: installing mechanism (10) packet
Connector sleeve (101), stop collar (102) and connecting rod (103) are included, the internal slide of first support plate (23) connects the company
The stop collar (102), and the bottom surface pair of the connector sleeve (101) are installed in female connector (101), the bottom surface of the connector sleeve (101)
Claim that the flexible connecting rod (103) is installed.
5. a kind of forest plantation digging apparatus according to claim 4, it is characterised in that: mechanism of digging pit (9) packet
Drilling rod (91), blade (92) and motor (93) are included, the top surface of the connector sleeve (101) is fixedly connected the motor (93), described
The bottom end of motor (93) is rotatablely connected the drilling rod (91), and the drilling rod (91) and the stop collar (102) are rotatablely connected, and institute
State the blade (92) of the side wall installation isometric helix shape of drilling (91).
6. a kind of forest plantation digging apparatus according to claim 4, it is characterised in that: elevating mechanism (5) packet
Hydraulic stem (51), hydraulic cylinder (52) and fixing sleeve (53) are included, the top surface of second support plate (42) is symmetrically installed described hydraulic
The hydraulic stem (51) is installed in the bottom end of cylinder (52), the hydraulic cylinder (52), and the bottom surface of the connector sleeve (101) is symmetrically installed institute
It states fixing sleeve (53), the hydraulic stem (51) is fixedly connected through the connector sleeve (101) with the fixing sleeve (53).
7. a kind of forest plantation digging apparatus according to claim 6, it is characterised in that: fixed mechanism (6) packet
Include fixed block (61), fixed plate (62), spring (63), the first fixed link (64) and the second fixed link (65), the connector sleeve
(101) bottom surface is symmetrically installed the fixed plate (62) that side wall is L shape, the fixed plate (62) and the fixing sleeve (53)
Between pass through the connecting rod (103) connect;One end of the fixed block (61) is installed by the fixed plate (62), the fixed block
(62) the other end installs second fixed link (65), and one end of second fixed link (65) is sliding by the spring (63)
Dynamic connection first fixed link (64), first fixed link (64) are fixed on first support plate (23) and described second
Between support plate (42).
8. a kind of forest plantation digging apparatus according to claim 7, it is characterised in that: damping (7) packet
Fixed ring (71) and decoupling rod (72) are included, the bottom surface of second support plate (42) installs the fixed ring (71), has elasticity
One end of the decoupling rod (72) be rotatablely connected the inner sidewall of the fixed ring (71), and the other end of the decoupling rod (71)
It is rotatablely connected the top surface of the connector sleeve (101);The length of first fixed link (64) and second fixed link (65) it
With the length for being less than the decoupling rod (72).
9. a kind of forest plantation digging apparatus according to claim 1, it is characterised in that: position-limit mechanism (11) packet
Limit plate (111), limited block (112) and pull ring (113) are included, it is L shape that the top surface of the connector sleeve (101), which is symmetrically installed side wall,
The limited block (112), the top surface of first support plate (21) is symmetrically rotatablely connected the limit plate (111);The limit
The pull ring (113) is installed in the top surface of position plate (111), and one end of the limit plate (111) engages the limited block (112).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810726332.6A CN108934291B (en) | 2018-07-04 | 2018-07-04 | Digging device for forest planting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810726332.6A CN108934291B (en) | 2018-07-04 | 2018-07-04 | Digging device for forest planting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108934291A true CN108934291A (en) | 2018-12-07 |
CN108934291B CN108934291B (en) | 2020-08-04 |
Family
ID=64485696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810726332.6A Active CN108934291B (en) | 2018-07-04 | 2018-07-04 | Digging device for forest planting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108934291B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105265068A (en) * | 2015-09-28 | 2016-01-27 | 邱汪洋 | Earth auger for agricultural use |
CN105284244A (en) * | 2015-11-16 | 2016-02-03 | 徐海恩 | Earth auger for agroforestry planting |
CN107258159A (en) * | 2017-08-11 | 2017-10-20 | 安徽独秀山蓝莓科技开发有限公司 | A kind of blueberry plantation punch device of digging pit |
CN107683654A (en) * | 2017-08-21 | 2018-02-13 | 高萌迪 | A kind of growth of watermelon equipment of digging pit |
CN108167385A (en) * | 2018-01-15 | 2018-06-15 | 南京工业职业技术学院 | A kind of electromechanical equipment damping device |
-
2018
- 2018-07-04 CN CN201810726332.6A patent/CN108934291B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105265068A (en) * | 2015-09-28 | 2016-01-27 | 邱汪洋 | Earth auger for agricultural use |
CN105284244A (en) * | 2015-11-16 | 2016-02-03 | 徐海恩 | Earth auger for agroforestry planting |
CN107258159A (en) * | 2017-08-11 | 2017-10-20 | 安徽独秀山蓝莓科技开发有限公司 | A kind of blueberry plantation punch device of digging pit |
CN107683654A (en) * | 2017-08-21 | 2018-02-13 | 高萌迪 | A kind of growth of watermelon equipment of digging pit |
CN108167385A (en) * | 2018-01-15 | 2018-06-15 | 南京工业职业技术学院 | A kind of electromechanical equipment damping device |
Also Published As
Publication number | Publication date |
---|---|
CN108934291B (en) | 2020-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104620752B (en) | Chinese yam harvester | |
CN208754645U (en) | A kind of oxygen-increasing device that loosens the soil for the plantation of sweet shaddock | |
CN115349419B (en) | Agricultural gardening seedling lifting device and seedling lifting method | |
CN110431969A (en) | A kind of field trial corn transplanting device | |
CN208675804U (en) | One kind being convenient for Chinese olive tree picking fruit device | |
CN111149782A (en) | Ground disease and pest control device for peanut planting base | |
CN108934291A (en) | Digging apparatus is used in a kind of plantation of forest | |
CN108934698A (en) | A kind of forest implantation methods | |
CN207948314U (en) | Liftable cucumber climbs rattan teapoy | |
CN208210644U (en) | A kind of Chinese herbal medicine planting machine being moved easily | |
CN106577063A (en) | Inverted V-shaped intelligent telescopic fruit tree hail-proof design mechanism | |
CN207163736U (en) | A kind of farm land Detection and Extraction system | |
CN108476847A (en) | Pears plant method for transplanting | |
CN101250918A (en) | Movable louver window of cultivation plastic tunnel | |
CN203353088U (en) | External discharge layered pit digger | |
CN209676836U (en) | A kind of portable plantlet transplantation device in gardens | |
CN2877252Y (en) | Fruit picking device | |
CN209089519U (en) | A kind of growing tomatoes are with climbing climing support frame | |
CN209330576U (en) | A kind of gardens pit-picker | |
CN106856787A (en) | A kind of positioning formula machine for digging Chinese yam | |
CN107046916A (en) | Screw dish harvester | |
CN208251099U (en) | Irregularly discarded stake pull-up | |
CN206629822U (en) | A kind of adjustable height biological control device for forest farm | |
CN212414461U (en) | Ground disease and pest control device for peanut planting base | |
CN205727362U (en) | A kind of upper laminating mechanism on automatization young fruit packing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |